Project management consultancy services

daa plc | Published April 5, 2017  -  Deadline May 3, 2017
cpvs
72224000, 34960000, 38581000, 42417200, 71000000, 71200000, 71220000, 71221000, 71223000, 71310000, 71311000, 71311100, 71311300, 71312000, 71315000, 71315200, 71315210, 71541000

Daa (also referred to in this document as the ‘Contracting Authority’) currently has a number of baggage handling system installations at Dublin and Cork Airports. As a result of upcoming regulatory compliance requirements and in response to the increased capacity requirements and need to consider asset life replacements of existing installations, the Contracting Authority wishes to procure the services of a Multi-Discipline Design and Delivery Consultant (hereafter referred to as the ‘Consultant’) to act on behalf of the Contracting Authority to design and project manage the delivery of a number of baggage handling system (BHS) projects from inception through to completion and handover. Initially the focus is anticipated to be an upgrade of the existing baggage handling systems to comply with Security Regulation EU No. 1087/2011 in respect of Standard 3 Hold Baggage Screening.

Daa (also referred to in this document as the ‘Contracting Authority’) currently has a number of baggage handling system installations at Dublin and Cork Airports. As a result of upcoming regulatory compliance requirements and in response to the increased capacity requirements and need to consider asset life replacements of existing installations, the Contracting Authority wishes to procure the services of a Multi-Discipline Design and Delivery Consultant (hereafter referred to as the ‘Consultant’) to act on behalf of the Contracting Authority to design and project manage the delivery of a number of baggage handling system (BHS) projects from inception through to completion and handover. Initially the focus is anticipated to be an upgrade of the existing baggage handling systems to comply with Security Regulation EU No. 1087/2011 in respect of Standard 3 Hold Baggage Screening.

The full scope of services will be outlined at RFT stage. The successful Consultant will be required to provide a multi-disciplinary team led by a Project Manager to prepare a full suite of design and delivery services associated with the delivery of a number of airport development projects associated with baggage handling systems. It is anticipated that the successful Consultant will be required to design and manage a wide variety of related issues ranging from the design of airport buildings and alterations, baggage handling systems, Information and Communications Technology (ICT) networks, utility services, buildings alterations, mechanical, electrical and plumbing (MEP) facilities and related structures.

It is intended that the Consultant will be appointed on a non-exclusive single party framework basis for up to five (5) years to facilitate future baggage handling and airport technologies projects.

Potential Applicants should note that daa does not anticipate that it will make further information about the Project or the Competition available to Applicants at this stage of the Competition (save for responses to clarification requests).

Structural engineering consultancy services

Dublin City Council | Published April 15, 2017  -  Deadline May 26, 2017
cpvs
71312000, 71310000, 71311000, 71311100, 71311300, 71313000, 71313440, 71318000, 71320000, 71322000, 71351810, 71355000, 71510000, 71520000, 71521000, 71540000, 71541000, 90700000, 90711400

A Multi Party Framework Agreement for Consultant Engineering Design Services for future Flood Alleviation Projects in County Dublin, with an initial contract for the River Poddle Flood Alleviation Scheme — using the Standard Conditions of Engagement for Consultancy Services (Technical). Estimated value which includes consultant's, contractor's, and other costs for all projects on Framework at 30 000 000 EUR. Estimated value for River Poddle Scheme at 7 000 000 EUR. Estimated value for other projects in the Framework range from 500 000 EUR to 4 000 000 EUR.

For further details please refer to tender documents available to download from www.etenders.gov.ie RFT ID: 116671.

A Multi Party Framework Agreement for Consultant Engineering Design Services for future Flood Alleviation Projects in County Dublin, with an initial contract for the River Poddle Flood Alleviation Scheme — using the Standard Conditions of Engagement for Consultancy Services (Technical). Estimated which includes consultant's, contractor's, and other costs for all projects on Framework at 30 000 000 EUR. Estimated value for River Poddle Scheme at 7 000 000 EUR. Estimated value for other projects in the Framework range from 500 000 EUR to 4 000 000 EUR.

