Provision of technical advice and assistance (consulting services) for the renovation / new construction of district heating systems.
ESPD'en and specifications are uploaded without number on notice when this has not been published yet, so it is applied when the notice is published.
Press http://permalink.mercell.com/64500122.aspx
Selling On behalf of Vestforbrænding handle the legislative tasks below Order no. 117 of 05.02.2013 on the developer's obligations and Decree 110 of 05/02/2013 - safety coordinator B (construction phase), as well as those of client-defined tasks that are above the statutory level .
See also FRI's description of services, in August 2014, The National Coordination.
The assignment includes the following services:
- Ongoing review of PSS (initial PSS prepared by safety coordinator P and refreshed and updated by the contractor), the collection and analysis of APV and APB incl. preparation of report.
- Start-up meetings / introduction to PSS etc. for new contractors
- Inspection of jobs
- Review of tender documents
- Safety meetings every 14 days incl. summary
- Security Round Ring 1 time per week. incl. supervision memo
- Possibly. security review by customer installations
- Possibly. tasks relating to the safety coordinator in the design.
Framework agreement extensive consulting engineering services for buildings and installations.
The assignment includes consulting services in connection. EIA project for the Little Belt South Wind Farm, including both aquatic and terrestrial plants - in total spread across 4 stages.
The assignment includes consulting services in connection. EIA process for the Little Belt South Wind Farm, including both aquatic and terrestrial plants - over a total of 4 phases:
Phase 1 - Planning
Phase 2 - Feasibility studies
Phase 3 - EIA
Phase 4 - Consultation and approval.
Energy Screening of a number of Aarhus' day-care centers as well as design and construction of energy-saving measures.
Tender documents are uploaded without number on notice when this has not been published yet, so it is applied when the notice is published.
Press http://permalink.mercell.com/66782002.aspx
In connection with the City of Aarhus Energy Renovation Project Aa +, there is a need for energy screening and subsequent implementation of energy saving measures by a number of municipal day-care centers.
The assignment includes holistic energy screening, where the individual property overall business case must be positive. With positive thought, that the property's overall result should give a positive net present value and internal rate of at least 3%. As such, the counselor not only focus on the low-hanging fruit, but on all approaches to the properties in which there is an energy savings and hence CO
Energy Screenings, design and execution of the individual properties are expected to be carried out from summer 2017 to the end of 2018. The 100 properties assigned continuously in the pools. There is thus built up a flow where a pool properties - typically a day care - energy screened and subsequently designed and made. As the construction phase may be long, there will be a need to start screening next pool of properties, while other properties will be under construction.
Energy Advisor should use Aarhus municipality web-based advisor tool developed in connection with Aa + project for calculating energy savings and economy, and subsequently recording changes.
The task will largely be based on dialogue and advisor must expect to have extensive contact with, inter alia, teaching staff as well as contractors and builders, etc.
Further information about the project and previously invited bids (tasks offered in the mini-tender under the framework agreement), can be found at www.aarhus.dk/aaplus
Offering includes technical and economic optimization of the parties' joint Capacity Plan 2016 for handling a 100-year rain event in and around Harrestrup. There must be a number of facilitation of delprojektgrupper to be mature construction projects. Moreover 4 range, respectively. conceptual design, contingency planning and planning management / monitoring should be prepared. The tender includes an option that is not specified in the service description, but which may consist of the same kind as the other tasks.
Offering includes building consultancy to technical and economic optimization of the parties' joint Capacity Plan 2016 for handling a 100-year rain event in and around Harrestrup. Capacity Plan includes projects at 50 different locations along Harrestrup. Capacity plan was drafted by the use of a three-way coupled hydraulic model. The project is a collaboration between 10 municipalities and their water companies. Under capacity project, a number of sub-projects set in motion the maturation of a portion of the construction projects. This work must advise facilitate. Moreover 4 range of conceptual and respectively preparedness and management / monitoring should be prepared.
Provision of technical advice and assistance (consulting services) for the renovation / new construction of district heating systems.
ESPD'en and specifications are uploaded without number on notice when this has not been published yet, so it is applied when the notice is published.
Press http://permalink.mercell.com/64500122.aspx
Lot 5 includes the provision of technical advice and assistance in the project and associated analyzes.
The technical advice may include:
- Preparation of project
- Walks into and company financial analysis
- Energy, fuel and climate analyzes.
Bygherrerådgivning.