Construction work

Miejski Zakład Komunikacji | Published December 7, 2016  -  Deadline December 21, 2016
cpvs
45000000, 45233140, 71000000

The contract execution described in the Employer's Requirements of the investment project "Construction Centre hub in Zielona Gora", consisting in particular on the design, construction, equipment, finishing and putting the Employer to use the center hub, the conditions set out in the Contract, in accordance with applicable law , technical and construction regulations, rules of technical knowledge, the utmost professional diligence.

Construction work

Miejski Zakład Komunikacji | Published November 19, 2016  -  Deadline December 6, 2016
cpvs
45000000, 45233140, 71000000

The contract execution described in the Employer's Requirements of the investment project "Construction Centre hub in Zielona Gora", consisting in particular on the design, construction, equipment, finishing and putting the Employer to use the center hub, the conditions set out in the Contract, in accordance with applicable law , technical and construction regulations, rules of technical knowledge, the utmost professional diligence.

Construction work

Miasto Zielona Góra | Published January 11, 2017  -  Deadline January 30, 2017
cpvs
45000000, 45111200, 45233120, 45316200, 45316110, 45231000, 45232150

1. The contract is for the implementation of the following tasks:

1.1. Task 1: Construction of ul. Agglomeration along with paths, under which will be conducted:

a) construction of the street. Agglomeration on the section from the street. Unification of the street. The station in Zielona Gora;

b) expansion of the provincial road No. 280 (ul. Unification) in Zielona Gora, involving the construction of the junction roundabout and the necessary infrastructure;

c) extension of ul. The station on the section from the street. Stefan Batory ul. Ułańska with the brim in Zielona Gora;

d) building links Canal Street. Unification in Zielona Gora;

1.2. Task 2: Construction of water in the street. Agglomeration and ul. Stefan Batory

in Zielona Gora, under which they will be conducted:

a) construction of water supply network of branches and connections - Phase II - in the street Stefan Batory (from the street. Energetyków to ul. Dworcowa) in Zielona Gora;

b) reconstruction of water mains in the street. Agglomeration in Zielona Gora.

Construction work

Miasto Zielona Góra | Published April 22, 2017
Winner
BUDIMEX S.A.
cpvs
45000000, 45111200, 45233120, 45316200, 45316110, 45231000, 45232150

1. The subject of the order is the following tasks:

1.1. Task 1: Construction of ul. Agglomeration with the paths under which the following will be done:

A) construction of ul. Agglomeration on the section from ul. Unification to ul. Dworcowa in Zielona Góra;

B) extension of the Voivodship Road No. 280 (Zielenia Street) in Zielona Góra, consisting in the construction of a roundabout with the necessary infrastructure;

C) extension of ul. Dworcowa on the stretch from ul. Stefan Batory to ul. Ułańska with a roundabout in Zielona Góra;

D) construction of the Link Canal at ul. Unification in Zielona Góra;

1.2. Task 2: Implementation of the water supply network in ul. Agglomeration and ul. Stefan Batory

In Zielona Góra, within which:

A) construction of a water supply system with branches and connections - Stage II - in Stefan Batory Street (from Energetyka Street to Dworcowa Street) in Zielona Góra;

B) reconstruction of the water supply system in ul. Agglomeration in Zielona Góra.

According to the order documents.

Construction work

Miasto Zielona Góra | Published December 13, 2016  -  Deadline January 20, 2017
cpvs
45000000, 45111200, 45233120, 45316200, 45316110, 45231000, 45232150

The contract is for the implementation of the following tasks:

Agglomeration along with paths, under which will be conducted:

The station in Zielona Gora;

Unification) in Zielona Gora, involving the construction of the junction roundabout and the necessary infrastructure;

Ułańska with the brim in Zielona Gora;

Unification in Zielona Gora;

Stefan Batory

in Zielona Gora, under which they will be conducted:

Dworcowa) in Zielona Gora;

Agglomeration in Zielona Gora.