For further details please refer to tender documents available to download from www.etenders.gov.ie RFT ID: 116671.

Architectural and related services

Transport Infrastructure Ireland (TII) | Published April 13, 2017  -  Deadline May 15, 2017
cpvs
71200000, 71210000, 71220000

The Irish Government's seven year investment plan titled ‘Building on Recovery: Infrastructure and Capital Investment 2016–2021’ provided for a new metro project for Dublin, referred to as ‘New Metro North’ (NMN). The National Transport Authority's (NTA) Transport Strategy for the Greater Dublin Area, 2016-2035 provides a framework for the planning and delivery of transport infrastructure and services in the Greater Dublin Area over the next two decades. TII, in collaboration with the NTA, are engaged in the process of developing the design of the NMN project. TII seeks to appoint an Architectural Practice (the ‘Consultant’) for Phase 1 of the NMN (Emerging Preferred Route/Concept Design phase).The Consultant shall provide a Scheme Concept Architect who will develop an Architectural Vision and Strategy for NMN. The Vision will shape an Architectural Strategy that will provide a distinct character and form for NMN.

The Scheme Concept Architect will be expected to work within strict budgetary constraints to deliver a project which combines the very best in architectural vision, without losing sight of the overarching need to ensure value for money for public funds.

Working in consultation with TII/NTA, the Concept Architect's scope of services for this Phase 1 shall include the following:

— Development of an Architectural Vision for NMN, shaping an Architectural Strategy that will provide a distinct character and form for NMN.

— Development of an Architectural Strategy which shall indicate how NMN's physical infrastructure, including at grade track, tunnels, bridges and other elevated sections will inhabit its surroundings and integrate with the city streetscape and public realm in both city and suburban locations and will be required to advise on the visual impact of New Metro North's physical infrastructure on the public realm and landscape for the Emerging Preferred Route.

— Development of an Architectural Concept for city centre and suburban stations.

— Provide advice and input into the emerging preferred route concept design, ensuring that the concept design aligns fully with the overall Architectural Strategy for the scheme.

— Working closely with TII Chief Architect and TII consultants and utilising design workshops as required, the Concept Architect will develop conceptual studies and scheme design drawings, with 3D graphics as necessary, to illustrate the application of the Architectural Strategy for specific NMN stations and at-grade and elevated track sections of the proposed alignments. This work will be carried out at agreed stages in the Route Alignment Options Study.

— Participate in Public/Stakeholder consultation meetings as required by the NMN Project Director or TII Chief Architect, illustrating the Architectural Strategy and how it may relate to specific locations.

CCE5772 River Bridge and Channel Survey Services (Qualification System).

Iarnrod Eireann-Irish Rail | Published October 23, 2015  -  Deadline November 26, 2018
cpvs
71631450, 44212120

Iarnród Éireann has over 350 bridges (structures greater than 2 m) over water. All these bridges and riverbeds require periodic inspections. Some inspections are carried out yearly, other are every 3 years and more are on a 6 yearly cycle. Iarnród Éireann is looking to appoint specialist expertise to undertake inspection of railway bridges that traverse water courses as well as carry out bridge and river surveys. The consultant is to provide expertise in the following areas: 1. Provide divers/surveyors for a bridge and riverbed inspections/surveys; 2. Record the topography using surveying techniques; 3. Using the previous base line surveys (supplied by IE) identify changes in the structure and/or the river channel; 4. Provide factual report on findings; 5. Provide for Engineers review of the factual report. The Qualification System is also to include for inspection of any structure following a flood event. In the period after a flood event structures throughout the IE network may need to be inspected to determine the extent, if any, of damage caused by the event. The availability of divers will form part of the evaluation. The divers/surveyors are to be trained for Personnel Track Safety (PTS) on the awarding of any contract. The cost of this will be included in any tenders. The successful Contractor will be required to supply appropriately qualified personnel.

