Public tenders for tunnel in Bulgaria

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Overhaul of hotel "Tunnel" - rooms, bathrooms, koridiri, Economy "Evksinograd".

Министерски съвет | Published March 1, 2016
cpvs
45000000

Overhaul of hotel "Tunnel" - rooms, bathrooms, koridiri, Economy "Evksinograd".

"Design and construction of the Struma motorway Lot 3.1 Tunnel" Jeleznitsa "with three detached positions".

Агенция Пътна инфраструктура | Published September 4, 2017  -  Deadline October 20, 2017
cpvs
45233110

The subject of the present public procurement with three distinct positions is "Design and construction of Struma" Lot 3.1 Tunnel "Zheleznitsa". In this sense, the purpose of the public procurement is to build the Struma Motorway Lot 3.1 from km 366 + 000 to km 370 + 400, including a tunnel with a length of 2 km. The order for each lot will be executed in accordance with the FIDIC Yellow Book contract terms. In the execution of the activities subject to this order, a technical design, work drawings and details should be drawn up, a complete construction and commissioning of the said section with a total length of about 4.40 km, of which 2 km tunnel part and 2, 40 km open road, with three subdivisions separated.

"Design and construction of the Struma motorway Lot 3.1 Tunnel" Zeleznitsa "with three lots

Агенция Пътна инфраструктура | Published October 19, 2017  -  Deadline November 28, 2017
cpvs
45233110

The subject of the present public procurement with three distinct positions is "Design and construction of Struma" Lot 3.1 Tunnel "Zheleznitsa". In this sense, the purpose of the public procurement is to build the Struma Motorway Lot 3.1 from km 366 + 000 to km 370 + 400, including a tunnel with a length of 2 km. The order for each lot will be executed in accordance with the FIDIC Yellow Book contract terms. In the execution of the activities subject to this order, a technical design, work drawings and details should be drawn up, a complete construction and commissioning of the said section with a total length of about 4.40 km, of which 2 km tunnel part and 2, 40 km open road, with three subdivisions separated.

"Carrying out design and construction works / engineering / on site:" Tunnel Krivia at km 388 + 897 on road I-1 / Е 79 / "Sofia-Kulata"

Агенция Пътна инфраструктура | Published June 22, 2017  -  Deadline July 28, 2017
cpvs
45233120

Construction of research and design and construction / engineering / on site: "Tunnel Krivia at km 388 + 897 on road I-1 / Е 79 /" Sofia-Kulata "with the length of 343 m. Movement in the tunnel takes place two- Two-lane sail. Width of the pavement - 8.5m; Height gauge - in the regulation - 4,5m; In the middle-5.4 m .; Width of the pavements-2X 1m. The scope of the contract covers the preparation of a Technical Project and a major repairs of the Krivia tunnel at km 388 + 897 on the road I-1 / E 79 / Sofia-Kulata - complete ubiquitous drainage of the inner surface and the road Canvas of the tunnel; Modernization of the lighting, signaling and fire-fighting system in the tunnel; Anticipation of a drainage and drainage system; New integrated waterproofing. System; Traffic lights; PBA, BP, PLO, OPD, WBD, Operation plan. And maintenance; Painting; Ensuring the shelf life of the company. With a view to ensuring safe conditions. Two-way and comfort of the travelers.

Specific Contract № 4720 / 08.19.2014, the object "Securing by building drainage systems of tunnel № 17 stations in Cherniche - PKYavorov tunnel № 19 stations in PKYavorov - Kresna a fifth railroad," concluded based on a framework agreement № 4217 / 27/12/2012 for lot № 4 with subject: "Repair, strengthening and restoration of railway infrastructure facilities" in a public procurement - Framework agreement with subject: "Repair, rehabilitation, modernization, maintenance, strengthening and restoration of infrastructure facilities in the lots. "

ДП „Национална компания Железопътна структура“ | Published August 29, 2014
Winner
ДЗЗД „Ж.П. Строй“, БУЛСТАТ 176 283 922р-н „Лозенец“, ул. „Околовръстен път“ № 159София 1700 mail@kram-komplex.bg +359 28601414 +359 28601441
cpvs
45221242, 45221220, 45221230

