Call +44 800 9755 164

Public tenders for construction in Slovakia

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionSlovakia

Environmental monitoring for construction

Národná diaľničná spoločnosť, a.s. | Published March 17, 2017  -  Deadline April 20, 2017
cpvs
71313450

Monitoring the impact of construction on selected elements of the environment before the construction, during construction and after commissioning. Start of construction of the expressway is planned in the second. Q-2018 and the estimated construction period is 4.5 years.

Railway construction works

Železnice Slovenskej republiky, Bratislava v skrátenej forme „ŽSR“ | Published February 24, 2017  -  Deadline April 4, 2017
cpvs
45234100, 71320000, 71311230, 31682200, 32344210, 32522000, 32523000, 32571000, 34632300, 34990000, 45234116, 45231400, 45221112, 45221220, 45100000, 45112000, 45262640, 45112700, 45316100, 45314310, 45221211, 45262620, 45220000, 45221111, 45213320, 45234115, 45111300, 45112210, 44112100, 45232221, 45315400, 45315600, 51612000, 32562000

1. The contract called ,, ZSR, Modernisation of railway line Devinska Nova Ves - state border SR / CR "is a copy of the PD, the provision of related ID and production.

2. It is a mixed contract pursuant to § 30 par. 1 PPA and the contract for construction work, where the successful tenderer (future construction contractor) ensures the development of PD.

3. It is a modernization of the railway line no. 110 (track - Bratislava - Kúty - state border SR / CR - Lanžhot CZE) network ZSR in section Devinska Nova Ves (hereinafter referred to as "MFN") - Kúty state border SR / CR, which includes the modernization of the two track sections and the implementation of ERTMS in the field railway line Bratislava-Kúty state border SR / CR (...) given in point II.2.4) of this notice.

Insulation and construction work entering school Turzovka - A pavilion

Mesto Turzovka | Published March 28, 2017  -  Deadline April 25, 2017
cpvs
45214210

The contract is construction work on the thermal insulation of external walls of the pavilion "A" Primary School in Turzovka and construction work input, which will consist of the construction of prezúvárne at the main entrance to the building, including the construction of the entrance ramp at the side entrance of the atrium.

Road bridge construction work

Slovenská správa ciest | Published February 28, 2017
cpvs
45221111

The contract is the reconstruction of bridges first-class roads in the Nitra and Trnava regions consisting of the following objects overhead, which the contracting authority enters as a whole:

- Road I / 51 Holíč bridge over the stream Chvojnica, ev. no. 51-050;

- Road I / 51 Levice most ev. no. 51-146;

- The I / 64 Nitra, most ev. no. 64-019;

- The I / 75 New Locks, most ev. no. 75-016;

- The I / 75 Slatina most ev. no. 75-042.

Reconstruction work on all bridges mainly consist of the complete exchange of the bridge superstructure ie road, insulation, drainage, sidewalks, parapets, railings, expansion joints, made of reinforced upper structure built interlocking boards and repair and reinforcement of the lower bridge construction.

Road I / 51 Holíč bridge over the stream Chvojnica, ev. no. 51-050:

Bridge over creek in rural Chvojnica Holic length of 39.408 meters. Part of the work is the strengthening of the slope paving and construction of two staircases at the bridge.

Road I / 51 Levice most ev. no. 51-146:

Most of the ZSR and the Ministry of Culture within the boundaries of the town of Levice length of 327.96 meters. Part of the work as the design of the road before and after the bridge on the DL. 352.06 m, footpaths, public lighting and building a staircase, protidotykovej barriers.

The I / 64 Nitra, most ev. no. 64-019:

Bridge over the river Nitra within the boundaries of the city of Nitra dl. 49.04 m. Part of the work also includes transhipment utilities.

The I / 75 New Locks, most ev. no. 75-016:

Bridge over the river Nitra within the boundaries of the city of New Castle length of 75.34 meters. Part of the work is the exchange between the roadway bridges.

