Public tenders for refurbishment in Finland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Project Management Services for the Refurbishment Works in the Embassy of Finland in Tokyo

Ministry for Foreign Affairs of Finland | Published March 16, 2016  -  Deadline March 25, 2016
cpvs
71000000

Ministry for Foreign Affairs of Finland has planned minor refurbishment works to be implemented in the Embassy of Finland in Tokyo locating in the address 3-5-39, Minami Azabu, Minato-ku, Tokyo 106-8561, Japan.The refurbishment works comprise interior construction and decoration works, heating, ventilation, air-conditioning, plumbing and electrical installations.

The Ministry for Foreign Affairs of Finland wishes to conclude a services contract with a qualified expert for the project management of the above mentioned refurbishment works.

The scope of contract includes the project management tasks during the implementation of the refurbishment works as scheduling, coordination and control of the works, quality control and reporting about them to the Client.

The refurbishment works are scheduled to start in May 2016 and to be completed in November 2016. The contract for the Project Management is scheduled to start in April 2016 and end in November 2016.

Refurbishment of Keminmaa 400 kV series capacitors

Fingrid Oyj | Published November 6, 2015  -  Deadline December 4, 2015
cpvs
65310000

Fingrid Oyj has decided to renew the duplicated control & protection systems of two series capacitors in Keminmaa substation as a turnkey basis. The substation area is situated in northern Finland, approximately 20 km north of Kemi. The delivery includes complete replacement of old control and protection systems as a turnkey basis including all design, civil works, electrical equipment, installations, testing, commissioning etc. Also some refurbishment works for ladders, cranes, safety equipment etc. are included in the project. The old systems are delivered by Nokia Capacitors in 1997.

Refurbishment of Keminmaa 400 kV series capacitors.

Fingrid Oyj | Published November 11, 2015  -  Deadline December 4, 2015
cpvs
65310000

Fingrid Oyj has decided to renew the duplicated control and protection systems of 2 series capacitors in Keminmaa substation as a turnkey basis. The substation area is situated in northern Finland, approximately 20 km north of Kemi. The delivery includes complete replacement of old control and protection systems as a turnkey basis including all design, civil works, electrical equipment, installations, testing, commissioning etc. Also some refurbishment works for ladders, cranes, safety equipment etc. are included in the project. The old systems are delivered by Nokia Capacitors in 1997.

Ministry of Foreign Affairs of Finland: Contract for Refurbishment Works in the Embassy of Finland in The Hague, Netherlands

Ulkoasiainministeriö | Published April 15, 2016  -  Deadline May 2, 2016
cpvs
45000000

The contract comprises of interior refurbishment and construction of partition walls, suspended ceiling, floor covering and painting works in the new embassy chancery. Total work area will be 500-600m².

The works are scheduled to begin in May/June 2016 and to be completed and handed over to the client in October 2016

VISA PARK C-HOUSE REFURBISHMENT

PADASJOEN KUNTA | Published September 2, 2014  -  Deadline September 16, 2014
cpvs
45000000

VISA PARK C-HOUSE REFURBISHMENT GROSS about 250 NELIÖÄ SINGLE LAYER, internal changes, TOTAL PIECE OF CIVIL HVAC their works.

Project Management Services for the Refurbishment Works in the Embassy of Finland in Paris

Ministry for Foreign Affairs of Finland | Published October 24, 2011  -  Deadline November 7, 2011
cpvs
71000000

The refurbisment works comprises interior construction and decoration works, heating, ventilation, airconditioning, plumbing and electrical installations in the Embassy of Finland in Paris. The Ministry for Foreign Affairs of Finland wishes to conlude a services contract with a qualified expert for the project management of the above mentioned refurbishment works. The scope of contract includes the project managemant tasks during the implimentation of the refurbishment works as scheduling, coordination and control of the works, guality control and reporting about them to the Client. The Client has aworded the contracts for construction, electrical and mecahanical works for three separate contractors and the works have begun. The refurbishment works are scheduled to be completed at the end off March 2011. Accordingly the contract for the Project Management is scheduled to start in october 2011 and end in March 2012

LAUNDRY building refurbishment works

Keski-Uudenmaan koulutuskuntayhtymä | Published April 6, 2016  -  Deadline May 2, 2016
cpvs
45000000

We ask for an offer Keuda Järvenpää Sibelius Bus 55, Laundry contract for building renovation building engineering works Järvenpää accordance with the tender documents.

Refurbishment covers an area of ​​about 420 square meters. Implementation period 6.6. - 06.10.2016. It is divided into contract with the building contractor acts as the general contractor for the project.

