Call +44 800 9755 164

Public tenders for construction in Slovakia

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionSlovakia

Construction work

Mesto Trenčín | Published November 4, 2016  -  Deadline December 12, 2016
The contract has as construction works to Peace Square reconstruction including the carrying out archaeological excavations and architectural-historical research and develop a feasibility project documentation for WiFi, sound system and video surveillance system.

Construction work

Hlavné mesto SR Bratislava | Published December 1, 2016  -  Deadline December 18, 2016

The contract is the design and further necessary documentation to the application for planning permission, the project documentation for the application for a building permit, ensuring engineering activities for the preparation and execution of the building and to provide for a package of services in representing the investor (builder) in dealings with the authorities concerned protecting public interests pursuant to special regulations, and other interested parties, carrying out construction according to prepared and approved design documentation for the building authority, power supervision, performance of documentation coordinator and safety coordinator. In detail the subject matter described in the tender documents for the contract.

Construction work

Mesto Trenčín | Published November 26, 2016  -  Deadline January 2, 2017

The contract has as construction works to Peace Square reconstruction including the carrying out archaeological excavations and architectural-historical research and develop a feasibility project documentation for WiFi, sound system and video surveillance system. Mesto Trenčín preparing a comprehensive solution to the reconstruction of Peace Square, which consists of a paved solutions and comprehensive reconstruction of engineering network owned by the city of Trenčín routed through the square as well as the reconstruction of networks owned by other administrators who are not subject to this competition.

At the same time the city of Trenčín will implement the exchange surfaces (paved) and installation of new equipment and elements of the square (eg. The stage, fountain, WiFi, camera system, sound system). An essential part of the implementation of reconstruction is carrying out archaeological excavations and architectural-historical research and it is necessary to develop its project documentation for the wifi, sound system and video surveillance system.

Construction management services

Východoslovenská vodárenská spoločnosť, a.s. | Published November 4, 2016
The winning bidder will be responsible for the performance of consulting services for the client, security and performance management activities of construction supervision and administration of contract work for the construction work under the project Malcov - Lenartov sewerage and sewage treatment plant; Through a team of duly authorized individuals (professionals) within the meaning of the provision of services.

Construction work for sports facilities

AS Trenčín, a.s. | Published November 2, 2016  -  Deadline December 5, 2016
The contract is the construction of the stadium of AS Trencin in Trencin. Further information is provided in the descriptive document.

Cycle path construction work

Mesto Prešov | Published November 22, 2016  -  Deadline December 11, 2016

The contract is the construction of bike paths, which is proposed in the route of the existing pedestrian walkway of the bridge in Bajkalská Street to the north along the river Torysa connected to the existing bike path and walkway for pedestrians. Part of the construction work will also build the ramp and relocation of public lighting. Bike paths will have a width of 3.0 meters, width of footpaths will be 1.5 meters. Its length is 483.75 meters.

Construction work for highways, roads

Národná diaľničná spoločnosť, a.s. | Published December 7, 2016  -  Deadline December 22, 2016

The contract is the design and execution of works for the project of the D1 motorway Mushroom - Ivachnová. Line construction D1 motorway Mushroom Ivachnova total length of 15.272 km is covered in width arrangement according to category D 26,5 / 100 (80). Following the prepared section of the D1 section Turany Mushroom, which begins at the intersection of Mushroom No connection. I / 18 road, cross Vah, the path III. tr. and track ZSR goes beyond community Hrboltová 4,046 km and enters a tunnel Čebrať (Cat. T 7.50) length of 2 km. Čebrať continues for a tunnel north of the village Likavka, Martinček, Lisková, cross track railway station, the River Vah, the I / 18 and the end attached to already existing highway Ivachnová. Range of construction: tunnel dl. about 2.026 km 3 intersections, 21 bridges (l. 4845 m), 8 door frames walls, retaining walls 7, a left-hand landing Ivachnová.

Construction work of the office of the municipality Selice.

MP Profit PB, s.r.o. | Published December 1, 2016  -  Deadline January 10, 2017
The proposed construction works deal with the exchange of doors and windows, thermal insulation of external vertical load bearing structures with flat roof construction and building entrance for disabled persons. For more information on the specifications.

