Call +44 800 9755 164

Public tenders for construction in Ince-in-makerfield United Kingdom

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionUnited Kingdomince-in-makerfield

Building construction work

Wigan Council | Published November 24, 2015  -  Deadline December 11, 2015
cpvs
45210000, 45262660, 45261214, 45262690, 45215210, 90910000, 45211000, 45421000, 45431200, 45332000, 45421131, 45262500, 45453100, 45310000, 45410000, 71630000, 90520000, 98390000, 45442110, 45451000, 45442100, 90690000, 45442120, 45442000, 45421142, 45262321, 45432110, 44112240, 45432120, 45262600, 45421143, 45441000, 45421100, 45421132, 44115710, 71550000, 45421148, 45262520, 90921000, 45261000, 98395000, 45261211, 45261212, 45262610, 45261200, 45261213, 45261320, 90911200, 45261215, 45312100, 31682510, 45421153, 45330000, 45331100

Building construction work

Golborne Railway Bridge, No. 010, East Lancashire Road (A580), Golborne – Major Structural Maintenance Works -2015 (Revised Scheme)

 | Published November 24, 2015
Winner
Eric Wright Civil Engineering Ltd
cpvs
45000000

The structural maintenance works comprises: Exposing the concrete bridge deck under the carriageway, Removal exposing waterproofing membrane, Installation of hybrid electrochemical protection system (Cathodic protection with sacrificial anodes), construction of ballast wall, undertake concrete repairs using polymer modified cementitious repair mortar, replacing the bridge buried joints, re-waterproofing of the bridge deck and road resurfacing works.

A49 Goose Green to Westwood Park Link Road.

Wigan Council | Published June 9, 2015
Winner
Galliford Try Infrastructure Ltd
cpvs
45233224, 45221110, 45233120, 45000000, 45200000, 45220000, 45221100, 45221111, 45233000, 45233100, 45233121, 45233130, 45233225, 71000000, 71250000, 71300000, 71311220, 71320000, 71322000, 71322300

Wigan Council is seeking to provide a new high capacity route into Wigan town centre from the south of the borough, improving access to the town centre and to the motorway network. The proposed A49 Goose Green to Westwood Park Link Road is a connection from the A49 Warrington Road at Goose Green to Westwood Park, north of Pearson's Flash. To achieve this aim Wigan Council is seeking to appoint 1 preferred bidder to complete design work and construct the A49 Goose Green to Westwood Park Link Road. The scheme will consist of 1 of the following options: (i) Approximately 0.9 km of new dual 2-lane carriageway which includes an upgrade from single 2 lane to dual 2-lane carriageway along the existing Westwood Park internal access road. Additionally, approximately 1.4 km of single 2-lane carriageway with full infrastructure construction to accommodate future dual carriageway. The scheme will incorporate three major structures to bridge existing watercourses, canals and a primary road; or (ii) Approximately 2.3 km of new dual 2-lane carriageway which includes an upgrade from single 2 lane to dual 2-lane carriageway along the existing Westwood Park internal access road. The scheme will incorporate three major structures to bridge existing watercourses, canals and a primary road.

A49 Goose Green to Westwood Park Link Road.

Wigan Council | Published October 22, 2014  -  Deadline November 24, 2014
cpvs
45233224, 45221110, 45233120, 45000000, 45200000, 45220000, 45221100, 45221111, 45233000, 45233100, 45233121, 45233130, 45233225, 71000000, 71250000, 71300000, 71311220, 71320000, 71322000, 71322300

Wigan Council is seeking to provide a new high capacity route into Wigan town centre from the south of the borough, improving access to the town centre and to the motorway network. The proposed A49 Goose Green to Westwood Park Link Road is a connection from the A49 Warrington Road at Goose Green to Westwood Park, north of Pearson's Flash. To achieve this aim Wigan Council is seeking to appoint one preferred bidder to complete design work and construct the A49 Goose Green to Westwood Park Link Road. The scheme will consist of one of the following options: (i) Approximately 0.9 km of new dual 2-lane carriageway which includes an upgrade from single 2 lane to dual 2-lane carriageway along the existing Westwood Park internal access road. Additionally, approximately 1.4 km of single 2-lane carriageway with full infrastructure construction to accommodate future dual carriageway. The scheme will incorporate three major structures to bridge existing watercourses, canals and a primary road; or (ii) Approximately 2.3 km of new dual 2-lane carriageway which includes an upgrade from single 2 lane to dual 2-lane carriageway along the existing Westwood Park internal access road. The scheme will incorporate three major structures to bridge existing watercourses, canals and a primary road.

Sediment Management System Consultancy Brief

Ashfield District Council | Published April 19, 2017  -  Deadline April 28, 2017
cpvs
77000000, 73000000, 90000000,

These work forms part of a Heritage Lottery Fund Project. Ashfield District Council are seeking to appoint a consultant to develop detailed designs and construction phase costing with supporting modelled / structural calculations for the creation of a sediment control area to be constructed at the main inlet to Kings Mill Reservoir. Key Consultant Skill Areas: • Hydraulic modelling • Sediment modelling • System design • Design experience of the built and natural environment. In order to express an interest and request the brief in full, please contact Lorraine Hodgson, Procurement Admin, at lorraine.hodgson@bassetlaw.gov.uk. Please express your interest by no later than 5pm Friday 28th April 2017. Closing date for submissions is 12pm, Friday 5th May 2017. Bids will be evaluated after the closing date.

Milton Rise Play Area Improvements

Ashfield District Council | Published April 7, 2016  -  Deadline April 22, 2016
cpvs
45000000, 37000000,

Ashfield District Council is seeking to obtain quotations for the removal of existing play equipment, site furniture and associated surfacing and the constriction and installation of pre- procured play equipment, site furniture and associated surfacing. Full details are in the specification.
  • 1