Public tenders for refurbishment in Vantaa Finland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Pähkinärinne school technical refurbishment works

Vantaan kaupunki, Pähkinärinteen koulun tekninen peruskorjaus rakennusurakka | Published November 16, 2015  -  Deadline December 14, 2015
cpvs
45000000

Pähkinärinne school was built in 1980. This refurbishment of the school's ventilation renewed (iv new machines are installed on the roof of the container machines), the majority of old electrical and lighting technology is dismantled and replaced. Construction of technical corrections to be done for instance. As regards surfaces and facade, improved airtightness of structures and local moisture damage is repaired. The kitchen also has a new service in the context of this basic improvement. The extent of the building is 5035 brm2. The building contractor acting as prime contractor, and the main implementer site johtovelvollisena. MEP work is done on the subscriber's separate purchasing and subjected to the main contract. Unfortunately draw up local plans. . NOTE! Ad information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. A direct link to the notification the additional information can be found here Hilma notification.

CORRECTION NOTICE: CORRECTION NOTICE: Pähkinärinne school technical refurbishment works

Vantaan kaupunki, Pähkinärinteen koulun tekninen peruskorjaus rakennusurakka | Published December 3, 2015  -  Deadline December 17, 2015
cpvs
45000000

Pähkinärinne school was built in 1980. This refurbishment of the school's ventilation renewed (iv new machines are installed on the roof of the container machines), the majority of old electrical and lighting technology is dismantled and replaced. Construction of technical corrections to be done for instance. As regards surfaces and facade, improved airtightness of structures and local moisture damage is repaired. The kitchen also has a new service in the context of this basic improvement. The extent of the building is 5035 brm2. The building contractor acting as prime contractor, and the main implementer site johtovelvollisena. MEP work is done on the subscriber's separate purchasing and subjected to the main contract. Unfortunately draw up local plans. . Additional Letter is becoming even later than Monday 7.12. NOTE! Ad information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. A direct link to the notification the additional information can be found here Hilma notification.

Kaivoksela school refurbishment of facades

Vantaan kaupunki, Tilakeskus, tilahallinta | Published March 7, 2016  -  Deadline April 5, 2016
cpvs
45000000

The total contract Kaivoksela school Renovation of the facades. The construction work includes Kaivoksela school facade material substitution, accompanied by their works. The contract area comprises all the facades, eaves, windows, water trays and canopies. BUILDING Kaivoksela school construction site ADDRESS: Kaivosvoudintie 10 RATU 17115 16125 BLOCK PLOT 1 PLOT AREA 8446 4800 KERROSLA LAYER CHAPTER 2 The current building was built in 1964-5. The building fire class P1. Loadbearing and separating constructions EI60 / REI60. The building has two floors. The sports hall is the high part of the building. In addition, the building associated with rising above the roof ventilation machine rooms. They facade material is coated with a thin steel plate, which is not subjected to changes. In made modifications and repairs in accordance with the plans, as well as demolition work required by the changes. The subject of the invitation to tender contract concerns the building contractor's work and responsibilities of the main contractor (project supervisor) in accordance with the tender thing-books. The acquisition is described in this invitation to tender in the Annexes. Offered a contract will be in accordance with the Annexes. The contract is the schedule: Work is scheduled to begin 06/06/2015. The works must be completed by 09/30/2015. The contractor may propose their own alternative proposal to the commencement of the work and an estimate of the duration of the work in connection with the offer. The latest contract negotiations contractors are invited to submit a proposal for weather protection during the work. Provider accompanied requirements: Comparison of Phase get deals that meet the mandatory requirements of the invitation to tender and the contract. Provider mandatory requirements are asked to clearly answer .Yes or not. Some passages required the submission of the dossier or report.

NOTE! Notification information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. Direct link to the notification of additional information can be found here Hilma-notification.

Purchase of tillage, machining and refurbishment services from 2018

Metsähallitus Metsätalous Oy | Published December 6, 2017  -  Deadline January 8, 2018
cpvs
77200000

Metsähallitus Metsähallitus Oy asks for electronic tenders for the excavation of excavators, continuous modification, machining and renovation joints in the forestry areas of Southern Finland, Ostrobothnia and Kainuu and Lapland. The duration and terms of the contracts are defined by procurement. The number of workloads in a row is annual. Work must be carried out according to job-specific service descriptions. See Section II.1.4 See Section II.1.4 See Section II.1.4 Metsähallitus Metsätalous Oy applies for electronic tenders for excavation, continuous modification, machining and rebuilding for the forest management areas of Southern Finland, Ostrobothnia and Kainuu and Lapland. The duration and terms of the contracts are defined by procurement. The number of workloads in a row is annual. This contract is divided into lots: yes Tenders may be submitted for: all lots Different alternatives are accepted (alternative tenders): no Different alternatives are accepted (alternative tenders): no Different alternatives are accepted (alternative tenders): no

