Geological consultancy services

Bundesamt für Strassen ASTRA Filiale Zofingen | Published November 26, 2016  -  Deadline February 3, 2017
cpvs
71351220

The Federal Roads Office is responsible for construction, maintenance and operation of the Swiss national road network.

The section of the national road N02 between the branches Hagnau and Augst future will be heavily overloaded without capacity enhancing measures. For this reason, an expansion from six to eight lanes is to take place. Simultaneously with the expansion of a total repair of the entire section is provided. Urgent conservation measures are implemented in the context of early UEMA (bridging measures).

The present tender mandate includes the geological baseline surveys and advising the builder and the project stakeholders regarding geological, hydrological and geotechnical issues.

Subject of the tendered contract consist of geological consulting services for phases GP / EK and AP / MK + MP (optional).

For detailed performance details in tender documents.

The Federal Roads Office is responsible for construction, maintenance and operation of the Swiss national road network.

The section of the national road N02 between the branches Hagnau and Augst future will be heavily overloaded without capacity enhancing measures. For this reason, an expansion from six to eight lanes is to take place. Simultaneously with the expansion of a total repair of the entire section is provided. Urgent conservation measures are implemented in the context of early UEMA (bridging measures).

The present tender mandate includes the geological baseline surveys and advising the builder and the project stakeholders regarding geological, hydrological and geotechnical issues.

Subject of the tendered contract consist of geological consulting services for phases GP / EK and AP / MK + MP (optional).

For detailed performance details in tender documents.

Consultative engineering and construction services

Bundesamt für Straßen ASTRA Filiale Zofingen | Published January 28, 2017
Winner
Rudolf Keller & Partner Verkehrsingenieure AG
cpvs
71310000

N02 / N14, 100054, total system bypass Lucerne, specialist transport; Phases AP / PGV and DP.

Consultative engineering and construction services

Bundesamt für Strassen ASTRA Filiale Zofingen | Published October 22, 2016  -  Deadline December 12, 2016
cpvs
71310000

On the national road N02 / N14 in the Lucerne is transit traffic overlap with important Swiss traffic flows and with the regional transport agglomeration Lucerne. The highway sections in Luzern are therefore utilized for long stretches to near the full capacity. According to updated traffic model these capacity problems likely worsen by 2030 on.

Geological consultancy services

Bundesamt für Straßen ASTRA Filiale Zofingen | Published April 28, 2017
Winner
SC+P Sieber, Cassina + Partner AG
cpvs
71351220

N02, 160031, 8S HAG AUG, Hagnau - Augst 8-Streifenausbau / Geologe - geologische Grundlagenerhebung und Beratung.

N02, 160031, 8S HAG AUG, Hagnau - Augst, 8 - way development / geologist - survey of geological bases and

advice.

Hagnau - Augst, 8 - way development / geologist - survey of geological bases and advice. N02, 160031, 8S HAG AUG.

Technical testing, analysis and consultancy services

Bundesamt für Straßen ASTRA Filiale Zofingen | Published January 4, 2017  -  Deadline February 13, 2017
cpvs
71600000

Builders sided material check conformity to the quality standards of the client in accordance with approved control plan of the builders and the test plan of the entrepreneur. That's procuring laboratory is responsible for the builders side material inspections and component testing of all departments of the conservation project incl. Preliminary. (Trassee, engineering structures, tunnels). The number and frequency of testing to the respective components are based on the progress of the planned activities and the approach concept created previously by the supplier and approved by the client. Additional studies due to defects / damage is possible in the usual proportions. Construction expected to be found by 2017 - instead 2022nd

Furthermore, the services include the deliberations of the client and the site managers, attending players selected meetings, preparation of audit reports and work in directing. The client expects the builders laboratory for ...

Technical testing, analysis and consultancy services

Bundesamt für Strassen ASTRA Filiale Zofingen | Published April 8, 2017
Winner
TFB AG
cpvs
71600000

N02, 080 126, EP Schanzl EP Schänzli / Bauherrenlabor.

N02, 080 126, EP Schanzl EP Schänzli / Laboratory of the client.

Geological and geophysical consultancy services

Bundesamt für Straßen ASTRA Filiale Zofingen | Published May 3, 2016
Winner
Pfirter, Nyfeler + Partner AG
cpvs
71351200

N02, 150004, Rheintu BS, Rhein tunnel Bâle élaboration projet général (GP) / géologue.

