Call +44 800 9755 164

Public tenders for construction in Worcester United Kingdom

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Building construction work

University of Worcester | Published November 18, 2016
cpvs
45210000, 45200000, 45214400, 45214000, 45211340, 45211350, 71220000, 71320000, 45000000

The University plans to establish a Framework Agreement made up of 3 contractors for the Major Construction Works Framework Agreement, and directly award a contract for the design and construction of a new student residence and mixed use campus: ‘University Court’.

University Court will be a mixed use development comprising of 1 500 student unit accommodation units including 10 ‘Y’ towers and town-houses as well as a student hub, lecturing and academic facilities at Oldbury Road, Worcester. It is presently proposed that the Framework will support the design and build of University Court which the University proposes will be constructed in 2 Project Phases. The University is also considering extending the scope of this framework to cover design and construction of the University's proposed new 7 Campus (it may or may not form part of the framework) and other future capital development projects above 5 000 000 GBP.

It is envisaged that there would be 3 contractors awarded a place on the framework, with the highest scoring bidder being immediately and directly awarded the contract for the 2-stage design and build Project Phase 1.

UOW508 Framework Agreement for the Provision of Medium Construction Related Works and Building Refur

University of Worcester | Published October 31, 2015
cpvs
45000000, 45450000, 45400000, 45214000, 45210000, 45212000, 45300000

Framework Agreement for the Provision of Medium Construction Related Works and Building Refurbishment.

Provision of Construction Related Professional Design Services.

Worcestershire County Council | Published October 31, 2014
Winner
Jacobs UK Limited
cpvs
71000000, 71530000

Worcestershire County Council (WCC) sought to establish an exclusive Contract to provide all requirements for Construction Related Professional Design Services for a period of up to 7 years (an initial 5 years plus up to 2 years extension ), effective from the 1.11.2014. TUPE applies to this Contract. The Contract covers the provision by the firm, directly or in part through a network of suitably qualified and experienced professional sub-consultants, all necessary professional advice and services needed to deliver WCC's capital building projects.

UOW508 Framework Agreement for the Provision of Medium Construction Related Works and Building Refurbishment

University of Worcester | Published April 6, 2016
Winner
Stepnell Limited
cpvs
45000000, 45450000, 45400000, 45260000, 45212000, 45211000, 45310000, 45430000, 45210000, 45351000, 45420000

The purpose of this framework is to appoint a number of suppliers who are skilled in building construction work, refurbishment works, new build and fast track projects to help us upgrade the Universities facilities. Such projects have recently included remodelling staff offices, refurbishing halls of residence and upgrading classroom facilities across the campus.

Typically the schemes falling under this contract will be between 300 000 GBP and 5 000 000 GBP in value. The University of Worcester is seeking to invite suitable Principle Contractors (as defined by the CDM Regulations 2015) to participate in this procurement process.

UOW508 Framework Agreement for the Provision of Medium Construction Related Works and Building Refur

University of Worcester | Published April 6, 2016
Winner
Barnwood Construction Limited, E Manton Limited, Novus Property Solutions Limited, Shaylor Group PLC, Speller Metcalfe Malvern Limited, Stepnell Limited
cpvs
45000000, 45450000, 45400000, 45260000, 45212000, 45211000, 45310000, 45430000, 45210000, 45351000, 45420000

The purpose of this framework is to appoint a number of suppliers who are skilled in building construction work, refurbishment works, new build and fast track projects to help us upgrade the Universities facilities. Such projects have recently included remodelling staff offices, refurbishing halls of residence and upgrading classroom facilities across the campus.

Typically the schemes falling under this contract will be between 300 000 GBP and 5 000 000 GBP in value. The University of Worcester is seeking to invite suitable Principle Contractors (as defined by the CDM Regulations 2015) to participate in this procurement process.

UOW508 Framework Agreement for the Provision of Medium Construction Related Works and Building Refurbishment.

University Of Worcester | Published November 24, 2015  -  Deadline December 21, 2015
cpvs
45000000, 45450000, 45400000, 45260000, 45212000, 45211000, 45310000, 45214000, 45430000, 45210000, 45351000, 45420000

The purpose of this framework is to appoint a number of suppliers who are skilled in building construction work, refurbishment works, new build and fast track projects to help us upgrade the Universities facilities. Such projects have recently included remodelling staff offices, refurbishing halls of residence and upgrading classroom facilities across the campus. Typically the schemes falling under this contract will be between 300 000 GBP and 5 000 000 GBP in value. The University of Worcester is seeking to invite suitable Principle Contractors (as defined by the CDM Regulations 2015) to participate in this procurement process.

