Supply operation and maintenance tasks in the process eredményéről_Épület Information Server electrical and plumbing systems for Mekhi

Magyar Energetikai és Közmű-szabályozási Hivatal | Published December 30, 2015
Winner
- KIVING Ingatlangazdálkodó és Beruházásszervező Kft.
cpvs
50710000, 50720000, 50750000

The object of the procurement Budapest for the Hungarian Energy & Utilities Regulatory Authority (Budapest, Sun ker. Bajcsy-Zsilinszky út 52.) asset management, V. ker. Bajcsy-Zsilinszky út 52. sz., And Budapest, V. ker. 23 Hunter Street, 25th office building at all premises and systems operating below full outer areas and supply of monitoring equipment as a whole with regard to operational and maintenance tasks, and the associated optional supply of ad hoc repair work. The building features: -1 - Level 2 garage. 2,613 m2 of warehouses, technology spaces: 493 m2 ground floor + 6 floors: offices, corridors: -2 5,533 m2. + Level 8 Level: Accessories - and service spaces: 2,172 m2 outdoor walkways, atriums, car exit: 307 m2 placed number: 320

. "A contract to the Office Famous Sports facilities maintenance, troubleshooting, operational duties," - Results of the procedure

Hírös Sport Szabadidő Létesítményeket Működtető és Szolgáltató Nonprofit Kft. | Published February 20, 2015
Winner
ENER-G Energia Technológia Zrt.
cpvs
50710000

The Bidder is responsible for "the performance of a contract to the Famous Sports Leisure Works Operator and Service Office facilities maintenance, troubleshooting, operational duties..": 1 / a. - Operation and maintenance (total area of ​​Customer), program administration duty Power system. - Power consumers and equipment maintenance and repair. - Automatic and Low Power Operation and maintenance (mechanical engineering related electrical system). - Boilers in the gym hall building twice yearly scheduled maintenance, operation and repair. Except for the water supply and sewerage. 1 / a. - Operation and maintenance (total area of ​​Customer), program administration duty Power system. - Power consumers and equipment maintenance and repair. - Automatic and Low Power Operation and maintenance (mechanical engineering related electrical system). Kecskemét Waterpark and an aquapark, 6000, Geza Csabay krt.2 / a - Beach boilers in the building twice a year scheduled maintenance, operation and repair. After closing the winter storage of water engineering, technical supervision of winter (frost risk). - Operation, maintenance and repair (total area of ​​Customer) Power system. - Power consumers and equipment maintenance and repair. - The plumbing systems, heating systems, gas pipelines, full maintenance, repair and operation except for water and sewerage network. - Staying on site at events, electricians duty administration. - Service 37/1996. SPC NM (X.18.) To safeguard the Kecskemét Bath and seasonal working Kecskemét Waterpark Waterslide Park and the main engineering tasks complete supply in accordance with legal requirements. 5 - Water Engineering and thermal well operation, maintenance and repair. - Operation, maintenance and repair (total area of ​​Customer) Power system. - Power consumers and equipment maintenance and repair. - Events, staying on site, electrician duty administration. - Automatic and Low Power Operation and maintenance (mechanical engineering related electrical system). - The plumbing systems, heating, cooling and ventilation systems, complete maintenance, repair and operation except for water and sewerage network of gas pipelines. - Operation and supervision, repair and maintenance required under legislation twice annual Sprinkler system. - Operation and supervision VISA generator system. - Staying on site at events, electricians duty administration. - Service to ensure the continued presence of the opening hours of full baths electrical technician for troubleshooting purposes. - Service 37/1996. SPC NM (X.18.) To safeguard the Kecskemét Bath and seasonal working Kecskemét Waterpark Waterslide Park and the main engineering tasks complete supply in accordance with legal requirements. Operation, maintenance and repair of Power System - 7. - Operation, maintenance and repair of equipment and Power customers. 2 - boilers in the hotel building twice yearly scheduled maintenance, operation and repair. - Operation, maintenance and repair of Power System. - Power consumers and equipment maintenance and repair. - The plumbing systems, heating, full maintenance, repair and operation except for water and sewerage network of gas pipelines. Indoor Swimming Pool, 6000, Isaac way first - the operation, maintenance and repair (total area of ​​Customer) Power system. - Power consumers and equipment maintenance and repair. 1 - Power system operation, maintenance and repair (total area of ​​Customer)

