Public tenders for consultant in Silkeborg Denmark

Find all Consulting tenders in the world.
Finding business opportunities has never been easier.

Results for consulting. Make a new search!

Provision of technical advice and assistance in the establishment of a new bridge over the river Gudenåen at Resenbro

Silkeborg Kommune | Published November 23, 2015  -  Deadline December 8, 2015
cpvs
71322300, 71247000, 71323200, 71327000, 71520000

The task includes detailed design procurement and contracting of a new TOSPO-right road bridge over the river Gudenåen at Resenbro and construction management and site supervision during the construction phase. Besides the bridge must be projected adjacent con-structures, including kajvægge along streams spreads and a pramdragersti at the bridge northwest end remuneration. The tender documents, including Ddbudsvilkår and draft consultant contract is available from Client consultant COWI, Kristian Smedegaard Bach, krbh@cowi.dk http://silkeborgkommune.dk/Erhverv/Udbud/Bygge-og-anlaeg/Detailprojektering-af-vejbro-over-Gudenaaen-ved-Resenbro

Software programming and consultancy services

Silkeborg Kommune | Published March 23, 2016
Winner
Assemble A/S
cpvs
72200000

SKI 19.02 ASP, Lot 2, Municipalities, Y10 - Education including purchased Nembørn II with supplementary allowance Learning Platform

Nembørn with supplementary allowance Learning Platform bought at Silkeborg Municipality and Viborg Municipality.

Evaluation consultancy services

Erhvervsstyrelsen | Published November 4, 2015
Winner
COWI A/S
cpvs
79419000

The joint evaluation of the regional growth efforts include evaluation of a wide range EUstrukturfondsprojekter (projects financed by the European Regional Development Fund or the Social Fund) and REMprojekter (Growth and development projects co-funded by regional development funds, but not with the structural funds). Evaluations shall be effective evaluations focused on whether the projects have worked or not and why. Evaluations shall supplement the register-based power measurements, which the contracting authorities themselves should be referred to. The requirements specification. Conceptually, evaluations thus have the character of 'theory-based impact evaluations', not 'counterfactual impact evaluations'. The evaluations will assess the projects result creation and help to strengthen the systematic learning across regions in order to develop and launch even more powerful strategies and projects in the future. In addition to the evaluation of individual projects must evaluator extract learning across projects and regions within the same action in the Regional and Social Funds and implement priority thematic evaluations, for example. regional cluster initiatives and efforts to strengthen growth in the periphery. In terms of numbers expected Framework Agreement to include evaluation of approximately 200-300 projects. In addition, as mentioned, to be drawn from learning to be anchored in growth forum secretariats and with the Danish Business Authority, and selected thematic evaluations. In terms of amounts expected Framework Agreement include a total of approximately 18-24000000 DKK. Please refer to the Framework Agreement and the requirement specification for information about the contents of the task.

Evaluation consultancy services

Erhvervsstyrelsen | Published June 20, 2015  -  Deadline August 24, 2015
cpvs
79419000

The joint assessment of regional growth efforts include evaluating a wide range of EU Structural Fund projects (projects financed by the European Regional Development Fund or the Social Fund) and REM projects (Growth and development projects co-funded by regional development funds, but not with the structural funds). Evaluations shall be effective evaluations focused on whether the projects have worked or not and why. Evaluations shall supplement the register-based power measurements, which the contracting authorities themselves should be referred to. The requirements specification. Conceptually, evaluations thus have the character of 'theory-based impact evaluations', not 'counterfactual impact evaluations'. The evaluations will assess project performance creation and help to strengthen the systematic learning across regions in order to develop and launch even more powerful strategies and projects in the future. In addition to the evaluation of individual projects must evaluator extract learning across projects and regions within the same action in the Regional and Social Funds and implement priority thematic evaluations, for example, the regional cluster initiatives and efforts to strengthen growth in the periphery. In terms of numbers expected Framework Agreement to include evaluation of approximately 200-300 projects. In addition, as mentioned, to be drawn from learning to be anchored in growth forum secretariats and with the Danish Business Authority, and selected thematic evaluations. In value terms is expected framework agreement to include a total of approximately 18-24000000 DKK. Reference is made to the Framework Agreement and the requirement specification for information about the contents of the task.

