Public tenders for tunnel in Hungary

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Contract award notice - "A KÖFOP-1.0.0-VEKOP-15-2016-00008" The government ASP further development and national extension (ASP 2.0) "Tunnel project ADSL central concentrator"

NISZ Nemzeti Infokommunikációs Szolgáltató Zártkörűen Működő Részvénytársaság | Published September 14, 2016
Winner
NETvisor Informatikai és Kommunikációs Zrt.
cpvs
32522000

Contract award notice - "A KÖFOP-1.0.0-VEKOP-15-2016-00008" The government ASP further development and national extension (ASP 2.0) "Tunnel project ADSL central concentrator"

Tunnel washer

Alsó-Szabolcsi Víziközmű Beruházási Társulás | Published May 19, 2016
cpvs

tunnel Washing

Chain Bridge Buda bridgehead electrical tunnel reconstruction

BKK Budapesti Közlekedési Központ Zártkörűen Működő Részvénytársaság | Published October 3, 2014  -  Deadline October 27, 2014
cpvs
45221242, 45234120

Determination of contract: The subject of a contract Contract: Chain Bridge Buda bridgehead electrical tunnel reconstruction

Suburban frame tunnel crushed stone ballast exchange and duct reconstruction process subject T-427/14

Budapesti Közlekedési Zártkörűen Működő Részvénytársaság | Published November 28, 2014  -  Deadline December 15, 2014
cpvs
45234116

Replacement of a contract for suburban and cable channel tunnel ballast bed frame reconstruction of the section: Crushed stone replacement and reconstruction of line cable channel tunnel Part B: Crushed stone replacement and bypass duct reconstruction area

Results of the "Chain of Buda bridgehead tram tunnel reconstruction" adopted procedure

BKK Budapesti Közlekedési Központ Zártkörűen Működő Részvénytársaság | Published February 20, 2015
Winner
Colas Alterra Zrt.
cpvs
45221242, 45234120

Within the framework of a contract for the "Chain Buda side tunnel electrical conversion 'below and detailed in the documentation: Description of construction and quantities: 1. Chain Bridge over the Chain Bridge tram tunnel tunnel is divided into several sections: • Section ramp retaining wall on the south side - will be rebuilt • South side "New" is built tunnel • Center - original - tunnel section - will be rebuilt • North is "new" building tunnels • North side ramp retaining wall section - not to be built at the south side of the second is the current pedestrian-cyclist wider pavement (sidewalk and bike path restoration of 2500 m2) 3. On the north side - will be overhead in supporting columns relocated next to the quay (column claim 9 pieces) 4. To replace the existing underground cables to be carried out by the Batthyány Square - - Before the Chain palace section between Clark Adam Square, retaining current tápszakasz or cabinet allocations. (DC traction cable laying 5,200 m), when the court building sixth track works (Vignol kétvezetősínes track construction of 352 vm) 5. Chain Bridge underpass reconstruction of the seventh art - tunnel walls - works Monolithic reinforced concrete construction of 1,593 m3, 8 upgrading. Power / redevelopment, underground cable network reconstruction overhead line network reconstruction (swinging wire 610 m), the establishment 9th catch-up-negative indicator, 10 Clark Adam Square park landscaping, tree trimming, tree replacement, completing all the specialist works 11 related. The task kötöttségként be considered: • The north ramp retaining wall is not built over. • The Chain bridge structure is not affected. • During the construction of the road surface may be affected as little as possible. • The area is under monumental protection. The job description includes detailed technical description part of the documentation.

owned by related Várhegyi tunnel I. District Council structural renovation of parts design services

BKK Budapesti Közlekedési Központ Zártkörűen Működő Részvénytársaság | Published March 9, 2017
cpvs
71320000

owned by related Várhegyi tunnel I. District Council structural renovation of parts design services

Suburban train tunnel ballast bed frame replacement and reconstruction of cable channel T-131/15

Budapesti Közlekedési Zártkörűen Működő Részvénytársaság | Published June 29, 2015  -  Deadline July 29, 2015
cpvs
45234116

Replacement of cable channels and the reconstruction of a contract suburban railway tunnel ballast bed frame

Co-operating rail substructure, superstructure, bridge and tunnel inspection activities 01/09/2014. - 31.12.2017. period.

MÁV Magyar Államvasutak Zrt. | Published May 17, 2014  -  Deadline June 16, 2014
cpvs
71000000, 71336000

Framework for conducting MÁV railway substructure, superstructure, bridge and tunnel testing framework agreement 09.01.2014 entrepreneurial activity. - 31.12.2017. period.

2011th Bridge 2-year renovation of structures process - Széchenyi Chain Bridge and Tunnel Várhegyi renovation of engineering services.

BKK Budapesti Közlekedési Központ Zártkörűen Működő Részvénytársaság | Published January 25, 2014
Winner
FŐMTERV Mérnöki Tervező Zrt.- CÉH Tervező, Beruházó és Fejlesztő Zrt. - MSc Mérnöki Tervező és Tanácsadó Kft.Lövőház u. 37.Budapest 1024 ludvig.laszlo@fomterv.hu +36 13459588 +36 13459550
cpvs
71245000, 71320000, 71246000

2011th Bridge 2-year renovation of structures process - Széchenyi Chain Bridge and Tunnel Várhegyi renovation of engineering services.

