Public tenders for consultative-engineering in Denmark

Find all Consulting tenders in the world.
Finding business opportunities has never been easier.

Results for consulting. Make a new search!

Consultative engineering and construction services 2015 / S 246-447605

Favrskov Kommune | Published January 20, 2016  -  Deadline January 26, 2016
cpvs
71310000, 71311000

The agreement includes technical advice and assistance in building consultancy for the construction of a new care center in Hammel. The new care center must contain 60 assisted living facilities, 18 short-term seats and three acute sites. Construction of the care center to be offered as a turnkey 'reverse tendering', and a contest.

Consultative engineering and construction services 2015 / S 224-408557

Hinnerup Fjernvarme | Published November 19, 2015  -  Deadline December 8, 2015
cpvs
71310000, 71311000, 71314000, 71320000, 71321000, 71323200

Hinnerup District wants to establish a new 10-12 MW biomass plant based on straw attached to their existing work. The existing buildings conceivably partly demolished and partly used for workshop. Biomass facility includes the main fuel storage, opriverhal, ash stock kedelhal, district heating installations and equipment, management and staff facilities. The assignment includes technical consulting services for Hinnerup District in connection with the biomass plant origins. The advisory services include in brief project management, detailed design of biomass plants and buildings, procurement, tendering and contracting for technical contracts and building and construction contracting, construction management and site supervision and project monitoring in the construction phase, work coordination and assistance with commissioning.

Advisory and consultative engineering services 2015 / S 202-366563

Københavns Kommune, Teknik- Miljøforvaltningen, KMC Nordhavn | Published November 19, 2015  -  Deadline November 30, 2015
cpvs
71318000, 71241000, 71311000, 90732400

In connection with an acute shortage of landfill capacity of the soil, invites Copenhagen Municipality hereby interested parties to draw up tenders to carry out a consultancy project, where various possibilities for the establishment of dump sites in both the short and long term will be assessed. The job offered at a fixed price of 1 500 000th

Consultative engineering and construction services 2015 / S 250-458074

Dansk Byggeri | Published December 26, 2015  -  Deadline February 9, 2016
cpvs
71310000, 71000000, 71313000, 71313440, 71500000, 71530000

Danish Construction offers construction and operation of the National Centre for Management and Recycling of Construction Waste (hereinafter 'VHGB'). VHGB to provide guidance, communication and knowledge management and recycling of construction waste of high professional quality disseminated through, inter alia, its own website. VHGB must hit a target group of contractors in the construction industry, clients, consultants, builders, owners, tenants, residents' organizations and operations staff. For a detailed description of the contract's scope, see tender documents with annexes. In relation to the performance of the task specifications are subject to final commitments for financial contributions from the Environmental Protection Agency. This is expected to be available in early / mid-January 2016.

Consultative engineering and construction services 2015 / S 171-311665

Skanderborg-Hørning Fjernvarme A.m.b.a. | Published September 17, 2015  -  Deadline September 28, 2015
cpvs
71310000, 71311000, 71314000, 71321000, 71323200

Skanderborg Hørning District Heating (SKFJ) wants to establish a 30 MW biomass plant in a non-ripened ground area. Biomass facility includes the main fuel storage, fuel processing (drying), biomass boiler plants, district heating installations and equipment, management, staff facilities, and construction and demolition construction of all the facilities. The assignment includes technical consulting services for SKFJ associated with biomass plant origins.

Consultative engineering and construction services 2015 / S 192-347831

Vejdirektoratet | Published October 3, 2015  -  Deadline November 9, 2015
cpvs
71310000, 71311300, 79140000

Road Directorate is a major public builder and buyer, which each year conducts projects for several billion., And has a large number of competition evictions in the form of contracts by Danish or EU laws.

Consultative engineering and construction services 2015 / S 174-316712

Aarhus Kommune | Published September 9, 2015  -  Deadline October 8, 2015
cpvs
71310000

In connection with Aarhus' Energy Renovation Project Aa +, there is a need for energy-screening and energy of a number of municipal larger properties.