Specific Contract № 4720 / 08.19.2014, the concluded on the basis of a framework agreement № 4217 / 27.12.2012g. with subject: "Securing by building drainage systems of tunnel № 17 stations in Cherniche - PKYavorov tunnel № 19 stations in PKYavorov - Kresna a fifth railroad" includes the following activities: 1 drainage and water outside tunnels and; 2 Construction of walkways of concrete slabs for safe passage through the tunnels of officials, which are planned to be implemented following works as follows: Breaking breaker with an existing ditch in a tunnel with a hammer breaking an existing GBS, breaking with breaker for making narrow rock excavation for drainage, loading and transportation of construction waste excavation and transport of existing ballasted abstraction, strengthening existing ballasted with formwork, supply and installation of perforated PVC pipes f 200, supply and laying the concrete base B10 in drain . pipes up one third of the height, supply and laying gravel fraction 25-45 mm for drainage, supply and installation of hand-washed river gravel, making concrete manholes, supply and installation of covers for manholes in tunnels, supply and installation concrete slabs for the walkway tunnel, marking the manholes with oil paint in the tunnel and construction of temporary work light in a tunnel.

"Selection of a contractor to perform a consultancy service - construction supervision of the site:" Tunnel Krivia at km 388 + 897 on road I-1 / E 79 / "Sofia-Kulata" ......... Continued in field II .1.4)

Агенция Пътна инфраструктура | Published June 22, 2017  -  Deadline August 4, 2017
cpvs
71521000

Continued by field II.1.1) ...... Subject of this contract is "Selection of contractor for the provision of consultancy service - construction supervision of the site:" Tunnel Krivia at km 388 + 897 on road I-1 / Е 79 / "Sofia-Kulata". In this sense, the purpose of the public procurement is the Road Infrastructure Agency to conduct an open procedure for the selection of a contractor for the provision of a consultancy service for construction supervision of the site: "Tunnel Krivia at km 388 + 897 on I-1 / E 79 / "Sofia-Kulata" in order to improve the technical and operational state of the tunnel and the roadway in the area of ​​the facility and to ensure safe conditions for movement.

"Development of Enhanced conceptual design for the project: Path III-5004" Gabrovo bypass "from km 0 +000 to km 31 +000, tunnel under Shipka peak with 3220 m length from km 24 +400 to km 27 +620 ".

Агенция „Пътна инфраструктура“ | Published November 15, 2013  -  Deadline December 12, 2013
cpvs
71320000

"Development of Enhanced conceptual design for the project: Path III-5004" Gabrovo bypass "from km 0 +000 to km 31 +000, tunnel under Shipka peak with 3220 m length from km 24 +400 to km 27 +620 ". The aim of the project is to determine the optimal length of the tunnel under Shipka, with proven technical and economic viability of sites and portals to form functionally and architecturally in harmony with the environment visible parts of the structure, facilities and installations in the tunnel. The project has the following characteristics: Description of the project - a common part: All project parts of the tunnel should be prepared with the technical elements in accordance with the regulations for the equipment and operation of road tunnels harmonized with European standards and width dimensions corresponding to gauge dual carriageway - D 10.50. Specifications: Main span: km 24 +400 - portal side of Gabrovo. End of section: km 27 +620 - Portal hand Kazanlak. The facility is within the: District Gabrovo and Stara Zagora. Tunnel length: 3,220 km, width gauge tunnel: G10.50 m Altitude gauge tunnel: 4.80 m fulfillment of the object of the contract will be made based on the approved terms of reference design includes implementation of the following project- exploration work (PCD): Development of a conceptual design expanded in scope and content, in accordance with the terms of reference for the design and all legal documents relating to the design of tunnels and facilities and technical infrastructure in compliance with the work program and timetable for its preparation. The project includes: Perform detailed geological and hydrogeological studies. Not allow construction of a tunnel through the property with active landslides. In areas of portals to perform detailed surveying (tachymeter pictures), and the same is bound to the support polygon, built in the design of the bypass of the town of Gabrovo. To develop a plot plan of pre sites. Development of projects in the following areas: A. Registration and submission of project materials content: - "Overall a geological report" - "Road" - "plot plan of pre sites", B. Systems related to the operation of the tunnel: - "Ventilation" - "Light in the Tunnel" - "Predportalno lighting" - "Traffic signal" - "TV Control" - "Phone System" - "Water and Fire Protection" - "total power"; - "Central control center" - Project coordination with all concerned agencies and owners of the affected infrastructure.