EC MTA Tunnel Microscope

Magyar Tudományos Akadémia Energiatudományi Kutatóközpont | Published March 9, 2015  -  Deadline April 17, 2015
cpvs
38510000

MTA EK Alagútmikroszkóp

Batthyány square terminal and construction of the structural frame work of tunnel T-430/14

Budapesti Közlekedési Zártkörűen Működő Részvénytársaság | Published June 29, 2015
Winner
Triman Építőipari Kft.
cpvs
45262300

A contract to Batthyány square terminal and frame tunnel construction works of construction of the principal amounts of the following: - Replacement of 540 m2 Luxalon ceiling - 300 lm drainage and waterproofing wall and ceiling junction - 1400 m2 painting of the detailed amounts included in the tender documentation.

Suburban train tunnel ballast bed frame replacement and reconstruction of the cable channel Procedure Law T-427/14

Budapesti Közlekedési Zártkörűen Működő Részvénytársaság | Published June 26, 2015
cpvs
45234116

Exchanging and cable channels a contract suburban frame tunnel ballast bed reconstruction of the section: Crushed stone replacement and duct reconstruction Line tunnel Part B: Crushed stone replacement and duct reconstruction detour around the main volumes are as follows: Section A: Crushed stone replacement and duct reconstruction Line tunnel - 1746 vm contaminated fragmented ballast bed, and cable channels demolition of the structures demolished to build superstructure, upper bedding showdown - 3875 m3 ballast bed replacement kéregalagútban - 1334 m cable channels demolition and new construction instead of volumes containing detailed in the tender documentation. Part B: Crushed stone replacement and duct reconstruction detour around - 8 bypass group and 554 vm contaminated fragmented ballast bed, and cable channels demolition of the decomposed body structure build back the upper bedding showdown - 1227 m3 ballast bed replacement crust tunnel - 352 m cable channels demolition and instead of new construction - the quantities contained in the detailed tender documents

Felhívás_Budapesti proceedings M3 metro line reconstruction: track construction, tunnel works; Interlocking Reconstruction; Modernization of railway communications, centralized dispatching systems subject

Budapesti Közlekedési Zártkörűen Működő Részvénytársaság | Published March 17, 2017  -  Deadline April 28, 2017
cpvs
45234116

Felhívás_Budapesti proceedings M3 metro line reconstruction: track construction, tunnel works; Interlocking Reconstruction; Modernization of railway communications, centralized dispatching systems subject

"Várhegyi tunnel owned by related structural parts I. District Council planning renovation of services' - Contract award procedure

BKK Budapesti Közlekedési Központ Zártkörűen Működő Részvénytársaság | Published May 4, 2016
cpvs
71320000

"Várhegyi tunnel owned by related structural parts I. District Council planning renovation of services' - Contract award procedure

"2011th 2 year bridge reconstruction work of art process - Szechenyi Chain Bridge and Tunnel Várhegyi renovation of facilities planning. "

BKK Budapesti Közlekedési Központ Zártkörűen Működő Részvénytársaság | Published September 3, 2013
Winner
BKK Budapesti Közlekedési Központ Zártkörűen Működő Részvénytársaság
cpvs
71245000, 71320000, 71246000

"2011th 2 year bridge reconstruction work of art process - Szechenyi Chain Bridge and Tunnel Várhegyi renewal planning services "as part of a contract.

Korrigendum_Budapesti M3 metro line reconstruction: track construction, tunnel works; Reconstruction interlocking; Modernization of railway communications, centralized dispatching systems subject

Budapesti Közlekedési Zártkörűen Működő Részvénytársaság | Published April 12, 2017
cpvs
45234116

Korrigendum_Budapesti M3 metro line reconstruction: track construction, tunnel works; Reconstruction interlocking; Modernization of railway communications, centralized dispatching systems subject

Tunnel washer

Alsó-Szabolcsi Víziközmű Beruházási Társulás | Published July 17, 2015  -  Deadline August 25, 2015
cpvs
42995100

Lower sales contract announced by Szabolcs Water Utility Association of Investment "Installing a combined channel ambulatory chassis washer 'in the context of the EEOP 1.2.0 / 09-11-2011-0016 identification number of projects.

Budapest metro line M3 reconstruction: track construction, tunnel works; interlocking, automatic train control system refurbishment; Modernization of railway communications, a central dispatcher systems

Budapesti Közlekedési Zártkörűen Működő Részvénytársaság | Published September 21, 2016  -  Deadline November 10, 2016
cpvs
45234116

Budapest metro line M3 reconstruction: track construction, tunnel works; interlocking, automatic train control system refurbishment; Modernization of railway communications, a central dispatcher systems

Corrigendum "Reconstruction of the Budapest metro line M3: track construction, tunnel works, renovation of safety equipment, modernization of railway communications, centralized dispatching systems" subject

Budapesti Közlekedési Zártkörűen Működő Részvénytársaság | Published April 5, 2017
cpvs
45234116

Corrigendum "Reconstruction of the Budapest metro line M3: track construction, tunnel works, renovation of safety equipment, modernization of railway communications, centralized dispatching systems" subject

Budapest metro line M3 reconstruction: track construction, tunnel works; interlocking, automatic train control system refurbishment; Modernization of railway communications, a central dispatcher systems - Withdrawal Method

Budapesti Közlekedési Zártkörűen Működő Részvénytársaság | Published November 28, 2016
cpvs
45234116

Budapest metro line M3 reconstruction: track construction, tunnel works; interlocking, automatic train control system refurbishment; Modernization of railway communications, a central dispatcher systems - Withdrawal Method