Geological and geophysical consultancy services

Bundesamt für Strassen ASTRA Filiale Zofingen | Published October 21, 2015  -  Deadline January 29, 2016
cpvs
71351200

The Federal Roads Office is responsible for construction, maintenance and operation of the Swiss national road network. Between Birsfelden and Basel Nordtangente a new tunnel connection between the branch and the branch Hagnau area is to be created (Project title Rhine tunnel) to relieve the national road N02. The core consists of two tunnels, each with one lane and a hard shoulder (variant C), which can also be operated in two-lane. The Cmax variant also includes a connection of traffic to and from Germany (including access ramps to connect the Rhine tunnel -. A5). The present tender mandate includes the geological baseline surveys and advising building owners and project participants in terms of geological, hydrological and geotechnical issues. A detailed service description can be found in the tender specifications (Annex 02). Subject of the tendered contract consist of geological consultancy services for the project and execution phases General project (optional).

Consultative engineering and construction services

Bundesamt für Straßen Astra, Filiale Zofingen | Published September 17, 2016  -  Deadline November 7, 2016
cpvs
71310000

On the national road N02 / N14 in the Lucerne is transit traffic overlap with important Swiss traffic flows and with the regional transport agglomeration Lucerne. The highway sections in Luzern are therefore utilized for long stretches to near the full capacity. According to updated traffic model these capacity problems likely worsen by 2030 on.

In 2004, the Federal Roads Astra granted the Canton of Lucerne commissioned to draw up an assessment of expediency for the solution of the predicted traffic-related problems in the Lucerne. With the additional clarifications 2008/2009 the overall system Bypass Luzern was evaluated as Bestvariante.

the General Project for the entire system Bypass Luzern was then initiated on the basis of the optimized Bestvariante "Bypass 2x2" by the Astra. The project includes the expansion of North, the tunnel bypass, the motorway incl. Connection Lochhof and supplementing South. At the same time the State Lucerne developed the project "clasp North" and measures for public transport. Although they are an integral part of the overall system to transportation Bypass Luzern, but not part of the general project and the follow-up phases.

The General Project exists. The approval decision by the Federal is expected by the end of 2016th Thereafter, the further processing in the phase AP / MK incl. PGV takes place followed by the phase DP / MP.

With this tender the project author services Teilpropjekt TP are 2/3 (tunnel bypass, city highway) procured, which are required for successful planning and projecting in Projektperimenter and the control of interfaces. The services to be provided in the TP 2/3 services are described in detail in the specification.

Consultative engineering and construction services

Bundesamt für Straßen Astra Filiale Zofingen | Published September 16, 2016  -  Deadline November 7, 2016
cpvs
71310000

On the national road N02 / N14 in the Lucerne is transit traffic overlap with important Swiss traffic flows and with the regional transport agglomeration Lucerne. The highway sections in Luzern are therefore utilized for long stretches to near the full capacity. According to updated traffic model expected to become by 2030 further this capacity problems.

In 2004, the Federal Roads Office ASTRA awarded the Canton of Lucerne commissioned to draw up an assessment of expediency for the solution of the predicted traffic-related problems in the Lucerne. With the additional clarifications 2008/2009 the overall system Bypass Luzern was evaluated as Bestvariante.

the General Project for the entire system Bypass Luzern was then initiated on the basis of the optimized Bestvariante "Bypass 2x2" by ASTRA. The project includes the expansion of North, the tunnel bypass, the motorway incl. Connection Lochhof and supplementing South. At the same time the State Lucerne developed the project "clasp North" and measures for public transport. Although they are an integral part of the overall system to transportation Bypass Luzern, but not part of the general project and the follow-up phases.

The General Project exists. The approval decision by the Federal is expected by the end of 2016th Thereafter, the further processing in the phase AP / MK incl. PGV takes place followed by the phase DP / MP.

With this tender the project author services subproject TP 4.1 (Supplementary South) procured that are erforderlch for successful planning and projecting in Projektperimenter and the control of interfaces. The services to be provided in TP 4.1 services are described in detail in the specification.

Consultative engineering and construction services

Bundesamt für Straßen Astra, Filiale Zofingen | Published September 17, 2016  -  Deadline November 7, 2016
cpvs
71310000

On the national road N02 / N14 in the Lucerne is transit traffic overlap with important Swiss traffic flows and with the regional transport agglomeration Lucerne. The highway sections in Luzern are therefore utilized for long stretches to near the full capacity. According to updated traffic model these capacity problems likely worsen by 2030 on.

In 2004, the Federal Roads Astra granted the Canton of Lucerne commissioned to draw up an assessment of expediency for the solution of the predicted traffic-related problems in the Lucerne. With the additional clarifications 2008/2009 the overall system Bypass Luzern was evaluated as Bestvariante.

the General Project for the entire system Bypass Luzern was then initiated on the basis of the optimized Bestvariante "Bypass 2x2" by the Astra. The project includes the expansion of North, the tunnel bypass, the motorway incl. Connection Lochhof and supplementing South. At the same time the State Lucerne developed the project "clasp North" and measures for public transport. Although they are an integral part of the overall system to transportation Bypass Luzern, but not part of the general project and the follow-up phases.

