Call +44 800 9755 164

Public tenders for consultant in Bulgaria

Find all Consulting tenders in the world.
Finding business opportunities has never been easier.

Results for consulting. Make a new search!
ConsultingBulgaria

Selection of a consultant to assess the compliance of the IP, construction supervision and preparation of technical passport of the object: Relocation of overhead 110 kV Znamenosets

Мини Марица изток ЕАД | Published April 21, 2017  -  Deadline May 16, 2017
cpvs
71521000

Choosing a licensed consultant to assess the compliance of investment projects, construction supervision and preparation of technical passport of the object: "Relocation of overhead 110 kV" Bearer "(owned by" Mini Maritsa Iztok "EAD) located in front fronts the conduct of mining activities in the eastern part of the deposit. Full description of the subject of the contract is specified in the documentation of participation, published on the buyer profile. The total project value of works subject to construction supervision is 1 924 086.76 lev, VAT excluded. The length of shifts power. Ducts project is 9832 meters. In FP 109/115 part DFS, the designer has determined the construction of the second category, under Article 137, Paragraph 1, Item 2 b "b" of the SPA in conjunction with Article 4, Paragraph 2, Item 1 Ordinance №1 / 30.07.2003 on the nomenclature of the types of structures.

Selection of a consultant to assess the compliance of the IP, construction supervision and preparation of technical passport of the object: Relocation of overhead 220 kV Ovcharitsa

Мини Марица изток ЕАД | Published April 21, 2017  -  Deadline May 16, 2017
cpvs
71521000

Choosing a licensed consultant to assess the compliance of investment projects, construction supervision and preparation of technical passport of the object: "Relocation of overhead 220 kV" Ovcharitsa "(owned by ESO) located forefront of conducting mining works in the eastern part of the deposit. Full description of the subject of the contract is specified in the documentation of participation, published on the buyer profile. The total project value of works subject to construction supervision is 4 485 521 lev, VAT excluded. The length of shifts power. Ducts project is 9490 meters. In FP 109/126 part DFS, the designer has determined the construction of the first category, according to Art.137, paragraph 1, item 1, b "b" of the SPA in conjunction with Article 2, Paragraph 2, Item 1 Ordinance №1 / 30.07.2003 on the nomenclature of the types of structures.

"Selecting a consultant for construction supervision of investment functions in the execution of works under the project" Reconstruction, renovation and equipment of buildings and rehabilitation ... Continues in VI.3)

Община Ловеч | Published March 23, 2017  -  Deadline April 28, 2017
cpvs
71521000

"Selecting a consultant for construction supervision of investment functions in the execution of works under the project" Reconstruction, renovation and equipment of buildings and rehabilitation of yards of kindergartens and schools in Lovech, build a school gym and rehabilitation yards in municipal schools in Lovech.. " The contract is divided into 2 / two / lots as follows: Lot №1: "reconstruction, renovation and equipment of buildings and rehabilitation of yards of kindergartens and nursery in Lovech" with the following sub-projects: Part № 1 reconstruction, renovation and equipment of the building and rehabilitation of the yard of kindergarten "Lyulyache" sq. Goznitsa, Lovech., Part №2-Reconstruction, renovation and equipment of buildings and rehabilitation of yards with the Depositary "Colourful cock" and kindergarten "Zora" in Lovech. Part №3-Rehabilitation yard of kindergarten "Joy", Lovech., Continues to VI.3)

KIDSF

 | Published August 30, 2016  -  Deadline August 30, 2017
cpvs

The Bulgarian Energy Efficiency and Renewable Sources Fund (“BEERSF”, the “Fund”) was established in 2005. The contract with the existing Fund Manager expires in 2016 and pursuant to a decision of the BEERSF Management Board and as per art. 87 (1) and 88 of the Bulgarian Energy Efficiency Act a new fund manager is to be selected.

 

The Ministry of Energy of the Republic of Bulgaria (the “Ministry”) intends to use grant funds under Grant Agreement No. 003 (the “Grant”) from the Kozloduy International Decommissioning Support Fund (the “KIDSF”), administered by the European Bank for Reconstruction and Development, to engage a suitably qualified consultant to assist the Ministry in preparing and implementing a competitive procedure for the selection of a Fund Manager for BEERSF.