The I / 75 Slatina Bridge, ev. no. 75-042:

Most of ZSR in rural village, dl. 295 m. Part of the reconstruction is to ensure the hillside construction of reinforced concrete walls and piles and relocation IS MTS cable VV ZSR, high-pressure gas pipeline DN 150th

Building construction work Hospital in Sala

Nitriansky samosprávny kraj | Published March 3, 2017  -  Deadline March 30, 2017
cpvs
45000000

Procured the construction work building the hospital in town Sala. Construction work relating to the exchange of existing doors and windows in plastic, window sills and side windows, insulation of external walls and roof, flat roof and redevelopment Parapet, restoration of exterior finishes including insulation cladding construction, repair existing sidewalks eaves around the building, repair or. replacement of plumbing structures dismantling and subsequent re-installation of flashings, drains, downspouts, dismantling and subsequent assembly by lightning assignments, projects and bills of quantities, which form part of the specifications.

Modernization of attachments for construction machines

AKCEPTA s.r.o. | Published March 1, 2017  -  Deadline June 15, 2017
cpvs
42611000

The contracting authority intends to purchase technology to modernize the production of attachments for construction equipment. Specifically, the CNC cutting machine for plasma which comprises: 1, CNC flame cutting stroj- 1pc 2 Tilting Plasma-unit 1pc 3, The LED-1pc 4, plasma-source 1pc 5, 6 -1ks air tables, filtration devices for plasma source (1pc), including pipes, bends and connectors 1pc-7 programming software (1 license) for tilting plasma unit 1pc-8 Set of spare dielov- electrode 100p-9 Set of spare dielov- nozzle 100p-10 Set of spare dielov- 11-100p protection, transport, assembly, packaging, operator training-1 unit specifications of the contract is in order to ensure compliance with the eligibility of expenditure on projects listed in the Annex. 2 of these specifications, which is exactly specified subject matter.

Cogeneration plant construction work

Tepláreň Košice, a.s. v skratke Teko, a.s. | Published February 24, 2017  -  Deadline April 12, 2017
cpvs
45251220, 45110000, 45223100, 45223210, 38424000, 71250000, 45259000, 45262640, 45232220

The contract is to perform works: Construction technology for high-efficiency cogeneration of electricity and heat as a substitute TEKO I carry out repairs and maintenance of the system operation, which is subject to execution of the work during the first sixty (60) months from the date technological equipment to the Customer.

The contract is to perform works: Construction technology for high-efficiency cogeneration of electricity and heat as a substitute TEKO I carry out repairs and maintenance of the system operation, which is subject to execution of the work during the first sixty (60) months from the date technological equipment to the Customer.

For more information on the specifications.

Additional information to point II.2.7) deadline for implementation of works is 18 months and then 60 months after the submission of the work will be carried out routine repairs and maintenance.

Benefits for the customer is evaluated based on the following formula:

After lambda = x (Pe x Ce x Pt + Ct - Pe x Cp / (eta e / 100) - LC / 24 x Cc - Csmt xn) -

- CSF / (dS / 12) - Cd / Do,

where

Following is a value representing an annual contribution to the authority,

2 specifications (the SP)

2 SP,

CE is the price of electricity from highly efficient combined heat and power generation in the amount of € 0.07504 / kWh.

2 SP,

CT is a heat price of € 0.0306 / kWh.

2 SP,

CP is the price of natural gas and associated costs in the amount of € 0.02066 / kWh calorific value,

2 SP,

The CC is the cost of ammonia water in the amount of € 0.138 / kg.

Csmt is variable price for the repair and maintenance under the contract based on one single motor engine hour in EUR / h net, offered to candidates

n is the number of engines, n = 4,

CSF is a fixed price for 60 months for repairs and maintenance performed under the contract in EUR excluding VAT, offered to candidates

DS is a time service under the contract in months, DS = 60,

CD is the total cost of the work in EUR excluding VAT, offered to candidates

To the depreciation period in years, to = 8th

"Trebuchet - Trenton, Bučovice, protect European tradition" - disclosure of the southern fortifications Trencin Castle: construction work

Ultima Ratio, s.r.o. | Published March 21, 2017  -  Deadline April 14, 2017
cpvs
45212314

The contract is construction work associated with making South Trenčín Castle fortifications, build and skultúrnenie access to Trencin Castle. A detailed description of the subject of the contract is in contract documents.

