Public tenders for consultant in Pine-bluff United States

Find all Consulting tenders in the world.
Finding business opportunities has never been easier.

Results for consulting. Make a new search!

C--Improve Access to Main Lobby 657-400

Department of Veterans Affairs, VA Heartland Network | Published June 2, 2016  -  Deadline June 22, 2016
cpvs

Synopsis: CONTRACT INFORMATION a. This A-E Services requirement is being procured in accordance with the Brooks Act (Public Law (PL0582) and implemented in accordance with the Federal Acquisition Regulation (FAR) Subpart 36. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work. b. This procurement is restricted to Service Disabled Veteran Owned Small Business (SDVOSB) firms located within a 350 mile radius of the John J. Pershing VA Medical Center, Poplar Bluff, Missouri. The mileage restriction is in compliance with VAAR 805.207(b). This requirement is being procured in accordance with the VAAR 836.606-73 as implemented in FAR Subpart 36.6. c. This is not a Request for Proposal and an award will not be made with this announcement. This announcement is a request for SF 330's from qualified contractors that meet the professional requirements. d. After the evaluation of SF330 submissions in accordance with the evaluation criteria, three or more of the most highly qualified firms will be chosen for interviews to present their approach to the design to arrive at selection of the number one firm for negotiations. The Government will not pay nor reimburse any costs associated with responding to this request. The Government is under no obligation to award a contract as a result of this announcement. The contract is anticipated to be awarded in September, 2016. e. Award of any resultant contract is contingent upon the availability of funds. f. No solicitation document is available and no other information pertaining to project scope, etc. is available at this time. Any request for assistance with submission or other procedural matters shall be submitted via email only (doug.jones@va.gov). g. Personal visits to discuss this announcement will not be allowed. h. The NAICS Codes for this procurement is 541310 Architectural Services and small business size standard of $7.5 Million. Award of a Firm Fixed Price contract is anticipated. Anticipated time for completion of design is approximately 180 calendar days including time for VA reviews. The A/E firm shall also be required to perform construction period services if award of a construction project contract is made. i. DATABASE REGISTRATION INFORMATION: VERIFICATION OF STATUS OF APPARENTLY SUCCESSFUL OFFEROR THIS ACQUISITION IS 100% SET-ASIDE FOR QUALIFIED SERVICE DISABLED VETERAN OWNED SMALL BUSINESS AE FIRMS IN COMPLIANCE WITH VAAR 852.219-10. ONLY BUSINESSES VERIFIED AND LISTED IN THE VENDOR INFORMATION PAGES DATABASE, (http://www.Vetbiz.gov), SHALL BE CONSIDERED. j. SYSTEM FOR AWARD MANAGEMENT (SAM): Federal Acquisition Registrations require that federal contractors register in the System for Award Management (SAM) database at www.sam.gov and enter all mandatory information into the system. Award cannot be made until the contractor has registered. Offerors are encouraged to ensure that they are registered in SAM prior to submitting their qualifications package. k. THE EXCLUDED PARTIES LIST SYSTEM (EPLS): To ensure that the individuals providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Excluded Parties List System (EPLS) located at www.sam.gov for each person providing services under this contract. Further the contractor is required to certify that all persons listed in the qualifications package have been compared against the EPLS list and are NOT listed. During the performance of this contract the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities. l. E-VERIFY SYSTEM: Companies awarded a contract with the federal government shall be required to enroll in E-Verify within 30 days of the contract award date. They shall also need to begin using the E-Verify system to confirm that all of their new hires and their employees directly working on federal contracts are authorized to legally work in the United States. E-Verify is an Internet-based system that allows an employer, using information reported on an employee's Form I-9, to determine the eligibility of that employee to work in the United States. There is no charge to employers to use E-Verify. (FAR 52.222-54) m. Qualified A-E firms are required to respond if interested by submitting one (1) original completed Standard Form 330 qualification package Parts I and II to include all consultants (form available on-line at: http://www.gsa.gov/portal/forms/download/116486) Must include in Part