Call +44 800 9755 164

Public tenders for consultant in Berlin Germany

Find all Consulting tenders in the world.
Finding business opportunities has never been easier.

Results for consulting. Make a new search!

Construction project management services

Senatsverwaltung für Stadtentwicklung und Wohnen, Abteilung V Hochbau | Published February 10, 2017  -  Deadline March 10, 2017
cpvs
71541000

Building housed from the year 1911th 

Q 2017 rehabilitated.

The measure to be awarded covers the remaining two wings and the interior renovation of the east wing except the auditorium.

will perform 2-3 stages.

Coordination with the historic preservation authorities is expected.

Following the existing provisional school extension building is dismantled.

Examined VPU from 11.18.2016 is provided as project information available.

These will be awarded as Projektsteuerungsleistungen delegable builders Services for:

- Areas of action:

1 organization

2 quantities and qualities,

3 Costs and funding,

4 Dates and capacities.

- Level A2 (power section 3 to 5) up to and including level B (power section 6 to 9) according to description of the delegated by the AG to the AN builders services (see tender documents / contract information).

Award proposal, preparation, leadership and participation in contract negotiations as specified by the AG, Preparation of contract drafts, obtaining the consent of the AG to negotiated outcomes

- Management and storage of a "record" is done physically in the office of the project management during the period of the project management of the power sections 3-9 including delivery and pick-up from and to the AG

- Project Figure in the booking system HHV: Picture and updating of individual and total costs of the measures in HHV over the whole project cycle, invoice booking in HHV

- EVergabe: processing of procurement processes in the power section 6 and 7 on the basis of the electronic procurement platform of the Senate Administration for Urban Development and Housing

- Reporting: cyclical reporting to fixed dates over funding agencies, need carriers and contracting

The planning involved to a general planning (buildings, technical equipment, structural engineering, building physics), engineers and specialized experts such as security coordinators, Fire protection consultants, and possibly other yet to be named party planning belong.

07/2005, 21.9.2005, available at

www.stadtentwicklung.berlin.de/service/rundschreiben).

  • 1