 

The scope of the assignment of the Consultant will include:

 

•    Analysis of the appropriate legal framework under which the selection of a Fund Manager for BEERSF shall be implemented and recommendation of a particular type of procurement procedure;

•    Determining the body that will implement the procurement process for the selection of the Fund Manager for BEERSF and will sign the Fund Management Agreement with the selected Fund Manager;

•    Elaboration of the full package of procurement documents for the selection of a Fund Manager, including a template for the Fund Management Agreement and support in their approval from all relevant authorities;

•    Assistance in the implementation of the procurement process for the selection of a Fund Manager for BEERSF;

•    Support in the negotiations, if any, with the selected Fund Manager and in the signature of the Fund Management Agreement.

 

The overall budget for the assignment is 15,000 Euro.

 

Selection of the Consultant will be subject to the Bank's Procurement Policies and Rules, Section 5.3 (a). The proceeds of the Grant will not be used for the purpose of any payment to persons or entities, of for any import of goods, if such payment or import is prohibited by a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations or under a law of official regulation of the Purchaser's country.

 

Interested consultants may contact:

Ministry of Energy

8 Triaditsa St., Sofia 1000, Bulgaria

Zdravka Pekova

Facsimile: +359 2 980 76 30 

E-mail: z.pekova@me.government.bg

Performance of the consultant for the objects within the project "Modernization of the educational infrastructure in the city of Varna"

Община Варна | Published March 20, 2017  -  Deadline May 9, 2017
cpvs
71521000

The subject of the contract relates to the selection of contractors to exercise construction supervision during construction of five sites in the implementation of the project - "Modernization of the educational infrastructure in the city of Varna" and to assess the compliance of investment projects construction supervision of five other object entrusted to the engineering in implementing the same project.

"Selection of a consultant under the SPA for an assessment of compliance of investment projects and construction supervision during construction works in two buildings of cultural infrastructure of Ob

Община Провадия | Published April 24, 2017  -  Deadline May 29, 2017
cpvs
71521000

The contract is funded under BC. Axis 2: "Support for energy. Efficiency in support centers in the periphery. areas "OPRD, which is aimed at improving the energy. efficiency of the public. and residential buildings. The scope of the contract includes ff. Activities: 1.Izgotvyane of conformity assessment of Invest. projects with the company. Report on compliance with essential. requirements under Art. 169, para 1, items 16 of the SPA in accordance with the requirements of Art. 142, paragraph 5 of the SPA for each project. 2. Implementation of the Consult. services exercise on p. supervision during the construction of each object acc. Article 166, Paragraph 1, Items 1 and 2 and Article 168 of the SPA in volume and scope acc. TDA requirements and regulations. acts incl. exercising control for completeness and correct compilation of documents and reports during st st, acc. Ordinance №3 / 2003 3.Izgotvyane of endings. report to instruct., according to Art. 168, para. 6 of LSP for each building; 4.Aktualizirane Techn. passport of each object, according to Art. 176b of the SPA and

Performance of the consultant for the sites associated with the optimization of the mass urban public transport within the project "Integrated urban transport in Varna - second phase"

Община Варна | Published April 24, 2017  -  Deadline May 30, 2017
cpvs
71521000

The subject of the contract is related to the selection of contractors to exercise construction supervision during the construction of three sites in the implementation of the project - "Integrated urban transport in Varna - second phase" and to assess the compliance of investment projects and exercising construction supervision during construction of five other sites awarded engineering in implementing the same project.

