Consultative engineering and construction services

Moholy-Nagy Művészeti Egyetem | Published December 15, 2016  -  Deadline January 17, 2017

"MOME Campus - Innovation and Creative Knowledge Park 'supply of investment-related elements of the implementation of the third project engineering consultants, construction and technical control of complex tasks organizer.

The present public procurement procedure "MOME Campus - Innovation and Creative Knowledge Park" as part of the performance-related element of the realization of investment projects third-engineering consultancy, construction and technical control of complex tasks organizer commission contract.

The contractor is also responsible for the "Campus MOME - Creative Innovation and Knowledge Park" building-related installation work of consulting engineers, construction inspectors and complex technical organizer, change management, and provision of supplies and related services, risk analysis tasks.

Winning bidder must complete the following tasks in particular:

- Making Risk Analysis,

- Document management,

- Assistance in obtaining permits and utilities branch,

- Work with the contractor,

- Construction and demolition technical inspection,

- Performance of geodetic control,

- Contracting as continuous information to clients,

- Making proposals to adopt and start and the end of the transfer process, the reports on entrepreneurship,

- Contribute to the establishment of procedures and usage process of organizing the commissioning of the facility,

- Organizing post-reviews,

- Preparation and monitoring of the contracts entered into detailed cost control and the implementation of the current financial payment schedule schedule

- Part of a project fit together critical elements in a process of clarifying generate control schedules.

"MOME Campus - Creative Innovation and Knowledge Park" project for the third projektelemébe Description of buildings / sub-project components:

Academic wing of the building (gross floor area: 7071 m2) Building held and utilization of renewal, transformation is possible.

Academic Wing, Building B (gross floor area: 4392 m 2): demolished, site of the new building is built.

Gondűző villa (gross floor area of ​​329 m2): Building a national monument protection, recovery is possible refurbishment.

Knowledge Center: The current site of the college built a new building.

Knowledge Center MOME heart and buildings combined gross floor area: 6369 m².

The car traffic plays a minor role compared pedestrian access between the buildings and outdoor functions, where appropriate, establishment of mixed traffic, green concrete way possible.

"MOME Campus - Creative Innovation and Knowledge Park" project implemented in buildings of the same date, the gross floor area of ​​18 160 sqm.

Outdoor area features: 13 291 m².

Contractor is also responsible for the warranty, the resolution to develop suitable proposals to the contracting authority reasoned technical issues related to liability.

For detailed information on the subject of government procurement include the procurement documents.

Evaluation consultancy services

Miniszterelnökség | Published December 20, 2016  -  Deadline January 20, 2017
§ 65 (10) bek. in accordance call point II.2.4) 1.2. 2 and 3.2. tasks under subsections or all tasks in terms of the provision of project management, as well as leading research tasks are essential tasks for which expects them to be the contractor (one joint bidders) perform. 

The proposed reform processes require the support of the ongoing investigation, monitoring, evaluation and practical kockázatelemzést- which the Prime Minister will take an external expert support for the following topic areas:

The use of EU funds in the development of political institutions activity monitoring and support.

Monitoring system design analysis, methodology.

Monitoring of Development Policy Analysis.

System-wide risk assessment and risk management recommendations.

Project proposals or life cycle assessments.

Schedule:

- One for the development of monitoring systems analysis / methodology,

- It is tested for monitoring development policy analysis / risk assessment and risk management recommendations periods (subject analysis): half calendar year, a total of at least 50 pieces (including a total of at least 50 focus group surveys and / or conducting the interview)

- Life cycle assessment test cases for a total of at least 10, according to the order

- Deadline for preparing analyzes (unless otherwise agreed) within 90 calendar days following the last day of the relevant period.