Production line construction carpentry

Úrad pre verejné obstarávanie | Published October 5, 2016  -  Deadline January 19, 2017
The contract is the supply of goods and services related to the supply of a new production line of carpenter construction and its installation in the premises of the contracting authority. Part of the subject of the contract must be complete software and equipment necessary for the operation and full utilization of line capacity, ie including controlling and design software connected and communicating directly, ie without intermediate inputs (data converter). Detailed definition of the object of the contract is listed in the description of the subject of the contract in the tender documents.

Construction work options for women

Občianske združenie BRIEŽDENIE | Published December 6, 2016  -  Deadline December 19, 2016
The contract has as object construction work to correct the existing accommodation facilities. The building is now used for the accommodation needs of women with children. The existing building is part of the accommodation with two floors and an unused attic. Support system object is a longitudinal wall with two outbuildings with reinforced concrete ceilings .Pôvodné stairs are reinforced concrete monolithic slab with lateral stringer. The existing walls are brick. The building is currently no structural defects / no cracks / waterproofing and shows no signs of disorders. Hardware building wiring and heating is outdated. Fillings / exterior windows, glass walls and doors / are original and are currently complying with the new thermal insulation requirements and standards. From the urban point of view there is no significant change functional areas, and communications links in the vicinity of the land. Buildings connected to public communication is through the repair of driveway paving. The proposed reconstruction of the object touches the whole building accommodation often including roof construction and facade. On the ground floor accommodation section has an entrance portion, premises hinterland cuisine, kitchen, dining room, rooms for mothers with children, premises boiler room drevohmotu that heats the whole area, appropriate sanitary facilities and communication space / hallway and staircase to the floor /, room for cleaning lady with the appropriate stock. In 2.NP and 3.NP are rooms for accommodation of mothers and children with adequate sanitary facilities and communication space, kitchen, office manager for the building and lounge for residents. Further details in tender documentation.

Construction of 15 housing units in the village Zákopčie

Obec Zákopčie | Published November 29, 2016  -  Deadline December 27, 2016
Project documentation and construction of 15 housing units in the village Zákopčie with technical facilities.

Construction of rental flats lower standard - Stage 1

Mesto Medzilaborce | Published December 6, 2016  -  Deadline December 29, 2016
The contract is the construction of two apartment blocks B1 and B2, which will serve as rental housing of a different standard for people in material or social need The subject of the contract is the construction of utilities.

Railway construction works

Železnice Slovenskej republiky, Bratislava v skrátenej forme „ŽSR“ | Published December 6, 2016
The contract called ,, ZSR, Modernisation of railway line Devinska Nova Ves - state border SR / CR "is a copy of the PD, the provision of related ID and production. 

1 PPA and the contract for construction work, where the successful tenderer (future construction contractor) ensures the development of PD.

It is a modernization of the railway. No.110 track (track - Bratislava - Kúty state border Slovak / Czech Republic Lanžhot) network ZSR in section Devinska Nova Ves (hereinafter referred to as "MFN") - Kúty state border SR / CR, which includes the modernization of the two track sections and the implementation of the ERTMS section of railway. line Bratislava-Kúty state border SR / CR:

Work: ,, ZSR, Modernisation of railway line Devinska Nova Ves - state border SR / CR "

A building "ŽSR, Modernization of railway track Devinska Nova Ves - state border SR / CR"

- Section A.1, DNV (outside) - Malacky sžkm 1,384 - 25,670 sžkm

.... Hereinafter referred to in points II.2.4) and II.2.14) of this notice.

