Zakład Gospodarki Komunalnej w Wieliczce Sp. z o.o. | Published October 21, 2017  -  Deadline November 13, 2017
cpvs
45000000, 45200000, 45111200, 45252000, 45230000, 45231100, 45231300, 45231000, 45231400, 45233253, 45233220, 45233250, 45233140, 45232400, 45233120, 45300000, 45331000, 45333000, 45331110, 45310000, 45311000, 45312100, 45315300, 45315600, 45317300, 45400000, 45262220

Construction of a sewage treatment plant in Wieliczka - Bogucice with a capacity of 360 m³ / h under the Operational Program Infrastructure and Environment 2014-2020 Measure 2.3 Water and Wastewater Management in Agglomeration.

Project pn. Construction of the sewage system in the Commune of Wieliczka - stage IV is planned to be implemented under the Operational Program Infrastructure and Environment 2014-2020 Measure 2.3 Water and Wastewater Management in Agglomeration, Investment Project No. 7: Construction of the Underground Water Treatment Plant in Wieliczka - Bogucice along with crude water pipelines and deep wells:

Task No. 7.2 - Construction of well W-2

Task No. 7.4 - Construction of an underground water treatment plant in Wieliczka - Bogucice with a capacity of 360 m³ / h.

Construction work

Zakład Gospodarki Komunalnej w Wieliczce Sp. z o.o. | Published October 28, 2017  -  Deadline November 21, 2017
cpvs
45000000, 45200000, 45111200, 45252000, 45230000, 45231100, 45231300, 45231000, 45231400, 45233253, 45233220, 45233250, 45233140, 45232400, 45233120, 45300000, 45331000, 45333000, 45331110, 45310000, 45311000, 45312100, 45315300, 45315600, 45317300, 45400000, 45262220

Construction of a sewage treatment plant in Wieliczka - Bogucice with a capacity of 360 m³ / h under the Operational Program Infrastructure and Environment 2014-2020 Measure 2.3 Water and Wastewater Management in Agglomeration.

Project pn. Construction of the sewage system in the Commune of Wieliczka - stage IV is planned to be implemented under the Operational Program Infrastructure and Environment 2014-2020 Measure 2.3 Water and Wastewater Management in Agglomerations, Investment Project No. 7: Construction of the Underground Water Treatment Plant in Wieliczka - Bogucice along with crude water pipelines and deep wells:

Task No. 7.2 - Construction of well W-2

Task No. 7.4 - Construction of an underground water treatment plant in Wieliczka - Bogucice with a capacity of 360 m³ / h.

Construction work

Zakład Gospodarki Komunalnej w Wieliczce Sp. z o.o. | Published November 18, 2017  -  Deadline December 28, 2017
cpvs
45000000, 45200000, 45111200, 45252000, 45230000, 45231100, 45231300, 45231000, 45231400, 45233253, 45233220, 45233250, 45233140, 45232400, 45233120, 45300000, 45331000, 45333000, 45331110, 45310000, 45311000, 45312100, 45315300, 45315600, 45317300, 45400000, 45262220

Construction of a sewage treatment plant in Wieliczka - Bogucice with a capacity of 360 m³ / h under the Operational Program Infrastructure and Environment 2014-2020 Measure 2.3 Water and Wastewater Management in Agglomeration.

Project pn. Construction of the sewage system in the Commune of Wieliczka - stage IV is planned to be implemented under the Operational Program Infrastructure and Environment 2014-2020 Measure 2.3 Water and Wastewater Management in Agglomeration, Investment Project No. 7: Construction of the Underground Water Treatment Plant in Wieliczka - Bogucice along with crude water pipelines and deep wells:

Task No. 7.2 - Construction of well W-2

Task No. 7.4 - Construction of an underground water treatment plant in Wieliczka - Bogucice with a capacity of 360 m³ / h.