Technical analysis or consultancy services

Commission for Energy Regulation | Published March 31, 2017  -  Deadline May 10, 2017
cpvs
71621000, 66171000, 72220000

The CER is seeking expert technical advice in relation to the design and implementation of a monitoring regime regarding Irish Water's capital investments. This is in the context of the revenue allowed by the CER to Irish Water in relation to capital expenditure and the associated, relevant baseline plan, budgets, targets, outcomes and outputs. Irish Water's capital investments include non-network capital investment such as investment in information technology (IT) and investment in capital maintenance. The monitoring regime will include review of periodic reporting by Irish Water and a process for the review of material changes to the baseline plan and/or associated outputs, outcomes and targets.

A detailed specification of requirements is set out in Appendix 1of the Request for Tender (RFT) available to download from www.etenders.gov.ie

The Commission for Energy Regulation (CER) is Ireland's independent energy and water regulator. The CER was established in 1999 and now has a wide range of economic, customer protection and safety responsibilities in energy. The CER is also the regulator of Irish Water as the national utility for the provision of public water and wastewater services.

The CER is seeking expert technical advice in relation to the design and implementation of a monitoring regime regarding Irish Water's capital investments. This is in the context of the revenue allowed by the CER to Irish Water in relation to capital expenditure and the associated, relevant baseline plan, budgets, targets, outcomes and outputs. Irish Water's capital investments include non-network capital investment such as investment in information technology (IT) and investment in capital maintenance. The monitoring regime will include review of periodic reporting by Irish Water and a process for the review of material changes to the baseline plan and/or associated outputs, outcomes and targets. The regime is to be in place for the third quarter of 2017. Training and knowledge transfer are required over the contract term, specifically regarding auditing and site investigations. In addition, ad-hoc advice regarding technical matters pertaining to Irish Water's delivery of water and wastewater investments, including non-network investments and capital maintenance, is required.

Software programming and consultancy services

Electricity Supply Board ( ESB ) | Published March 29, 2017  -  Deadline April 26, 2017
cpvs
72200000, 72210000, 72211000, 72212000, 72212400, 72212480, 72212482

Electric Ireland intends to procure SaaS / Vendor hosted software for a Campaign Management System (CMS) which will centrally manage campaigns across all customers and interaction types throughout their lifetime with Electric Ireland various business units. The applicant will supply and implement the Campaign Management System.

The CMS will allow effective management and reporting on campaigns, including outgoing and incoming customer communication, capturing and reporting customer feedback on the campaign and managing and reporting on customer surveys.

Structural engineering consultancy services

South Dublin County Council | Published March 28, 2017  -  Deadline May 12, 2017
cpvs
71312000, 71311000, 71311300, 71313000, 71320000, 71541000, 79411000, 79415200, 79419000, 90712100

South Dublin County Council requires the services of a multi-disciplinary Consulting engineer to provide some or all stages including preliminary design, planning, detailed design, tender action, supervision and management of construction and handover stages; including PSDP services for the Management of Grange Castle Business Parks and to advise on engineering decisions / issues that arise in the parks during the duration of the framework.

Transport systems consultancy services

Grangegorman Development Agency | Published March 28, 2017  -  Deadline May 3, 2017
cpvs
71311200, 71000000, 71322500, 71335000, 71420000, 71530000

Important Notice: This is not the Tender Stage. No priced bid should be made at this stage. See Project Information Memorandum. Complete and return the pre-qualification questionnaire, with supporting documents, only by post or hand to the Grangegorman Development Agency. Email final submissions will not be accepted.

Refer to PIM.

Technical analysis or consultancy services

Commission for Energy Regulation | Published March 18, 2017  -  Deadline April 26, 2017
cpvs
71621000, 66171000, 71600000, 72220000

The Commission for Energy Regulation (CER) is Ireland's independent energy and water regulator. The CER seeks expert technical and economic consultancy advice to assist it in setting allowed revenues for Irish Water for the next revenue control period. The successful tenderer will provide advice on Irish Water's operational expenditure, capital expenditure and other associated items.