Results and time-consuming:

- Analyzes the scope of monitoring systems / methodologies minimum gross 200 000 strokes (200 experts estimated time required days)

- The scope of development policy analysis monitoring at least 80 000 gross strokes per analysis (estimated time investment of 75 experts days)

- Scope of system-wide risk assessment / risk management proposals for a minimum of 50 000 gross strokes per analysis (estimated time required 80 day's expertise TOI)

- Scope of project / tender lifecycle tests at least 50 000 gross strokes per analysis (estimated time investment of 80 experts days)

- Analysis of the monitoring systemic risk assessment / risk management ja-iron galleries, fulfilling life cycle studies required to conduct interviews and / or focus group surveys.

Examination of the National Reform Programme are met.

Schedule:

- Examined period: calendar year, a total of at least 2,

- Deadline for preparing analyzes (unless otherwise agreed) within 90 calendar days following the last day of the relevant period.

Results and time-consuming:

- Analyzes the scope of analysis without attachments at least one knock-down 200 000 gross (250 experts estimated time required days)

- Interviews and / or focus groups to conduct studies necessary for the preparation of analyzes.

Professional monitoring of government intervention, information and communication systems.

establishment of a monitoring system.

Information and Communication monitoring development policy analysis.

Information and Communication industry developments, trends show expert analysis.

Schedule:

- One for the development of monitoring systems analysis / methodology,

- ICT development policy analysis, monitoring / ICT industry developments, trends show expert analysis examined periods (subject analysis): half calendar year, a total of at least 6.

Results and time-consuming:

- Deadline for preparing analyzes (unless otherwise agreed) within 90 calendar days following the last day of the relevant period,

- Scope of the monitoring system for the description of a minimum of 200 000 gross strokes (estimated time required expertise 350 days)

- Scope of ICT development policy analysis, monitoring minimum gross 200 000 strokes (150 experts estimated time required days)

- Scope of the ICT industry developments / trends analysis, expert demonstration minimum gross 200 000 characters (estimated time investment of 50 experts days)

- Interviews and / or focus groups to conduct studies necessary for the preparation of analyzes.

Detailed requirements of the procurement documents.

Systems consultancy services

Magyar Nemzeti Levéltár | Published December 28, 2016  -  Deadline January 27, 2017

Administrative processes and the development, planning, legal, privacy expectations of system design, system alignment SZEÜSZ relations.

The overall objective of the project is to create a Service archive operational efficiency by increasing the national coverage and electronic archival services for accessing.

tasks to be performed by the contractor conditions.

related to the implementation of the project management and organization products result.

The task includes the preparation of the current administrative processes and related services designed to survey the situation, product planning and regulatory, administrative and legal aspects of the concept and the management system planning.

The job Production:

Situation analysis, organizational development and service concept.

# Based on assessment of organizational processes involved in the Project Objectives;

# Organizational and administrative anomalies;

# Analysis of the electronic government regulatory environment;

# Exploring the need for regulatory changes,

# Examination of the existing Administrative Services Regulated fit and applicability;

# Administrative processes of the administration of fit testing (selected organization;

# Organization and service development concept.

Privacy impact assessments, information security requirements;

# EU data protection directive in effect;

# definition of privacy and information security functional requirements;

# Privacy and information security regulatory proposals;

# administrative cooperation with partner institutions;

Administration system design.

The management system requirements contained in the plan will ensure the project results, adequacy of the administrative point of view.

The task includes the following areas:

# Situation analysis, organization and service development concept;

Receive Data # What impact analysis and design of information security requirements;

# Check the logical design model;

# Process design and modeling;

#-Related SZEÜSZ s cooperation planning;

# Updating plans related to the Project;

# Monitoring and performance measurement criteria;

# Planned sustainability of financial planning processes.

Regulatory proposals, drafts of legislation and regulations.

# Administration regulatory legislation in draft legal text;

# Internal regulations draft texts;

# Documents establishing cooperation with the administrative bodies;

# realization plan.

Expert support of project implementation on the basis of the customer (applicant) side management and organizational aspects

The task of achieving continuous organizational development and management of archival hand-organizational expert support, solution design and implementation of the tasks arising advice.