I Section H an organizational chart of the firm (excludes consultants) and a design quality management plan. Submission information incorporated by reference is not allowed. All submissions must be bound in 3 ring binder) and a CD copy of the Standard Form 330. n. Completed package shall be delivered on or before June 22, 2016 by 2:00PM CDT to the following address: Department of Veteran Affairs, NCO 15 Contracting Office, Attn: Contracting Officer: Douglas Jones, Contracting Office Address: 1500 N. Westwood Blvd., Poplar Bluff, Missouri, 63901. o. Outermost envelope or packaging shall clearly identify Solicitation number and project. Information shall be submitted via commercial courier service, mail or hand carried deliveries. Telegraphic, email, and facsimile forms are prohibited. PROJECT INFORMATION Description of work to be performed includes: Architect-Engineering services are required for Schematics Design, Design Development, Construction Documents, Technical Specifications, Construction Period Services, Site Visits, Cost Estimates, and all other related information for Project 657-400, Improve Access to Main Lobby. The project will include design work for the preparation of 100% complete working drawings and contract documents using edited VA Master Specifications to complete the following: I. STATEMENT OF AE TASKS A. The AE shall furnish all services for a complete schematic design, design development, construction documents, bid documents, Technical Specifications, Cost Estimates, construction period services, Site Visits, As-Built Documentation, and all other related information as outlined in the "AE Instructions" for project 657-400, Improve Access to Main Lobby, John J. Pershing VA Medical Center. 1) Tasks " Initial survey/conceptualization o Conduct initial survey of spaces, utilities, fixtures, layout, landscaping, architecture, seismic shell, walkways, and all other appurtenances associated with the main lobby or front entrance o Complete a geotechnical evaluation, if necessary, and review prior boring logs o Meet with Facility Planner, Leadership, and other applicable members of the facility Integrated Project Team (IPT) to solidify our needs, discuss layout, etc. o Survey for hazardous materials (lead, asbestos, etc.) " Conceptualization o Create concept drawings and submit to the Contracting Officer's Representative (COR) " No more than three distinct concept designs are requested o Create design posters and submit to the COR " Utilize the facility Interior Design Scheme o Meet with IPT to discuss concepts, recommendations, and approve a particular concept " Design Phase o Design all items contained within the scope of work, as needed, for a complete construction package " Drawings " Abatement drawings " Specifications " Abatement specifications " Visualizations " Final visualizations to display in Lobby " Cost Estimates " Note and estimate Bid Alternates that could be taken away from the project but not reduce the Scope of Work; incorporate Bid Alternates as an integral part of the project o Total amount of Bid Alternates required to meet minimum of 20% of base bid construction cost, per Minor Construction Handbook " Include provisions for small, disabled, veteran-owned businesses, locality, rurality, etc. that have a considerable impact to the cost of construction " Scope of Work for Construction " Construction Submittal Sheet " Per specifications, expected submittals requiring approval " Design calculations for HVAC, structural, seismic, etc. o GSF limits, per the Project Tracking Report (PTR) application " No more than 2,000 GSF, new " No more than 1,258 GSF, renovated o Meet with the IPT, per the submittal schedule below, after design submittal to the COR " Take meeting minutes " Record actions and track to completion " Disperse information as needed " Take notes of decisions made, and require signatures of approval from the IPT o Submit a CD containing all information relating to the final design of the project to the COR " Solicitation/Pre-Bid Phase o Provide information on the project as requested by the COR and the Contracting Officer (CO) o Attend pre-bid meeting to discuss concerns, answer questions, and be a stakeholder in the construction process o Work with the CO to issue amendments to the solicitation o Work with the CO to answer Requests For Information (RFIs) " Construction Phase o Provide Construction Period Services " Review submittals from the construction contractor " Approve/deny submittals based on design specifications " Respond to RFIs from the construction contractor or COR " Coordinate with the COR to complete site visits or walkthroughs at milestones of construction " Coordinate with the COR to complete a Punch-List " Coordinate with the COR to complete a final walkthrough " Provide industrial hygiene oversight for abatement of hazardous materials " As-Built drawings, full-size mylars " Update current plumbing, electrical, and space drawings with changes due to this work 2) The AE will be required to attend in person (or Senior Delegate of AE) to pre-bid meetings, a pre-construction meeting, project construction meetings and a final inspection meeting. There will also be various construction site meetings that will require a representative of the AE. 3) AE will provide meeting notes and or minutes for meetings and conference calls. 