Call +44 800 9755 164

Public tenders for construction in Slovakia

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionSlovakia

Construction of Temporary Storage - Nesluša

Ultima Ratio s.r.o. | Published January 11, 2017  -  Deadline February 6, 2017
Construction of Temporary Storage. A detailed description of the subject of the contract is located in the specifications.

Construction of Temporary Storage - Oravská Polhora

Ultima Ratio s.r.o. | Published January 11, 2017  -  Deadline February 6, 2017
Construction of Temporary Storage. A detailed description of the subject of the contract is located in the specifications.

Construction work for industrial buildings

Jadrová a vyraďovacia spoločnosť, a.s. | Published December 23, 2016

The contract will be elaborated and delivered PD building and construction. As part of the documentation will be subject to fulfillment of supply PD for the removal of buildings, relocation of utilities, development and delivery of PD for construction permit construction "Completing the storage capacity of spent fuel 'within the meaning of the Act no. 50/1976, 541/2004 and 355/2007, detailed design, safety documentation for SW placing in service. As part of the implementation will be subject to fulfillment of construction of storage tanks of SNF dry method and delivery of 3 files storage containers and 2 pieces of shading handling files. Further information will be provided in the tender documents.

Development and delivery of PD building and construction. As part of the documentation will be subject to fulfillment of supply PD for the removal of buildings, relocation of utilities, development and delivery of PD for construction permit construction "Completing the storage capacity of spent fuel 'within the meaning of the Act no. 50/1976, 541/2004 and 355/2007, detailed design, safety documentation for SW placing in service. As part of the implementation will be subject to fulfillment of construction of storage tanks of SNF dry method and delivery of 3 files storage containers and 2 pieces of shading handling files.

Further information will be provided in the tender documents.

Construction work for industrial buildings

Jadrová a vyraďovacia spoločnosť, a.s. | Published January 6, 2017  -  Deadline March 6, 2017

The contract is the development and delivery of PD building and construction. As part of the documentation is subject to fulfillment of supply PD for the removal of buildings, relocation of utilities, development and delivery of PD for construction permit construction "Completing the storage capacity of spent fuel 'within the meaning of the Act No.50 / 1976.541 / 2004 and 355/2007, implementation documentation, safety documentation for SW placing in service. In the implementation it is subject to fulfillment of construction of storage tanks of SNF dry method and delivery of 3 files storage containers and 2 pieces of shading handling files.

Further information is provided in the tender documents.

Development and delivery of PD building and construction. As part of the documentation is subject to fulfillment of supply PD for the removal of buildings, relocation of utilities, development and delivery of PD for construction permit construction "Completing the storage capacity of spent fuel 'within the meaning of the Act No.50 / 1976.541 / 2004 and 355/2007, implementation documentation, safety documentation for SW placing in service. In the implementation it is subject to fulfillment of construction of storage tanks of SNF dry method and delivery of 3 files storage containers and 2 pieces of shading handling files.

Further information is provided in the tender documents.

Production line construction carpentry

Úrad pre verejné obstarávanie | Published October 5, 2016  -  Deadline January 19, 2017
The contract is the supply of goods and services related to the supply of a new production line of carpenter construction and its installation in the premises of the contracting authority. Part of the subject of the contract must be complete software and equipment necessary for the operation and full utilization of line capacity, ie including controlling and design software connected and communicating directly, ie without intermediate inputs (data converter). Detailed definition of the object of the contract is listed in the description of the subject of the contract in the tender documents.