Client-side activities on the basis of expert technical support, management, and organizational aspects of the project in its entirety,

# Support in the procurement notices;

# Cooperation with suppliers engaged in its implementation;

# System management consulting;

# Based on the request of a project management professional preparation materials;

# Managerial decision support and quality management configuration;

# Project-oriented leadership skills in shaping, strengthening;

# Result of the project's products - ensuring the legal correctness of their opinions demand;

# Support for the development activities;

# System design and implementation support.

Support for the introduction of change processes and organizational development within the organization results

# Processes and organizational development results;

# Support for business continuity implementation.

SZEÜSZ in the development of co-ökkel support.

KAB);

# Of customer service activities.

A detailed job description on the go. prev. included.

Evaluation consultancy services

NFP – Nemzeti Fejlesztési Programiroda Nonprofit Korlátolt Felelősségű Társaság | Published December 28, 2016  -  Deadline January 30, 2017

A framework agreement within the framework of the Environment and Energy Efficiency Operational Programme (KEHOP) to perform professional tasks waterworks projects in the 2014-2020 programming period the implementation of the European Union, the water utilities to install and sustainability related.

The tasks of the Contracting Government Decree. 339/2014. (XII.19.) was named in the 2014-2020 programming period, wastewater collection and treatment, water quality improvement and preparation of projects financed from the KEHOP and implementation, as well as the conduct of the required procurement procedures care as well.

Subject Accordingly, the procedure for the present framework agreement technical experts shall wastewater collection and treatment and water quality improvement projects at the expense of KEHOP implementation, sustainability, required to install below and in the technical specifications and tender documents to be issued during the race reopening detailed according to the maximum subject to a ceiling.

The experts of the tasks may be particular to the following activities:

- The preparation and compilation of water utility assets, inventory valuation advice; cost-efficiency and sustainability tests have been performed, the rain operating period cost estimates, preparation Replacement needs based on part of Rolling Development Plan Replacement Plan, which is forecasting, determining the expected replacement costs as well as the newly created, all affected by the investment of existing installations.

The planned total allocation net 8,000,000,000 HUF.

Contracting indicate that the total amount planned quantity Yes. Based Contracting Authority is not required to be fully utilized during the race re-openings, while the amount purchased may not exceed the envisaged overall amount, ie the envelope.

The one-time special contracts expected to be fulfilled ...

Business and management consultancy services

Külgazdasági és Külügyminisztérium | Published December 10, 2016  -  Deadline January 16, 2017

A pályázók és kedvezményezettek kapacitásainak támogatása a Duna Régió Stratégiával és az európai területi társulásokkal összefüggésben” című, KÖFOP 3.3.3-15. 2016-00002. azonosító számú kiemelt projekt keretében külső szakértői és tanulmányírási szolgáltatások beszerzése.

Az eljárás a felhívás II.2) pontjaiban meghatározott két részből áll.

Duna Régió Stratégiában résztvevő szereplők kapacitásfejlesztése a vízgazdálkodási (4. és 5.) és energetikai (2.) prioritásterületekhez, valamint komplex térségfejlesztési programokhoz kapcsolódóan, szakértői és tanulmányírási szolgáltatások igénybevételével nettó 36 259 843 HUF keretösszegig.

A részletes feltételeket a műszaki leírás tartalmazza.

A Duna Régió Stratégia keretében, a felmerülő igények alapján a KKM esetileg határozza meg a konkrét beszerzendő szakértői szolgáltatásokat, amelyek megfelelnek a KÖFOP projektben lefektetett céloknak és az alábbi főbb tevékenységi köröket fedik le:

— EU-s pályázatírás, pályázatok előkészítése (INTERREG, közvetlen EU-s források).

— Felmérések, adatbázisok, kutatások készítése.

— Szakértői tanácsadás.

