Call +44 800 9755 164

Public tenders for tunnel

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Road tunnel construction work

Statens vegvesen Region vest | Published April 12, 2017  -  Deadline August 7, 2017
cpvs
45221241, 71322000, 45310000

County roads 7 Hagaås tunnel and the Liaros tunnel shall be upgraded in accordance with the Tunnel Safety Regulations (TSF) and the Norwegian Public Roads Administration's handbook N500.

All electrical equipment shall be replaced and new technical rooms shall be constructed in both tunnels. New fans shall be installed in the Hagaås tunnel. Some blasting works must be expected.

The contract will be carried out as a turnkey contract.

The Hagaås tunnel and the Liaros tunnel are situated along county road 7 in Samnager municipality. The tunnels shall be upgraded in accordance with the Tunnel Safety Regulations (TSF) and the handbook N500.

The assignment includes engineering design, renovation and documentation for the described tunnels. The assignment will also include temporary operation of the safety equipment during the construction stage.

The assignment also includes the renovation of side areas in the tunnels adapted to escape routes, the construction of necessary technical buildings and infrastructure required for the implementation of the project. Blasting works must be expected. Both tunnels shall be safety approved.

Y--ASL Tunnel Expansion

Department of the Interior, U. S. Geological Survey | Published March 22, 2017  -  Deadline April 27, 2017
cpvs

XX::OT::XX ASL Tunnel Expansion

E105 Trifontunnel electromagnetic tunnel

Statens vegvesen Region nord | Published April 1, 2017
cpvs

Work on completion of the road project E105 is in its final phase. Road and tunnel is handed over from the installation contractor before year-end 2016 and the works on Bøkfjorden bridge to be completed by 1 September 2017. Electrical works in the tunnel, 680 meters, can proceed without that there should be other works in the area of ​​comprehensive nature.
Works to be performed under this contract the cable racks and lighting, safety equipment, distribution boards, UPS and battery systems, emergency network and radio equipment, SROanlegg, road lighting and completion of earthing systems.

Tunnel washer

SNCF Mobilités | Published March 28, 2017  -  Deadline April 26, 2017
cpvs
42995100

(S) tunnel (s) of washing and steaming are for railway equipment such as motors, power converters, rotors, tanks, power drawers .... The differences have workpieces weighing up to 2 000 kg and dimensions corresponding to a 1300 mm side cube.

Bids are requested for: a purchase.

Tunneling Expert Expert Tunnel Offenburg PfA 7.1

Deutsche Bahn AG FEI - Beschaffung Infrastruktur | Published April 21, 2017  -  Deadline May 3, 2017
cpvs
71311230

Tunneling Technical Experts Tunnel Offenburg PfA 7.1 Karlsruhe

Replacement of the Lièpvre tunnel lighting system

Direst | Published April 21, 2017  -  Deadline May 22, 2017
cpvs
45310000

Replacement of the Lièpvre tunnel lighting system

Repair reptiles fences 2017/2018 tunnel Rastatt

Deutsche Bahn AG FEI - Beschaffung Infrastruktur | Published April 3, 2017  -  Deadline April 27, 2017
cpvs

ABS / NBS K / B STA1 Ka-Ba PfA 1.2, Tunnel Rastatt, repair reptiles fences 2017/2018