4) The A-E shall provide competent design and construction period services utilizing individuals who are adequately knowledgeable of the various design disciplines including but not limited to architectural and engineering of structural, mechanical, electrical, and special systems as required by the project. Changes in personnel from those who are proposed in negotiations, interviews, kick-off meeting, and/or A-E submission forms must be approved in writing. The registered individuals who will stamp the completed documents shall accomplish engineering design work. B. The AE shall provide cost estimation, project scheduling & phasing, bid period and construction period services as further described in the contract. Estimates shall have a full itemized line item breakout commensurate with the degree of design accomplished. At the Schematic Design phase, square foot estimates would be adequate. As the design progresses in detail, so the estimate would progress in detail. C. The AE shall provide bid documents in both hard paper copies and electronic format. Electronic format shall include AutoCAD and Microsoft Word/Excel as well as PDF format for all. Final PDF of the construction drawings shall include the professional stamp. D. AE shall design construction to phase and coordinate work to minimize disruptions to medical center operations. Outages shall be minimized and temporary conditions planned to maintain critical utility systems. Suitable space/access for mechanical room equipment maintenance must be maintained throughout construction. Must keep the number of outages to a minimum and group common work. Phasing of interruptions shall be clearly indicated on the construction documents. E. A-E shall design within funding limitations. AE shall coordinate cost control measures with COR to design within funding limits. Cost control alternatives shall be explored in Design Development (DD's). The AE is required by national VA Directive to include at least a minimum of 20% bid deductions. F. Review AE Quality Alerts from the TIL. Design completion timeframe of 200 days after receipt of the Notice to proceed. The A/E firm shall also be required to perform construction period services after award of the construction project contract. In accordance with FAR 36.204, the estimated magnitude of the resulting construction project is between $1,000,000.00 and $5,000,000.00. EVALUATION FACTORS: Selection criteria are in accordance with Federal Acquisition Regulation (FAR) Part 36.602-1 and VA Acquisition Regulation (VAAR) Part 836.602-1. Prospective firms are required to address all selection criteria within submitted SF330 packages using additional pages as necessary. SF 330 submissions including any additional pages are not to exceed fifty (50) pages. Prospective firms are required to address all selection criteria within submitted SF330 packages using additional pages as required and SF 330 submissions including any additional pages are not to exceed fifty (50) pages. Qualifications (SF330) submitted by each firm for Project # 657-400 for John J. Pershing VA Medical Center will be reviewed and evaluated based on the following evaluation criteria listed below: 1. Professional Qualifications: the qualifications of the individuals which will be used for these services will be examined for experience and education and their record of working together as a team. A&E firms shall have licensed professional architects/engineers currently registered in the state of Missouri or in a state of which Missouri has recognized the engineering license. The specific disciplines which will be evaluated are Architects (ACHA - American College of Healthcare Architects), Communication Specialist (minimum Voice and Data), Civil Engineer, Mechanical Engineers, Electrical Engineers, Structural Engineers, Estimators, CAD operators, Project Managers, fire protection engineer, and Certified Healthcare Interior Designer (CHID). 