— Projekt-előkészítő tanulmányok.

— Komplex, térségi programok generálását és finanszírozását szolgáló megalapozó tanulmányok a rendelkezésre álló EU-s források eredményes felhasználását célozva.

— Energetikai és vízügyi ágazati tanulmányok a DRS magyar társkoordinálású 2., 4. és 5. prioritásterületeinek specifikus akcióterveihez illeszkedően.

— Stratégiai dokumentumok, akciótervek kidolgozása pályázati forrás lehetőségek feltérképezésével (forrástérkép) és beazonosításával.

1 szakértői embernap 8 óra (8 x 60 perc) munkavégzésnek felel meg.

Az európai területi társulásokat működtető intézményi és területi szereplők kapacitásfejlesztése, szakértői és tanulmányírási szolgáltatások igénybevételével nettó 93 543 307 HUF keretösszegig.

A részletes feltételeket a műszaki leírás tartalmazza.

Az ETT-k igényeit figyelembe véve, a KÖFOP és a projektben lefektetett céloknak megfelelően a KKM határozza meg az elvégzendő szakértői szolgáltatásokat, amelyek az alábbi főbb tevékenységi köröket fedik le:

— EU-s pályázatírás, pályázatok előkészítése (CBC, DTP, CENTRAL, INTERREG, hazai operatív programok, közvetlen EU-s források).

— Külső szakértői tanácsadás az uniós támogatásokra való pályázással kapcsolatos területeken.

— Projekt-előkészítő tanulmányok, megvalósíthatósági tanulmányok és költség-haszon elemzések készítése gazdaságfejlesztés, turizmus, infrastruktúrafejlesztés, kerékpárutak, vállalkozásfejlesztés témakörökben – kapcsolódóan az ETT-k EU-s forrást célzó pályázataihoz.

— Műszaki tanulmányok, műszaki tervezési (mérnöki) munkák elvégzése EU-s pályázatokhoz kapcsolódóan (kerékpárutak).

— Mintaprojektek kidolgozása.

— Felmérések, adatbázisok, kutatások készítése.

— Stratégiai dokumentumok, akciótervek kidolgozása EU-s pályázati forrás lehetőségek feltérképezésével (forrástérkép) és beazonosításával.

1 szakértői embernap 8 óra (8 x 60 perc) munkavégzésnek felel meg.

Business analysis consultancy services

Közbeszerzési és Ellátási Főigazgatóság | Published December 10, 2016  -  Deadline January 20, 2017
those parts of institutions governed by Decree No 25.) for who constitute the Annual Development Frames prevailing nominated and won support organization, supply or quality expert services related to implementation of the projects made necessary administrative IT systems. 

The individual parts procurement, as well as precise definition of the tasks included in the notice point II.2.4) and Specifications are included in other public documents.

Subject: process and organizational development, management, organization and control, financial planning, követelményspecifikálás, system design, system integration, testing, education, migration, implementation support, professional services in planning operations related to the scope of administrative IT systems.

Yield: 1 package of services.

The bidder must demonstrate that the security of the Contracting Authority's disposal, the contractor's choice:

a) In case the required amount of money held by the Hungarian State Treasury Tender No. 10032000-06060071-20000002 bank account (payment account) transfer certificate issued by a bank debit notification (bank statement), or the transferor bank transfers; In case of submission of proof of payment cash payment;

b) for providing a guarantee or surety undertaken by financial institutions or insurance to separate the concatenated manner by submitting a bid guarantee or surety issued by the original of the financial institution or insurance company;

c) issued under an insurance contract - with surety - in the case of the promissory note promissory copies of the filing.

Subject: Administrative IT systems for planning, implementation, providing quality assurance services related to deployment.

Quantity: 1. service package.

