Public tenders for consultant in Debrecen Hungary

Find all Consulting tenders in the world.
Finding business opportunities has never been easier.

Results for consulting. Make a new search!

"Debrecen, Violet u. No. 17. child during surgery and related health visitor consultant building and renovation of low-voltage construction work on computer networks "- Information

Debrecen Megyei Jogú Város Önkormányzata | Published November 12, 2014
Winner
Dryvit Profi Kft.
cpvs
45310000

Debrecen, Violet u. No. 17. children's medical clinic under construction and consulting work related to nursing building renovation of low-voltage networks and IT. Quantity: - 7 pcs computing network office building - building 7 pc office telephone network - alarm network system components back replacement - 1 rack cabinet construction of additional information, a detailed job description, contracting requirements, project-related background information are detailed in the tender documentation. Contracting entities T. Bidders note that if you call or manufacturer-trans- mitters, frequency, type of thing, process, activity, patent or reference to the marks in the documentation provided, or unpriced budget announcement (s) specified include the name only the nature of the subject and made up in addition to the name or not, with clear recommendations to contracting-specified-in storage - in the PPA. Referred to in § 48 paragraph (3) 310/2011. Based on Government Regulation § 26 (6) (XII.23.) - Equivalent megajánlásokat accept.

Consultative engineering and construction services

Hajdú-Bihar Megyei Kormányhivatal | Published January 13, 2016
Winner
Utiber Közúti Beruházó Kft.
cpvs
71310000, 71631000, 71318000

The following tasks full-service supply: 1. geodetic and hyperspectral surveying, field data collection. Part of the tasks to be performed are: 1. lézerszkenneres and digital measuring camera recording; 2. hyperspectral survey; 3. geodetic field survey and data collection. The survey area covered: 34 km². Geotechnical study completion, preparation of an opinion. Offeror's offer should include the acquisition or construction plans required for the completion of each test licenses. Development of conceptual alternatives, preparation of conceptual engineering design. The analysis should consider making at least the following solutions versions of the designer: to increase, the airport can accommodate streams of water surplus capacity caused by improper drainage of water stagnation, túlnedvesedés, groundwater level rise and inundation nyílttükrű form. The Tócó accommodate the capacity to increase the number of joint intervention, are achieved by a combination (for selecting the actual combination will be the version by analyzing, task): - river gauge expansion, - embankment construction - surnames underground construction of the left bank of the Tócó watercourse - Lovász-zug reservoir as site storage utilization - odaltározók building - construction of a dam upstream, - opportunities to build containment basin - water detection system build - operation control system building - building roads maintenance; b, the airport exemption from harmful excess water from: - the airport water settle - from the airport to külvizektől exemption, - construction of rainwater drainage system for potential industrial park area as well as brick and Strawberry gardens - the channel 7-0-0 mederrekonstrukciója, - Construction of roads maintenance; c in the southern industrial zone to meet future water needs - the Eastern Main Canal water use, - Debrecen southern part of the opening of new water sources (Mikepércs direction). It needs to consider their options and the technical requirements of a mains connection is to the city water supply system within the framework of the preparation of the concept. The ticket must be allocated komplexicitás envisaged between the tasks to be performed under the tender - other working parts switch geodetic surveying, soil mechanics - resulting in the implementation of their results in examinations. Making plans for licensing, permitting the submission of plans for participation in the authorization process, the water rights and - if necessary - to obtain a building permit. Self-selected by the client version elements need to make the licensing plans. The plan must satisfy the licensing 18/1996. Technical specifications for the content of the water right licensee Plan (VI.13.) No KHVM. Entrusted with the task of submitting plans for approval to the required format and the appropriate number of copies of the relevant regulatory authorities for approval. Export-wide tender documents, technical specifications for the content of the export documentation 15) on. No preparation of construction plans. The airport can accommodate increasing the water capacity of the surpluses of water courses and the airport plans for intervention and export facilities necessary for the discharge of harmful water from surplus shall be drawn up on the basis of the licensing plans. If the southern industrial zone to meet future water needs - according to the decision of the principal - the opening of a new water sources to be solved, the design and construction of wells monitoring network has to be prepared

Consultative engineering and construction services

Tiszántúli Környezetvédelmi ésTermészetvédelmi Felügyelőség | Published February 5, 2015  -  Deadline March 19, 2015
cpvs
71310000, 71631000, 71318000

The agency contract "Improving water management situation airports of international significance and its environment" EEOP related supply-7.9.0 / 12 / -2014-0039 identification number of applications planning and approval tasks.

Information on the procedure eredményéről_DEK-257_ "for the University of Debrecen in the consultation phase to conduct pediatric studies TÁMOP 1,2,3-4.2.6-15 / 1-2015-0001 no. Within the framework of the project ".

Debreceni Egyetem | Published October 7, 2015
Winner
Auxiliis Clinical Development Korlátolt Felelősségű Társaság
cpvs
79411000

Related to Good Clinical Practice (GCP) and clinical trial operational activities (eg study coordinator tasks, the principles of internal procedures design, etc.) of documents, preparation of guidelines of the program section is designed to help ensure that the Clinical Center prepared a contributor to attend GCP-compliant pediatric trials. • Identify Operational jobs related to clinical trial activities GCP-compliant study: o Principal Investigator o substudy o Study coordinator o Study nurse o Other preparation jobs • Job description patterns • Process Regulatory documents, procedures preparation of design principles overview • GCP training material, taking into account the pediatric population specific issues, expectations of the Offeror resulting from the examination required to be met: • Preparation of job description samples pages 80-100 (4-8 after identification of posts)) • Expert days amely1 pieces GCP preparation of training material, in view of the specific issues arising from the pediatric examination , development of standard operating procedures expectations sample (phase 2, 3): The work instructions steps lower level of regulatory documents describe specific workflow. The program is intended point concerned departments of the pediatric Phase 2 and 3 studies to support the preparation of the local regulatory system design templates. • Proposing quality system: formation required to conduct Phase 2 and 3 study recommended SOPs and work instructions list • Each regulatory documents in respect of sample documents elkésztése which the individual concerned DE departments adapted to the Offeror's own use is required to be met: • Expert Days, which the regulatory system required the development of consultations, to determine the necessary elements of the proposed regulatory system. (Recommended List of Regulatory Documents), page 240-300) Development of Standard operating procedures (phase 1): The work instructions steps lower level of regulatory documents describe specific workflow. Preparation of regulatory documents required for the purpose of the program point established phase one testing site to work. • Establishment of Quality System Documentation background of a Phase 1 study in preparing a list of necessary SOPs and work instructions • The development of F1 testing service adapted SzME-k and instructions of the Bidder must be met: • Expert Days, which are necessary regulatory framework of the Phase 1 study site development of consultations, determine the necessary elements of the proposed regulatory system. (Recommended List of Regulatory Documents), page 350-440)
  • 1