2. Specialized Experience and Technical Competence: specific experience and technical skill in the type and scope of work required for medical facilities new construction and renovations to existing medical facilities, including, where appropriate, experience in energy conservation, pollution prevention, waste reduction, and the use of recovered materials. Experience and qualifications of personnel proposed for assignment to the project and their record of working together as a team. 3. Capacity to Accomplish the Work: the general work load and staffing capacity of the design office which will be responsible for the majority of the design and the ability to accomplish the work in the required time will be evaluated. In accordance with VAAR 852.219-10(c)(1), prime contractors shall clearly demonstrate how they will meet the requirement that at least 50 percent of the design work be accomplished by employees of the concern or employees of eligible service-disabled veteran owned small business subcontractor/consultant. 4. Past Performance: the past performance of projects that are complete (design and construction) that the firm has designed relevant in scope to the advertised project that were accomplished with the Department of Veterans Affairs, other Government agencies, and private industry in terms of cost control, quality of work, and compliance with performance schedules will be examined. Project past performances that are older than 3 years will receive a lesser score than those references for projects accomplished within the past 3 years. 5. Location of Design Firm: the geographic proximity of each firm to the location of the VA Medical Center will be evaluated. The mileage restriction is in compliance with VAAR 805.207(b). This criterion will apply to the office from which the majority of the design services will be performed. Firms within 350 miles of the medical center will receive a maximum score. Firms more distant than 350 miles will receive a zero score for this criterion. 6. Claims and Terminations: record of significant claims against the firm or terminated contracts because of improper or incomplete architectural and engineering services will be examined. 7. Reputation in A-E Community: reputation and standing of the firm and its principal officials with respect to professional performance, general management, and cooperativeness.

C--A-E Services Replacement of Roof Building 102 Phase 2

Department of Veterans Affairs, VA Bay Pines Health Care System | Published July 8, 2015  -  Deadline August 27, 2015
cpvs

Architectural Engineering Services Scope of Work and Minimum Requirements for A/E Submissions of Drawings: Specifications Project #516-14-106 Replace Roof Building 102 Phase 2 (Sections A, C, D and Clerestory on the Central Support Facility) General Information Document Type: Pre-solicitation Notice Solicitation Number: VA248-15-R-1599 Posted Date: July 8, 2015 Response Date: August 27, 2015 Archive Date: Oct. 6, 2015 Classification Code: C- Architect and Engineering services Contracting Office Address Department of Veterans Affairs, C.W. Bill Young VAMC, Attn: Chris LaShure Contracting Officer 10000 Bay Pines Blvd., Bldg. 2 RM 328, Bay Pines, Florida 33744 Description CONTRACT INFROMATION: This contract is being procured in accordance with the Brooks A-E act as implemented in the FAR Subpart 36.6. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work. A-E services are required for site investigation, planning, engineering studies, and concept design. Final design and construction phase services for the subject project. North American Industrial Classification System code is 541330, which has a size standard of $15,000,000 in average annual receipts. This announcement is open only to eligible Service Disabled Veteran Owned Small Businesses 100% set aside. A firm-fixed-price contract will be negotiated. The contract is anticipated to be awarded in FY 2015. To be eligible for contract award, firms must be registered in the System for Award Management (SAM). Register via the internet site at https://www.sam.gov. The anticipated contract is subject to FAR 52.222-41 Service Contract Labor Standards. A. Architect/Engineering (A/E) Services are to include the preparation of reports, plans, specifications, cost estimates and construction period services as necessary for the completion of Project 516-14-106, Replace Roof Building 102 Phase 2. Scope of work to include the following items: 1. Architectural/Engineering (A/E) services are to include the design development, plans and specifications for the roof replacement of Building 102 Phase 2 at the Bay Pines VA Healthcare System, Bay Pines, Florida. 