Slovak / Czech (corners No. Hr.) Sžkm 68.090 to 74.900

Slovak / Czech, Part 1 (sžkm 71.600 to 74.900)

Slovak / Czech, Part 2 (sžkm 68.090 to 71.600)

Slovak / Czech "

- Section B.1: DNV (outside) - Malacky sžkm 1,384 - 25,670 sžkm

- Section B.2: Malacky (outside) - Kuty sžkm 25.670 to 68.090

Slovak / Czech (corners No. Hr.) Sžkm 68.090 to 74.900

Slovak / Czech, Part 1 (sžkm 71.600 to 74.900)

Slovak / Czech, Part 2 (sžkm 68.090 to 71.600)

Devínske lake - Kuty km 3.526 to 49.907 for a speed of 160 km / h. "

Kosec - Nozdrovice journey on the street in the park, construction work

Obec Košeca | Published November 17, 2016  -  Deadline December 14, 2016
The subject matter is defined by the construction project "Kosec - Nozdrovice journey on the street in the park, construction work" who made ARKON STUDIO, sro Žilinská 790/17, 017 01 Považská Bystrica in February 2016 order number: AA / 03/16 / PP. It is the realization of communication and storm sewers. Detailed in the tender documents.

Construction of new bridges and adjacent communications in the village Košeca

Obec Košeca | Published November 17, 2016  -  Deadline December 14, 2016
The subject matter is defined by the construction project "construction of new bridges and adjacent communications in the village Košeca" who made Ing. John Sandanus, Slovak Republic Square 10, 014 01 Bytča in December 2015, order number: 201601.3. It is the realization of the object So_01 Košecký Bridge over the creek and SO_02 communications. Detailed in the tender documents.

Project documentation with 04 A - Upper Construction of leisure space JAMA

Ateliér BAAR, s. r. o., | Published November 23, 2016
The contract is a modification and extension of project documentation for SO 04 and service building - upper construction of green roofs and green walls.

Construction of rental housing - Select, II. phase

E-RAN Development, s.r.o. | Published November 22, 2016
The contract is a "construction of rental apartments SELECT II. Stage including infrastructure and land." The interests of the contracting authority's purchase of an apartment house with twelve residential units meeting the current standard conditions for a loan from the State Housing Development Fund and grants from MDVaRR SR with the necessary facilities and land. Overall, it is in a residential building planned twelve apartments on two floors, of these are planned eight bedroom, two bedroom and two one-bedroom. Breakdown Structures: SO 101 Rental apartment building SO 102 Communication, parks and paved surfaces with 201 Drinking water connection, SO 202 sewage connection, SO 203 storm sewer SO 205 Connection NN, SO 206 weak current connection.

Development of projects for construction permit at the construction implementation project: "Reconstruction of the Cultural House Poprad -"

Archstudio, spol. s r.o. | Published November 17, 2016
Changes proposed to change the nature of the object both indoors and outdoors. Changes in the interiors would significantly improve the overall logistics space and streamline the functioning of the entire building. Exterior changes will bring a new quality in the expression object and its relationship to the surrounding environment. Building part A (first layout Changes- entrance foyer and its relationship to space zázemia- increase in capacity terms - a new main entrance, new escape stairs at the east fasáde- disposal of existing external staircase second building- architectural modifications cover the main entrance markízou- new cladding the whole building - new exterior communication core - change the shape of the roof) B Hardware - central vykurovanie- complete indoor installation, including a new boiler, electric - complete construction indoor installation, sanitary - complete indoor installation, ventilation areas selected C outer surfaces (parking arrangement flat- public lighting- drainage area of ​​the parking lot)

Construction of sewerage network + WWTP for elementary schools with kindergarten Hladovka

Ultima Ratio s.r.o. | Published December 6, 2016  -  Deadline December 29, 2016
The contract is the execution of works related to the construction of new local sewage treatment plant (hereinafter referred to as WWTP) and the construction of the sewage system. Sewage pipeline is proposed to drain sewage from the existing residential building, next school, after school, kindergarten and municipal office, the new distribution of rainwater and sewage system. Wastewater treatment plant will purify sewage water from the new sewer system.

Construction work

Trenčiansky samosprávny kraj | Published November 25, 2016  -  Deadline December 29, 2016

The contract is the reconstruction and distribution monoblock IS Hospital Prievidza (Operating Theatres) "- Hospital based in Prievidza Bojnice. A detailed description of the purpose of the contract forms part of the specifications and their annexes.

The contract is the reconstruction and distribution monoblock IS Hospital Prievidza (Operating Theatres) "- Hospital based in Prievidza Bojnice. A description of the scope and requirements relating to the subject of the contract form part of the specifications and their annexes.