Purchase of tillage, machining and refurbishment services from 2018

Metsähallitus Metsätalous Oy | Published May 17, 2018
Winner
Maansiirto Mikko Porvari Ky,Jani Rantala,Matias Mäkikoskela,Keltalan Konepalvelu Ky,Kaivinkoneurakointi Arto Hakkarainen,Koneurakointi Arto Kangas,Metsä-Kinnunen Ay,METSÄMOTTI KY,Haverinen Janne kaivinkoneurakointi,M. ja H. Rintamäki Oy,Koneurakointi Juopperi,J. Varajärvi oy
cpvs
77200000

Metsähallitus Metsähallitus Oy has requested electronic tenders for the excavation of excavators, continuous modification, machining and rebuilding for the forestry areas of Southern Finland, Ostrobothnia and Kainuu and Lapland. The duration and terms of the contracts are defined by procurement. Work must be carried out according to job-specific service descriptions. In the contract period, the target quantity of procurement contracts can be increased by one (30%) of the contract (contractor and entrepreneur), as the industry is characterized by productivity differences per supplier. See Section II.1.4 See Section II.1.4 See Section II.1.4 See Section II.1.4 See Section II.1.4 See Section II.1.4 See Section II.1.4 See Section II.1.4 See Section II.1.4 See Section II.1.4 See Section II.1.4 See Section II.1.4 See Section II.1.4 See Section II.1.4 Metsähallitus Forestry Ltd has applied for electronic tenders for the excavation of excavators, continuous modification, machining and rebuilding for the forestry areas of Southern Finland, Ostrobothnia and Kainuu and Lapland. The duration and terms of the contracts are defined by procurement. Work must be carried out on a variety of work-related services This contract is divided into sections: yes

Acquisition of excavation, refueling and logging services from 2018 additional procurement

Metsähallitus Metsätalous Oy | Published June 5, 2018
Winner
Veljekset Kortesoja Ky,Maanrakennus Tapani ja Mika Pasanen Avoin Yhtiö,Metsäkuljetus Meriläinen Oy,Oiva Kaivu Oy
cpvs
77200000

Metsähallitus Forestry Ltd has requested electronic tenders for the excavation, refurbishment and logging of timber harvesting in the forest management area of ​​Southern Finland. Timber harvesting is in one lot No. 1. The duration and terms of the contracts are defined by procurement. Work must be carried out according to job-specific service descriptions. During the contract period, the contract goal may increase the target target of a contract by up to 30% of the target of a work order determined by the contract. See Section II.1.4 See Section II.1.4 See Section II.1.4 See Section II.1.4 See Section II.1.4 Metsähallitus Forestry Ltd has applied for electronic tenders for excavation, refurbishment and timber harvesting in the forest management area of ​​Southern Finland. Timber harvesting is in one lot No. 1. The duration and terms of the contracts are defined by procurement. Work must be carried out on a variety of work-related services This contract is divided into sections: yes

Airfield pavement construction work

Finavia Oyj | Published November 12, 2015  -  Deadline November 25, 2015
cpvs
45235111

The subject of the contract is Helsinki-Vantaa Airport traffic areas paving contract, accompanied by their other their works (eg. Stainless steel kaapelointiputkien installations). In addition to the contract refurbishment works to be carried out by smaller paving Finavia Helsinki-Vantaa Airport. For the year 2016 works a subscriber space in accordance with the invitation to tender. The end of 2017 works are a subscriber option. Work sites will be agreed separately in accordance with the contract.

Regions stop construction work in 2015

Vantaan kaupunki | Published June 8, 2015  -  Deadline July 1, 2015
cpvs
45200000

The acquisition includes the City of Vantaa 2015 line-autopysäkkikatoksien related to the renovation program of construction works. In addition, the acquisition includes bus stops refurbishment work on the City of Vantaa, the reliability of public transport improvement program. Total construction works is 34 and they are located in different parts of the city. NOTE! Ad information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. A direct link to the notification the additional information can be found here Hilma notification.