The bidder must demonstrate that the security of the Contracting Authority's disposal, the contractor's choice:

a) In case the required amount of money held by the Hungarian State Treasury Tender No. 10032000-06060071-20000002 bank account (payment account) transfer certificate issued by a bank debit notification (bank statement), or the transferor bank transfers; In case of submission of proof of payment cash payment;

b) for providing a guarantee or surety undertaken by financial institutions or insurance to separate the concatenated manner by submitting a bid guarantee or surety issued by the original of the financial institution or insurance company;

c) issued under an insurance contract - with surety - in the case of the promissory note promissory copies of the filing.

Business analysis consultancy services

Közbeszerzési és Ellátási Főigazgatóság | Published December 20, 2016  -  Deadline January 20, 2017

Service Framework Agreement 168/2004. those parts of institutions subject to Regulation (V. 25) on. for people who are considered the Annual Development Frames prevailing nominated and won support organization, procurement experts or quality assurance services relating necessitated the implementation of projects Administrative IT systems.

The individual parts procurement, as well as precise definition of the tasks included in the notice point II.2.4) and Specifications are included in other public documents.

Consultative engineering and construction services

NIF Zrt. | Published December 31, 2016  -  Deadline February 10, 2017

The M85 motorway Csorna II. - OH stretch between Sopron and Sopron care required under the North-western bypass construction works of engineering tasks a service contract.

under an agency contract with the 2 x 2 lane M85 motorway Csorna II. - Between Sopron OH 31 + 550-95 + 332 km no. , 63.8 km long section between or 2 * supply of one-lane 3.6 km long Sopron north-western bypass construction works of engineering tasks, preparation, public procurement, preparation, prepared by the contractor construction design documentation prior to the associated execution monitoring, with comment, approval tasks.

The conducting engineering work - among others - the following sub-activities include:

- The procurement process for the selection of contractor involvement,

- Construction plans drawn up by the contractor opinion, reviewing and making recommendations for approval,

- Technical inspection (roads, objects, hydraulic engineering, construction and közműkiváltás)

- Contractor claims to express an opinion,

- Price studies, preparation of expert studies price,

- Physical and financial progress monitoring, reviewing and approving corporate agendas,

- Preparation of regular reports to the customer,

- Archaeological survey work, monitoring, coordination,

- Control of plant installation works,

- Verification of environmental problems,

- Monitoring and documentation of job security,

- Workflow tracking, documentation (monitoring)

- Carrying out engineering tasks warranty period,

- Monitoring tasks following the technical handover.

Brief introduction to the project:

The project is intrinsically linked to the area of ​​Sopron in Sopron 3.6 km long north-western bypass as well.

Customer reserves the right to any further into sections for each stage.

M85 Csorna II. schedule - Sopron East section:

ARC. name.

M85 east-Sopron - Fertőrákos CSP. The section between:

ARC. name.

M85 Fertõrákos CSP. - OH Sopron in Sopron marked section of the 8647th north-western bypass also:

ARC. name.

Featured Government intends rhythmic and continuous implementation of design, engineering tasks for which the dump is required at the same time.

The total volume of detailed technical requirements included in the technical specifications as part of the procurement documents.

Contracting points out that, in case things megajánlása equivalent to the equivalence of the bidder must demonstrate its offer.

Computer support and consultancy services

Magyar Nemzeti Bank | Published December 24, 2016  -  Deadline January 27, 2017

CISCO networking equipment support.

Cisco network (LAN, WAN, SAN), storage area network (SAN) and DWDM equipment company to provide monthly support to ensure 99.7% uptime commitment from 01/04/2017 up to 03/31/2019 period. For more information about the documentation.

Consultative engineering and construction services

NIF Zrt. | Published January 7, 2017  -  Deadline January 20, 2017

Order contract for M7 - 710 c. highway junction, No. 710. perform engineering tasks highway wiring project.

Technical analysis or consultancy services

Budapest Főváros Önkormányzata | Published January 7, 2017  -  Deadline January 17, 2017

A contract / The capital's public transport operations analysis, in order to create efficiency and sustainability sectoral strategy and action plan.