UOW508 Framework Agreement for the Provision of Medium Construction Related Works and Building Refur

University of Worcester | Published November 24, 2015  -  Deadline December 21, 2015
cpvs
45000000, 45450000, 45400000, 45260000, 45212000, 45211000, 45310000, 45214000, 45430000, 45210000, 45351000, 45420000

The purpose of this framework is to appoint a number of suppliers who are skilled in building construction work, refurbishment works, new build and fast track projects to help us upgrade the Universities facilities. Such projects have recently included remodelling staff offices, refurbishing halls of residence and upgrading classroom facilities across the campus. Typically the schemes falling under this contract will be between 300 000 GBP and 5 000 000 GBP in value. The University of Worcester is seeking to invite suitable Principle Contractors (as defined by the CDM Regulations 2015) to participate in this procurement process.

UOW508 Framework Agreement for the Provision of Medium Construction Related Works and Building Refurbishment.

University of Worcester | Published October 31, 2015
cpvs
45000000, 45450000, 45400000, 45214000, 45210000, 45212000, 45300000

UOW508 Framework Agreement for the Provision of Medium Construction Related Works and Building Refurbishment.

Building construction work

University of Worcester | Published October 28, 2016  -  Deadline December 5, 2016
cpvs
45210000, 45200000, 45214400, 45214000, 45211340, 45211350, 71220000, 71320000, 45000000

It is envisaged that there would be three contractors awarded a place on the framework, with the highest scoring bidder being immediately and directly awarded the contract for the two-stage design and build Project Phase 1.

Building construction work

University of Worcester | Published July 21, 2016
cpvs

It is envisaged that there would be three contractors awarded a place on the framework, with the highest scoring bidder being immediately and directly awarded the contract for the two-stage design and build Project Phase 1. These details are subject to change following the University's market testing exercise.

UOW572 Appointment of an Approved Inspector for the construction of University Court (Phase 1)

University Of Worcester | Published October 6, 2016  -  Deadline October 20, 2016
cpvs
71315200

Appointment of an Approved Inspector for the construction of University Court (Phase 1)

Architectural Consultancy Services — Construction of New Fire and Police Station

Place Partnership | Published December 8, 2016  -  Deadline January 10, 2017
cpvs
71200000, 71000000, 71210000, 71220000, 71221000

Place Partnership Ltd on behalf of the Hereford and Worcester Fire & Rescue Authority is seeking expressions of interest from architectural practices with proven experience in the design of emergency service projects to act as principle consultant as part of a single co-ordinated project for a new joint purpose Fire, Police Station & Training Facilities project in Hereford.

The anticipated gross internal area is currently circa 6,600 m2 and will additionally include a fire service training facility and parking for both employees and visitors.

Architectural Consultancy Services — Construction of New Fire and Police Station

Place Partnership Limited | Published December 8, 2016  -  Deadline January 17, 2017
cpvs
71200000, 71000000, 71210000, 71220000, 71221000

Place Partnership Ltd on behalf of the Hereford and Worcester Fire & Rescue Authority is seeking expressions of interest from architectural practices with proven experience in the design of emergency service projects to act as principle consultant as part of a single co-ordinated project for a new joint purpose Fire, Police Station & Training Facilities project in Hereford.

The anticipated gross internal area is currently circa 6,600 m2 and will additionally include a fire service training facility and parking for both employees and visitors.