Olympic stadium refurbishment, construction and excavation works, the total contract

Helsingin kaupungin rakennusvirasto, HKR-Rakennuttaja | Published May 19, 2016
cpvs

Olympic stadium refurbishment, construction and excavation works, the total contract. Procurement of a negotiated procedure.

Olympic stadium refurbishment, construction and excavation works, the total contract

Helsingin kaupungin rakennusvirasto, HKR-Rakennuttaja | Published May 19, 2016
cpvs
45000000

Olympic stadium refurbishment, construction and excavation works, the total contract. Procurement of a negotiated procedure.

Strait refurbishment of the Central courtyard area

Pyhäjärven kaupunki | Published May 8, 2017  -  Deadline May 23, 2017
cpvs
45200000

Pyhäjärven city Pyhäsalmen urban Salmen Central School courtyard area (southern courtyard and north courtyard) refurbishment - a chore. The contract includes performed comprehensive draining facility yards, it includes, for example. unloading of the new line, the, piping, buildings, blocks of flats and surface structures, green and planting work, electrical work, valasituksia, camera system, low exercise area with equipment in accordance with the plans drawn up by the subscriber. Pyhäjärven city Pyhäsalmen urban Salmen Central School courtyard area (southern courtyard and north courtyard) refurbishment - a chore. The contract includes performed comprehensive draining facility yards, it includes, for example. unloading of the new line, the, piping, buildings, blocks of flats and surface structures, green and planting work, electrical work, valasituksia, camera system, low exercise area with equipment in accordance with the plans drawn up by the subscriber.

Lapland house renovation and extension of the roof renewal and refurbishment works.

Rovaniemen kaupungin tilaliikelaitos | Published March 7, 2014  -  Deadline March 28, 2014
cpvs
45212000

Lapland building renovation and expansion - a project of the roof renewal and refurbishment works.

Keuda-house refurbishment building automation contract

Keski-Uudenmaan koulutuskuntayhtymä | Published February 16, 2016  -  Deadline March 14, 2016
cpvs
45330000

We ask for an offer Keuda Kerava, Central Street 3, Keuda contract for the renovation of the house-building automation and engineering works in Kerava in accordance with the tender documents.

Refurbishment covers an area of ​​about 2,000 square meters. Implementation period 4.4. - 04.08.2016. It is divided into contract with the building contractor acts as the general contractor for the project.

Hämeenkyrön TK clinic refurbishment and vo 1 roof repair

Hämeenkyrön kunta | Published April 14, 2015  -  Deadline May 13, 2015
cpvs
45000000

Hämeenkyrön health center in the clinic refurbishment, as well as Ward 1 roof repair package contract

refurbishment work

Espoonkruunu Oy | Published January 25, 2012
Winner
Hormiahaka Oy Kalliolaaksontie 5 A FI-02920 Espoo FINLAND
cpvs
45453100

IV-järjestelmien puhdistus ja säätö neljässäkymmenessä (40) kiinteistössä. Kohteissa kerros-, rivi- ja luhtitaloja.

Mäntymäki school administrators refurbishment and extension to the canteen to multi-mode project rakennuttamiskonsulttipalvelut

Kauniaisten kaupunki | Published June 16, 2017  -  Deadline July 7, 2017
cpvs
71000000

the subject of the contract is Mäntymäki school administrators refurbishment and expansion project of the canteen monitoimitilaksi- rakennuttamiskonsulttipalvelut the invitation to tender and to the extent set out in its Annexes. the subject of the contract is Mäntymäki school administrators refurbishment and expansion project of the canteen monitoimitilaksi- rakennuttamiskonsulttipalvelut the invitation to tender and to the extent set out in its Annexes.

Lapland house renovation and extension of the roof renewal and refurbishment works

Rovaniemen kaupungin tilaliikelaitos | Published June 10, 2014
Winner
Polarkate Oy
cpvs
45212000

Lapland building renovation and expansion project of the roof renewal and refurbishment works

CORRECTION NOTICE: FINNISH CENTRE OFFICE FLOOR sewer and 2K refurbishment

Eläketurvakeskus | Published December 11, 2014  -  Deadline January 12, 2015
cpvs
45000000, 45332000

Tender to select the contractor on the ground of sewers and 2K refurbishment contract for the execution. The acquisition is described in more detail in the invitation to tender and the supporting documents. The acquisition has been published 12.02.2014 procurement announcement titled the Finnish Centre office on the ground of sewers and 2k refurbishment. The original tender notice, the object tutustumisajankohdasta should be agreed at the latest by 11.12.2014. This correction notice is extended in an excursion REGISTRATION until 16/12/2014.