Construction work options for women

Občianske združenie BRIEŽDENIE | Published January 16, 2017  -  Deadline February 7, 2017
The contract has as object construction work to correct the existing accommodation facilities. The building is now used for the accommodation needs of women with children. The existing building is part of the accommodation with two floors and an unused attic. Support system object is a longitudinal wall with two outbuildings with reinforced concrete ceilings .Pôvodné stairs are reinforced concrete monolithic slab with lateral stringer. The existing walls are brick. The building is currently no structural defects / no cracks / waterproofing and shows no signs of disorders. Hardware building wiring and heating is outdated. Fillings / exterior windows, glass walls and doors / are original and are currently complying with the new thermal insulation requirements and standards. From the urban point of view there is no significant change functional areas, and communications links in the vicinity of the land. Buildings connected to public communication is through the repair of driveway paving. The proposed reconstruction of the object touches the whole building accommodation often including roof construction and facade. On the ground floor accommodation section has an entrance portion, premises hinterland cuisine, kitchen, dining room, rooms for mothers with children, premises boiler room drevohmotu that heats the whole area, appropriate sanitary facilities and communication space / hallway and staircase to the floor /, room for cleaning lady with the appropriate stock. In 2.NP and 3.NP are rooms for accommodation of mothers and children with adequate sanitary facilities and communication space, kitchen, office manager for the building and lounge for residents. Further details in tender documentation.

Architectural, construction, engineering and inspection services

Eustream, a.s. | Published December 13, 2016  -  Deadline January 31, 2017

A feasibility study is to propose a bi-directional pipeline links between the Slovak Republic and South Eastern Europe.

The detailed specification is indicated in the tender documents and annexes to the tender documents.

A feasibility study is to propose a bi-directional pipeline links between the Slovak Republic and South Eastern Europe.

The feasibility study will take into account the required three variants (including 2 variants by the contracting authority and the contractor shall propose one variant):

Option 1: Construction of a new pipeline from Slovakia (Velke Kapusany KS) through the territory of Hungary (via a node Csengersima Beregdaróc KS), Romania and Bulgaria (through node Giurgiu Ruse) to the external border of the EU in Bulgaria, such as Turkey or the Black Sea.

Option 2: Construction of a new pipeline from Slovakia (KS Velke Kapusany and / or units United Zlievce) through the territory of Hungary (via node Csanádpalota), Romania and Bulgaria (through node Giurgiu Ruse) to the external border of the EU in Bulgaria, such as Turkey or Coast Black sea.

Option 3: Construction of a new pipeline from Slovakia (KS Velke Kapusany and / or units United Zlievce) to the external border of the EU in Bulgaria, such as Turkey or the Black Sea. This variant is a variant consisting entirely or partly of new infrastructure.

The detailed specification is indicated in the tender documents and annexes to the tender documents.

Construction of the pipeline and the development of an integrated information system Traffic

GAMO a.s. | Published January 12, 2017  -  Deadline December 2, 2017
Somersaults direct negotiated procedure will be the construction of the pipeline and the development of an integrated information system Units for automating and supporting process control operation based Transpetrol existing Rīsu and providing complete service support the author's work.

Construction of storm sewer with oil separators and the construction of a paved handling area, including repairing fences.

Národné lesnícke centrum (NLC) | Published January 10, 2017  -  Deadline February 6, 2017
As the construction of a new storm sewer connection dimensions DN 200 mm and a length of 35.30 dimension DN 150 mm with a length of 25.50 m with a connection to an existing single complex sewage system. Oil separators (ENT) will be built as plnoprietočný with output 15.0 l / s of wastewater polluted rain. Construction of the paved area in front of the building of asphaltic concrete garage will be provided with a link sprayed at the first stage of the surface of 503 m2. Rainwater from paved surfaces is lifted into the trough of line through sewerage connection salary in the new complex sewage system. Excess soil taken to a landfill. Repair fencing. On a concrete wall brick fence is removed and replaced with a wire fence to a height of 2 m. More information is given in the tender documents.

Construction structures and materials; auxiliary products to construction (except electric apparatus)

Ministerstvo vnútra Slovenskej republiky | Published December 23, 2016  -  Deadline February 8, 2017

Shipments of portable helicopter station to ensure 24-hour operation, has to be designed to suit the requirements of the hangar and operation of aircraft.

The contract is the supply of two sets of "portable helicopter station to ensure 24-hour operation." Portable helicopter-mounted station consisted of a hangar for helicopters and eight modules and containers: accommodation module 4 pieces, 1 piece sanitary module, module living room and kitchen one unit, module unit 1 meeting room, private room 1 pc. A more detailed specification of the hangar and the individual modules is given in the tender documents.