UOW564 Framework Agreement for the Provision of Major Construction Works

University Of Worcester | Published October 26, 2016  -  Deadline December 5, 2016
cpvs
45000000

The purpose of this procurement is twofold: (1) to identify three Bidders to award a place on the Framework and (2) to allow the selection of a preferred Contractor to manage and complete the detailed design and procurement for the scheme from RIBA Stage 3 design through to RIBA Stage 4 for the University Court Phase 1 Project under the PCSA (and the Building Contract at the University’s discretion). The University Court Phase 1 Project will be carried out as a “two-stage” design and build project. It is the current intention (although the University is not obliged) that upon successful completion of the above under the PCSA, the selected Contractor may be appointed to carry out the construction of University Court Phase 1 Project under the Building Contract. The University is following the Restricted Procedure in Regulation 28 of the Regulations. The University is conducting this procurement on behalf of itself and UW Developments Ltd (06308702). Both the University and UW Developments Ltd will be entitled to call-off contracts under the Framework. The current plan is for UW Developments Ltd to be the employer under the University Court Call-Off Contract (although this is subject to change at the University’s discretion).

Provision of a new 2 Form Entry First School

Place Partnership Limited | Published July 23, 2016  -  Deadline August 22, 2016
cpvs
50000000, 45000000

Place Partnership Limited, on behalf of Worcestershire County Council, are seeking a suitably qualified and experienced contractor for the construction of a new 2 form entry 1st school (PAN 60) on a new site.

Provision of a new 2 Form Entry First School

Place Partnership | Published July 23, 2016  -  Deadline August 15, 2016
cpvs
50000000, 45000000

Place Partnership Limited, on behalf of Worcestershire County Council, are seeking a suitably qualified and experienced contractor for the construction of a new 2 form entry 1st school (PAN 60) on a new site.

Perdiswell Leisure Centre — New Swimming Pool Complex.

Worcester City Council | Published October 15, 2015
Winner
Speller Metcalfe Limited
cpvs
45223000

Single stage Design and Build from RIBA Stage D; documents for the design and phased construction of a new swimming pool facility and refurbishment to the existing building infrastructure, services and landscaping for local authority owned leisure facility.

WCC - Perdiswell Swimming Pool and Leisure Centre.

Worcester City Council | Published February 28, 2015  -  Deadline March 27, 2015
cpvs
45223000, 45223210, 45223200, 45223300, 45223800, 45212000, 45212110, 45212212, 45212220, 45212290

Single stage Design & Build from RIBA Stage D; documents for the design and phased construction of a new swimming pool facility and refurbishment to the existing building infrastructure, services and landscaping for local authority owned leisure facility.

New Wyre Forest Fire Station and Training Facilities Kidderminster

Place Partnership Limited | Published May 11, 2017
Winner
Bond Bryan Architects Limited
cpvs
71000000, 71200000, 71210000, 71220000, 71221000

Design of emergency service projects to act as principle consultant as part of a single co-ordinated project for the design and construction of a new Fire Station and Training Facilities project in Wyre Forest Worcestershire.

Worcestershire Parkway Railway Station Design and Build Contract.

Worcestershire County Council | Published September 5, 2015  -  Deadline October 2, 2015
cpvs
60000000, 71000000, 79415200, 71315000, 71300000, 71320000, 45000000, 45213000, 45213320, 45213321, 45221113, 45234129, 45234115, 45223000, 71312000, 71321000, 71322000, 45233100, 45233130

The final design, construction and bringing into use of a new railway station located at the intersection of the Worcester to Oxford and the Birmingham to Gloucester railway lines on the B4084 in the vicinity of Norton (see detailed location above). The proposed contract is for the final design and construction of the railway station to include: — 3 platforms, — Station building, — Passenger footbridge and lifts, — Site preparation, — 500 space car park, — Flood Mitigation works and drainage, — Internal roadways, — Footpaths and lighting, — Track and signalling works(the construction element of track and signalling works may be undertaken by Network Rail). As an option, the associated highway access and realignment including a roundabout on the B4084 and flood mitigation works to a culvert under the B4084. The scope of this proposed contract is to: — Produce a GRIP 5 detailed design based on the employers requirements, the GRIP 4 approved design provided and the planning consent and associated conditions, — Obtain all necessary design approvals and consents, — Design and manage all utility connections and diversions, — Construct the station and associated services and deliver a fully operational station facility before the December 2017 timetable change date, — Test and commission all elements of the construction in accordance with the specification and standards, — Provide as constructed information, O&M manual and health and safety file, — Manage and coordinate handover to Train Operating Company and Network Rail. The contractor will be expected to fully participate as a member of the project team and to identify efficiencies and savings within the design in order to produce demonstrable value for the Council. The overall programme for the works is commencement in March 2016 with completion in November 2017.