Feasibility study - construction and modernization of Maintenance Base trolleybus infrastructure and trolleybus lines, sub-stations and obratisko

Dopravný podnik mesta Žiliny s.r.o. | Published March 13, 2017  -  Deadline April 19, 2017
cpvs
71241000

The contract is a service of drawing up and delivery of the feasibility study of the national project. This is a non-investment project under the Integrated Operational Programme Infrastructure 2014 - 2020 co-funded by the European Union. Managing Authority for the above Operational Programme is the Ministry of Transport and Construction of the Slovak Republic. Project title: Feasibility study - construction and modernization of Maintenance Base trolley buses, upgrading infrastructure trolleybus lines and sub-stations, construction of new trolleybus lines and obratisko in Zilina. Detailed definition and specification of object of the contract set out in the tender documents.

Construction work

Trenčiansky samosprávny kraj | Published March 2, 2017  -  Deadline April 4, 2017
cpvs
45000000

The contract has as construction work on roads II. Class in the Trenčín Region. Detailed description of the subject of the contract is the description of each part of the procurement itself as well as in the tender documents and the relevant project documentation.

The purpose of the construction is to improve the construction and technical condition of the affected road section. Purpose of the work is to implement the structural and technical security measures to increase the life of the road, road safety, reduce accidents, mitigation of adverse impacts of transport (noise, air pollution, vibration, ...).

The total length of the route of the reconstructed section of road is a 3 590 m.

The technical solution was designed and based on the results of diagnostics road (Profilograph and Kuab FWD 50) measured in 2015 Slovak Road Administration (Bratislava road network database) and diagnosis - non-destructive measurement and diagnostics segment.

Detailed description of the subject of the contract is located or in the tender documents. their annexes.

The purpose of the construction is to improve the construction and technical condition of the affected road section. Purpose of the work is to implement the structural and technical security measures to increase the life of the road, road safety, reduce accidents, mitigation of adverse impacts of transport (noise, air pollution, vibration ...).

The technical solution was designed and based on the results of diagnostics road (Profilograph and Kuab FWD 50) measured in 2015 Slovak Road Administration (Bratislava road network database) and diagnosis - non-destructive measurement and diagnostics segment.

Detailed description of the subject of the contract is located or in the tender documents. their annexes.

Supervision of construction work for the construction of I / 77 Bardejov southwest bypass

SGS Czech Republic, s.r.o. | Published December 8, 2016  -  Deadline August 1, 2017
cpvs
71315300

Monitoring the effects of the D1 motorway Bratislava Vajnory - Triblavina to live. prost. - Noise, biota, surface water, water from surface runoff and groundwater before the construction, during construction and during operation

Národná diaľničná spoločnosť, a.s. | Published March 8, 2017  -  Deadline April 4, 2017
cpvs
71313450

Monitoring the effects of the D1 motorway Bratislava Vajnory - Trblavina environmental noise, biota, surface water, water from surface runoff and groundwater before the construction, during construction and during operation.

Design and engineering for the construction work of roads KSK: Construction works II / 552 Košice-Large Kapušany-UA border in the stretch a total length of 74.6 km

Košický samosprávny kraj | Published March 13, 2017  -  Deadline April 25, 2017
cpvs
71200000

Developing PC and IR - Construction works II / 552 Košice - Large Kapušany - UA border in the stretch a total length of 74.6 km (project ID 007). One-step preparation of project documentation for building permits in the details of the final design, including specification measurement and itemized budget construction and engineering - to ensure publication of the relevant building permits, respectively. approvals of building offices.