Construction work for mining

Kopalnia Soli „Wieliczka” Spółka Akcyjna | Published January 7, 2016
cpvs
45254100

Construction work for mining

Expansion of the provincial road No. 966 Wieliczka-Tymowa involving the construction of pavement drainage system, reconstruction of the existing conventions and the construction of bus bays in the town of Trumpets.

 | Published June 23, 2015  -  Deadline July 15, 2015
cpvs
45111200, 45232411, 45233200

The contract is for the expansion of the provincial road No. 966 Wieliczka-Tymowa involving the construction of the pavement with rainwater sewerage, reconstruction of existing conventions and the construction of bus bays on the stretch ref. 050 from km 0 + 012.50 to km 0 + 126.50 (left), from km 0 + 100.00 to km 0 + 470.70 (right) in the town of Trumpets, the municipality Biskupice, province. Lesser detailed scope of work shall specify: - construction project No. 10 annexed hereto, - Technical Specification Workmanship and the Receipt of Work constituting Appendix No. 11 hereto, - bill of quantities constituting Appendix No. 8 to the SETC ..

Construction work for sewage pipes

Gmina Wieliczka | Published December 22, 2015
Winner
Przedsiębiorstwo Wielobranżowe TOM-KAMW Krzysztof Tomczyk
cpvs
45232440

Construction work on how to carry 23 out of the lane PVC pipes Wed. 160 mm - 92 m and an asphalt surface with an area of ​​835 m2.

Construction work for mining

Kopalnia Soli „Wieliczka” Spółka Akcyjna | Published May 19, 2015  -  Deadline June 25, 2015
cpvs
45254100

1. The contract is for construction of a new rash of excavated material on the item. IV underground part of the Mine Mine "Wieliczka" Salt, "the mining robots". 2. In implementing the mining contractor is required: 1) organize children's works, 2) prepare the technology works execution, 3) execute mining works, 4) provide the material necessary for the implementation of mining operations, 5) provide equipment and facilities necessary to carry out the works mining, 6) provide persons with appropriate permissions and qualifications for supervision over mining works. 3. Mining work must be done in accordance with: 1) documentation of the project named "Technical design of a new rash of excavated material at a level IV Salt Mine" Wieliczka "SA" "- which is attached as Annex 1 to the specifications, 2) the" Instructions for fire protection impregnation of wood Housing and design elements excavations in KS "Wieliczka" SA to the material it is difficult to inflammation, "introduced the use of Traffic Ordinance Mine Manager of 8.3.2011 - a copy of which is attached as Annex 2 to the specifications, 3)" Instructions for the safe conduct of ripping roofs and side walls in the underground workings and caverns Salt Mine "Wieliczka" - a copy of which is attached as Annex 3 to the specification.

Construction work for mining

Kopalnia Soli „Wieliczka” Spółka Akcyjna | Published July 18, 2015
Winner
Górnicze Przedsiębiorstwo Robót Specjalistycznych Hydrokop Sp. z o.o.
cpvs
45254100

1. The contract is for construction of a new rash of excavated material on the item. IV underground part of the Mine Mine "Wieliczka" Salt, "the mining works." 2. In implementing the mining contractor is required: 1) organize children's works; 2) prepare the technology works execution; 3) carry out mining works; 4) provide the materials necessary to carry out mining operations; 5) provide equipment and facilities necessary to carry out mining operations; 6) provide persons with appropriate permissions and qualifications for supervision over mining works. 3. Mining work must be done in accordance with: 1) documentation of the project named "Technical design of a new rash of excavated material at a level IV Salt Mine" Wieliczka "SA" "- which is attached as Annex 1 to the specifications, 2) the" Instructions for fire protection impregnation of wood Housing and design elements excavations in KS "Wieliczka" SA to the material it is difficult to inflammation, "introduced the use of Traffic Ordinance Mine Manager of 8.3.2011 - a copy of which is attached as Annex 2 to the specifications, 3)" Instructions for safe performance of ripping roofs and side walls in the underground workings and caverns Salt Mine "Wieliczka" - a copy of which is attached as Annex 3 to the specification.