A detailed specification of requirements is set out in Appendix 1 of the Request For Tender( RFT) available to download from www.etenders.gov.ie

Project management consultancy services

Sustainable Energy Authority of Ireland | Published April 26, 2017  -  Deadline May 26, 2017
cpvs
72224000, 75100000, 79410000, 79952000, 80000000, 80100000, 80200000, 80532000

The Sustainable Energy Authority of Ireland (SEAI) has a mission to play a leading role in transforming Ireland into a society based on sustainable energy structures, technologies and practices.

SEAI wishes to appoint 1 service provider to develop, implement and manage all aspects of the One Good Idea project in collaboration with SEAI.

The objectives of the project are to:

— Engage students in the topic of sustainable energy, motivate them to act and to encourage their peers to get involved;

— Empower students so that they have an interest in sustainable energy and take responsibility for their actions;

— Leverage the awareness and interest of the whole school and the broader community; and

— Complement other SEAI schools programmes.

For more information, please refer to the RFT published on www.etenders.gov.ie

IT services: consulting, software development, Internet and support

An Bord Pleanála | Published March 28, 2017  -  Deadline May 5, 2017
cpvs
72000000, 32424000, 32571000, 48000000, 48800000, 48810000, 48820000, 48821000, 48822000, 48825000, 50332000, 72212517, 72262000

An Bord Pleanála's requirements are primarily related to infrastructure services (processing, storage and networks) and end-to-end managed services– the exact nature to be discussed with participants invited to the dialogue phase. Hosting could extend to include PaaS, possibly SaaS requirements and other related services in the future.

Managed services to provide full end-to-end management of the above infrastructure services (and PaaS/SaaS if relevant); including, but not limited to, call and issue resolution, support, maintenance, monitoring, backup and business continuity, disaster recovery and related managed IT professional services.

The framework relates to providers who have access to a minimum of two data centres located within the European Economic Area (EEA) and which are subject to the provisions of EU law in relation to data storage and transmission and where the data centres have been certified to ISO 27001 or similar.

An Bord Pleanála's requirements are primarily related to infrastructure services (processing, storage and networks) and end-to-end managed services– the exact nature to be discussed with participants invited to the dialogue phase. Hosting could extend to include PaaS, possibly SaaS requirements and other related services in the future.

Managed services to provide full end-to-end management of the above infrastructure services (and PaaS/SaaS if relevant); including, but not limited to, call and issue resolution, support, maintenance, monitoring, backup and business continuity, disaster recovery and related managed IT professional services.

Within the Scope of this framework ABP has the following requirements from providers who have access to a minimum of two data centres located within the European Economic Area (EEA) and which are subject to the provisions of EU law in relation to data storage and transmission and where the data centres have been certified to ISO 27001 or similar:

— Establishment and provision of a managed hosting service for ABP's suite of applications CRM, Portal and GIS. This could be extended to include other applications in the future.

— Provision of an end-to-end managed support service for the external hosting environment supporting ABP's suite of applications up to the application layer including management of the operational relationships with other third party suppliers.

— Provision of a mechanism, based on daily rates, to instigate necessary change, enhancement, improvements etc. to the infrastructure (virtual and physical) to support the needs of the organisation into the future for the duration of the framework.

IT services: consulting, software development, Internet and support

National Transport Authority | Published November 5, 2016  -  Deadline May 2, 2017
cpvs
72000000, 48218000, 48219000, 71311200, 72200000, 72210000, 72211000, 72212000, 72212100, 72212200, 72212210, 72212213, 72212214, 72212220, 72212331, 72212422, 72212460, 72212461, 72212463, 72212500, 72212517, 72222000, 72253200, 72322000, 72510000

The National Transport Authority (NTA) has, in order to align the expiry of the contract for both the National Intermodal Journey Planner (NJP) and Public Transport Stop Information System (PTSIS) contracts extended the duration of the National Intermodal Journey Planner contract to October 2018. This extension will facilitate the combined procurement of an integrated NJP and PTSIS solution in the future. The NTA has proceeded with the procurement process by the issue of a PIN for Market Consultation for Transport Information Systems and Services.

