Call +44 800 9755 164

Public tenders for construction in Glenrothes United...

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Provision of O & M Manuals, New Build Housing, Roxburgh Road, Glenrothes

Fife Council | Published February 21, 2017  -  Deadline March 8, 2017
cpvs

The Sub-Contract Works Package (SCWP) comprises the supply of supervision, labour and materials to carry out the provision of the O&M Manual (Ref WP024) all as described in the accompanying tender documents. There are NO Sub-Contractor design elements. The SCWP will be awarded as a FIXED PRICE (for duration of the Main Contract works), LUMP SUM subcontract NOT re-measureable. Estimated value – approx. £5k. The Main Contract Works (MCW) comprises the new build construction of 17 Nr Houses at Roxburgh Road, Glenrothes – 13 Nr House Types.

Provision of O & M Manuals, New Build Housing, Langside Crescent, Kennoway

Fife Council | Published February 21, 2017  -  Deadline March 8, 2017
cpvs

The Sub-Contract Works Package (SCWP) comprises the supply of supervision, labour and materials to carry out the provision of the O&M Manual (Ref WP024) all as described in the accompanying tender documents. There are NO Sub-Contractor design elements. The SCWP will be awarded as a FIXED PRICE (for duration of the Main Contract works), LUMP SUM subcontract NOT re-measureable. Estimated value – approx. £5k. The Main Contract Works (MCW) comprises the new build construction of 24 Nr Houses at Langside Crescent, Kennoway – 9 Nr House Types.

Dunfermline Business Centre DS3950850 LTHW System Upgrade

Fife Council | Published February 17, 2017  -  Deadline March 10, 2017
cpvs

The full installation shall comply with the conditions laid down in the Standard Conditions of Contract contained within the Bills of Quantity.It is recommended that tenderers visit the site to familiarise themselves with the full extent and nature of the works requires as no redress will be made at a later date for the lack of such knowledge. Full survey of the existing LTHW installation. Should findings from the survey differ from the reported as-installed information developed from Fife Council’s visual inspection, this shall be highlighted by the Contractor for the attention of the Design Team prior to commencing with works on site. The Design Team will review these differences and advise how to proceed. Extension of the existing Low Temperature Hot Water (LTHW) systems. Generally, provision of thermal insulation of all new LTHW pipework and existing pipework if missing from the existing installation. This to be in accordance with BS5422. Testing and commissioning of all installed works. Re-balancing of LTHW systems over all floors. Minor redecoration as necessary to the existing building fabric post completion. Compliance with CDM requirement. Generally, provide all works associated with the provision of a completed and functioning LTHW installation. These works must be completed and invoiced within the current calendar year therefore Tenderers must complete Contractor's requirements on page 23 or their tender shall be deemed Non-Compliant. It is anticipated that these work shall be carried out over the summer months May-September 2017. For access to site please contact the Project CA Jonathan Coppock on 013451 555555 ext 446522 or email Jonathan.Coppock@fife.gov.uk Any questions relating to the project must be posted through the PCS portal. Tenderers will be responsible for the removal and disposal of all their own rubbish and waste in line with the relevant criteria indicated in this document. All Fife Council Building Services, Construction sites operate a five point PPE system. Please note the Site will be run under the Considerate Constructors scheme. All works should be carried out under normal working site hours. No Overtime working will be allowed unless specifically requested and instructed by the Project Supervisor on site through our CVI process. Should you fall behind with the agreed program there will be no reimbursement for any overtime working should you fall behind the agreed program. .
  • 1