Budapest, VII. Renovation of Wesselényi utca 17. ERöMŰVHÁZ HVAC system

Erzsébetváros Fejlesztési és Beruházási Korlátolt Felelősségű Társaság | Published February 17, 2016
Winner
Oppidum Kft.
cpvs
45453100, 71245000, 45332000, 45333000, 45331000, 45331110, 45262630, 45262522, 45430000

Budapest, VII. Wesselényi utca 17. ERöMŰVHÁZ renovation of plumbing systems, which cover in particular:
- Production of gas plan
- Production of building construction plan,
- 82 pieces of ceiling and wall penetrations sewing services,
- Ending 43 pieces of gas appliances,
- Disconnect the gas lines (16 t),
- Making walkway,
- Making tiling boiler house (50 m2)
- 2 x T90 installation of fire doors,
- Heating insulation (584 m);
- Construction of gas pipelines (64 m);
- Construction of a black steel pipe heating wires (584 m);
- Installation of heating pipeline (2047 m);
- Installation of 3 gas boilers,
- Construction of three new pieces of chimney systems,
- 146 pieces of radiators installation of fittings.
The contractor is also responsible for heritage protection and technical contributions of the chimney (FŐKÉTÜSZ license) supply, gas plan in the Main Gas Plc. And sanctioned by.

Works contract. Budapest No.4 Installation of internal stations: Metro Line Section I

Budapesti Közlekedési Zártkörűen Működő Részvénytársaság | Published December 14, 2015
Winner
Swietelsky Magyarország Kft.
cpvs
45223200, 45350000, 45223220, 45313200, 45315100, 45262650, 45331210

No. 4 in Budapest. Installation of internal stations: Phase I underground lines. Structural works: Peronfödémek, stairs, fire protection and adequate safety standards Delimitation of space (floors, partitions), and certain mechanical and electrical equipment support structures for the construction. 2. Architecture works: For each placement of stations designed glass skylights. 3. Building installation work full meeting the needs of metro operation and construction of the subway stations of line segments associated plumbing systems. Ventilation, air conditioning: in all areas, working space, etc. Ventilation, human and technological fields tartózkodású air-conditioning (cooling) air supply of treated water supply, sewage disposal: Solving the station for water and fire water supply to the public network, along with all the auxiliaries. The construction of the entire csurgalék- and sewage collection, transfer enhancement systems and fittings, controlled with the utility grid connection, complete. The building systems - fire protection plan fits - development, to ensure the full viability of remote monitoring. Electrical installation work are building the network of ground stations. Passenger information and ticketing must be carried out to install the equipment and install their quality must be ensured. This work should be linked to the travel insurance tariffs imposed lerovását and control systems (ticket dispenser, ticket checkers, peronzárak, access control systems, closed peronrendszer, etc) to install. Escalators and lifts every metro station - purchase and installation required at least two 10-seat, driverless mode of public passenger elevators - especially for the disabled. Közműkiváltási In addition, it works to build the metro stations outside közműbekötéseit and utilities associated with that sort of surface work. Special engineering centers vízködoltó the stations to be installed, which provide a selective fire extinguished with fire-risk areas (track sections next to the platform, cable squares, etc), water mist. Line Tunnels incorporate internal structures to build and line the route lighting, HVAC and electrical equipment installation and grounding line network structures. 10 stations surrounding surface works to be carried out into this work phase includes all railroad and road construction, pavement construction, park and green space planning exercise. The Contractor is also responsible for the preparation and approval for construction plans based on the Tender for Construction Projects and official authorizations required for implementation.