The scope of the contract includes:

the station,

Unification,

the station,

4) reconstruction of the roundabout Anna Borchers,

5) reconstruction of the roundabout Clement Felchnerowskiego,

6) reconstruction of the existing geometry of the intersection,

7) construction of parking spaces,

8) Construction of the sidewalk,

9) the construction of a bicycle path

10) construction of pedestrian and bicycle

11) reconstruction and construction of public and private meetings,

12) performance of bituminous surfaces (roads, bicycle paths, pedestrian and bicycle)

13) carrying the surface of granite (ring roundabout, bus turnout)

14) carrying the surface of polbruku (roadway, parking lots, driveways and sidewalks)

15) incorporating stone and prefabricated concrete elements (curbs and edges)

16) carry out vertical adjustment and situational devices in the lane (the unit of valves for water, gas, telecommunications wells and sewage)

17) construction of storm water drainage,

18) construction of the Channel Links,

19) reconstruction of the gas network,

20) reconstruction and construction of water supply network,

21) construction of water supply connections to irrigate green areas on two roundabouts,

22) liquidation of collision with overhead lines and lines LV and MV,

23) reconstruction of sewage systems and telecommunication networks,

24) construction of street lighting,

25) construction of the illumination of pedestrian crossings,

26) reconstruction of the bus bay,

27) construction of retaining walls,

28) demolition of buildings, fences and squares,

29) elimination of interfering greenery in the existing and projected traffic lane (felling of trees and shrubs)

30) development of green areas,

31) the performance of the target traffic organization (marking horizontal and vertical)

32) the performance of safety equipment movement.

Object of the contract should be performed according to the project documentation and the Technical Specifications of the Workmanship and the Receipt of Work contained in Appendix I.5 hereto.

A detailed description of the contract is contained in Annex I.3 to the Terms of Reference and

Terms of Reference

The contractor made on the subject of the contract to provide guarantee for works

Terms of Reference.

The Contracting Authority requires that the persons designated by the Contractor who will participate

Where the above. people will not have fluent Polish period and for the execution of the contract the Contractor is obliged to provide the interpreter at his own expense and their own efforts.

1502, as amended. d.) persons performing n. actions in the implementation of the contract:

1) execution of demolition,

2) execution of earthworks,

3) performance frameworks,

4) execution of road surface, sidewalks, paths, pedestrian and bicycle routes and exits,

5) execution of the elements of the target traffic organization,

6) perform storm sewer system,

7) performance lighting,

8) The performance of the water supply network,

9) performance of the district heating network,

10) the performance of the gas network,

11) the performance of the telecommunications network,

12) the removal of colliding with existing infrastructure

necessary for the implementation of the order

The successful contractor is required to submit to the Purchaser before signing statement with the list of persons performing above. activity.

Construction supervision services

Wojewódzki Szpital Kliniczny im. K. Marcinkowskiego w Zielonej Górze Sp. z o.o. | Published October 18, 2017  -  Deadline November 21, 2017
cpvs
71520000

The subject of the order is the execution, on behalf of the Ordering Party and on its behalf, of the Supervision Inspector's services for the execution of construction works covering the construction in the form of design and build the Maternal and Child Health Center in the Provincial Clinical Hospital. Karol Marcinkowski in Zielona Góra Sp. z oo

Ring road construction work

Województwo Lubuskie – Zarząd Dróg Wojewódzkich | Published April 20, 2016  -  Deadline May 25, 2016
cpvs
45233122

Construction work for bypasses

Architectural, construction, engineering and inspection services

Miasto Zielona Góra | Published April 20, 2016  -  Deadline October 20, 2016
cpvs
71000000, 71320000, 71322000, 71240000, 45233120, 45233121, 45233122, 45233128, 45233129, 45233130, 45233162, 45110000, 31527260, 34922100

Ochla - Zielonogórska and DW 283;

6) the construction of sidewalks and bicycle paths;

7) the possible construction of bus bays;

8) construction of access roads;

9) conventions;

10) reclamation of land within the site demolition of existing roads;

11) The construction of the 5 runs business, including serving also as animal crossings;

12) the construction of road culverts, including serving as passages for animals;

13) execution of traffic safety equipment, among others protective barriers, guards przeciwolśnieniowych, railings, lighting;

14) the construction of weather stations;

15) The construction of the technological channel;

16) The construction of the drainage system, including Road ditches, retention reservoirs - infiltration, storm water drainage, drainage, sedimentation tanks and separators, pumping rainwater;

17) reconstruction of watercourses and drainage facilities, cleansing, streamlining and proper protection (cut-off) of the existing drainage facilities and receivers for the effective operation of water facilities thrilling water from the land and the road lane;

18) removal and planting of trees and shrubs and transfer of protected plant,

19) the performance of isolation green belts;

20) construction and reconstruction of essential infrastructure facilities underground and overground;

21) the construction of road lighting within intersections;

22) demolition of buildings;

23) to perform a complete restoration of territories occupied by the technical facilities and social services, construction sites, roads during construction and any other areas transformed by the Contractor.