Consultative engineering and construction services 2015 / S 118-214461

FEMERN BÆLT A/S // CVR:28986564 | Published June 20, 2015  -  Deadline June 29, 2015
cpvs
71310000, 71311230, 71311300, 71312000, 71313000, 71313100, 71314100, 71315000, 71315100, 71315200, 71317200, 71317210, 71318100, 71320000, 71330000, 71520000, 71530000, 71540000

Rådgivning inden for ingeniørvæsen og byggeri 2015/S 118-214461

Consultative engineering and construction services 2015 / S 118-215062

Roskilde Kommune | Published June 20, 2015  -  Deadline July 20, 2015
cpvs
71310000, 71210000, 71311000, 71312000, 71315210

This exercise is total advising the project from the outline proposals for retail / procurement project of an interlocking system to ensure the Roskilde Inderfjord West and Jyllinge Nordmark. The task is divided into two lots.

Consultative engineering and construction services 2015 / S 118-214462

FEMERN BÆLT A/S // CVR:28986564 | Published June 20, 2015  -  Deadline June 29, 2015
cpvs
71310000, 71320000, 71330000, 71520000, 71530000, 71540000

Rådgivning inden for ingeniørvæsen og byggeri 2015/S 118-214462

Framework 17.06 consulting engineering services.

Aarhus Universitets Hospital | Published April 17, 2014
Winner
Alectia A/STeknikerbyen 34Virum 2830
cpvs
71311000, 71320000

Engineering Consultancy for the project "Energy optimization of ventilation systems and conversion of CTS at Aarhus University Hospital."

17.05 Framework Agreement on Technical consulting services in connection with construction projects.

Statens og Kommunernes Indkøbs Service A/S | Published December 7, 2013
Winner
Rambøll Danmark A/SHannemanns Allé 53København S 2300
cpvs
71000000

SKI provider framework agreement in 1705 Bygherrerådgivning construction projects. Framework 1705 client advisory services in connection with construction projects is one of 6 framework. The other five framework agreements include benefits in client advisory services in connection with construction projects (framework agreement in 1705 Bygherrerådgivning), consulting engineering services (Framework 1706 Consultative engineering and 1708 Consultative engineering services 2) and architectural services (Framework 1707 Architectural services and 1709 Architectural Services 2). The framework agreement is divided as listed below: 1 Performance Area Technical consulting services in connection with construction projects consists of: Lot 1A: Technical consulting services in connection with construction projects - Capital Region and Region Zealand. Lot 1B: Technical consulting services in connection with construction projects - Region of Southern Denmark. Lot 1C: Technical consulting services in connection with construction projects - Central Denmark Region and North Jutland. Advisors of the Framework Agreement executed under Architectural Council / Association of Consulting Engineers Power Descriptions, Client Consultancy, December 2003. The following contractual relationship between client and consultant, will initially be governed by ABR89. Customers will then assign specific fee arrangements with the Framework Agreement by the use of mini-tender (renewed competitive tendering). Tenderers who wish to be assigned to one of the three offered lots should in the first phase and the quotation phase contribute with their own skills within the offered tasks / projects. Projects covered by the framework agreement may vary in design and size, and it is not a requirement that all services in the performance specifications are included in the specific project. Scope of services included in the specific project will appear in the fee agreement. The Framework Agreement can be used by public organizations and institutions at the time of submission of this notice to be published in the Supplement to the Official Journal subscriber (customer) in SKI. It is currently on approx. 32 000 customers. List of SKI customers may be obtained by. phone SKI customer service, +45 33427000, and is also part of the final tender documents. It should be noted that SKI also on the customer list.

EU procurement of technical consultancy - Engineering Consultancy.

DR | Published July 11, 2013
Winner
Alectia A/STeknikerbyen 34Virum 2830
cpvs
71300000, 71310000

Rådgivningspgaverne ranging from advice for rebuilding projects of interest-building nature of specialized services for technical installations such as ventilation and air conditioning technology and sound and light installations in relation to media production. The tasks are divided into 2 lots (east and west of the Great Belt) It is expected that tasks are distributed as 70% east of the Great Belt and 30% west of the Great Belt.

Framework 17.06 consulting engineering services - Partial 80 - detecting errors couplings.

Fredensborg Kommune | Published April 15, 2014
Winner
Rambøll Danmark A/SHannemanns Allé 53København S 2300
cpvs
71300000, 71242000, 71241000, 71240000, 71243000, 71244000, 71245000, 71246000, 71247000, 71248000, 71310000, 71311000

Fee Agreement reached under the SKI framework 17.06, consulting engineers, sub-agreement 80 fee agreements include detection of errors couplings.