Contracting Yes. 98.§ Paragraph (3). The process according applicable. The possible offer services Subject: Making and consistent with business and transport studies. Terms of the acquisition: the conditions set out in this notice.

Computer support and consultancy services

NISZ – Nemzeti Infokommunikációs Szolgáltató Zártkörűen Működő Részvénytársaság | Published January 14, 2017  -  Deadline January 31, 2017

Existing SUN and SUN servers (Hitachi) purchase warranty extension for storage.

Purchase of an existing Sun servers and Sun (Hitachi) for storage of a warranty extension, as follows:

170 piece tool SUN (SUN / Brocade devices, servers, and Sun / Hitachi storage) vendor warranty extension until 30.06.2017.

SUN / Hitachi sharp operated stores in respect of the technical content specified items 169 and 170 series for the sake of a higher level of operational safety increase the supply warranty extension is necessary to provide extended warranty.

01/07/2017-period subsequent to quarter-on-year redemption period (two quarters of call options) of 170 db tool SUN (SUN / Brocade devices, servers, and Sun / Hitachi storage) vendor warranty extension.

the exact requirements for the lease extension is included in the technical specifications and the draft Treaty.

The list of assets to be covered warranty extension includes technical specifications as part of the procurement documents.

IT services: consulting, software development, Internet and support

Nemzeti Média- és Hírközlési Hatóság | Published December 14, 2016  -  Deadline January 19, 2017

Support within the framework of Operation Unified Metrology Information System (SMIS) a contract.

subject to this procedure, the National Media and Communications Authority (hereinafter referred to as NMHH) Modular Metrology their premises operated by Information System (hereinafter referred to as EMIR) and related Doktár System includes crisp, test and development environments.

to be performed by the contractor shall:

- Development environment to maintain,

- Ensuring Error Reporting Service (365 days a year through 7x24 access interface)

- System Status Tracking,

- Application management support,

- Education,

- Follow Legislation,

- Telephone and email support provided through electronic,

- Keeping up to date documentation,

- Managing a consistent source,

- Within a 24-year-Site Support Engineer Day frame,

- Within 12 days engineer Computer Support Framework Act,

- Within 12 days Engineering Consultation, collaboration with integration testing year frame

- System Parameter performing tasks within a year to 30 days development engineer frame.

The detailed definition of tasks to be performed by the Contractor in the Technical description.

IT services: consulting, software development, Internet and support

Budapest Főváros Kormányhivatala | Published December 23, 2016  -  Deadline January 26, 2017

The EKEIDR extension and the associated specialized systems integration, professional system analysis and design, supply and expert workflow tasks associated with preparing survey and design tasks.

The EKEIDR extension and the associated specialized systems integration, professional system analysis and design, workflow and expert tasks related to preparing survey and design tasks in supply as follows:

Create action plan for implementing workflow support for administrative affairs.

Records management, specialized systems and processes and the development of electronic administration reference concept.

Development planning expert system support processes in the implementation of the general EKEIDR rel-3 workflow support concept.

in order to uniform nationwide system expertise supporting 450 pieces of process-rel EKEIDR implementation of the preparation of a preliminary design to support the special procedures selected depend on the management and document management workflow.

Development of pre-integration concept in this context.

Determination of EKEIDR-rel integrated KEÜSZ SZEÜSZ and services.

The government's official designation EKEIDR-rel induce or integrated records management systems and expertise.

Systems consolidation, integration planning and implementation, technical support, in this context.

The integration between planning and EKEIDR in the project and KEÜSZ SZEÜSZ services, integration support for its implementation, as well as preparation of claim made against information systems provide electronic administration requirements for milk INTENDED EKEIDR in this context.

Planning EKEIDR and integration between document management software and systems expertise in the project, as well as professional support for integration implementation.