Business services: law, marketing, consulting, recruitment, printing and security

Department of Jobs, Enterprise and Innovation | Published April 21, 2017  -  Deadline May 19, 2017
cpvs
79000000, 79300000

The successful tenderer will be required to produce a report for the Department of Jobs, Enterprise and Innovation (DJEI) in Ireland.

The successful tenderer will be required to profile the composition of trade and investment of Ireland and a range of EU Member States with the UK, and to provide an evidence base to inform Ireland's policy positions as part of the wider negotiation on the UK's future relationship with the EU.

Multi-functional buildings construction work

South Dublin County Council | Published April 26, 2017  -  Deadline June 16, 2017
cpvs
45211350, 45000000, 45210000, 45211000, 45211100, 45211300, 45211340, 45211360, 71000000, 71311000, 71312000, 71324000, 71334000, 71400000, 79993100, 90712100

The project is for the development of a site at Kilcarbery, Dublin 22 for a sustainable, mixed tenure housing development in accordance with the Kilcarbery Grange Preliminary Masterplan (‘Masterplan’), the South Dublin County Council Development Plan 2016-2022, Rebuilding Ireland, an Action Plan for Housing and Homelessness and planning legislation. The development site has an estimated capacity for 892 units (subject to planning permission), with the exact number to be explored during the dialogue stage. The required tenure mix is anticipated to be 30 % social housing units to be sold to the Council and 70 % private residential housing units. The Council is seeking to identify an economic operator that has all of the right skills and is considered most capable of working in collaboration with the Council, to identify the optimal solution for the development site in accordance with the Masterplan and the Council's requirements and to deliver it as efficiently as possible.

The project is for the development of a site at Kilcarbery, Dublin 22 for a sustainable, mixed tenure housing development in accordance with the Kilcarbery Grange Preliminary Masterplan (‘Masterplan’), the South Dublin County Council Development Plan 2016-2022, the plan entitled Rebuilding Ireland, an Action Plan for Housing and Homelessness by the Department of Housing, Planning, Community and Local Government and Planning legislation. It is envisaged that the delivery timeframe for the project will be within five years from the grant of planning permission with potential extension(s) of up to 5 years. It will be the responsibility of the successful economic operator to obtain planning permission for the project.

The economic operator must include the following subcontractors within its team, all of whom will be assessed at PQQ stage:

1. Construction Contractor

2. Architect

3. Civil and Structural Engineer

4. Mechanical and Electrical Engineer

5. Quantity Surveyor

6. Landscape Architect

7. Planning and Environmental Consultant

The successful economic operator will be required to deliver all supporting infrastructure within the development site including a road junction at the outer ring road, a spine road through he development site and a pumping station and a rising main as set out in further detail in procurement documents.

Qualification system for the provision of safety assurance support and independent safety assessor consultancy service

Iarnrod Eireann-Irish Rail | Published February 5, 2016  -  Deadline February 3, 2018
cpvs
71318000, 71317210, 79417000

This Qualification System requirement is for provision of services in the disciplines Safety Assurance

Managers (SAM) and Independent Assessors (IA). Services to be provided under

this Qualification System will be to provide support to Iarnród Éireann (IE) in the

delivery of safety assurance documentation, safety cases and other related

services across a wide and varied project portfolio.

Road bridge construction work

South Dublin County Council | Published March 29, 2017  -  Deadline May 3, 2017
cpvs
45221111, 45221110, 45233120, 79415200

Framework for Consultants for Various Road and Bridge Projects.

  • 1