2. A/E to provide a complete design for the removal of the existing four ply (4 ply) coal tar roofing system on Building 102 Sections A, C, D and the clerestory on the Central Support Facility including the replacement of all roof drain bowls, clamping rings, strainers and new drain pipes up to twenty feet (20 feet), the replacement of a new lightning protection system. All work will comply with VA Construction Details (HO8-4), VA Construction Standards (HO8-3), and NFPA Standard 90A. The design is to be in accordance with strictest guidelines. Provide bid alternate deducts by roof sections. 3. A/E to provide complete medical center site plan with all buildings, roads, parking lots and other major features as a phasing plan. Plan shall show all contractor work, staging and storage areas. VA will provide a master site plan for Auto Cad conversion. 4. A/E shall hire or provide a licensed Fire Protection Engineer who will certify the completed construction documents meet all current NFPA Life Safety Codes as well as all codes pursuant to current VA Fire Protection Design Manual. 5. A/E shall hire a licensed Certified Industrial Hygienist to perform a limited NESHAP Asbestos Survey on all roof decks and clerestory's. 6. A/E Basis of Design: Two ply torched applied Modified over a new Four (4) inch thick insulation with a recover board complying with Florida Energy Code. 7. Perform all other work as necessary to provide a complete and finished job. B. All site visits necessary to gather data and information is the responsibility of the Architect/Engineer Firm. The A/E will conduct interviews with key VA personnel as necessary to obtain additional information. C. The design shall comply with the applicable requirements of local, state and federal codes, ordinances, regulations, and standards. D. National Environmental Policy Act (NEPA) Evaluation Compliance Guidance - At the very minimum a Categorical Exclusion (CATEX) form or an Advanced CATEX form must be completed as part of the A/E's completed design package. These forms may be found on pages 9 and 10 of Part 11 of the Interim Guidance by clicking on the link below. http://vaww.ceosh.med.va.gov/01EE/02EE Specific Topics/03EE NEPA/04EE VA Policies DUSHOMlte ms/interimGuidanceDoc.pdf MINIMUM REQUIREMENTS A. The following define the minimum requirements for review purposes only. This does not relieve the A/E of responsibility to produce a complete set of drawings and specifications in accordance with industry standard practice and VA criteria. 1. General a. VA Handbook, H-08-15, Volume C, MINOR NEW BUILDING, ADDITION & RENOVATION PROJECTS, August 1992 as applicable to design shall define the minimum requirements of completion for each submission except as modified herein. b. All disciplines involved with the design are required to obtain copies of this document and become thoroughly familiar prior to the initiation of the work. c. The A/E will be provided with copies of existing record drawings that relate to the project, the criteria for the project, and appropriate orientation by the VA. VA master specifications and other referenced materials are available over the Internet and can be obtained by contacting http://www.cfm.va.gov/til/ . A blank VA drawing with logo will be provided upon request in Auto Cad format. The A/E shall prepare all architectural, engineering, and site drawings and specifications. The degree of completion and the stages of degree of completion and the stages of submission shall be as specified in H-08-15. d. There will be three contract document submissions, (35%), (70%), and Construction Documents (100%). At each submission, all drawings shall be dated and appropriately labeled in large block letters above or next to the title block. All drawings shall be submitted on size "E", 30" X 42" format. The VA will provide a VA formatted blank drawing with VA logo in Auto Cad format. e. In each submission the A/E shall incorporate the material specified in the prior submission, revised according to the comments made by the VA at the prior review. Approval of a submission will not be made with out incorporation of comments made during the prior submission. f. Each submittal shall include roof plans of all disciplines in the same scale as the architectural drawings. Architectural drawings shall be required for all room locations identified that are necessary to replace roof drains and piping in ceiling space below roof deck. g. Provide computations and sizing calculations for structural, electrical and mechanical designs. For computerized calculations, submit complete and clear documentation of computer programs, interpretation of input/output and description of program procedures and full explanation of all coded and abbreviated terms. h. The A/E shall submit a construction cost estimate with the drawings at each project