Consulting services for water-supply and waste consultancy

Министерство на регионалното развитие и благоустройството | Published March 18, 2017  -  Deadline April 24, 2017
cpvs
71800000, 79111000

The contract aims to support Works in ensuring the efficiency and sustainability in the management of water supply and sewerage industry by providing advice, analysis, documents and more. Relating to contracts for management, maintenance and operation of water supply systems and facilities and provision of water and sewerage services, concluded under the provisions of the water Act, with plumbing assets and the development of water supply systems. The consulting services will include: legal interpretation of existing national and European legislation on drinking water and the disposal and treatment of wastewater; regulation of water and sewerage services, as well as contracts for management, maintenance and operation of water supply systems and facilities and provision of water and sewerage services in case of legal issues related to their implementation, and support for defining changes and / or drafting of legislation acts and strategic documents related to the plumbing industry and ensuring its financial viability.

Ensuring efficiency and sustainability in the management of water supply and sewerage sector in the regions of Veliko Tarnovo, Gabrovo and Targovishte by providing advice, analysis, documents and more. Relating to contracts for management, maintenance and operation of water supply systems and facilities and provision of water and sewerage services, concluded under the provisions of the water Act, with plumbing assets and the development of water supply systems. The consulting services will include: regulation of water and sewerage services, as well as contracts for management, maintenance and operation of water supply systems and facilities and provision of water and sewerage services in case of legal issues related to their implementation, and support strategic documents related to the industry Water and ensuring its financial viability in the long term. Activity 1: Preparation of an annex / and to the signed contract (incl. Attachments) for management, maintenance and operation of water supply systems and facilities and provision of water and sewerage services (Treaty on the /) between the Association of Water separate territory ...

Evaluation consultancy services

Столична община | Published March 24, 2017  -  Deadline April 25, 2017
cpvs
79419000

The awarding of this procedure is done in conjunction with the need to attract external experts to assist the municipality in its capacity as Intermediate Unit in the evaluation of proposals from IPGVR and investment program of the municipality.

1.1. Key expert "Financier":

In order execution expert will have to carry out activities related to the verification of the financial part of the project proposal, including but not limited to assessing financial analysis, examination and assessment of cost-benefit analysis, as well as to assist the Ministry of Health and members of the commission in 1 every aspect of financial indicators of the project, both at the administrative compliance and eligibility, and on technical and financial evaluation.

1.2. Key Expert "State aid":

In order execution expert will have to carry out activities related to verification of compliance with the applicable State aid regime and the conditions of the hypothesis of a lack of state aid as defined by the MA Guidelines for Applicants.

1.3. Lot № 3 "Landscape Architect":

In order execution expert will have to perform (such obligations are not limited to that) activities related to the review and assessment of technical documentation in the "Landscape architecture".

1.4. Lot № 4: "Architect":

In order execution expert will have to perform (such obligations are not limited to that) activities related to the review and assessment of technical documentation in the "Architecture".

1.5. Lot № 5: "Civil Engineer":

In order execution expert will have to perform (such obligations are not limited to that) activities related to the review and assessment of technical documentation in part works.

1.6. Lot № 6: "Engineer Track":

In order execution expert will have to perform (such obligations are not limited to it ...

Consultative engineering and construction services

Община Търговище | Published April 22, 2017  -  Deadline May 25, 2017
cpvs
71310000

Under this contract to be performed services related to the implementation of investment control of 15 sites, including:

- monitoring the design and construction process, incl. Control of quantity, quality and relevance of the performed construction works and construction products used in the project documentation and implementing agreements;

- Signing a protocol for receiving technical / detailed design, transmission protocol on the construction site; protocol to establish suitability for use of the site; and protocols for receiving the completed quantities and types of construction work to complete implementation of the policy on renovation of buildings.

Object: Residential building located in the city. Targovishte, bul. "Tsar Liberator" № 30.

176 on plan. Targovishte.

- Year Built: 1985

- type of construction system: Large / large-area formwork /.

- Number of floors: 14 fl.

- Number of inputs: one flat section with two entrances.

- Built area: 526.41 m 2 .

- Total area of ​​the building: 9 305,78 m 2 .

- Heated area: 7172 m 2 .

- Heated volume: 20,061 m 3 .