The General Project exists. The approval decision by the Federal is expected by the end of 2016th Thereafter, the further processing in the phase AP / MK incl. PGV takes place followed by the phase DP / MP.

With this tender the project author services subproject TP 1 (expansion Nord) procured, which are required for successful planning and projecting in Projektperimenter and the control of interfaces. The services to be provided in the TP 1 services are described in detail in the specification.

Consultative engineering and construction services

Bundesamt für Straßen ASTRA Filiale Zofingen | Published January 21, 2017
Winner
CES Bauingenieur AG
cpvs
71310000

N02 / N14, 100054, Système global, contournement de Lucerne, Auteur du projet 4.1 (PV TP 4.1); phases AP / MK y compris et PGV DP / MP.

Consultative engineering and construction services

Bundesamt für Straßen ASTRA Filiale Zofingen | Published January 21, 2017
Winner
Lombardi SA Ingegneri Consulenti
cpvs
71310000

N02 / N14, 100054, Système global, contournement de Lucerne, Auteur du projet TP 2/3 (PV TP 2/3); phases AP / MK y compris et PGV DP / MP.

Consultative engineering and construction services

Bundesamt für Straßen ASTRA Filiale Zofingen | Published January 5, 2017
Winner
B + S AG
cpvs
71310000

N02 / N14, 100054 système, global, contournement de Lucerne, auteur du projet TP 1 (PV TP 1); phases AP / MK y compris et PGV DP / MP.

N02, 160031, 8S HAG AUG Hagnau - Augst 8-strip expansion / Geologist - geological baseline survey and consulting

Bundesamt für Strassen ASTRA Filiale Zofingen | Published November 21, 2016  -  Deadline February 3, 2017
cpvs
71351220

CPV: 71351220 - Geological Consulting

N02, 160031, 8S HAGAUG, Hagnau - Augst 8-stripe extension / geologist - geological foundation survey and consultation

Bundesamt für Strassen ASTRA Filiale Zofingen | Published April 27, 2017  -  Deadline February 3, 2017
cpvs

N02, 160031, 8S HAGAUG, Hagnau - Augst 8-stripe extension / geologist - geological foundation survey and consultation

IT services: consulting, software development, Internet and support

Bundesamt für Strassen ASTRA Filiale Zofingen | Published September 2, 2015
Winner
Amstein + Walthert Progress AG
cpvs
72000000

130070, SI-VM, intégration des installations de gestion du trafic dans l'AM VM (INA) / auteur du projet et directeur des travaux de construction dans les unités territoriales UT VIII, UT X et UT XI.

N02, 080 126, EP SCHÄNZL, EP Schänzli / Reprografiearbeiten for execution plans

Bundesamt für Strassen ASTRA Filiale Zofingen | Published March 15, 2016  -  Deadline April 25, 2016
cpvs
79823000

The conservation project EP Schänzli includes various maintenance and expansion measures in accordance with the strategy of UPlaNS ASTRA. In addition to the repair measures on route N02 / H18 (about 10 km) and to the 90 inventory objects (bridges, retaining walls, overpasses and underpasses) particularly important repair measures on tunnel Schänzli and the Aufweitung- and expansion measures of the tunnel Hagnau are provided. With the tunnel widening and creating a new Überwerfungsbauwerkes accident black spots are eliminated. Further, the realization of a road wastewater treatment plant and a stack basin is provided. The project also the entire preservation section was investigated noise tests and the necessary noise protection measures defined.

In preparation 2016 and the start of construction in 2017, the reproduction of a variety of plans and lists of consultants is necessary. In addition, the plans after processing are digitally provide on an exchange platform and store accordingly. More details are provided in the specification.

N02, 080 126, EP SCHÄNZL, EP Schänzli / Reprografiearbeiten for execution plans.

Bundesamt für Straßen ASTRA Filiale Zofingen | Published March 19, 2016  -  Deadline April 25, 2016
cpvs
79823000

The conservation project EP Schänzli includes various maintenance and expansion measures in accordance with the strategy of UPlaNS ASTRA. In addition to the repair measures on route N02 / H18 (about 10 km) and to the 90 inventory objects (bridges, retaining walls, overpasses and underpasses) particularly important repair measures on tunnel Schänzli and the Aufweitung- and expansion measures of the tunnel Hagnau are provided. With the tunnel widening and creating a new Überwerfungsbauwerkes accident black spots are eliminated. Further, the realization of a road wastewater treatment plant and a stack basin is provided. The project also the entire preservation section was investigated noise tests and the necessary noise protection measures defined.

In preparation 2016 and the start of construction in 2017, the reproduction of a variety of plans and lists of consultants is necessary. In addition, the plans after processing are digitally provide on an exchange platform and store accordingly. More details are provided in the specification.