Evaluation Consultancy Services 2015 / S 118-215048

Erhvervsstyrelsen | Published June 20, 2015  -  Deadline August 24, 2015
cpvs
79419000

The joint assessment of regional growth efforts include evaluating a wide range of EU Structural Fund projects (projects financed by the European Regional Development Fund or the Social Fund) and REM projects (Growth and development projects co-funded by regional development funds, but not with the structural funds). Evaluations shall be effective evaluations focused on whether the projects have worked or not and why. Evaluations shall supplement the register-based power measurements, which the contracting authorities themselves should be referred to. The requirements specification. Conceptually, evaluations thus have the character of 'theory-based impact evaluations', not 'counterfactual impact evaluations'.

Architectural, construction, engineering and inspection services

Silkeborg Kommune | Published August 25, 2015
Winner
Årstiderne Arkitekter P/S
cpvs
71000000, 71530000

Silkeborg Municipality and Silkeborg IF Invest A / S has decided to jointly build a new turnkey stadium Silkeborg Arena. New Silkeborg Arena has been named Jysk Park should be included in the Silkeborg Municipality corresponding area Søholt Sports Park, next door to the existing sports hall (Jutland Arena) and in connection with the existing training facility and arrival at the scene, the future new highway and »business corridor '. Jysk Park will be constructed with a spectator capacity of 10,000 seats and complete with lounge and conference facilities. Total consultant's job is to assist the municipality of Silkeborg and Silkeborg IF Invest A / S in connection with the implementation of the above construction project, and in this connection carry out the following advisory. Advice in accordance with FREE and DANISH ARK's performance descriptions concerning the Construction and Planning in 2012, sections 1, 2, 3 and 4 and any other services as stated in the tender documents. The total development budget for realization of Jutland Park is set at a maximum of 120 m excluding. VAT. Silkeborg Municipality and Silkeborg IF Invest A / S has decided that the fee for the above advice performance determined based on a market price for the task sets an overall honorarsum for total counseling at 7 m excluding. VAT.

Architectural, construction, engineering and inspection services 2015 / S 083-147798

Arbejdernes Byggeforening Silkeborg, Arbejdernes Andels-Boligforening Silkeborg og Silkeborg Boligselskab | Published April 29, 2015  -  Deadline May 27, 2015
cpvs
71000000

Architectural, construction, engineering and inspection services workers Construction Association (AB) Silkeborg, Workers Cooperative-Housing Association (AAB) Silkeborg Silkeborg Boligselskab (hereinafter referred to as 'contracting entities') hereby offers framework agreement on comprehensive advice. This procurement carried out by the contracting entities, but on behalf of each fund, administered by the contracting entities. After the offering end - ie after the conclusion of the Framework Agreement - contracting departments to frame the terms, with the selected lead consultant as independent economic entities. Contracting entities existing housing units includes over 6,500 homes in construction, ranging from multi-storey buildings to one level houses. Departments include both family housing, youth housing and housing for the elderly as well as institutions and commercial leases. The framework agreement is expected to put up projects involving a total of advice by new buildings and renovations done in professional, head - or turnkey. It is difficult to be precise about the Framework Agreement extent, the scope depends on allowances for new construction and approvals by respectively beboerdemokratiet and Landsbyggefonden. It noted further that it offered a framework agreement is not exclusive, and that the contracting entities reserves the right to conclude agreements for total consultancy with other companies in the framework agreement. Advice provided acc. FREE and Danish ARK Performance Description of Building and Planning. More information will appear in the tender documents, which are sent by invitation to tender.