Tender for a Wind Tunnel

Swansea University | Published April 15, 2017
cpvs
38900000

The College of Science has a requirement for a wind tunnel for testing living birds. With this system, the bird sets its own wings to fly in the tunnel. This approach was devised in the 1960s, when its potential was only partly developed. The size and speed of the tunnel are designed to provide natural flying conditions for any bird that might be used. Force measurements are made by looking at the bird’s balance, rather than from in-tunnel instruments. The wind tunnel is funded through the European Research Council (ERC) project at Swansea University II.1.5) Estimated total value Value excluding VAT: 331 200.00 GBP II.1.6) Information about lots This contract is divided into lots: No II.2) Description II.2.3) Place of performance NUTS code: UKL18 II.2.4) Description of the procurement The College of Science has a requirement for a wind tunnel for testing living birds. With this system, the bird sets its own wings to fly in the tunnel. This approach was devised in the 1960s, when its potential was only partly developed. The size and speed of the tunnel are designed to provide natural flying conditions for any bird that might be used. Force measurements are made by looking at the bird’s balance, rather than from in-tunnel instruments II.2.5) Award criteria Price is not the only award criterion and all criteria are stated only in the procurement documents II.2.6) Estimated value Value excluding VAT: 331 200.00 GBP II.2.7) Duration of the contract, framework agreement or dynamic purchasing system Start: 01/07/2017 End: 31/05/2018 This contract is subject to renewal: No II.2.9) Information about the limits on the number of candidates to be invited II.2.10) Information about variants Variants will be accepted: No II.2.11) Information about options Options: No II.2.13) Information about European Union funds The procurement is related to a project and/or programme financed by European Union funds: Yes Identification of the project: ERC Starter Grant Section IV: Procedure IV.1) Description IV.1.1) Type of procedure Open procedure IV.1.8) Information about Government Procurement Agreement (GPA) The procurement is covered by the Government Procurement Agreement: Yes IV.2) Administrative information IV.2.2) Time limit for receipt of tenders or requests to participate Date: 19/05/2017 Local time: 12:00 IV.2.4) Languages in which tenders or requests to participate may be submitted EN IV.2.6) Minimum time frame during which the tenderer must maintain the tender Duration in months: 3 (from the date stated for receipt of tender) IV.2.7) Conditions for opening of tenders Date: 19/05/2017 Local time: 12:00 Place: Swansea University Section VI: Complementary information VI.1) Information about recurrence This is a recurrent procurement: No VI.2) Information about electronic workflows Electronic ordering will be used Electronic invoicing will be accepted Electronic payment will be used VI.3) Additional information As part of the tender process, a site visit to the University’s Singleton Park campus has been arranged for suppliers, on the afternoon of Friday 5th May 2017. This visit will provide an opportunity for companies to gain some insight into the environment of the provision as well as to ask questions relating to the tender process and specification Those companies wishing to attend should confirm their interest by 12 noon on Wednesday 3rd May 2017 via the BravoSolution Message Board facility, providing the staff names of those attending (suppliers are respectfully asked to limit attendees to two company representatives only). Attendees should set aside approximately 1.5 hours in their diaries and should report to the main foyer of Fulton House (Building 17 on document 11 Singleton Campus site plan) by 14.00hrs. Please do not just turn up without confirming your attendance first as this may compromise the management of the visit. Suppliers should note that although companies are encouraged to support this visit, attendance is not compulsory and will not affect the evaluation of a subsequent tender submission NOTE: The authority is using eTenderwales to carry out this procurement process. To obtain further information record your interest on Sell2Wales at http://www.sell2wales.gov.wales/search/search_switch.aspx?ID=64673 (WA Ref:64673) The buyer considers that this contract is suitable for consortia bidding. VI.4) Procedures for review VI.4.1) Review body Swansea University Procurement - Finance, Swansea University, Singleton Park Swansea SA2 8PP UK Telephone: +44 1792295890 Internet address(es) URL: www.swansea.ac.uk VI.5) Date of dispatch of this notice 13/04/2017 Information added to the notice since publication. Additional information added to the notice since it's publication. No further information has been uploaded. Main Contact: l.miles@swansea.ac.uk Admin Contact: N/a Technical Contact: N/a Other Contact: N/a Commodity Categories Commodity Categories IDTitleParent Category 38900000Miscellaneous evaluation or testing instrumentsLaboratory, optical and precision equipments (excl. glasses) Delivery Locations Delivery Locations IDDescription 1018Swansea Alert Region Restrictions The buyer has restricted the alert for this notice to suppliers based in the following regions. Alert Region Restrictions There are no alert restrictions for this notice. Copyright © Sell2Wales Connect with us Email signup Subscribe to our email newsletter Subscribe Call us on 0800 222 9004 Accessibility| Privacy Policy & Cookies| Site map| Terms & Conditions| © Millstream Associates Limited 2017 //

Construction work for tunnels

Autobahnen- und Schnellstraßen-Finanzierungs-Aktiengesellschaft | Published April 11, 2017
cpvs
45221240, 31720000

S16, refurbishment tunnel Pians-Quadratsch u. Tunnel Gurnau, Structural u. Elektromaschinelle services.

Elektromaschinelle equipment.

Construction work.

Realization of the safety record of Boulc tunnel and preliminary and safety record of the Rousset Pass tunnel in the department of Drôme

DÉPARTEMENT DE LA DRÔME M. le Président du Conseil départemental Direction des Déplacements Service Entretien Exploitation et Sécurité de la Route et du Matériel 1 place Manouchian BP 2111 - 26021 Valence - CEDEX Tél : 04 75 75 92 92 - Fax : 04 75 75 92 78 | Published April 22, 2017
cpvs

This consultation concerns the implementation of the safety record of Boulc tunnel and preliminary dossier and safety of the Col du Rousset tunnel, knowing that both tunnels are longer than 300 m, to the issuance of their authorizations operating and validation work programs.

Airlock, Tunnel, Pressurized Package

Department of the Army, Defense Logistics Agency Detachment | Published March 27, 2017  -  Deadline May 11, 2017
cpvs

Item: Airlock, Tunnel, Pressurized PackageNSN: 4240-01-330-8886PN: 5-19-11342 (Cage 81361, ECBC Engineering)Qty: 33 each basic, 33 each optionPackaging: Military B with Special Packaging InstructionsFOB: DestinationNote 1:  This procurement is a 100% Total Small Business Set-AsideNote 2:  See the technical data package (TDP) at the following weblink:  https://www.fbo.gov/notices/2243c56ba96003eee33243baa509c204Note 3:  Once the solicitation document has been approved, it will be posted here on FBO for public viewing.  The estimated due date for proposals is 11 May 2017 by 5:00PM EDT.