"Extension of the system to control access to sensitive information."

Електроенергиен системен оператор ЕАД | Published February 7, 2014  -  Deadline March 20, 2014
cpvs
30200000

- Expansion of the system for security access to information resources (Cloud Management Server), which includes: specialized device - Network Appliance, 1000 lic, 300Mb/sec - 2 pc. License link - Networks - 10 tunnel license; - Annual maintenance of the system by the manufacturer; - Installation, configuration and commissioning of the supplied means to protect data transmission experience of contracting specialists to work with the proposed security solutions.

Geological studies for the construction of highway "Struma" Lot 3 "Blagoevgrad-Sandanski" in the areas of tunnel gorge and Zheleznitsa.

Национална компания „Стратегически инфраструктурни проекти“ | Published November 13, 2013  -  Deadline January 13, 2014
cpvs
71351913, 71351100

"Struma" highway route is approximately 150 km long, located in the southwestern part of the country between junction "Daskalovo" (the town of Pernik) and the border between Bulgaria and Greece in the village tower and e part of Pan-European Transport Corridor IV, and part of the TEN-T network and is divided into four lots: - Lot 1 Lower Dikanya to Dupnitza, - Lot 2 Dupnitza to Blagoevgrad, - Lot 3, Blagoevgrad to Sandanski - Lot 4 Sandanski to crossing the Greek border in the Tower . Lot 1 was put into operation, and Lots 2 and 4, currently under construction, as Assignor of these contracts RIA. For Lot 3 envisages the construction of a new motorway to gauge A29 dual carriageway with an approximate length of 64 km, divided into three subsections as follows (only the approximate mileage and length): - Lot 3.1, Blagoevgrad to Krupnik, a length of about 21 km, from km 359 to km 381, with the intersections, earth works and facilities, including a tunnel with a length of about 2.6 km near the village railway. - Lot 3.2 between Krupnik and armchairs. This stretch, with an approximate length of 20 km, 381 km to 401 km, passes through mountainous terrain. The main part of the plot is a tunnel (or two tunnels) in the gorge, with a total length of about 15 km. - Lot 3.3, 23 km from Kresna to Sandanski, from km 401 +800 to 423. Geological surveys under this procurement will be carried out in the Lot 3.1 and 3.2 in order to provide the necessary geological data and information on the framing of the tunnel project and include: - a review of archival documents and literature - geological mapping - geophysical studies based on seismic refraction method and reflected waves, - Geological Survey through exploratory core drilling - taking soil, rock and water samples and various field tests in boreholes - equipment of drilling as piezometers - laboratory test taken soil, rock and water samples - making inzherno Geological Survey Reports.

"Preparation of financial analysis and risk assessment for the project" Increasing the volume of the lower outlet of "Chaira" with the construction of the dam "Yadenitsa" and reversible pressure tunnel to connect to the dam "W

Национална електрическа компания ЕАД | Published February 10, 2017  -  Deadline March 7, 2017
cpvs
79311400

Preparation of financial analysis and risk assessment for the project "Increasing the volume of the lower outlet of" Chaira "with the construction of the dam" Yadenitsa "and reversible pressure tunnel to connect to the dam" Chaira "(Project" Yadenitsa ")

Selection of contractors for: Extension Project Sofia metro third metro - Depot Blvd "Botevgradsko road" - Blvd "Vladimir Vazov" - downtown - jk "Sheep font" first stage - from km 4 +950 to km 11 +966.34 In lots: I. Lot № 1: Section from km 11 +966.34 (starting shaft of a tunnel-boring machine) to km 8 996.69 (end of MS 11) with 2. stations; II. Lot № 2: Section from km 8 996.69 (end of MS 11) to 6 km 561.05 (end of MC 8) with 3 pcs. stations; III. Lot № 3: Section from km 6 561.05 (end of MC 8) to km 4 +950 2 pc. stations and tunnel section; IV. Lot № 4: tunnel section running with a tunnel-boring machine (TBM) of 11 km 966.34 (starting shaft) to 5 km 248.57 (output shaft).