Construction work in connection with the completion of the establishment of the Museum of the Holocaust in Sered

HORNEX, a.s. | Published December 22, 2016
Implementation project for the construction objects and operation sets designed for setting up a Holocaust museum in Sered (hereafter Museum) consists of five buildings, barracks longitudinal, 3 of which objects were Stage I wager works gradually renovated, building inspections and properly, and 2 unfinished buildings were initiated reconstruction práce.Predmetom contract is fully refurbished two unfinished building objects that are part of existing museums. As part of the reconstruction is completed static security of both buildings, constructed the interior spaces in the exposure part of the building was realized in all professions, replace the roofing and windows, repair the facade. Interior space objects will be modified in the light of other requirements associated with the operation, such as social and technical zázemie.V front of the building is designed boiler room, storage, toilet, space for cleaners. The remaining space is allocated to the exhibition of the museum, or a portion of space for educational purposes.

The construction or conversion of houses with rental flats FOLLOWED transfer of ownership for the community ŽEHRA

Obec Žehra | Published January 16, 2017  -  Deadline February 7, 2017
The contract is the construction of 36 apartments in the grounds of a lower standard candidate meeting the requirements to provide loans and grants to purchase them under the Act č.443 / 2010 Coll ,, Act No.150 / 2013 Coll as well as the associated Infrastructure and the subsequent purchase of the contracting authority. Object of the contract is part of the technical infrastructure and land. Land must be owned by the applicant. Contract award will be binding letter of intent. Site conditions are as follows: 1st construction must be built based on valid building permit and in accordance with the project documentation verified by the building office on the property candidate sites identified in the approved program of economic development of the municipality Zehra. 2. Maximum building height is 3 floors. 3.Jednotlivé apartments must meet those laws required parameters. 4.Priemerná floor area of ​​rental housing may not exceed 45 m2. 5.Vybavenie dwellings must meet the requirements for a lower standard. 6.Kanalizáciu wastewater to be addressed in the sewage system of the village. 7.Byty must meet the energy performance requirements for energy class A +. 8.Byty be legally skolaudované to 31/05/2019. Built 9.Po end to the dwelling house was required to hand over all connections and village land for the agreed purchase price of 10, - €.

Construction or conversion of rental flats of standards with the subsequent transfer PROPRIETARY RIGHTS

Obec Kamenná Poruba | Published January 13, 2017  -  Deadline February 6, 2017
The contract is the construction of 30 apartments in the grounds of a lower standard candidate meeting the requirements to provide loans and grants to purchase them under the Act č.443 / 2010 Coll ,, Act No.150 / 2013 Coll as well as the associated Infrastructure and the subsequent purchase of the contracting authority. Object of the contract is part of the technical infrastructure and land. Land must be owned by the applicant. Contract award will be binding letter of intent. Site conditions are as follows: 1st construction must be built based on valid building permit and in accordance with the project documentation verified by the building office on the property candidate sites identified in the approved program of economic development of the municipality Kamenná Poruba 093 03 Vranov nad Topľou. 2. Maximum building height is one floor. 3.Jednotlivé apartments must meet those laws required parameters. 4.Priemerná floor area of ​​rental housing may not exceed 45 m2. 5.Vybavenie dwellings must meet the requirements for a lower standard. 6.Kanalizáciu wastewater to be addressed in the sewage system of the village. 7.Byty must meet the energy performance requirements for energy class A +. 8.Byty be legally skolaudované to 31/05/2018. Built 9.Po end to the dwelling house was required to hand over all connections and village land for the agreed purchase price of 10, - €.

Construction or conversion of rental flats of standards with the subsequent transfer PROPRIETARY RIGHTS

Obec Kamenná Poruba | Published January 13, 2017  -  Deadline February 6, 2017
The contract is the construction of 40 apartments in the grounds of a lower standard candidate meeting the requirements to provide loans and grants to purchase them under the Act č.443 / 2010 Coll ,, Act No.150 / 2013 Coll as well as the associated Infrastructure and the subsequent purchase of the contracting authority. Object of the contract is part of the technical infrastructure and land. Land must be owned by the applicant. Contract award will be binding letter of intent. Site conditions are as follows: 1st construction must be built based on valid building permit and in accordance with the project documentation verified by the building office on the property candidate sites identified in the approved program of economic development of the municipality Kamenná Poruba 093 03 Vranov nad Topľou. 2. Maximum building height is one floor. 3.Jednotlivé apartments must meet those laws required parameters. 4.Priemerná floor area of ​​rental housing may not exceed 45 m2. 5.Vybavenie dwellings must meet the requirements for a lower standard. 6.Kanalizáciu wastewater to be addressed in the sewage system of the village. 7.Byty must meet the energy performance requirements for energy class A +. 8.Byty be legally skolaudované to 31/05/2018. Built 9.Po end to the dwelling house was required to hand over all connections and village land for the agreed purchase price of 10, - €.