Under this contract to be performed services related to the implementation of investment control of the facility, including:

- monitoring the design and construction process, incl. Control of quantity, quality and relevance of the performed construction works and construction products used in the project documentation and implementing agreements;

- Signing a protocol for receiving technical / detailed design, transmission protocol on the construction site; protocol to establish suitability for use of the site; and protocols for receiving the completed quantities and types of construction work to complete implementation of the policy on renovation of buildings.

25.

6 plan of square. "Zapad-1" c. Targovishte.

- Year Built: 1974

- type of construction system: PPP / lift slabs /.

- Number of floors: 6 fl.

- Inputs: 4 ent.

- Area: 1000 m 2 .

- Total area of ​​the building: 6994 m 2 .

- Heated area: 5692 m 2 .

- Heated volume: 15,939 m 3 .

Under this contract to be performed services related to the implementation of investment control of the facility, including:

- monitoring the design and construction process, incl. Control of quantity, quality and relevance of the performed construction works and construction products used in the project documentation and implementing agreements;

- Signing a protocol for receiving technical / detailed design, transmission protocol on the construction site; protocol to establish suitability for use of the site; and protocols for receiving the completed quantities and types of construction work to complete implementation of the policy on renovation of buildings.

Object: Residential building located in the city. Targovishte, bul. "Metropolitan Andrei" № 85.

8 on plan. Targovishte.

- Year Built: 1980

- type of construction system: Large / large-area formwork /.

- Number of floors: ent. And ent. H - 6 fl., Ent. B and ent. G - 7 fl., Ent. C ent. D ent. D & ent. E - 8 fl.

- Number of inputs: 8 ent.

- Built area: 046.70 m 2 2 .

- Total area of ​​the building: 14 185,14 m 2 .

- Heated area: 12 915 m 2 .

- Heated volume: 30,499 m 3 .

Under this contract to be performed services related to the implementation of investment control of the facility, including:

- monitoring the design and construction process, incl. Control of quantity, quality and relevance of the performed construction works and construction products used in the project documentation and implementing agreements;

- Signing a protocol for receiving technical / detailed design, transmission protocol on the construction site; protocol to establish suitability for use of the site; and protocols for receiving the completed quantities and types of construction work to complete implementation of the policy on renovation of buildings.

Object: Residential building located in the city. Targovishte,. "Constanta" № 79.

192 on plan. Targovishte.

- Year Built: 1986

- type of construction system: EPZHS / Large-panel Residential building /.

- Number of floors: 8 fl.

- Number of inputs: 2 ent.

- Built area: 424 m 2 .

- Total area etc.

"Selection of a consultant under the SPA for exercises. Of inde. p. Supervision of works in executive / CPP buildings in connection with the implementation of the project: "Energy renovation of MZHS in Dobrich, OPRD 3 OP

Кметът на Община град Добрич | Published April 10, 2017  -  Deadline May 16, 2017
cpvs
71520000

The object of all lots incorporates: implementation of construction supervision during construction of all types of works / CPP to be implemented by the developer of the site, in accordance with statutory powers and duties of the artist as a person exercising construction supervision of construction stipulated in Art. 166, art. 168, art. 178 TDA. The construction supervision is carried out in the compulsory coverage as required by the TDA requirements of Ordinance №3 2003 on drawing up acts and protocols during construction, taking into account the requirements of the Ordinance on the essential requirements for construction and conformity assessment of construction products and all laws and regulations in the construction sector in Bulgaria.

Hardware disaster-recovery consultancy services

Министерство на финансите | Published April 11, 2017  -  Deadline April 28, 2017
cpvs
72120000

The order concerns warranty maintenance and repair of devices and specific configurations serving critical applications and devices with non-critical functionality in the technical infrastructure in the MF system.

"Supervision of works and consulting engineers under the contractual terms of the International Federation of Consulting Engineers ......."

Община Видин | Published April 24, 2017  -  Deadline May 30, 2017
cpvs
71521000

"Supervision of works and consulting engineers under the contractual terms of the International Federation of Consulting Engineers / FIDIC - F? D? Ration International des Ing? Nieurs-Conseils / construction and engineering projects, designed by the developer (" Red book) ", published in 1999 to build 'wastewater treatment plants (WWTP) - Vidin."

