Call +44 800 9755 164

Public tenders for construction in Vila-real Portugal

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work for water and sewage pipelines

Águas do Norte, SA | Published July 1, 2016  -  Deadline August 16, 2016
cpvs
45231300

Construction of pipes for water and wastewater

Foul-water piping construction work

Águas do Norte, SA | Published February 7, 2017  -  Deadline March 22, 2017
cpvs
45232411

This contract includes the construction of the following infrastructure:

- Intercetor gravity with a length of 3026 meters (plate - Intercetor the partial St.ª Natalia);

- Intercetor gravity with a length of 2716 meters (Telões - partial Intercetor of St.ª Natalia).

Reservoir construction works

Águas do Norte, SA | Published August 19, 2016  -  Deadline October 3, 2016
cpvs

- Earthwork and reinforced concrete construction of the storage cells and camera maneuvers, including coatings and paints, the implementation of the peripheral drainage and background systems, sections of the inlet pipes, outlet and discharge the reservoir and paving, sealing and external drainage of the respective grounds;

- Opening and closing with supply ditch and laying pipes and fittings in FFD, maneuvering and safety agencies, implementation of the respective chambers and spare floors.

Sewage pumping stations construction work

Águas do Norte, SA | Published October 11, 2016  -  Deadline November 22, 2016
cpvs
45232423, 45232411

This enterprise is engaged in the construction of a pumping duct to the intersection with the existing riser pipe, with a path that will divert the lift system of the new deployment area Municipal Stadium Mesão Frio. Proceeding shall be also the remodeling of the EE01, endowing it with a new electric pump group with greater capacity for the pass system to work only with a pumping station. They will also be made other Beneficiations this facility, such as the installation of an automatic grid harrowing and installation of an emergency generator.

Construction works for sewage treatment plants, purification plants and refuse incineration plants

Águas do Norte, SA | Published March 31, 2017  -  Deadline May 15, 2017
cpvs
45252000

This enterprise is engaged in the design-construction Pinheiro Wastewater Treatment Plant.

Construction works for sewage treatment plants, purification plants and refuse incineration plants

Águas do Norte, SA | Published May 18, 2017  -  Deadline May 29, 2017
cpvs
45252000

The purpose of this project is the design-construction of the Sewage Treatment Plant of Pinheiro.

Construction work for water and sewage pipelines

Águas do Norte, S.A. | Published July 5, 2016
Winner
Construções Carlos Pinho, Lda
cpvs
45231300

This enterprise is engaged in the construction of Junqueira reservoirs (RJQ) Bagunte (RBG) and Touguinhó (RTG) and respective intake pipes that will supply the parishes of Bagunte, Ferreiró, Junqueira, Greater Outeiro, Stop, Touguinhó and Touguinha, in Vila do Conde municipality.

Construction works for sewage treatment plants, purification plants and refuse incineration plants

Águas do Norte, SA | Published January 25, 2017  -  Deadline March 8, 2017
cpvs
45252000, 45232411

This enterprise is engaged in the design-construction of the Wastewater Treatment Plant Gralheira and intercetor connection to it.

Reservoir construction works

Águas do Norte, SA | Published December 16, 2016  -  Deadline January 30, 2017
cpvs
45247270, 45232100

This contract includes rehabilitation and upgrading of three drinking water reservoirs, located in the municipalities of Mirandela and Vila Flor, including repairs of concrete structures; coatings; supply and replacement of piping, equipment and accessories; and improvements to the level of protection / security in access and communications level.

Construction supervision services

Águas do Norte, SA | Published April 27, 2016  -  Deadline June 8, 2016
cpvs
71520000

This acquisition services is engaged in the monitoring and verification of the exact fulfillment of the projects and its amendments, the contract between the Employer and the Contractor, the Specification which is part of the contract, the respective Work Plan in force as well as quality management, coordination of safety and health at work (including coordination of the health and safety Plan), environmental management (including coordination of the Plan environmental management, or equivalent document verifying the implementation of the Plan of prevention and Construction and Demolition Waste Management (PPGRCD) by the contractor, since the assignment of the contract until the provisional reception and preparation of compilations Techniques of Works and Cadastre Infrastructural of the work assets, based on technical elements provided by the contractors and according to the models and instructions established.

Construction work for sewage pipes

Águas do Norte, SA | Published November 20, 2015  -  Deadline December 25, 2015
cpvs
45232440

Construção de condutas de esgoto

Gas supply mains construction work

Sonorgás — Sociedade de Gás do Norte, SA | Published November 11, 2015
cpvs
45231221

Construção de condutas de gás

Construction work for sewage pipes

Águas do Norte, SA | Published November 18, 2015  -  Deadline December 3, 2015
cpvs
45232440

This enterprise is engaged in the enforcement of domestic wastewater drainage system in Mancelos Parish, Amarante, consisting of collecting gravity network total length of 2525 meters of gravitational network.

Construction work for water and sewage pipelines

Águas do Norte, SA | Published January 20, 2017  -  Deadline March 9, 2017
cpvs
45231300

This enterprise is engaged in the execution, in the parishes of Cepelos, S. Goncalo, Bustelo, Lowland and Candemil in Amarante.

This enterprise is engaged in the execution, in the parishes of Cepelos, S. Goncalo, Bustelo, Lowland and Candemil in Amarante.

Foul-water piping construction work

Águas do Norte, SA | Published January 13, 2017  -  Deadline February 27, 2017
cpvs
45232411, 45232423

This enterprise is engaged in the execution of intercetores of Barrimau II, Figueiras I, S. Mamede I and II, Salgueirinhos, Cernadelo and Ribeira White; pumping station and conduct of White Ribeira.

Construction work for water and sewage pipelines

EMARVR, Água e Resíduos de Vila Real, EM, SA | Published December 16, 2016  -  Deadline January 13, 2017
cpvs
45231300

Decontamination basin of the Corgo - sewage drainage and renovation of the Valley Champion water network.

Decontamination basin of the CORGO - sewage drainage and renovation of the Valley Champion water network.

Foul-water piping construction work

Águas do Norte, SA | Published March 31, 2017  -  Deadline May 15, 2017
cpvs
45232411

This enterprise is engaged in the rehabilitation of Intercetor Gravity Moledo (Caminha Municipality).

Foul-water piping construction work

Águas do Norte, SA | Published August 26, 2016  -  Deadline October 6, 2016
cpvs

This enterprise is engaged in the rehabilitation of S. Romao Intercetor (Viana do Castelo - Industrial Zone) and includes: the substitution of open trench, several intercetor the sections of S. Romao, and the rehabilitation of sections by bursting (Pipe Bursting) or continuous jacketing and timely jacketing.

Construction work for water and sewage pipelines

Águas do Norte, SA | Published October 29, 2016  -  Deadline December 16, 2016
cpvs
45231300

- Wastewater Gondar drainage network - Phase 2 - provides for the implementation of domestic waste water drainage system, consisting of collecting gravity network approximate length of 3766.50 meters, two pumping stations and even two pumping pipes of total length 318.50 meters divided into eleven drainage basins, according to their delivery into the existing grid. It is also expected to build crossings perpendicular to EN15 National Road to the network connection;

Construction work for water and sewage pipelines

Águas do Norte, SA | Published November 3, 2016  -  Deadline December 22, 2016
cpvs
45231300

This enterprise is engaged in the execution, in the parish of Gôve, the following infrastructure: