Call +44 800 9755 164

Public tenders for construction in Slovenska-bistrica Slovenia

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionSloveniaslovenska-bistrica

Construction work for water projects

Občina Slovenska Bistrica | Published November 14, 2015
Winner
Map-Trade d.o.o.
cpvs
45240000

Subject to further orders additional unforeseen work or works in the reservoirs Črnec, Velenik and Bojtina, which was approved by the Supervisory Engineer, namely: - protection of the construction pit against erosion on VH Velenik - building partition walls and finishing plaster on the van sheets in all three reservoirs - backfilling behind the walls and above the cover plate, - insurance excavation VH Velenik due to landslide, - supply, transport and installation of wireless communications, - installation of tubing for submersible pump in the VH Črnec - execution of ventilation in the facility VH Velenik - modified work Electrical installations - protection embankment from erosion by making investments to stone all three reservoirs, - unforeseen assembly work - tubing.

Construction work for water projects

Občina Slovenska Bistrica | Published December 15, 2015
Winner
Map-Trade d.o.o.
cpvs
45240000

Re additional orders are further unexpected and more or less works or works in the reservoirs Črnec, Velenik and Bojtina, which was approved by the Supervisory Engineer, namely: - more or less part of the basic agreement and the annexes, - additional work for the Commission's decision to settle disputes a) Request 17 - Installations in the old facility Velenik; b) The 4 - connection of tubing.

Construction work for pipelines, communication and power lines

Občina Slovenska Bistrica | Published December 15, 2015
Winner
Nigrad d.d.
cpvs
45231000

Subject to further orders additional unforeseen work or pipeline Šikole-Slovenian Bistrica, which was approved by the Supervisory Engineer, namely: - to ensure the functional performance of water supply system and associated offs and provision of an adequate standard of drinking water supply, which means provision of adequate Supply pressure the fluidity of water distribution pipelines.

Construction work

OBČINA ILIRSKA BISTRICA | Published March 23, 2016
cpvs
45000000, 45100000, 45200000, 45300000, 45400000, 45310000, 45320000, 45350000

Object of the contract is the execution of construction, finishing and installation work under the new construction of the school building. Works include: - construction work and finishing work (preparatory work, demolition works, earthworks, concrete works, bricklaying, carpentry, sanitation, façade works, locksmith's work, aluminum products, PVC products, installation of joinery, plaster ceilings, ceramic work, house painting, tlakarska work, carpenter products, assembly works, other finishing works, landscaping); - Technological equipment; - electrical installations; - Hardware Installation.

Construction work

OBČINA ILIRSKA BISTRICA | Published March 24, 2016  -  Deadline June 21, 2016
cpvs
45000000, 45100000, 45200000, 45400000, 45210000, 45310000, 45320000, 45350000

Subject of the contract is the execution of construction, finishing and installation work under the new construction of the school building and the partial reconstruction of the existing school building. Works include: - construction works and finishing works (preparatory works, earthworks, concrete works, bricklaying, carpentry, sanitation, façade works, locksmith works, aluminum products, PVC products, installation of joinery, plaster ceilings, ceramic work, paintwork work tlakarska work, carpenter products, assembly works, other finishing works, landscaping); - electrical installations; - Hardware Installation.

Construction work

DOM UPOKOJENCEV Podbrdo | Published March 25, 2016  -  Deadline April 22, 2016
cpvs
45000000, 45200000, 45300000

Construction of the extension of the existing buildings retirement home Podbrdo, with electrical and mechanical installations.

Engineering services

Občina Slovenska Bistrica | Published November 14, 2015
Winner
Region d.o.o.
cpvs
71300000

Re additional orders are further unforeseen and more work in relation to the services of expert supervision of construction within the framework of Operation "Drinking water supply in the basin Dravinja - Municipality of Slovenian Bistrica", namely: - additional and more work due to changes in contractor, - additional and more Work due to changes FIDIC conditions - due to changes in the legislation on value added tax, - additional and more work due to changes in the number of contractors and construction sites, - additional and more work for greater lengths of piping.

Construction work

DOM UPOKOJENCEV Podbrdo | Published January 19, 2016  -  Deadline February 10, 2016
cpvs
45000000, 45200000

The subject of the tender is the construction of the boiler room and storage room, move fecal and stormwater sewer. The new facility will be located between the buildings and the existing building will be buried in the ground. The estimated maximum dig depth is 6 meters, due to the proximity of existing facilities will be in the stage of excavation pits necessary to provide adequate protection embankment and the foundations of the existing building. For the protection is provided 'jet grouting' 'method, the contractor will work conducted in accordance with the detailed design plan insurance excavation.

Construction work

Občina Ilirska Bistrica | Published October 1, 2014
cpvs
45000000

Gradbena dela

Building construction work

Občina Ilirska Bistrica | Published August 13, 2016
cpvs

Ilirska Bistrica Municipality / public partner invites all potential promoters / private partners to submit their tenders interest in the implementation of the project of public-private partnerships in energy restoration and renovation of public buildings of the Municipality of Ilirska Bistrica on the model of contractual assurance of savings. The public partner is to reduce the operating costs (energy costs and maintenance) in its public facilities with the implementation of PPPs.

Electrical installation work

DOM UPOKOJENCEV Podbrdo | Published February 9, 2016  -  Deadline February 29, 2016
cpvs
45310000, 45350000, 45330000

Implementation of mechanical and electrical works for the construction of a new biomass boiler at the unit of the Institute Tolmin.
  • 1