Construction work

Miejski Zakład Komunikacji | Published October 19, 2016  -  Deadline November 24, 2016
cpvs
45000000, 45233140, 71000000

As part of the Contractor shall perform the tasks m.in .: internal and external communication system with accompanying infrastructure, reconstruction of the existing technical infrastructure and the construction of a new technical infrastructure necessary for the proper functioning of the investment project, the demolition and removal of existing objects in the area of ​​investments and colliding with the planned changes, land use (such as landscaping, green), two Cubic features, constituting the Customer Service Centre and the social facilities of drivers and employees MZK, encapsulation footbridges along with the necessary reconstruction and renovation of the viaduct, system passenger transport, roofing square hub, two parking lanes and maneuvering, and all other tasks listed and described in the Employer's Requirements.

Architectural, construction, engineering and inspection services

Rejonowy Zarząd Infrastruktury Zielona Góra | Published January 12, 2016  -  Deadline February 2, 2016
cpvs
71000000

Architectural, construction, engineering and inspection services

Architectural, construction, engineering and inspection services

Rejonowy Zarząd Infrastruktury Zielona Góra | Published March 4, 2016  -  Deadline March 24, 2016
cpvs
71000000

Architectural, construction, engineering and inspection services

Architectural, construction, engineering and inspection services

Rejonowy Zarząd Infrastruktury Zielona Góra | Published January 27, 2016  -  Deadline February 19, 2016
cpvs
71000000

Architectural, construction, engineering and inspection services

Architectural, construction, engineering and inspection services

Rejonowy Zarząd Infrastruktury Zielona Góra | Published January 28, 2016  -  Deadline February 25, 2016
cpvs
71000000

Architectural, construction, engineering and inspection services

Construction work

Miasto Zielona Góra – Urząd Miasta Zielona Góra | Published October 17, 2017  -  Deadline November 24, 2017
cpvs
45000000

1. The project will involve the construction of bicycle infrastructure in the area of ​​the functional area of ​​Zielona Góra on the n. sections:

Route 4: from the Roundabout of the Sybir to the "Wild Ochel".

Ochla - Forest.

1.3.Trasa N3: within the district road no. 1187F from km 10 + 593.01 - 12 + 340.41 and from km 13 + 622.25 - 13 + 898.09.

The subject of the order must be made in accordance with the design documentation and the Technical Specifications for the Implementation and Acceptance of Works contained in Annex I.5 to SIWZ.

8 pt.

The project will involve the construction of bicycle infrastructure in the area of ​​the functional area of ​​Zielona Góra. sections:

Tatr. 4: from the Roundabout of the Sybir to the swimming pool "Wild Ochel".

Ochla - Forest.

1.3.Trasa N3: within the district road no. 1187F from km 10 + 593.01 - 12 + 340.41 and from km 13 + 622.25 - 13 + 898.09.

The subject of the order should be made in accordance with the design documentation and the technical specifications of the execution and acceptance of works included in Annex I.5 to SIWZ.

A detailed description of the object of the contract is included in Annex I.3 to the SIWZ and

Terms of Reference.

Article 8 (1) of the Public Procurement Law requires that the subject matter of the order be fulfilled, taking into account the needs of all users, including accessibility for the disabled.

Terms of Reference.

The ordering party requires the persons indicated by the Contractor to attend

Where the above Persons will not have proficiency in Polish language for the period and for the purpose of realization of the object of the contract the contractor is obliged to provide the translator at his own expense and his own efforts.

1502 with later. d. performance of the object of the contract:

1) execution of earth works;

2) construction of substructures;

3) execution of pavement, pavements, pedestrian and cycle routes;

4) street lighting.

The selected Contractor is obliged to submit to the Employer before signing the contract a statement together with a list of persons performing the aforementioned. operations.

7 pattern contract.

The selected Contractor is obliged to provide the Contracting Authority with a contractual material and financial schedule before signing the contract.

Activity co-financed under the Regional Operational Program - Lubuskie 2020, Priority Axis 3 Low Carbon Economy, Measure 3.3 Reducing Low Urban Emissions, Sub-measure 3.3.3 Reducing Low Emissions in Cities - Zielona Góra.