Planning services for conversion station Stendal and dismantling Röxer Tunnel

Deutsche Bahn AG FEI - Beschaffung Infrastruktur | Published April 21, 2017  -  Deadline May 19, 2017
cpvs
71320000, 71322000, 71322500

Planning services for conversion station Stendal and dismantling Röxer Tunnel Performance phases 5 (4) for the trades Traffic engineering, civil engineering, structural engineering, technical equipment, optional LPH 6 and 7 Stendal

Pedestrian tunnel construction work

SNCF Réseau | Published April 22, 2017  -  Deadline May 15, 2017
cpvs
45221243

The work covered by this contract concerns the security and improvement of the conditions for the evacuation of users of the Meudon tunnel. They consist mainly of digging the exhaust gallery and the 2 branches of connection with the existing railway tunnel.

This market consists of two main works:

- The evacuation gallery,

- Connection branches.

The evacuation gallery, this is a tube of 3.5 m inside diameter, for a length of 1600 m. The evacuation gallery is planned to be dug in the tunnel boring machine, its covering is made up of reinforced concrete voussoir. A concrete renformi is cast in the lower part of the gallery to reveal a flat width of 2.40m.

The two connecting branches are located respectively at Pk 11 + 601 and Pk 10 + 537 connected to the west end of the railway tunnel by an evacuation gallery. The connecting branches are 30m long and connect the exhaust gallery to the railway tunnel.

Each branch has a 10m long lock, the cunette is connected to the central channel of the railway tunnel. The construction of the last meters of the shoots and the piercing of the tunnel pedestal at the right of these are services not included in the present project.

The main quantities are as follows:

Structural Concrete 1 850 m 3

Steels HA 141 840 kg

Welded mesh including sprayed concrete 76 450 kg

Handrails 3 450 ml

Road repairs rue Maneyrol 850 m 2

Provision of a tunnel boring machine at the front 1 flat rate

Waste disposal and landfilling 24,900 m 3

Prefabricated reinforced concrete racks 1,700 ml

The quantities above are given for information only and are not contractual.

Procurement of Elastomeric Lead-Lag Damper of small Scale Rotor Hub for Rotor Wind Tunnel Test

Korea Aerospace Research Institute : KARI | Published March 31, 2017
cpvs

Procurement of Elastomeric Lead-Lag Damper of small Scale Rotor Hub for Rotor Wind Tunnel Test

Road tunnel construction work

DEGES Deutsche Einheit Fernstraßenplanungs- und -bau GmbH | Published April 7, 2017  -  Deadline May 16, 2017
cpvs
45221241

New tunnel Waggershausen (B16), BW 15, BW 51, route BA 2 for B31, Baulos. 8

Drilling Explanations Kirschhofen Tunnel, Fachinger Tunnel and Kalkofen Tunnel

Deutsche Bahn AG FEI - Beschaffung Infrastruktur | Published April 21, 2017  -  Deadline May 15, 2017
cpvs
45221000

Geotechnical exploratory drilling, field tests and laboratory tests

Rehabilitation of the Nordby and Smithy Hagen tunnel, NPRA Region east

Statens vegvesen Region øst | Published April 18, 2017
cpvs

Nordby tunnel was opened in 1992 and consists of a dual bore tunnel with two lanes in both directions. The tunnel has 5 technical rooms of which 3 of them are located inside the tunnel. The tunnel length is 3850 meters.
Smithy Hagen tunnel was opened in 1999 and consists of a single bore tunnel having two lanes in one direction. The tunnel has a technical room located in the day (above the tunnel). The tunnel length is 892 meters.
The work includes a complete rehabilitation of the Nordby and Forgings Hagen Tunnel E6 Following. In addition, there are approximately 6.6 km of work in open stretches (Nordby north - Ringnes, referred to as Vinterbrosenteret Sletta 2.1 km); Nordby south - Smithy Hagen north, 0.8 km; Smithy Hagen south - Korsegården 3.7 km. In the tunnel approach zone will be established portals and sign with corresponding trenches.
Primarily, the work carried out in one run at a time, with traffic in the second race. Working zones are characterized and the tunnel should be substantially performed as night work, but with the exception of two closure periods totaling 5 months

New Tunnel Waggershausen (B16), BW15, BW51 for B31, BL8

DEGES Deutsche Einheit Fernstraßenplanungs- und -bau GmbH | Published March 17, 2017  -  Deadline April 25, 2017
cpvs
45221241

New Tunnel Waggershausen (B16), BW 15, BW 51, Route 2 BA for the B31 line, Section 8

Tunnel Remedy Sunnmøre - Offer 2 - Rv. 658 Ellingsøy Tunnel, rv. 658 valderøy tunnel and fv. 658 godøy tunnel

Statens vegvesen Region midt | Published March 28, 2017
cpvs

Advance Notification tunnel repair work on Ellingsøy Tunnel 3520 m, valderøy tunnel 4220 m and 3840 m godøy tunnel.
Estimated announcement in April 2017.

E 39 Masfjord tunnel, tunnel upgrade

Statens vegvesen Region vest | Published March 29, 2017  -  Deadline June 2, 2017
cpvs
45000000

Upgrades of electrical and control technical systems and structural engineering in Masfjord tunnel.