Pähkinärinne school technical refurbishment works

Vantaan kaupunki, Pähkinärinteen koulun tekninen peruskorjaus rakennusurakka | Published November 16, 2015  -  Deadline December 14, 2015
cpvs
45000000

Pähkinärinne school was built in 1980. This refurbishment of the school's ventilation renewed (iv new machines are installed on the roof of the container machines), the majority of old electrical and lighting technology is dismantled and replaced. Construction of technical corrections to be done for instance. As regards surfaces and facade, improved airtightness of structures and local moisture damage is repaired. The kitchen also has a new service in the context of this basic improvement. The extent of the building is 5035 brm2. The building contractor acting as prime contractor, and the main implementer site johtovelvollisena. MEP work is done on the subscriber's separate purchasing and subjected to the main contract. Unfortunately draw up local plans. . NOTE! Ad information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. A direct link to the notification the additional information can be found here Hilma notification.

FINNISH CENTRE OFFICE FLOOR sewer and 2K refurbishment

Eläketurvakeskus | Published December 2, 2014  -  Deadline January 12, 2015
cpvs
45000000, 45332000

Tender to select the contractor on the ground of sewers and 2K refurbishment contract for the execution. Renovation contract covers the tender documents the work completed document to be placed on the list of those plans. The contract takes the form of the total contract. Selected by tender, become a contractor acting as prime contractor and the legislation referred to in the main implementer. The contract must be completed no later than 28/08/2015. The acquisition is described in more detail in the invitation to tender and the supporting documents.

Harjavalta the health economic office refurbishment clinic premises

Keski-Satakunnan terveydenhuollon kuntayhtymä | Published November 4, 2014  -  Deadline November 28, 2014
cpvs
45000000

Harjavalta the health economic office refurbishment includes a counseling center premises in civil works / plumbing and ventilation works / electrical work -rakennustekniset the work of the principal contract -putki- and ventilation works side-by--sähkötyöt management contract management contract Price: Total VAT distinguishing Any additional work requested to separate the hourly charge rate.
Categories
  Finland - Show all countries
Helsinki (49)Helsingin kaupunki (42)Järvenpää (23)Tampere (21)Lahti (15)Kotka (11)Vantaa (10)Helsinki (7)Jyväskylä (7)Lahti (7)Espoon kaupunki (6)Lappeenranta (6)Oulu (6)Rantasalmi (6)Kajaani (5)Turku (5)Valtioneuvosto (5)Hämeenlinna (4)Kauniainen (4)Kouvola (4)Oulun kaupunki (4)Raasepori (4)Ylihärmä (4)Eurajoki (3)Forssa (3)Kangasala (3)Kerava (3)Kuusankoski (3)Oys (3)Pori (3)Riihimäki (3)Rovaniemi (3)Sipoo (3)Seinäjoki (3)Taivalkoski (3)Espoo (2)Eura (2)Iisalmi (2)Ilmajoki (2)Kaavi (2)Kotka (2)Loviisa (2)Mikkeli (2)Puumala (2)Sastamala (2)Ulvila (2)Vaasa (2)Covernment (1)Eduskunta (1)Eläketurvakeskus (käyntiosoite kirjurinkatu 3, helsinki) (1)Eläketurvakeskus (käyntiosoite kirjurinkatu3, helsinki) (1)Eduskunta (1)Espoo (1)Evijärvi (1)Government (1)Helen (1)Hsy (1)Haapavesi (1)Harjavalta (1)Helsingin yliopisto (1)Hyvinkää (1)Hämeenkyrö (1)Iisalmi (1)Imatra (1)Joensuu (1)Jyväskylä (1)Joensuu (1)Jyväskylän yliopisto (1)Jämsä (1)Kalajoki (1)Kangasniemi (1)Kannus (1)Kaustinen (1)Keitele (1)Kempele (1)Kiinteistö oy auroranlinna (1)Kokkola (1)Kuopio (1)Laihia (1)Lohja (1)Naantali (1)Nivala (1)Nokia (1)Padasjoki (1)Parola (1)Pietarsaari (1)Pukkila (1)Pyhäsalmi (1)Ranua (1)Reisjärvi (1)Seinäjoki (1)Salo (1)Sastamala (1)Sauvo (1)Savonlinna (1)Siilinjärvi (1)Simpele (1)Sotkamo (1)Turku (1)