Construction work

Miasto Zielona Góra – Miejski Zakład Komunikacji | Published February 16, 2017  -  Deadline March 30, 2017
cpvs
45000000, 71000000, 45111100, 45300000, 45310000, 45330000, 45331000, 45400000, 45213314, 45213352, 45233000, 45111291, 45112700, 45231400, 45342000, 45210000

The contract is the execution described in the Employer's Requirements of the investment project under the name of "Reconstruction of the bus depot of MZK in Zielona Gora", consisting in particular on the design, construction, equipment, finishing and putting the Employer to use the bus depot of MZK in Zielona Gora, under the conditions laid down in the contract, in accordance with applicable law, technical and construction regulations, rules of technical knowledge, the utmost professional diligence.

The work referred to in the preceding sentence, in each case relate to the preparation of project documentation and implementation on the basis of their works and to complete any actions incumbent on the Contractor referred to in the Specification.

Object of the contract is one of the activities carried out within the framework of the Project entitled. "The integrated low-carbon public transport in Zielona Gora", planned to be co-financing from the budget of the European Union from the Cohesion Fund under the Operational Programme Infrastructure and Environment 2014-2020.

Editions, 1999).

A detailed description of the contract was included in the Employer's Requirements, meaning all of the following documents: The Functional Utility constitutes a description of the contract for the investment project entitled. "Reconstruction of the bus depot of MZK in Zielona Gora", together with all attachments, modifications, additions and original content additions and changes in the document made in accordance with the Contract and any requirement for execution of the Works and perform other contractual obligations arising out of the Terms of Reference.

Architectural, construction, engineering and inspection services

Agencja Mienia Wojskowego Oddział Regionalny w Zielonej Górze | Published October 13, 2017  -  Deadline November 14, 2017
cpvs
71000000

The object of the contract is, in particular, the execution of the Design Documentation, which will consist of:

- pre-design studies, in particular conceptual design, containing the definition of program and space with the Purchaser, final proposals for materials, solutions and equipment;

- building design serving, after approval by the contracting authority, obtaining a construction permit decision;

- draft projects prepared to the extent necessary for the construction, with details adapted to the nature and specificity of the contract, including:

- Land development project (concerning mines playgrounds, land reclamation with greenery planting with necessary details, details and description);

- technical specifications for the execution and acceptance of construction works;

- Other projects resulting from solutions adopted in conceptual and construction projects;

- Prospectus and cost estimate for all industries;

- Task Costs.

Road bridge construction work

Województwo Lubuskie – Zarząd Dróg Wojewódzkich | Published October 29, 2016  -  Deadline December 12, 2016
cpvs
45221111, 45221110

The contract is for: Road works: preparatory works, earthworks, a road drainage, foundation, foundation of land stabilized binders, base course asphalt concrete, pavement, finishing works, traffic safety elements streets, work bridge: foundation, reinforcement, concrete , steel construction, insulation, drainage, bearings, expansion joints, safety devices, other robots.

Road construction works

Urząd Miasta Zielona Góra | Published August 4, 2015
Winner
Budownictwo Hydro-Energetyka Dychów Sp. z o.o.
cpvs
45233120, 45316213, 45231000, 71320000

Object of the contract includes the execution of the investment project entitled. "The construction of cycling infrastructure within the functional area of ​​the City of Zielona Gora - City Zielona Gora" with the division into tasks: Wanda), preparation of project documentation and on the basis of works on the construction of bicycle lanes in the city of Zielona Gora. The city plans to carry out the task of funding from the European Union under the integrated territorial investment .. The scope of the contract includes: Task 1: Decorative 3 with obtaining the necessary permits for the use of the realized object. A detailed description of the contract is contained in Annex 11 to the tender documents constituting the description of the order and in the design documentation and STWiOR No. 13 annexed hereto. Task 2: Działkowa 19, which includes bicycle paths in the City of Zielona Gora. Execution of works and construction of bicycle paths on the basis of the developed design documentation referred to in paragraph 7.3.2.1. with obtaining the necessary permits for the use of the realized object. A detailed description of the contract is contained in Annex 11 to the tender documents constituting the description of the order and the Functional Program - Utility attached as Annex 12 to the ToR. In the absence of EU task No. 2 is completed at the stage of design documentation and obtaining a decision on the construction permit, the application works or decisions authorizing the investment on the scope of the study covered by the functional and operational program

