Call +44 800 9755 164

Public tenders for construction in Zielona-gora Poland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionPolandzielona-gora

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Województwo Lubuskie – Zarząd Dróg Wojewódzkich | Published April 15, 2017  -  Deadline May 23, 2017
cpvs
45230000

The investment includes:

- extension of the existing roadway structure (the complete demolition and construction of new construction) and to regulate its width to 6.5 (lanes 3.25 m),

- construction of new pavements,

- development and construction of the conventions,

- expansion of bus bays,

- expanding the existing crossing (796.21 + 13 km) along the lateral inlets district road No. 1043F and municipal road 002403F,

- expansion of the existing lighting of pedestrian paths leading to bus stops,

- construction traffic safety elements - lamps doświetlających pedestrian crossing sign and active D-6

- removing trees and bushes colliding,

- the development of road ditches with the expansion and construction of culverts,

- extension of drainage ditches Specific R-Br-S1 and No. R-Br-S2 consisting in making new culverts

- construction of sewage skarpowych.

The contract is:

Fur and Szprotawa.

The goal of the investment is to improve the functional properties, utility and safety conditions for all road users.

The investment includes:

- extension of the existing roadway structure (the complete demolition and construction of new construction) and to regulate its width to 6.5 (lanes 3.25 m),

- construction of new pavements,

- development and construction of the conventions,

- expansion of bus bays,

- expanding the existing crossing (796.21 + 13 km) along the lateral inlets district road No. 1043F and municipal road 002403F,

- expansion of the existing lighting of pedestrian paths leading to bus stops,

- construction traffic safety elements - lamps doświetlających pedestrian crossing sign and active D-6

- removing trees and bushes colliding,

- the development of road ditches with the expansion and construction of culverts,

- extension of drainage ditches Specific R-Br-S1 and No. R-Br-S2 consisting in making new culverts

- construction of sewage skarpowych.

Detailed description of the contract and the technical requirements are defined in Chapter III of the Terms of Reference.

Zielona Gora: Development of design documentation execution of works titled .: Redevelopment of the district road No. 1192F in m. Ostrzyce

Powiat Zielonogórski | Published July 18, 2016  -  Deadline October 31, 2017
cpvs
45233120, 71320000, 45233222

The contract to develop the project documentation execution of construction works on the reconstruction of the district road No. 1192F (plot no. 426 cadastral Ostrzyce 0005) in m. Ostrzyce. The task is to improve the quality of life, safety of pedestrians and vehicle drivers and rural landscape on a stretch of 982 mb. Design works and works that are the subject of this public procurement procedure must be done in accordance with the attached Functional Utility Program (PFU), the Terms of Reference in the present procedure for the award of a public contract, with the Act of 29 January 2004. Public procurement law, other generally applicable in this respect the law and the rules of technical knowledge and standards from the point of view of the task. The Contractor under this procedure must be obtained legally required opinions, consents, agreements, permits and exemptions, as well as the execution of construction works on the basis of the documentation developed; obtaining all administrative decisions - necessary for the design and execution of the contract in accordance with the Construction Law and the preparation of documents required for the commissioning of the works. The contractor performs construction work on the basis approved by the Employer design documentation and in accordance with the technical knowledge and the transfer of the Employer of the agreement. As part of the agreed contract price, the Contractor is obliged to carry out supervision during the execution of works in full. Object of the contract must be made in accordance with applicable regulations in this regard, in particular, the Act of 7 July 1994. Construction Law (Dz. U. 2016 pos. 290). A detailed description of the contract is contained in Annex 1 to the Terms of Reference. WARNING! The task will be settled in 2017 ..

Zielona Góra: construction work for the reconstruction of coke and BOILER - CARBON No. 4, 9, 11, 14, 16, 22 IN CONNECTION WITH GAS GAS LOW PRESSURE FOR BUILDING BOILER In Wędrzyn.

 | Published July 11, 2016  -  Deadline August 2, 2019
cpvs
45000000

The investment will be located in a closed area and includes a plot registration No. 14/4, 601, 603, 15/3 contained within the registration Bison 0054, the cadastral unit 080704-5 Sulęcin, permanent management RZI in Zielona Gora. In the complex plots are building structures, internal roads, high greenery in the form of trees and green low. Land plots is armed with a network: - teletechnical - energy - water supply - sewage system - heating network channel. The existing boiler-coke and coal at the JW in 5701 Wędrzyn are located in administrative buildings, social workers and maintenance units in separate rooms. In most boilers they are partially sited below ground or in the basement. Boiler room are made of masonry walls with solid brick and reinforced concrete ceilings. Lighting boiler - natural through windows or using wells doświetlających the boiler sunk under the terrain. In the area of ​​investment, there is no external gas network ..

Engineering design services

Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Zielonej Górze | Published April 15, 2017  -  Deadline May 25, 2017
cpvs
71320000

Development of technical documentation for:

1 - Rozbud. the national road No. 22 on the Crossing. district road No. 1278F Sulęcin - Kolchin,

Goraj)

3 - Rozbud. the national road No. 27 on the Crossing. district road No. 1181F Wilkanowo - Salt.

4 -Rozbud. the national road No. 27 on the Crossing. the provincial road 288,

5 - Rozbud. national road No. 32 at Crossing. the provincial road 286,

6 - Rozbud. national road No. 32 at Crossing. of provincial road No. 285,

7 - Rozbud. national road No. 32 at Crossing. of provincial road No. 304,

8 - Rozbud. the national road No. 22 on the Crossing. with the national road No. 24 Wałdowice

Pniów

10 - Rozbud. the national road No. 27 on the section from km 51 + 200 to km 51 + 400 doświetleniu involving the pedestrian crossing along

Sands.