submission. This estimate shall show the cost of construction which would be expected to be reflected by the contractor's bids, if the bids were submitted on the same day as the estimate. The level of the estimate shall be consistent with the degree of completeness of the drawings being submitted. Simply stated, this means that if a construction element is shown, it must be priced; if it is shown in detail, it must be priced in detail. For detailed elements, "lump sum" or "allowance" figures will not be accepted. The A/E shall incorporate in the design a deduct bid alternate of 20% of estimated total construction cost. i. The A/E shall provide follow-up notes of all meetings held with V.A. personnel within seventy-two (72) hours after the meeting. B. Construction Period Services: 1. The A/E will review shop drawings and submittals during the construction phase of this project. 2. The A/E will conduct a total of 10 construction period site visits, which will include the final inspection. 3. At the completion of the project the A/E will provide: (a) The original drawings reflecting all as-built conditions. Collection of as-built data shall be the responsibility of the A/E. Source material shall include data obtained during A/E site visits, shop drawings, changes to contract documents, and modifications and notes on working drawings as provided by the contractor. (b) One (1) set of as-built drawing files in AUTO-CAD current release format. (c) One (1) set of edited specifications in MicroSoft Word for Windows. C. Completion Time: Working drawings and specifications - 150 days; with one week for Schematic Review; one week for Design Development #1; one week for Design Development #2; and one week for Construction Documents. The VA will take one week to review each submission. D. Submittals: The A/E will provide 4 sets of blue prints, and 4 sets of edited specifications at each drawing submission. E. Issuance of Bid: The A/E will provide 5 sets of blueprints, 1 set of reproducible originals and 1 set of unbound reproducible quality specifications for issuance of bid. F. Design Review: The A/E will be required to attend each review submission upon notification by the Contracting Officer. SUBMISSION REQUIREMENTS: A/E firms responding to this announcement shall submit two (2) hard copies via (CD or DVD) Standard Form (SF) 330s, Architect-Engineer Qualifications, to the following Contracting Office Address: Department of Veterans Affairs C.W. Bill Young VAMC Attn: Chris LaShure Contracting Officer 10000 Bay Pines Blvd., Bldg. 2 RM 328 Bay Pines, Florida 33744 The SF 330 form may be downloaded from www.gsa.gov/forms. Completed SF 330's shall include the primary firms, subcontractor firms, and any consultants expected to be used on the project. Do not submit information incorporating by reference. Submit required documents no later than 2:00 PM, EST on August 27 2015. This notice is issued solely for information and planning purposes only. This is NOT a request for proposal. Questions may be directed via email to Chris LaShure- chris.lashure@va.gov. No phone calls please. Point of Contact Chris LaShure Contracting Officer, chris.lashure@va.gov Notice This acquisition is for architect-engineer (A-E) services, and is procured in accordance with the Brooks A-E Act as implemented in Subpart 36.6 of the Federal Acquisition Regulation. A-E firms meeting the requirements described in this announcement are invited to submit: (1) a Standard Form (SF) 330, Architect-Engineer Qualifications, Parts I and II, and (2) any requested supplemental data to the procurement office shown. Firms registering for consideration for future Federal A-E projects are encouraged to electronically submit SF 330 Part II, General Qualifications, to http://www.bpn.gov/orca/login.aspx, and to update at least annually. Firms with a SF 330 Part II on file in this central Federal database do not need to submit a Part II for this acquisition unless directed by the announcement. Firms responding to this announcement before the closing date will be considered for selection, subject to any limitations indicated with respect to size and geographic location of firm, specialized technical expertise or other requirements listed. Following an evaluation of the qualifications and performance data submitted, three or more firms that are considered to be the most highly qualified to provide the type of services required will be chosen for negotiation. Selection of firms for negotiation shall be made in order of preference based on the demonstrated competence and qualifications necessary for satisfactory performance in accordance with the specific selection criteria listed in the announcement.
  • 1