Architectural, construction, engineering and inspection services

Arbejdernes Byggeforening Silkeborg, Arbejdernes Andels-Boligforening Silkeborg og Silkeborg Boligselskab | Published April 29, 2015  -  Deadline May 27, 2015
cpvs
71000000

Workers Construction Association (AB) Silkeborg, Workers Cooperative-Housing Association (AAB) Silkeborg Silkeborg Boligselskab (hereinafter referred to as 'contracting entities') hereby offers framework agreement on comprehensive advice. This procurement carried out by the contracting entities, but on behalf of each fund, administered by the contracting entities. After the offering end - ie after the conclusion of the Framework Agreement - contracting departments to frame the terms, with the selected lead consultant as independent economic entities. Contracting entities existing housing units includes over 6,500 homes in construction, ranging from multi-storey buildings to one level houses. Departments include both family housing, youth housing and housing for the elderly as well as institutions and commercial leases. The framework agreement is expected to put up projects involving a total of advice by new buildings and renovations done in professional, head - or turnkey. It is difficult to be precise about the Framework Agreement extent, the scope depends on allowances for new construction and approvals by respectively beboerdemokratiet and Landsbyggefonden. It noted further that it offered a framework agreement is not exclusive, and that the contracting entities reserves the right to conclude agreements for total consultancy with other companies in the framework agreement. Advice provided acc. FREE and Danish ARK Performance Description of Building and Planning. More information will appear in the tender documents, which are sent by invitation to tender.

Architectural, construction, engineering and inspection services 2016 / S 017-026158

Silkeborg Kommune | Published January 26, 2016  -  Deadline February 22, 2016
cpvs
71000000, 71200000, 71300000, 71400000



The original Nordre School (later called Sølyst school, Nordre department) located on Nylandsvej 16 in Silkeborg, has been closed since sommerren 2014. Schools must now demolished (but retained existing gyms and locker rooms situated against playing fields) and on that area are planned performed respectively new Cultural Centre (approximately 500 m 2 ) And 36 residences designed for use for mentally disabled. In the residential section also includes common areas and facilities for staff (a total of approximately 2,700 meters 2 )

There must also be carried terrain, landscape and paving work that meets both the requirements and needs of the various projects (in terms. Parking spaces, etc.) and meet the desire to achieve a comprehensive settlement in good landscape architectural quality.

This notice concerns the provision of comprehensive advice on these projects. There should be parallel with total consultancy work, a new plan for the area. The local plan prepared by the Municipality of Silkeborg, but the lead consultant to assist Silkeborg Municipality with necessary project information regarding design features, technical decisions, landscape features incl. traffic and parking conditions, etc. - all in the form of illustrated maps, photos, drawings and description.

The local planning work incl. preliminary project, construction program and feasibility study is expected in the period May-August 2016. Project is expected in the period September 2016 - April 2017. Construction time around July 2017 - september 2018.

Architectural, construction, engineering and inspection services

Silkeborg Kommune | Published January 26, 2016  -  Deadline February 22, 2016
cpvs
71000000, 71200000, 71300000, 71400000

The original Nordre School (later called Sølyst school, Nordre department) located on Nylandsvej 16 in Silkeborg, has been closed since sommerren 2014. Schools must now demolished (but retained existing gyms and locker rooms situated against playing fields) and on that area are planned performed respectively new Cultural Centre (approximately 500 m 2 ) And 36 residences designed for use for mentally disabled. In the residential section also includes common areas and facilities for staff (a total of approximately 2,700 meters 2 )

There must also be carried terrain, landscape and paving work that meets both the requirements and needs of the various projects (in terms. Parking spaces, etc.) and meet the desire to achieve a comprehensive settlement in good landscape architectural quality.

This notice concerns the provision of comprehensive advice on these projects. There should be parallel with total consultancy work, a new plan for the area. The local plan prepared by the Municipality of Silkeborg, but the lead consultant to assist Silkeborg Municipality with necessary project information regarding design features, technical decisions, landscape features incl. traffic and parking conditions, etc. - all in the form of illustrated maps, photos, drawings and description.

The local planning work incl. preliminary project, construction program and feasibility study is expected in the period May-August 2016. Project is expected in the period September 2016 - April 2017. Construction time around July 2017 - september 2018.

  • 1