The contract is for the execution of the technical documentation allowing for the implementation of the task called. "Extension of the national road 22 at the intersection of the district road No. 1278F Sulęcin - Kolchin ', together with

- the development of materials to the decision to permit the implementation of road investment (ZRID);

- obtaining the aforementioned. decision.

- author's supervision during construction works.

The investment is located in Lubuskie, sulęciński district, municipality Krzeszyce, at the intersection of national road No. 22 district road No. 1278F outside built-up areas.

Goraj) "with:

- the development of materials to the decision to permit the implementation of road investment (ZRID);

- obtaining the aforementioned. decision.

- author's supervision during construction works.

The investment is located in Lubuskie, międzyrzecz county, municipality Przytoczna, at the intersection of national road No. 24 through No. F1327 and county road no 192 outside built-up areas.

The contract is for the execution of the technical documentation allowing for the implementation of the task called. "Extension of the national road 27 at the intersection of DP F1181 Wilkanowo - Salt ', together with

- the development of materials to the decision to permit the implementation of road investment (ZRID);

- obtaining the aforementioned. decision.

- author's supervision during construction works.

The investment is located in Lubuskie, Zielona district, municipality Swidnica, the national road No. 27 at the junction with the DP Wilkanowo F1181 - Salt.

The contract is for the execution of the technical documentation allowing for the implementation of the task called. "Extension of the national road 27 at the intersection of DW

288 "with:

- the development of materials to the decision to permit the implementation of road investment (ZRID);

- obtaining the aforementioned. decision.

- author's supervision during construction works.

The investment is located in Lubuskie, Zielona district, municipality Bobrzański Novgorod, the national road No. 27 at the junction with the DW 288 runs outside the built-up area.

The contract is for the execution of the technical documentation allowing for the implementation of the task called. "Extension of the national road 32 at the intersection with the road no 286 ', together with

- the development of materials to the decision to permit the implementation of road investment (ZRID);

- obtaining the aforementioned. decision.

- author's supervision during construction works.

Gubinek from km 4 + 000 to km 4 + 400, in the area of ​​undeveloped.

The contract is for the execution of technical documentation allowing

called for the task. . "Extension of the national road 32 at the intersection with the road no 285 ', together with

- the development of materials to the decision to permit the implementation of road investment (ZRID);

- obtaining the aforementioned. decision.

- author's supervision during construction works.

Gubinek from km 1 + 800 to km 2 + 200, outside built-up areas.

The contract is for the execution of the technical documentation allowing for the implementation of the task called. "Extension of the national road 32 at the intersection with the road no 304 ', together with

- the development of materials to the decision to permit the implementation of road investment (ZRID);

- obtaining the aforementioned. decision.

- author's supervision during construction works.

Okunin from km 75 + 300 to km 75 + 700, on rural roads.

The contract is for the execution of the technical documentation allowing for the implementation of the task called. "Extension of the national road 22 at the intersection with the national road No. 24 (Wałdowice) 'with:

- the development of materials to the decision to permit the implementation of road investment (ZRID);

- obtaining the aforementioned. decision.

- author's supervision during construction works.

The investment is located in Lubuskie, sulęciński district, municipality Krzeszyce Lubniewice and, at the intersection of national road No. 22 with the national road No. 24, outside built-up areas.

Pniów "with:

- the development of materials for decision-

Supervision of building work

Generalna Dyrekcja Dróg Krajowych i Autostrad, Oddział w Zielonej Górze | Published April 13, 2017  -  Deadline May 23, 2017
cpvs
71247000, 71520000, 71248000

Supervision over the design and execution of the Works and contract management: Design and construction Service Areas cat. I 'Racula East "on expressway S3 in the system design and build, together with the concept for the ILO" Racula East "Cat. II

Service category: 12.

Implementation of the contract is subject to Polish law, including in particular the law dated 7.7.1994, the Construction Law (Journal of Laws of 2016. Pos. 290 as amended.) Act of 23.04.1964 r. Civil Code (Dz. U. of 2016. pos. 380 as amended.) and the Act of 29.1.2004 r. public procurement Law, hereinafter referred to as the public procurement Law (ie Journal of Laws of 2015. item. 2164, as amended.).

Employer does not accept partial bids.

The contract covers the management and supervision of works proj., And works such as designing, obtaining required by law decisions and building permits, construction, obtaining approval for use decision and the commissioning of a building, taking into account in particular the pedal. elements:

roadways maneuvering and parking spaces, equipment and technical solutions secures traffic, detached building toilets, roofing vacation destinations, landscaping elements, fire hydrants for the fire brigade, fire tank, the position of the discharge of wastewater from coaches, set garbage cans, electrical installation, lighting, terrain ILO , storm water drainage and sanitation, along with a tank bezodpływowym, green, column alarm.

Zielona Gora: Completion of works on the viaduct over the railway line in the DK 12 at km 58 + 718 m in. Chrobrów

Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Zielonej Górze | Published July 26, 2016  -  Deadline September 30, 2017
cpvs
45100000, 45221100, 45233120

The contract is for the task under the name: Completion of works on the viaduct over the railway line in the DK 12 at km 58 + 718 in the m. Chrobrów The investment includes: - protection of the viaduct before the demolition works, - completion of the execution of the abutments temporary - installation of the temporary facility - ratio of traffic on the temporary object - demolition of elements remaining part of the existing structure - the execution of the target - the introduction of a permanent organization of traffic - demolition of temporary object - restoration of borders lane road and marking posts PD execution of the contract is subject to Polish law, in particular the law of 7 July 1994 years construction Law (Dz. U. 2016 pos. 290), the Act of 23 April 1964. civil Code (Dz. U. 2016, item. 380 as amended.) and the Act of 29 January 2004 . public procurement Law (Dz. U. of 2015., pos. 2164) ..
  • 1