17.08 Framework Agreement on Estate Management Services 2
Statens og Kommunernes Indkøbs Service A/S | Published November 29, 2013
Winner
Rambøll Danmark A/SHannemanns Allé 53København S 2300
SKI provider framework agreement in 1708 Consultative engineering services 2 comprehensive engineering services for the planning, construction projects and construction projects. Framework 1708 Engineering services 2 is one of the 5 framework. Framework 1708 Consultative engineering services 2 covers only services in the schools and recreation planning and transport. The other four framework agreements include services within client consultancy (framework agreement in 1705 Bygherrerådgivning), consulting engineering services in the infrastructure and planning, supply planning, health, research and teaching, administration and culture, institutions and residences, Energy, Water Supply and Drainage - supply. (Framework 1706 Consulting Engineering Services) and Architectural services (Framework Agreement in 1707 and 1709 Architectural services Architectural services 2). The framework agreement is divided into 4 lots as listed below: 1 Performance Area Schools and leisure consist of: Lot 1A Schools and Recreation - Capital Region and Region Zealand. Lot 1B: Schools and leisure - Region of Southern Denmark. Lot 1C: Teaching and leisure - Central Denmark Region and North Jutland. 2 Performance range Trafikplanlægnign is nationwide and includes: Lot 2: Traffic planning. Advisors of the Framework Agreement executed according to the Association of Consulting Engineers / Practising Landscape Architects Council / Danish Architectural Firms: Performance Descriptions, Construction and Planning, April 2006 and according to the Association of Consulting Engineers / Danish Architectural Firms: Performance Descriptions Building and Planning, 2012. The following contractual relationship between client and consultant, will initially be governed by ABR89 Framework 1708 Consulting Engineering Services 2 includes advice forms a turnkey solution shared opinions and the advice as described in Performance Descriptions Building and Planning Section 0.2-0.4. For initial advice (section 1), project management (2.1), construction management (Section 4.1.), ICT management (Section 2.2), and safety coordination (both in design and under construction) is that these services are incidental to the Client's overall project. This means that services can not be purchased as independent engineering services but must be part of the client's overall project. The client must use a framework agreement in 1708 Consultative engineering 2, where the main objective of the project is expected to mean that it is natural and normal for the client that the services are engineering services. The client can at assessing whether the main purpose of the specific project covered by this framework, emphasizing complexity of the project in relation to engineering services, which typically includes technical installations and structures as well as the expected cost of engineering services for the project. If the main purpose of the client's project is architectural services, which typically include the design of buildings and civil engineering, aesthetics and interaction between elements Client must use the 1709 Architectural services 2 For Technical supervision (section 4.2). and consultancy in the operation phase (point 5) applies to those performed by the profession, which has projected that part of the project. The framework agreement includes counseling forms lead consultancy, shared opinions and the advice as described in Performance Descriptions Engineering and Planning Section 0.2-0.4. For advice before planning (section 1), project management (2.1), construction management (Section 4.1.), IT coordination (2.2) and security coordination (both in design and under construction) is that these services are incidental to the Client's overall project . This means that services can not be purchased as independent engineering services but must be part of the client's overall project. The client must use a framework agreement in 1708 Consultative engineering 2, where the main objective of the project is expected to mean that it is natural and normal for the client that the services are engineering services. The client can at assessing whether the main purpose of the specific project covered by this framework, emphasizing complexity of the project in relation to engineering services, which typically includes technical installations and structures as well as the expected cost of engineering services for the project. If the main purpose of the client's project is architectural services, which typically include the design of buildings and civil engineering, aesthetics and interaction between elements Client must use the 1709 Architectural services 2 For Technical supervision (section 4.2). and consultancy in the operation phase (point 5) applies to those performed by the profession, which has projected that part of the project. Customers will then assign specific fee arrangements with the Framework Agreement by the use of mini-tender (renewed competitive tendering). Selling wishing to be awarded one of the four offered lots should in the first phase and the quotation phase contribute with their own skills within the offered tasks / projects. The use of sub-consultants in fo