IT services: consulting, software development, Internet and support

Министерство на здравеопазването | Published April 4, 2017  -  Deadline May 5, 2017
cpvs
72000000

"Selection of a contractor for monthly maintenance and upgrade software program" Improving the sustainability of the National Tuberculosis Program. " The scope of the contract includes the following activities:

1. Monthly maintenance and upgrade online system for collecting data from sub-recipients and partners Program needs Unit "Monitoring and Evaluation";

2. Monthly maintenance of software Unit "Finance" and Unit "Delivery";

3. Monthly maintenance and upgrade of an information system for registering patients with tuberculosis, suspected and contact persons.

"Selection of a contractor for monthly maintenance and upgrade of specialized software for the program" Improving the sustainability of the National Tuberculosis Program. "

The scope of the contract includes the following activities:

1. Monthly maintenance and upgrade online system for collecting data from sub-recipients and partners Program needs Unit "Monitoring and Evaluation";

2. Monthly maintenance of software Unit "Finance" and Unit "Delivery";

3. Monthly maintenance and upgrade of an information system for registering patients with tuberculosis, suspected and contact persons.

Business and management consultancy and related services

Община Дългопол | Published April 14, 2017
cpvs
79400000, 79421200

Consultancy and management activities and related services

Construction-site supervision services

Община Ловеч | Published March 24, 2017  -  Deadline April 27, 2017
cpvs
71521000

"Selecting a consultant for construction supervision of investment functions in the execution of works under the project" Reconstruction, renovation and equipment of buildings and rehabilitation of yards of kindergartens and schools in Lovech., Construction of a school gym and rehabilitation yards in municipal schools in Lovech.. "

The contract is divided into 2 / two / lots as follows: Lot № 1: "Reconstruction, renovation and equipment of buildings and rehabilitation of yards of kindergartens and nursery in Lovech." With the following sub-projects: Part № 1 - reconstruction, renovation and equipment of the building and rehabilitation of the yard of kindergarten "Lyulyache" sq. Goznitsa, Lovech.; Part № 2 - Reconstruction, renovation and equipment of buildings and rehabilitation of yards with the Depositary "Colourful cock" and kindergarten "Zora" in Lovech. "Part № 3 - Rehabilitation of the yard of kindergarten" Joy ", Lovech.; Continues VI.3).

Construction-site supervision services

Община Ловеч | Published April 6, 2017  -  Deadline May 4, 2017
cpvs
71521000

Selection of a consultant for construction supervision of investment functions in the execution of works on the project "Reconstruction, renovation and equipment of buildings and rehabilitation of yards of kindergartens and schools in Lovech. Build a school gym and rehabilitation gardening spaces in public schools in Lovech.. "

The contract is divided into two / two / lots as follows: Lot № 1: "Reconstruction, renovation and equipment of buildings and rehabilitation of yards of kindergartens and nursery in Lovech." The following sub-projects: Part № 1 - reconstruction, renovation and equipment of the building and rehabilitation of the yard of kindergarten "Lyulyache" sq. Goznitsa, Lovech.; Part № 2 - Reconstruction, renovation and equipment of buildings and rehabilitation of the yard with the Depositary "Colorful cock" and Kindergarten "Zora" in Lovech. "Part № 3 - Rehabilitation of the yard of kindergarten" Joy ", Lovech.; Continues VII.2).

Construction of three gas transmission pipelines in Bulgaria

 | Published January 31, 2017  -  Deadline January 30, 2018
cpvs

This General Procurement Notice is an update of the General Procurement Notice (No. 8161-GPN-17149) published on EBRD web site on 29 January 2016.

Bulgartransgaz EAD (the "Employer") intends to use Grant proceeds provided by the Kozloduy International Decommissioning Support Fund ("KIDSF"), administrated by the European Bank for Reconstruction and Development (EBRD, "the Bank") under Grant Agreement No 057 and its own funds, to construct gas pipelines with a total length of 122 km to connect the municipalities of Svishtov, Pirdop, Panagiurishte, Bansko and Razlog to the national gas transmission network (the Project).