„Метрополитен“ ЕАД | Published April 2, 2014  -  Deadline May 29, 2014
cpvs
45221200, 71327000

Subject of this procurement is to design and implementation of the first stage of the project for the extension of the subway in Sofia metro third track of which covers the underground section of km.4 +950 km.11 to 966.34 by the following route: bul " Vl. Vazov "street" Professor Milko Bichev "" Evlogi and Hristo Georgiev "," Orlov Most "boulevard" Vasil Levski "Blvd" Patriarch Euthymius "," Praga "street "George of Sofia", Medical College / Medical Complex - campus, crossing "Bulgaria" boulevard "Geshov" street "Kyustendil", "Krasno Selo" - "Zhitnitsa." The total length of the section is 7016.34 m Along envisaged to build 7 units. stations. The contract is divided into four lots: - Lot 1: Section from km 11 +966.34 (starting shaft of TBM) to km. 8 996.69 (end of MS 11) with 2. stations. - Lot 2: Section from km 8 996.69 (end of MS 11) to km.6 561.05 (end of MC 8) with 3 pcs. stations. - Lot № 3: Section from km 6 561.05 (end of MC 8) to +950 km.4 with 2. stations and tunnel section. - Lot № 4: Tunnel section performed with a tunnel-boring machine (TBM) of 11 km 966.34 (starting shaft) to 5 km 248.57 (output shaft).

"Supply, cutting, removal and installation of carpet, skirting boards and in hotel" Tunnel "holding" Evksinograd "

Министерски съвет /МС/ на Република България /РБ/ | Published November 29, 2016  -  Deadline December 6, 2016
cpvs
39531310

Tenders must be submitted in a sealed opaque packaging with the inscription: "Supply, cutting, removal and installation of carpet, skirting boards and in hotel" Tunnel "holding" Evksinograd ". The packaging shall bear the name / company participant, address, contact person, phone number and fax. Package with the tender contains the following documents: 1. Offer (Appendix № 1); 2. Technical Proposal (Appendix № 2); 3. Bid (Appendix № 3); 4. Declaration (Annex № 4); 5. Declaration (Annex № 5); 6. Information on participants (Appendix № 6); 7. Declaration (Annex № 7); 8. Declaration (Annex № 8) - where applicable; 9. Declaration (Annex № 9) - where applicable; 10. A copy of the registration document (when not specified identification code / UIC / under Art. 23 of the Commercial Register Act) when the participant is a legal entity or sole trader or a copy of the identity document, when the participant is a natural person . Foreign persons present the document in an official translation. When it is presented UIC, according to Art. 23 of the Commercial Register Act, the participants - legal entities or sole proprietorships apply standing certificate (original or certified copy of the participant). Foreign persons present an equivalent document issued by a judicial or administrative authority of the State where they are established. The document should be issued not earlier than 3 (three) months from the date of submission of the tender. 11. Other documents.

Delivery of epaulettes and insignia hard-tunnel allegedly PIA, Air Force and Navy.

Министерство на отбраната /МО/ | Published March 27, 2017  -  Deadline March 30, 2017
cpvs
39561133 (FB13)

The deadline for submission of tenders shall be extended by three days pursuant to Art. 188, paragraph 2 of the Public Procurement Act.

Delivery of epaulettes and insignia hard-tunnel allegedly PIA, Air Force and Navy.

Министерство на отбраната /МО/ | Published March 20, 2017  -  Deadline March 27, 2017
cpvs
39561133 (FB13)

"Cutting, sewing, delivery and installation of thin and thick curtains and bedspreads hotel" Tunnel "holding" Evksinograd "and" Dobrudzha yard "object" Shabla "

Министерски съвет /МС/ на Република България /РБ/ | Published December 1, 2016  -  Deadline December 8, 2016
cpvs
39515100