CHANGE IN SUSPENSION OF SUSPENSION INSIDE OF THE SUSPENSION AND REFURBISHING OF BUILDING, KAARINA

Metsähallitus, Luontopalvelut | Published November 30, 2017  -  Deadline December 30, 2017
cpvs
45000000

Drawings The ELY Center of Southwest Finland has begun to focus on the content and bounds of the Contract: The following will clarify the work belonging to the developer not included in the contract to be purchased: • Disassembly of an Old Toilet Building Contractor dismantles a new toilet building in a concrete tank under a toilet. • Disassembly of the interior The customer is responsible for the interior demolition work prior to the surface work before the start of the work. • Archaeological Surveillance of Excavations Partitions of the Department in order of importance: 1. Underground LVS works - Including the underground LVIS line up to the warm space of the interior, ie the kitchen and the cleaning compartment. 2. The toilet building renewal 3. Implementation of the toilet HVAC work 4. Implementation of Tuva HVAC works APPENDICES Appendix Appendix 1_A01 Asema_urakkalaskenta 2_A02 pohjat_urakkalaskenta cafeteria cafeteria julkisivut_urakkalaskenta 3_A03 Appendix Appendix Appendix 4_A04 wc_urakkalaskenta 5_Rakennekuva_wc 6_Huoneselostus_urakkalaskenta Appendix Appendix Appendix 7_Rakennustapaselostus_urakkalaskenta 8_I room and toilet Appendix 9_asema, water and sewage pipes Annex 10_LV housing and fittings Annex 11_LVI Terminal Annex Annex 12_S_Lighting and sockets, 1st floor101 Annex 13_S_Lighting and sockets, 2nd floor102 Annex 14_S_heating points, 1st floor103 Annex 15_Slamping and sockets, wiring110 Annex 16_S_heating points, wc 111 Annex 17_S_high diagram and assembly image 201 Annex 18_Latching_MH 4142-2017-2 Appendix 19_ Building permit, security guard Appendix 20_ Building permit, toilet Annex 21_Children's guardrail modification work TYPE SAFETY DOCUMENTS Annex 22_Children's toilet renewal TYPE SAFETY DOCUMENTS Drawings Va The ELY Center of Rsinais Finland has initiated the scope and limitations of the Contract: The following will clarify the works belonging to the developer not included in the contract to be purchased: • Disassembly of an Old Toilet Building Contractor dismantles a new toilet building in a concrete tank below the toilet. • Disassembly of the interior The customer is responsible for the interior demolition work prior to the surface work before the start of the work. • Archaeological Surveillance of Excavations Partitions of the Department in order of importance: 1. Underground LVS works - Including the underground LVIS line up to the warm space of the interior, ie the kitchen and the cleaning compartment. 2. The toilet building renewal 3. Implementation of the toilet HVAC work 4. Implementation of Tuva HVAC works APPENDICES Appendix Appendix 1_A01 Asema_urakkalaskenta 2_A02 pohjat_urakkalaskenta cafeteria cafeteria julkisivut_urakkalaskenta 3_A03 Appendix Appendix Appendix 4_A04 wc_urakkalaskenta 5_Rakennekuva_wc 6_Huoneselostus_urakkalaskenta Appendix Appendix Appendix 7_Rakennustapaselostus_urakkalaskenta 8_I room and toilet Appendix 9_asema, water and sewage pipes Annex 10_LV housing and fittings Annex 11_LVI Terminal Annex Annex 12_S_Lighting and sockets, 1st floor101 Annex 13_S_Lighting and sockets, 2nd floor102 Annex 14_S_heating points, 1st floor103 Annex 15_Slamping and sockets, wiring110 Annex 16_S_heating points, wc 111 Annex 17_S_high diagram and assembly image 201 Annex 18_Latching_MH 4142-2017-2 Annex 19_ Building permit, security guard Appendix 20_ Building permit, toilet Annex 21_Children's guardrail modification work TYPE SECURITY DOCUMENTS Annex 22_Children's toilet repeat TYPE SAFETY DOCUMENTS Annex 23_As you and pictures of the subject

Korso elderly center transformation, points II.1.5 and III.2.3

Vantaan kaupunki | Published December 10, 2014
Winner
Teppo Pietarinen, P&R Arkkitehdit Oy
cpvs
71242000

Korso center for the elderly, the current Metso's Home, in 1993 the two-storey building housing services for older people. Contract relates to building renovation and alteration planning as a whole. The customer is the design of a contractual chief designer. Chief designer acquires Planning, which includes architectural, structural, electrical and HEVAC designer, kitchen designer and coordinator of the data model. Chief designer is architect. Subscriber target calculation refurbishments and alterations of the total cost is EUR 5.1 million (VAT 0%). Property refurbishment and alterations have been prepared dated 31.3.2014 connected to the need to study / project plan. Tarvesevitys / project plan attached to the invitation to tender attachment.

