Call +44 800 9755 164

Public tenders for construction in Zielona-gora Poland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionPolandzielona-gora

Construction work

Miasto Zielona Góra – Miejski Zakład Komunikacji | Published February 16, 2017  -  Deadline March 30, 2017
cpvs
45000000, 71000000, 45111100, 45300000, 45310000, 45330000, 45331000, 45400000, 45213314, 45213352, 45233000, 45111291, 45112700, 45231400, 45342000, 45210000

The contract is the execution described in the Employer's Requirements of the investment project under the name of "Reconstruction of the bus depot of MZK in Zielona Gora", consisting in particular on the design, construction, equipment, finishing and putting the Employer to use the bus depot of MZK in Zielona Gora, under the conditions laid down in the contract, in accordance with applicable law, technical and construction regulations, rules of technical knowledge, the utmost professional diligence.

The work referred to in the preceding sentence, in each case relate to the preparation of project documentation and implementation on the basis of their works and to complete any actions incumbent on the Contractor referred to in the Specification.

Object of the contract is one of the activities carried out within the framework of the Project entitled. "The integrated low-carbon public transport in Zielona Gora", planned to be co-financing from the budget of the European Union from the Cohesion Fund under the Operational Programme Infrastructure and Environment 2014-2020.

Editions, 1999).

A detailed description of the contract was included in the Employer's Requirements, meaning all of the following documents: The Functional Utility constitutes a description of the contract for the investment project entitled. "Reconstruction of the bus depot of MZK in Zielona Gora", together with all attachments, modifications, additions and original content additions and changes in the document made in accordance with the Contract and any requirement for execution of the Works and perform other contractual obligations arising out of the Terms of Reference.

Zielona Góra: construction work for the reconstruction of coke and BOILER - CARBON No. 4, 9, 11, 14, 16, 22 IN CONNECTION WITH GAS GAS LOW PRESSURE FOR BUILDING BOILER In Wędrzyn.

 | Published July 11, 2016  -  Deadline August 2, 2019
cpvs
45000000

The investment will be located in a closed area and includes a plot registration No. 14/4, 601, 603, 15/3 contained within the registration Bison 0054, the cadastral unit 080704-5 Sulęcin, permanent management RZI in Zielona Gora. In the complex plots are building structures, internal roads, high greenery in the form of trees and green low. Land plots is armed with a network: - teletechnical - energy - water supply - sewage system - heating network channel. The existing boiler-coke and coal at the JW in 5701 Wędrzyn are located in administrative buildings, social workers and maintenance units in separate rooms. In most boilers they are partially sited below ground or in the basement. Boiler room are made of masonry walls with solid brick and reinforced concrete ceilings. Lighting boiler - natural through windows or using wells doświetlających the boiler sunk under the terrain. In the area of ​​investment, there is no external gas network ..

Zielona Gora: Development of design documentation execution of works titled .: Redevelopment of the district road No. 1192F in m. Ostrzyce

Powiat Zielonogórski | Published July 18, 2016  -  Deadline October 31, 2017
cpvs
45233120, 71320000, 45233222

The contract to develop the project documentation execution of construction works on the reconstruction of the district road No. 1192F (plot no. 426 cadastral Ostrzyce 0005) in m. Ostrzyce. The task is to improve the quality of life, safety of pedestrians and vehicle drivers and rural landscape on a stretch of 982 mb. Design works and works that are the subject of this public procurement procedure must be done in accordance with the attached Functional Utility Program (PFU), the Terms of Reference in the present procedure for the award of a public contract, with the Act of 29 January 2004. Public procurement law, other generally applicable in this respect the law and the rules of technical knowledge and standards from the point of view of the task. The Contractor under this procedure must be obtained legally required opinions, consents, agreements, permits and exemptions, as well as the execution of construction works on the basis of the documentation developed; obtaining all administrative decisions - necessary for the design and execution of the contract in accordance with the Construction Law and the preparation of documents required for the commissioning of the works. The contractor performs construction work on the basis approved by the Employer design documentation and in accordance with the technical knowledge and the transfer of the Employer of the agreement. As part of the agreed contract price, the Contractor is obliged to carry out supervision during the execution of works in full. Object of the contract must be made in accordance with applicable regulations in this regard, in particular, the Act of 7 July 1994. Construction Law (Dz. U. 2016 pos. 290). A detailed description of the contract is contained in Annex 1 to the Terms of Reference. WARNING! The task will be settled in 2017 ..

Zielona Gora: Completion of works on the viaduct over the railway line in the DK 12 at km 58 + 718 m in. Chrobrów

Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Zielonej Górze | Published July 26, 2016  -  Deadline September 30, 2017
cpvs
45100000, 45221100, 45233120

The contract is for the task under the name: Completion of works on the viaduct over the railway line in the DK 12 at km 58 + 718 in the m. Chrobrów The investment includes: - protection of the viaduct before the demolition works, - completion of the execution of the abutments temporary - installation of the temporary facility - ratio of traffic on the temporary object - demolition of elements remaining part of the existing structure - the execution of the target - the introduction of a permanent organization of traffic - demolition of temporary object - restoration of borders lane road and marking posts PD execution of the contract is subject to Polish law, in particular the law of 7 July 1994 years construction Law (Dz. U. 2016 pos. 290), the Act of 23 April 1964. civil Code (Dz. U. 2016, item. 380 as amended.) and the Act of 29 January 2004 . public procurement Law (Dz. U. of 2015., pos. 2164) ..
  • 1