17.08 Framework Agreement on Estate Management Services 2

Statens og Kommunernes Indkøbs Service A/S | Published November 29, 2013
Winner
Rambøll Danmark A/SHannemanns Allé 53København S 2300
cpvs
71300000

SKI provider framework agreement in 1708 Consultative engineering services 2 comprehensive engineering services for the planning, construction projects and construction projects. Framework 1708 Engineering services 2 is one of the 5 framework. Framework 1708 Consultative engineering services 2 covers only services in the schools and recreation planning and transport. The other four framework agreements include services within client consultancy (framework agreement in 1705 Bygherrerådgivning), consulting engineering services in the infrastructure and planning, supply planning, health, research and teaching, administration and culture, institutions and residences, Energy, Water Supply and Drainage - supply. (Framework 1706 Consulting Engineering Services) and Architectural services (Framework Agreement in 1707 and 1709 Architectural services Architectural services 2). The framework agreement is divided into 4 lots as listed below: 1 Performance Area Schools and leisure consist of: Lot 1A Schools and Recreation - Capital Region and Region Zealand. Lot 1B: Schools and leisure - Region of Southern Denmark. Lot 1C: Teaching and leisure - Central Denmark Region and North Jutland. 2 Performance range Trafikplanlægnign is nationwide and includes: Lot 2: Traffic planning. Advisors of the Framework Agreement executed according to the Association of Consulting Engineers / Practising Landscape Architects Council / Danish Architectural Firms: Performance Descriptions, Construction and Planning, April 2006 and according to the Association of Consulting Engineers / Danish Architectural Firms: Performance Descriptions Building and Planning, 2012. The following contractual relationship between client and consultant, will initially be governed by ABR89 Framework 1708 Consulting Engineering Services 2 includes advice forms a turnkey solution shared opinions and the advice as described in Performance Descriptions Building and Planning Section 0.2-0.4. For initial advice (section 1), project management (2.1), construction management (Section 4.1.), ICT management (Section 2.2), and safety coordination (both in design and under construction) is that these services are incidental to the Client's overall project. This means that services can not be purchased as independent engineering services but must be part of the client's overall project. The client must use a framework agreement in 1708 Consultative engineering 2, where the main objective of the project is expected to mean that it is natural and normal for the client that the services are engineering services. The client can at assessing whether the main purpose of the specific project covered by this framework, emphasizing complexity of the project in relation to engineering services, which typically includes technical installations and structures as well as the expected cost of engineering services for the project. If the main purpose of the client's project is architectural services, which typically include the design of buildings and civil engineering, aesthetics and interaction between elements Client must use the 1709 Architectural services 2 For Technical supervision (section 4.2). and consultancy in the operation phase (point 5) applies to those performed by the profession, which has projected that part of the project. The framework agreement includes counseling forms lead consultancy, shared opinions and the advice as described in Performance Descriptions Engineering and Planning Section 0.2-0.4. For advice before planning (section 1), project management (2.1), construction management (Section 4.1.), IT coordination (2.2) and security coordination (both in design and under construction) is that these services are incidental to the Client's overall project . This means that services can not be purchased as independent engineering services but must be part of the client's overall project. The client must use a framework agreement in 1708 Consultative engineering 2, where the main objective of the project is expected to mean that it is natural and normal for the client that the services are engineering services. The client can at assessing whether the main purpose of the specific project covered by this framework, emphasizing complexity of the project in relation to engineering services, which typically includes technical installations and structures as well as the expected cost of engineering services for the project. If the main purpose of the client's project is architectural services, which typically include the design of buildings and civil engineering, aesthetics and interaction between elements Client must use the 1709 Architectural services 2 For Technical supervision (section 4.2). and consultancy in the operation phase (point 5) applies to those performed by the profession, which has projected that part of the project. Customers will then assign specific fee arrangements with the Framework Agreement by the use of mini-tender (renewed competitive tendering). Selling wishing to be awarded one of the four offered lots should in the first phase and the quotation phase contribute with their own skills within the offered tasks / projects. The use of sub-consultants in fo

Prequalification concerning. limited offer of total consultancy (engineering consultancy with associated architect) at SHS Sønderborg

Region Syddanmark | Published September 30, 2015  -  Deadline October 20, 2015
cpvs
71300000, 71000000, 71200000, 71500000

Prequalification concerning. limited offer of total consultancy (engineering consultancy with associated architect) for the refurbishment of the local psychiatry in the existing building 22 and partially in building 21 at SHS Sønderborg.