The contracting authority pays the price for the supply, cutting, sewing and assembly of thin and thick curtains and bedspreads hotel "Tunnel" holding "Evksinograd" and "Dobrudzha yard" object "Shabla" to 12.28.2016 In the event that activities the execution of the order can not be carried out within this period, they will be paid in advance upon presentation of a guarantee for the full amount of the advance payment. Tenders must be submitted in a sealed opaque packaging with the inscription: "Cutting, sewing, delivery and installation of thin and thick curtains and bedspreads hotel" Tunnel "holding" Evksinograd "and" Dobrudzha yard "object" Shabla ". The packaging shall bear the name / company participant, address, contact person, phone number and fax. Package with the tender contains the following documents: 1. Offer (Appendix № 1); 2. Technical Proposal (Appendix № 2); 3. Bid (Appendix № 3); 4. Declaration (Annex № 4); 5. Declaration (Annex № 5); 6. Information on participants (Appendix № 6); 7. Declaration (Annex № 7); 8. Declaration (Annex № 8) - where applicable; 9. Declaration (Annex № 9) - where applicable; 10. A copy of the registration document (when not specified identification code / UIC / under Art. 23 of the Commercial Register Act) when the participant is a legal entity or sole trader or a copy of the identity document, when the participant is a natural person . Foreign persons present the document in an official translation. When it is presented UIC, according to Art. 23 of the Commercial Register Act, the participants - legal entities or sole proprietorships apply standing certificate (original or certified copy of the participant). Foreign persons present an equivalent document issued by a judicial or administrative authority of the State where they are established. The document should be issued not earlier than 3 (three) months from the date of submission of the tender. 11. Other documents.

"Padding furniture in the hotel" Tunnel "and" Monastery "holding" Evksinograd "and" Dobrudzha yard "object" Shabla "

Министерски съвет /МС/ на Република България /РБ/ | Published December 1, 2016  -  Deadline December 8, 2016
cpvs
98394000

Principal paid the price for cutting, sewing and upholstering furniture in the hotel "Tunnel" and "Monastery" holding "Evksinograd" and "Dobrudzha yard" object "Shabla" to 28.12.2016 In the event that the implementation activities of the order can not be carried out within this period, they will be paid in advance upon presentation of a guarantee for the full amount of the advance payment. Tenders must be submitted in a sealed opaque packaging with the inscription: "Padding furniture in the hotel" Tunnel "and" Monastery "holding" Evksinograd "and" Dobrudzha yard "object" Shabla ". The packaging shall bear the name / company participant, address, contact person, phone number and fax. Package with the tender contains the following documents: 1. Offer (Appendix № 1); 2. Technical Proposal (Appendix № 2); 3. Bid (Appendix № 3); 4. Declaration (Annex № 4); 5. Declaration (Annex № 5); 6. Information on participants (Appendix № 6); 7. Declaration (Annex № 7); 8. Declaration (Annex № 8) - where applicable; 9. Declaration (Annex № 9) - where applicable; 10. A copy of the registration document (when not specified identification code / UIC / under Art. 23 of the Commercial Register Act) when the participant is a legal entity or sole trader or a copy of the identity document, when the participant is a natural person . Foreign persons present the document in an official translation. When it is presented UIC, according to Art. 23 of the Commercial Register Act, the participants - legal entities or sole proprietorships apply standing certificate (original or certified copy of the participant). Foreign persons present an equivalent document issued by a judicial or administrative authority of the State where they are established. The document should be issued not earlier than 3 (three) months from the date of submission of the tender. 11. Other documents.

Motorway construction works

Национална компания „Стратегически инфраструктурни проекти“ | Published December 3, 2015  -  Deadline January 25, 2016
cpvs
45233110, 45221111, 45221241, 71320000

The object of this contract is the construction (design and construction) of "Struma" highway tunnel Lot 3.1 "Railways". The order will be executed in accordance with FIDIC conditions of contract Yellow Book. In implementing the activities covered by this order shall be prepared technical projects, working drawings and details to build entirely and put into operation Subdivision Lot 3.1 Tunnel "Railways" from km 366 +000 to km 370 + 460, including tunnel with a total length of 4.46 km, of which 2 km tunnel part and 2.46 km open road.

Design and construction of highway "Struma" Lot 3.1 - Tunnel "Railways".

Национална компания „Стратегически инфраструктурни проекти“ | Published January 31, 2014
cpvs
45233110, 71312000

Проектиране и строителство на АМ „Струма" Лот 3.1 - тунел „Железница".

"Geological studies for the construction of highway" Struma "Lot 3" Blagoevgrad-Sandanski "in areas of the tunnels in the Kresna Gorge and Zheleznitsa."