The Project will require procurement of goods, works and services as follows:

1. Gas transmission pipeline to Svishtov

Scope - supply of equipment, installation, construction and commissioning of a high pressure gas transmission pipeline, automated gas regulation station (AGRS) to the town of Svishtov and auxiliary facilities.

2. Gas transmission pipeline to Panagiurishte and Pirdop

Scope - supply of equipment, installation, construction and commissioning of a high pressure gas transmission pipeline, AGRS to the town of Panagiurishte, AGRS to the town of Pirdop and auxiliary facilities.

3. Gas transmission pipeline to Bansko and Razlog

Scope - supply of equipment, installation, construction and commissioning of a high pressure gas transmission pipeline, AGRS to the town of Razlog, AGRS to the town of Bansko and auxiliary facilities.

4. Consulting services for design and of a Project Management Unit Consultant were already procured within the scope of the Grant Agreement.

The total budget for the Project is 21,8 million EUR, 50% will be funded by KIDSF and 50% by Bulgartransgaz EAD.

Procurement will commence in the last quarter of 2017.

Contracts implementation is expected to take between 12 and 30 calendar months, followed by a Defects Notification Period.

Contracts to be financed with the proceeds of the KIDSF will be subject to the Bank’s Procurement Policies and Rules and will be open to firms from any country.

The proceeds of the Grant shall not be used for the purpose of any payment to persons or entities, or for any import of goods, if such payment or import is prohibited by a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations or under a law or official regulation of the Employer's country.

 

Interested parties may contact:

Name:              Svetlana Koycheva
Job position:    Projects Management Dept.
Address:          Bulgartransgaz EAD
Lulin 2 District66 P. Vladigerov Blvd. 336 Sofia, Bulgaria
Phone:             +359 2 9396372
Fax:                 +359 2 9250063
E-mail: Svetlana.Koycheva@bulgartansgaz.bg

 

Consultancy services for the development of opinions, analyzes, contracts, documents, proposals for changes in the applicable regulations related to the management, maintenance and operation of water systems

Министерство на регионалното развитие и благоустройството | Published March 17, 2017  -  Deadline April 25, 2017
cpvs
71800000

The contract aims to support Works in ensuring the efficiency and sustainability in the management of water supply and sewerage industry by providing advice, analysis, documents and more. Relating to contracts for management, maintenance and operation of water supply systems and facilities and provision of water and sewerage services, concluded under the provisions of the water Act, with plumbing assets and the development of water supply systems. The consulting services will include: legal interpretation of existing national and European legislation on drinking water and the disposal and treatment of wastewater; regulation of water and sewerage services, as well as contracts for management, maintenance and operation of water supply systems and facilities and provision of water and sewerage services in case of legal issues related to their implementation, and support for defining changes and / or drafting of legislation acts and strategic documents related to the plumbing industry and ensuring its financial viability.

"Performing construction work in implementing the project: Improvement of green area to" Diagnostic Consulting Center I - Shumen "Ltd."

Община Шумен | Published March 20, 2017  -  Deadline April 28, 2017
cpvs
45000000

Sites subject to renovation and improvement is the green area to "DKC I - Shumen" LTD coverage PI 83510.666.50 area 3669 square meters, PI 83510.666.51 an area of ​​994 square meters, PI 83510.666.52 area 1674 m2, PI 83510.666.53 an area of ​​197 square meters, PI 83510.666.54 an area of ​​1239 square meters, city. Shumen. The construction is IV-TA category, according to Article 137, para. l, item 4 b. "D" from ZUT.Predvizhdat measures to improve the physical environment through the rehabilitation of existing pavement on sidewalks, providing an accessible environment and integration of disadvantaged groups, building energy-saving street and park osvetlenie.Pri reconstruction of green areas are envisaged new irrigation systems, as well as the formation of new recreation areas, installation of new benches, incl. for disadvantaged people, bins, a new rack for bicycles, as well as new data plate cleaning of existing monuments, construction of a new playground for children up to 3 years. replace the existing one.