Pähkinärinne school technical renovation of building side

Vantaan kaupunki, Pähkinärinteen koulun tekninen perusparannus putkiurakka | Published November 17, 2015  -  Deadline December 14, 2015
cpvs
45000000

Pähkinärinne school was built in 1980. This refurbishment of the school's ventilation renewed (iv new machines are installed on the roof of the container machines), the majority of old electrical and lighting technology is dismantled and replaced. Construction of technical corrections to be done for instance. As regards surfaces and facade, improved airtightness of structures and local moisture damage is repaired. The kitchen also has a new service in the context of this basic improvement. The extent of the building is 5035 brm2. The building contractor acting as prime contractor, and the main implementer site johtovelvollisena. MEP work is done on the subscriber's separate purchasing and subjected to the main contract. Unfortunately draw up local plans. . NOTE! Ad information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. A direct link to the notification the additional information can be found here Hilma notification.

Pähkinärinne school technical upgrading electrical contract

Vantaan kaupunki, Pähkinärinteen koulun tekninen perusparannus sähköurakka | Published November 17, 2015  -  Deadline December 14, 2015
cpvs
45000000

Pähkinärinne school was built in 1980. This refurbishment of the school's ventilation renewed (iv new machines are installed on the roof of the container machines), the majority of old electrical and lighting technology is dismantled and replaced. Construction of technical corrections to be done for instance. As regards surfaces and facade, improved airtightness of structures and local moisture damage is repaired. The kitchen also has a new service in the context of this basic improvement. The extent of the building is 5035 brm2. The building contractor acting as prime contractor, and the main implementer site johtovelvollisena. MEP work is done on the subscriber's separate purchasing and subjected to the main contract. Unfortunately draw up local plans. . NOTE! Ad information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. A direct link to the notification the additional information can be found here Hilma notification.

Pähkinärinne school technical renovation of the ventilation contract

Vantaan kaupunki, Pähkinärinteen koulun tekninen perusparannus ilmanvaihtourakka | Published November 17, 2015  -  Deadline December 14, 2015
cpvs
45000000

Pähkinärinne school was built in 1980. This refurbishment of the school's ventilation renewed (iv new machines are installed on the roof of the container machines), the majority of old electrical and lighting technology is dismantled and replaced. Construction of technical corrections to be done for instance. As regards surfaces and facade, improved airtightness of structures and local moisture damage is repaired. The kitchen also has a new service in the context of this basic improvement. The extent of the building is 5035 brm2. The building contractor acting as prime contractor, and the main implementer site johtovelvollisena. MEP work is done on the subscriber's separate purchasing and subjected to the main contract. Unfortunately draw up local plans. . NOTE! Ad information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. A direct link to the notification the additional information can be found here Hilma notification.

CORRECTION NOTICE: CORRECTION NOTICE: Pähkinärinne school technical upgrading electrical contract

Vantaan kaupunki, Pähkinärinteen koulun tekninen perusparannus sähköurakka | Published November 30, 2015  -  Deadline December 21, 2015
cpvs
45000000

Pähkinärinne school was built in 1980. This refurbishment of the school's ventilation renewed (iv new machines are installed on the roof of the container machines), the majority of old electrical and lighting technology is dismantled and replaced. Construction of technical corrections to be done for instance. As regards surfaces and facade, improved airtightness of structures and local moisture damage is repaired. The kitchen also has a new service in the context of this basic improvement. The extent of the building is 5035 brm2. The building contractor acting as prime contractor, and the main implementer site johtovelvollisena. MEP work is done on the subscriber's separate purchasing and subjected to the main contract. Unfortunately draw up local plans. . Electricity contract changes in plans. NOTE! Ad information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. A direct link to the notification the additional information can be found here Hilma notification.

Acquisition of excavation, refueling and logging services from 2018 additional procurement

Metsähallitus Metsätalous Oy | Published February 26, 2018  -  Deadline April 3, 2018
cpvs
77200000

Metsähallitus Metsähallitus Oy asks for electronic tenders for excavation, refurbishment and wood harvesting for the forest management area of ​​Southern Finland. Timber harvesting is in one lot No. 1. The duration and terms of the contracts are defined by procurement. The number of workloads in a row is annual. Work must be carried out according to job-specific service descriptions. See Section II.1.4 See Section II.1.4 See Section II.1.4 See Section II.1.4 See Section II.1.4 Metsähallitus Forestry Ltd will apply for electronic tenders for the excavation of excavators, reforestation and timber harvesting in the forestry area of ​​Southern Finland. Timber harvesting is in one lot No. 1. The duration and terms of the contracts are defined by procurement. The number of workloads in a row is annual. This contract is divided into lots: yes Tenders may be submitted for: all lots Different alternatives are accepted (alternative tenders): no Different alternatives are accepted (alternative tenders): no Different alternatives are accepted (alternative tenders): no
  • 1