Национална компания „Стратегически инфраструктурни проекти“ | Published May 28, 2014
Winner
Обединение "Геопс-геотехника-консулт" с ЕИК 176648901кв. Долни Воден, ул. "Кукленски път" № 5Асеновград 4230 office@geopsbg.com +359 896838390 +359 33149292
cpvs
71351913

Highway "Struma" is a track of about 150 km, located in the southwestern part of the country between junction "Daskalovo" (the town of Pernik) and the border between Bulgaria and Greece in the village of Tower and e part of Pan-European Transport Corridor IV, and part of the TEN-T network and is divided into four lots: - Lot 1 Lower Dikania to Dupnitsa - Lot 2, Dupnitza to Blagoevgrad - Lot 3, Blagoevgrad to Sandanski - Lot 4 Sandanski to crossing the Greek border at the Tower . Lot 1 was put into operation, and Lots 2 and 4, currently under construction, as Assignor of these contracts RIA. For Lot 3 envisages construction of a new highway to gauge A29 dual carriageways with an approximate length of 64 km, divided into three subsections as follows (only the approximate mileage and length): - Lot 3.1, Blagoevgrad to Krupnik, a length of about 21 km from km 359 to km 381, the corresponding intersections, earth works and facilities, including a tunnel with a length of about 2.6 km, near the village of railways. - Lot 3.2 between Krupnik and armchairs. This stretch a length of approximately 20 km, from km 381 to km 401, passes through mountainous terrain. The main part of the station's tunnel (tunnel or two) in the gorge, with a total length of about 15 km. - Lot 3.3, 23 km from Kresna to Sandanski, from km 401 +800 to 423. Geological surveys covered by this procurement will be carried out in the Lot 3.1 and 3.2 in order to provide the necessary geological data and information on the stage of preparation of the tunnel project and include: - a review of archival documents and literature; - Geological mapping; - Geophysical studies based on seismic refraction method and reflected waves; - Geological Survey through exploratory core drilling; - Taking soil, rock and water samples and various field tests in boreholes; - Equipment of the exploratory wells as piezometers; - Laboratory testing of soil taken, rock and water samples - preparing inzherno Geological Survey Reports.

Motorway construction works

Агенция „Пътна инфраструктура“ | Published October 12, 2017
cpvs
45233110, 71311220

The subject of the present public procurement with 3 detached positions is "Design and construction of Struma" Lot 3.1 "Zheleznitsa" tunnel. In this sense, the purpose of the public procurement is to build the Struma Motorway Lot 3.1 from km 366 + 000 to km 370 + 400, including a tunnel with a length of 2 km. The order for each lot will be executed in accordance with the FIDIC Yellow Book contract terms.

In the execution of the activities subject to this order, a technical design, work drawings and details should be drawn up, a complete construction and commissioning of the said section with a total length of about 4.40 km, of which 2 km tunnel part and 2, 40 km open road, with 3 subdivisions separated.

The activities under this OP include: design and construction of road section with A29 gauge from km 366 + 000 to km 366 + 720, as well as shifting of the fourth class road BLG 1071 (I-1 Blagoevgrad - Simitli), bridges crossing the following obstacles: the Struma River, road I-1 (Е-79), railway. line Sofia - Kulata, fourth-class road BLG 1071, as well as the construction of a service tunnel road at the northern gate of the "Jeleznitsa" tunnel. The total length of the bridge facilities in the subdivision is about 620 m and the area is about 18 000 sq. M. It is necessary to construct fortification walls, drainage facilities, as well as construction / reconstruction of engineering networks: optical and copper cables, OC96FO and OK12FO in channel network crossing the road; Reconstruction of the Power Line (20 kV Tunnel).

Implementation of the design and construction of a railway tunnel in a subdivision of km 366 + 720 to km 369 + 000 with 2 separate pipes, each about 2,000 m. Each, tunnel systems, installations, intelligent transport systems. The OP 2 activities include a service tunnel at the southern gateway of the Jeleznitsa tunnel; technological / service centers and adjacent areas in the north and south. portal of the tunnel; a helicopter landing, a bridge over Suha River with a length of about 132 m along the Struma motorway, correction of Suha Reka, bridge ...