Ring road construction work

Województwo Lubuskie – Zarząd Dróg Wojewódzkich | Published April 15, 2016  -  Deadline May 31, 2016
cpvs
45233122

The investment includes:

Industry road

- Preparatory works

- Earthworks

- foundation

- surfaces

- Finishing works

- Road markings and traffic safety devices

- Elements streets

- Green road

Industry Bridge

Construction of PG-21 + 5 km 303.30

- Preparatory works

- foundation

- surfaces

- Safety equipment

- foundation

- reinforcement

- concrete

- insulation

- Expansion joints

- Security features

- Other bridge works

The construction of animal crossings PZ-20 at km 4 + 962.80 and PZ-22 at km 5 + 599.91

- Preparatory works

- Finishing works

- foundation

- reinforcement

- concrete

- steel structures

- insulation

- Other bridge works

Sanitary - construction of storm water drainage

- Earthworks

- Storm water drainage

Sanitary - reconstruction of water supply and sewerage

- Reconstruction of the collision plumbing

Electric industry - lighting roundabout

- Works for electricity power lines (roundabout No. 4)

Electric industry - collision overhead

- Works for the construction of overhead lines (collisions - roundabout No. 3, collisions - roundabout No. 4)

Electric industry - collisions Cable

- Reconstruction of the overhead line 0,4 kv on cable (collisions roundabout No. 4)

- Reconstruction of street lighting power (collision roundabout No. 4)

The telecommunications industry - removing collision

- Collision T-4 Telecommunications SA

Detailed description of the contract and the technical requirements set forth in Chapter III Terms of Reference.

Architectural, construction, engineering and inspection services

Agencja Mienia Wojskowego Oddział Regionalny w Zielonej Górze | Published October 7, 2017  -  Deadline November 14, 2017
cpvs
71000000

The object of the contract is, in particular, the execution of the Design Documentation, which will consist of:

- pre-design studies, in particular conceptual design, containing the definition of program and space with the Purchaser, final proposals for materials, solutions and equipment;

- building design serving, after approval by the contracting authority, obtaining a construction permit decision;

- draft projects prepared to the extent necessary for the construction, with details adapted to the nature and specificity of the contract, including:

- Land development project (concerning mines playgrounds, land reclamation with greenery planting with necessary details, details and description);

- technical specifications for the execution and acceptance of construction works;

- Other projects resulting from solutions adopted in conceptual and construction projects;

- Prospectus and cost estimate for all industries;

- Task Costs.

Provision should be made for the design of existing playground elements in the design documentation.

It is necessary to provide a system of fencing playground with the gate (preferred metal) and assembly of small architecture within the square (benches, trash baskets).

Selection of materials and technology strictly according to the manufacturer's instructions and recommendations.

The design documentation will consist of:

a) Pre-design studies, in particular a conceptual design, containing a description of the program and space concept with the Purchaser, final proposals for materials, solutions and equipment;

b) building design serving, after approval by the contracting authority, obtaining a building permit;

c) executive designs developed to the extent necessary for construction, with details adapted to the nature and specificity of the contract, including:

- Land development project (concerning mines playgrounds, land reclamation with greenery planting with necessary details, details and description);

- technical specifications for the execution and acceptance of construction works;

- Other projects resulting from solutions adopted in conceptual and construction projects;

- Prospectus and cost estimate for all industries;

- Statement of Costs of the Investment Task;

Provision should be made for the design of existing playground elements in the design documentation.

It is necessary to provide a system of fencing playground with the gate (preferred metal) and assembly of small architecture within the square (benches, trash baskets).

Selection of materials and technology strictly according to the manufacturer's instructions and recommendations.

The design documentation will consist of:

a) Pre-design studies, in particular a conceptual design, containing a description of the program and space concept with the Purchaser, final proposals for materials, solutions and equipment;

b) building design serving, after approval by the contracting authority, obtaining a building permit decision;

c) executive designs developed to the extent necessary for construction, with details adapted to the nature and specificity of the contract, including:

- Land development project (concerning mines playgrounds, land reclamation with greenery planting with necessary details, details and description);

- technical specifications for the execution and acceptance of construction works;

- Other projects resulting from solutions adopted in conceptual and construction projects;

- Prospectus and cost estimate for all industries;