Construction or reconstruction of the house with rental housing with subsequent transfer of ownership rights in OBCI ŽEHRA

Obec Žehra | Published January 16, 2017  -  Deadline February 7, 2017
The contract is the construction of 18 flats lower standard on the property candidate meeting the requirements to provide loans and grants to purchase them under the Act č.443 / 2010 Coll ,, Act No.150 / 2013 Coll as well as the associated Infrastructure and the subsequent purchase of the contracting authority. Object of the contract is part of the technical infrastructure and land. Land must be owned by the applicant. Contract award will be binding letter of intent. Site conditions are as follows: 1st construction must be built based on valid building permit and in accordance with the project documentation verified by the building office on the property candidate sites identified in the approved program of economic development of the municipality Zehra. 2. Maximum building height is 3 floors. 3.Jednotlivé apartments must meet those laws required parameters. 4.Priemerná floor area of ​​rental housing may not exceed 45 m2. 5.Vybavenie dwellings must meet the requirements for a lower standard. 6.Kanalizáciu wastewater to be addressed in the sewage system of the village. 7.Byty must meet the energy performance requirements for energy class A +. 8.Byty be legally skolaudované to 31/05/2019. Built 9.Po end to the dwelling house was required to hand over all connections and village land for the agreed purchase price of 10, - €.

Supervision of construction work for the construction of I / 77 Bardejov southwest bypass

SGS Czech Republic, s.r.o. | Published December 8, 2016  -  Deadline August 1, 2017

External construction supervision for the construction of I / 66 Brezno - bypass, phase.

SGS Czech Republic, s.r.o. | Published December 19, 2016

Architectural, construction, engineering and inspection services

Mesto Žilina | Published January 5, 2017  -  Deadline February 20, 2017

The aim is to obtain proposals for the most appropriate use of public urban spaces with park square Sadom SNP as the assembly, transit and residence space. Based on the results and recommendations of the jury announcer with the winner, based on the results of direct negotiated procedure (§ 81 point. H) and section 116 paragraph. 1) point. a) of the Public Procurement Act), enters into a contract for work under the provisions of § 536 and following of the Commercial Code for the processing of urban-landscape studies Andrej Hlinka Square with Parish Stairs and a set of SNPs. Given the nature and definition of the solution of public space in Zilina, as contracting authority, on the basis of exclusive rights of copyright under the Act No.185 / 2015 Coll. (Copyright Act) and according to § 81 point. b) paragraph. 3) of the VO proceed with the study authors to direct the negotiated procedure on the signing of a contract for work on the subsequent processing of project documentation.

Architectural, construction, engineering and inspection services

Slovenská správa ciest | Published January 13, 2017

The contract is the provision of a comprehensive activities related to the management and control of the safety of the road to take pursuant to § 4 of Act 249/2011 Coll. Safety Management of Roads and on amendments to certain laws, analysis of traffic accidents, develop classifying black spots, the draft measures and subsequent economic evaluation.

The concession for the design, construction, financing, operation and maintenance of the new University Hospital in Bratislava with an expected 30-year provision of health care in this hospital, including the provision of capacity for teaching

Úrad pre verejné obstarávanie | Published December 12, 2016  -  Deadline December 1, 2017
The contracting authority carries out procurement of the new University Hospital in Bratislava (Nunb) in the form of a concession contract to be competitive dialogue procedure addressing the proposal (model developed using innovative concepts), construction (including the supply of medical and non-medical equipment), financing, operation and maintenance of the building Nunb, including the provision of health care and ensuring capacity to teach students all the extent and under the conditions specified in the documentation for competitive dialogue.