17.09 Framework Agreement on Architectural Services 2

Statens og Kommunernes Indkøbs Service A/S | Published November 29, 2013
Winner
White arkitekter A/SVestre Kaj 2, 1. salNæstved 4700
cpvs
71200000

SKI provider framework agreement in 1709 Architectural services 2 comprehensive architectural services in connection with construction projects and construction projects. Framework 1709 Architectural services 2 is one of the 5 framework. Framework 1709 Architectural services 2 covers only services in the schools and leisure. The other four framework agreements include services within client consultancy (framework agreement in 1705 Bygherrerådgivning), consulting engineering services (Framework 1706 Consulting Engineering Services, as well as a framework agreement in 1708 consulting engineering services 2) Architectural services for infrastructure and planning, health, research and teaching, administration and culture, institutions and residential and Supply (Framework 1707 Architectural services). The framework agreement is divided into 3 lots as listed below: 1 Performance Area Schools and leisure consist of: Lot 1A Schools and Recreation - Capital Region and Region Zealand. Lot 1B: Schools and leisure - Region of Southern Denmark. Lot 1C: Teaching and leisure - Central Denmark Region and North Jutland. Advisors of the Framework Agreement executed according to the Association of Consulting Engineers / Practising Landscape Architects Council / Danish Architectural Firms: Performance Descriptions, Construction and Planning, April 2006 and according to the Association of Consulting Engineers / Danish Architectural Firms: Performance Descriptions Building and Planning, 2012. The following contractual relationship between client and consultant, will initially be governed by ABR89 Framework 1709 Architectural services 2 includes advice forms a turnkey solution shared opinions and the advice as described in Performance Descriptions Building and Planning Section 0.2-0.4. For initial advice (section 1), project management (2.1), construction management (Section 4.1.), ICT management (Section 2.2), and safety coordination (both in design and under construction) is that these services are incidental to the Client's overall project. This means that services can not be purchased as separate architectural services but must be part of the client's overall project. The client must use a framework agreement in 1709 Architectural services 2, where the main objective of the project is expected to mean that it is natural and normal for the client that the services are architectural services. The client can at assessing whether the main purpose of the specific project covered by this framework, emphasizing complexity of the project in relation to architectural services, which typically include the design of buildings and civil engineering, aesthetics and interaction between the elements and the expected cost of architectural services in the project . If the main purpose of the Client's project engineering services, which typically includes technical installations and structures shall client use 1708 Consulting Engineering Services 2 For Technical supervision (section 4.2). and consultancy in the operation phase (point 5) applies to those performed by the profession, which has projected that part of the project. The framework agreement includes counseling forms lead consultancy, shared opinions and the advice as described in Performance Descriptions Engineering and Planning Section 0.2-0.4. For advice before planning (section 1), project management (2.1), construction management (Section 4.1.), IT coordination (2.2) and security coordination (both in design and under construction) is that these services are incidental to the Client's overall project . This means that services can not be purchased as separate architectural services but must be part of the client's overall project. The client must use a framework agreement in 1709 Architectural services 2, where the main objective of the project is expected to mean that it is natural and normal for the client that the services are architectural services. The client can at assessing whether the main purpose of the specific project covered by this framework, emphasizing complexity of the project in relation to the architect's services, which typically include the design of buildings and civil engineering, aesthetics and interaction between the elements and the expected cost of architectural services in project. If the main purpose of the Client's project engineering services, which typically includes technical installations and structures shall client use 1708 Consulting Engineering Services 2 For Technical supervision (section 4.2). and consultancy in the operation phase (point 5) applies to those performed by the profession, which has projected that part of the project. Customers will then assign specific fee arrangements with the Framework Agreement by the use of mini-tender (renewed competitive tendering). Selling wishing to be awarded one of the three offered lots should in the first phase and the quotation phase contribute with their own skills within the offered tasks / projects. The use of sub-consultants in connection with a turnkey solution found among the advisers assigned to the corresponding sub-agreement for a framework agreement in 1708 Consultative engineering 2 The Framework Agreement sets out the terms on mini-tender.