The EKEIDR-rel induce, professional document management software and systems specified project triggering, as well as those registered in the data migration planning and triggering systems, migration of professional support.

A detailed job description included the procurement documents.

IT services: consulting, software development, Internet and support

Országos Rendőr-főkapitányság | Published January 3, 2017  -  Deadline February 9, 2017

-RUTIN A contract (road police information system) module to develop mobile applications KÖFOP-1.0.0 - Applications context of VEKOP-15 "Innova" project.

The development was supported by the necessary routine use on all platforms achieved, namely Android, iOS and Windows Phone apps are both required for turn-by-turn navigation, integrated native support.

navigation solution according to the subject of acquisition shall be pursued majority of client-server architecture (off-board navigation), ie the services required (map service, routing, geocoding) on ​​the server side, and client-side applications to map and route satisfying display of user interactions manage and navigate to the path done.

The developed system of road incidents and traffic restrictions related management must provide the National Police present system of direct integration or to ensure receipt supplied by third parties and road events, and of course planning to take account of the route, as well as a web application in cinematography assist.

During the development of ROUTINE application and server environment will be expanded:

- Off-board navigation,

- The National Police outside traffic affects the ability to receive information,

- During navigation traffic events on the vehicle's path by signaling

- In the vicinity of the oncoming vehicle navigation specially marked vehicles running "detection" and the driver of alerts.

During development, the goal is not only to third-party services traffic information, but also to further develop a mobile application that uses this information to citizens and is also used for this application.

activities to be undertaken by the contractor:

- System Development,

- Testing,

- Education,

- Support.

the provision of related services:

- Conveyor side project management,

- Participation in the handover process,

- Participation in the pilot plant.

The documents to be delivered:

- Logical and physical system design,

- Test plan

- Operating manual

- user manual,

- Documentation of education,

- Education Plan

- Teaching aids.

A detailed technical description included in other public documents.

Availability of other public documents:

The tender offer documents from at least one contractor or subcontractor named in the offer to be electronically reach of the procurement documents and receipt of the acceptance statement must show that the procura@procura.co.hu sending e-mail to the expiry of the tender deadline.

Tentative procurement:

KÖFOP-contracting 1.0.0 - "Innova" Project proposals can be submitted in the framework VEKOP-15 calls for proposals and contracting demand for assistance has been receiving, acceptance of the amount needed are small or considered to be a circumstance for which the procedure is declared ineffective .

Based on (12) of § 135 of the implementation phase of the Managing Authority approval conditional contract for the entry into force of the Grant Contract.

IT services: consulting, software development, Internet and support

NISZ – Nemzeti Infokommunikációs Szolgáltató Zártkörűen Működő Részvénytársaság | Published December 29, 2016

Public administration in order to consolidate the IT infrastructure to reduce costs (EAC) extension (KÖFOP-1.0.0-VEKOP-15-2015-00005) c., as well as the Government Authentication Service (Gov CA) (KÖFOP-1.0.0-VEKOP-15 -2015-00004) c. In connection projects in central and naplógyűjtő- assets and associated licenses analysis system for transport, installation and implementation.

The solution is delivered in respect of operators and analysts education.

Compared to the technical specifications, contracting individual sections of defined volumes option as follows: EPS sufficient to serve 25 000 licenses.

Contractor required tasks:

The required log collection and analysis tools and storage products required for operation, network equipment, software and servicing 150 000 EPS sufficient transport license.

The hardware and software installation, configuration and connection of the log sources of temporary and permanent locations.

The devices Moving the temporary holder to the final scene.

The hardware and software integration of existing RSA SA log analysis system.

Implementation of the integration work Contracting existing backup and archiving system, and the EAC was established in connection with the cloud automation system provided by NISZ Zrt. services.

log formats analysis is included, but not natively supported parser-s development of 500 hours of work.

Preparation of the documentation required for the preparation of s-Parser.