Information portal construction and transportation equipment

FANCY PHARMACY, a.s. | Published March 3, 2017  -  Deadline April 5, 2017
cpvs
72000000

The contract is the development of an information portal and its commissioning

The construction of the fountain in the park Stur in Zilina

Mesto Žilina | Published March 20, 2017  -  Deadline April 12, 2017
cpvs
45248000

The contract is the construction of the fountain in the park Stur in Zilina, which is designed as a floor fountain square shape with a hidden pool. The main elements of the fountain is 29 dynamic, individually controlled nozzles, and 25 of them have managed blowjob pointing vertically upward and 4 are inclined laminar beams. All jets will have its own pump, all of which will be jointly controlled from a common control unit located in the engine. Loneliness fountain then create jets arranged in a grid of 5x5m with axial spacing of 1.5 m. The maximum amount of second burst nozzle is designed 3m. The nozzles are arranged in five mutually hydraulically connected channels. Detailed definition of the object of the contract forms part of the specifications B.1 Description of the object of the contract, part specifications Annex. 1. Project documentation and Annex. 2 enter the bill of quantities. To identify the specific type of material (s) or material (product) of a specific manufacturer, the contracting authority allows such a substitute material (product) equivalent materials (products) that meets the functional and quality characteristics. In this case, it is necessary to adjust the value in the form reports and assessment.

Construction work of professional teaching - the reconstruction of school

Košický samosprávny kraj | Published March 6, 2017  -  Deadline April 4, 2017
cpvs
45214310

The establishment of specialized classrooms, laundry and drying rooms and related construction works on 1 PP and 1 NP in secondary vocational schools Gemerská 1, Košice.

Construction work

Mesto Žiar nad Hronom | Published March 15, 2017  -  Deadline April 18, 2017
cpvs
45000000, 45211350

The object of the construction work is complete insulation of the building, replacement of windows, doors and glass walls, balancing UK system for insulation, draft new bleskozvodovej system and wiring.

The object of the construction work is complete insulation of the building, replacement of windows, doors and glass walls, balancing UK system for insulation, draft new bleskozvodovej system and wiring. The present solution does not interfere with the existing layout object Town Hall. After implementation of structural modifications mainly insulation administrative building - Town Hall Building this facility will meet all technical requirements and standards under the applicable laws and regulations (Act č.555 / 2005 Coll., On energy performance of buildings and amending certain laws, as amended , MTCRD Decree Nr. 364/2012 Coll., implementing the Act č.555 / 20015 Coll.) and technical standards in the Slovak Republic (STN 73-0540-2)). Reduce the heat loss of the building, reducing energy consumption, thermal comfort is achieved, reducing the cost of operations, increase energy efficiency and the like.

Construction work

Trenčiansky samosprávny kraj | Published March 10, 2017  -  Deadline April 4, 2017
cpvs
45000000

The aim of the project Improving cycling infrastructure in TSK after construction is to combine the top center of the district Nove Mesto nad Vahom to Plevník Drieňové in Považskobystrickom district. The total length of the route is about 100 km.

The contract is a solution .: Part I section 6 - Puchov - Nosická dam divided into two separate parts, line A 3 with a length of 288.70 mA B line with a length of 778.30 meters. The total length of the section is 4 067.00 m.

The contract is a solution .: Part II section 1 - Horna Streda Nové Mesto nad Váhom with the total length of the path is 13 439.58 meters.

Construction of the pipeline and the development of an integrated information system Traffic

GAMO a.s. | Published January 12, 2017  -  Deadline December 2, 2017
cpvs
72230000

Somersaults direct negotiated procedure will be the construction of the pipeline and the development of an integrated information system Units for automating and supporting process control operation based Transpetrol existing Rīsu and providing complete service support the author's work.

ZPS and DSS Carpathian, Žilina - construction work - additional cradle-lift

Žilinský samosprávny kraj | Published March 28, 2017  -  Deadline April 24, 2017
cpvs
45215200

The contract is the extension and socket to lift the block B ZPS and DSS on the street. Carpathian no. 6 in Zilina. It is a 5-storey building with basement, covered with a flat roof, consisting of two to 1.np interconnected blocks A and B. The upper floors are separate blocks are communicatively linked. Before running the extension and socket of the elevator is be performed to remedy transhipment drains, sewers because the trail leads in place for future extension. From the structural point of view, the proposed extension of reinforced concrete structures with a roof and wall thicknesses of 200 mm. The new envelope is insulated using a thermal insulation composite system with insulation min. wool hr. 150 mm. Roofing is a thermal insulation polystyrene hr. 300 mm and a covering made of PVC foil. Since the elevator evacuation is necessary on each floor create a separate hall. The atria are the new SDK cassette panels that overlap ventilation air intakes.