Call +44 800 9755 164

Public tenders for construction in Funchal Portugal

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Building construction work

Município do Funchal | Published February 21, 2017  -  Deadline April 5, 2017
cpvs
45210000

Contract for renovation / construction of housing complex of Quinta Falcão - 30 fires infrastructure and exterior arrangements.

Reservoir construction works

A.R.M. — Águas e Resíduos da Madeira, SA | Published February 2, 2017  -  Deadline March 20, 2017
cpvs
45247270

reservoir construction for irrigation water storage with useful capacity of 6000 m³ and respective accessory organs in the Hall, Ponta do Pargo.

Public tender.

Drinking-water treatment plant construction work

A.R.M. — Águas e Resíduos da Madeira, SA | Published February 16, 2017
cpvs
45252126

Construction of drinking water treatment plant

Access road construction work

Região Autónoma da Madeira, através da Secretaria Regional dos Assuntos Parlamentares e Europeus (Direção Regional de Estradas) | Published February 11, 2017  -  Deadline March 28, 2017
cpvs
45233226

With reference to the section currently under construction Regional Road 108, the designated "Fast Track Câmara de Lobos - Estreito de Câmara de Lobos", hereinafter only VR, fully enforced in Câmara de Lobos County, the need to run it was verified one road extension access to VR by Ensign Manuel Joaquim Lopes Street. The extension of access, intercetará VR towards Estreito de Câmara de Lobos - Funchal. The extension of access will have an approximate length of 186 meters. The contract includes the channeling of water line adjacent to the entrance.

Canal tunnel construction work

ARM — Águas e Resíduos da Madeira, SA | Published February 23, 2017  -  Deadline April 10, 2017
cpvs
45221244, 45247110

Execution of the contract for 'Recovery of North Levada - Haul South - Spike Tunnel ", according to the specifications, which will be based, in summary, the following works:

I. Implementation of a tunnel between the spigot and Plum, double-transport function of the required flow downstream and storage of water (minimum volume to store 15 000 m 3 );

II. Execution secondary connecting tunnel between the tunnel Spiker and the channel in the area of ​​capture of Balcony stream;

III. Rehabilitation driven sections located in the South Haul North Levada. In addition to improving the channel coating, this rehabilitation includes recovery / repair partitions boxes flow rates, water intakes, culverts, crossings, surface spillways and bottom outlets; and

IV. Installation Recovery support the exploitation of Levada - Shelter Eira do Mourão.

Public tender.

  • 1