Preparation of documents related to the system, making available.

The operator and crew training analyst.

Bidder must provide the system offered as part of the bid price, complete (including hardware and software components) 12 month warranty and operating grants, as defined in accordance with the technical specifications.

IT services: consulting, software development, Internet and support

NISZ – Nemzeti Infokommunikációs Szolgáltató Zártkörűen Működő Részvénytársaság | Published January 7, 2017  -  Deadline January 16, 2017

Oracle software products, software manufacturers following and supporting technical specifications in Appendix 10 620 pieces of license with respect to 12.31.2017. (+ 6 month option). A detailed list of manufacturers and szoftverkövetésben detailed content and subject matter of the procurement in question grant licenses include technical description of the procurement.

IT services: consulting, software development, Internet and support

Országos Rendőr-főkapitányság | Published January 7, 2017  -  Deadline February 17, 2017

Service contract to provide hardware support.

Part 1: central SAN extension devices operated by the National Police of hardware maintenance.

Part 2: Central Repair and maintenance of servers operated by the National Police.

Service contract to provide hardware support.

Part 1: central SAN extension devices operated by the National Police of hardware maintenance.

Flat-rate charges option prior to the rescue center operated system equipment maintenance.

1300 hours system integration engineer (consulting) services.

450 hours EMC Networker backup system engineering support services.

providing 150 pieces of media data clearing services.

The determination of the needs and requirements included in the technical specification.

Central Repair and maintenance services under a service contract, operated by the National Police Headquarters servers

Technical procurement specification defined objective of completing the Police currently being used in different establishments of servers and equipment maintenance, repair and ensure continuous operation, with particular regard to the following:

To prevent damage to equipment preventative maintenance.

Receiving the reports and documentation.

Telephone assistance.

On-site troubleshooting.

providing professional service.

providing consultancy.

- Support Equipment Package costs is set out in the Specification Summary Tables -101 db server and CS8400 High End Storage System.

The determination of the needs and requirements included in the technical specification.

IT services: consulting, software development, Internet and support

Országos Rendőr-főkapitányság | Published January 7, 2017  -  Deadline February 20, 2017

framework service contracts to provide Oracle support.

Part 1: Oracle software and hardware support and operation of associated support services.

Part 2: framework service contract for Oracle Business Intelligence, and private cloud deployment.

Oracle software and hardware support and operation of associated support services.

Oracle support contract ID number CSI Product name - number of metrics Quantity * Quantity of days.

5376202 18406947 Exadata Storage Server Software - Disk Drive Perpetual 84 61320th

5983888 19211445 Oracle Active Data Guard - Processor Perpetual 32 23360th

5983888 19207389 Exadata Storage Server Software - Disk Drive Perpetual 36 26280th

5983888 19211445 Oracle Database Enterprise Edition - Processor Perpetual 16 11680th

5983888 19211445 Oracle Partitioning - Processor Perpetual 16 11680th

Product Name Quantity Metric.

Oracle Consulting Services Day 1 000th

The determination of the needs and requirements included in the technical specification.

under a service contract with Oracle Business Intelligence, and private cloud deployment.

under a service contract with Oracle Business Intelligence, and private cloud deployment.

Product Name Quantity Metric.

Oracle BI Suite Extended Edition Named User Plus 25th

Product Name Quantity Metric.

Oracle Directory Services Plus 70 * Employee User.

Database Enterprise Edition 2 Processors.

RAC 2 Processor.

Cloud Management Pack for Oracle Database 2 Processor.

Database Lifecycle Management Pack 2 Processor.

The determination of the needs and requirements included in the technical specification.

IT services: consulting, software development, Internet and support

Nemzeti Rehabilitációs és Szociális Hivatal | Published January 13, 2017  -  Deadline January 17, 2017

A contract to supply 'IT system development tasks "related to the special project" EFOP-1.1.1-15 Changed disabled people support "section.