Wieliczka: Construction of 12 sections of street lighting in the municipality Biskupice

Gmina Biskupice | Published July 19, 2016  -  Deadline July 19, 2016
Winner
USŁUGI ELEKTROINSTALACYJNE KRZYSZTOF MUSIAŁ, Wieliczka, 32-020 Jawczyce 37, kraj/woj. małopolskie.
cpvs
45232210, 45231400, 45316110

The contract is for the execution of works on the construction of a line of street lighting located: 1. the local road No. 560012K in Bodzanow and a communal plot No. 457 in Przebieczany 2 at a communal plot No. 243/1 in Zabłocie hamlet Jackdaws 3. at No. 560025K local road in the village of Trumpets hamlet Podryje 4. the local road No. 560050K in Sułów 5. at a communal plot No. 119 in Sławkowice 6 at a communal No. 560036K in Łazany hamlet Wola Podłazańska 7 at a communal plot No. 376/3 in Biskupice 8. the local road No. 560056K in Biskupice 9. along the municipal road No. 560058K in Tomaszkowice 10. the local road No. 560063K in Przebieczany 11 at a communal plot No. 133 in Biskupice and local road plot No. 1072 in Przebieczany hamlet Zapanki 12 at a communal No. 560005K in Trumpets hamlet Zborówek. They determine the detailed scope of work: - Project construction regulations constituting the enclosure 9 to SIWZ - Technical Specifications Execution and Receipt of Work constituting Annex 10 to the ToR ..

Construction work for mining

Kopalnia Soli „Wieliczka” Spółka Akcyjna | Published February 25, 2015
Winner
Górtech Przedsiębiorstwo Górnicze Sp. z o.o.
cpvs
45254100

1. The contract is for a depopulation IX level of the underground part of Wieliczka Salt Mine "Wieliczka", hereinafter referred to as "mining works." 2. In the context of the implementation of the mining contractor is required: 1) organize children's works; 2) prepare the technology performance of works; 3) carry out mining works; 4) provide the materials necessary to carry out mining operations; 5) provide machinery and equipment necessary to comply with mining; 6) ensure that persons with appropriate permissions and qualifications for supervision over mining works. 3. Mining work shall be performed in accordance with the design documentation under the name "Project Technical liquidation IX levels in the Wieliczka Salt Mine SA" constituting Annex 1 to the Terms of Reference,

Wieliczka Expansion of the provincial road No. 966 Wieliczka-Tymowa involving the construction of bus bays on the section ref. 040 from km 2 + 011.65 to km 2 + 157.65, together with the construction of drainage and protection telecommunication network in the town of Trumpets, the municipality Biskupice, province. Lesser

Gmina Biskupice | Published July 19, 2016  -  Deadline July 19, 2016
Winner
WIK-POL Usługi Transportowe, Roboty Ziemno-Drogowe, Wiesław Kurzawa, Wieliczka, 32-020 Sułów 136, kraj/woj. małopolskie.
cpvs
45111200, 45232411, 45233200

Expansion of the provincial road No. 966 Wieliczka-Tymowa involving the construction of bus bays on the section ref. 040 from km 2 + 011.65 to km 2 + 157.65, together with the construction of drainage and protection telecommunication network in the town of Trumpets, the municipality Biskupice, province. Lesser. They determine the detailed scope of work: - construction project constituting the enclosure 9 to SIWZ - Technical Specification Workmanship and the Receipt of Work constituting Appendix No. 10 hereto, - bill of quantities constituting the enclosure 7 to SIWZ ..

Construction work for mining

Kopalnia Soli „Wieliczka” Spółka Akcyjna | Published January 8, 2016
Winner
Górnicze Przedsiębiorstwo Robót Specjalistycznych HYDROKOP Sp. z o.o.
cpvs
45254100

1.Przedmiot order. The contract is the execution chamber Gaisruck security level III - Phase II underground part of the Wieliczka Salt Mine "Wieliczka hereinafter" mining works ". 2.Zakres work under mining. In implementing the mining contractor is required: 1) organize children's works, 2) to take technology to the work, 3) carry out mining works, 4) provide the materials necessary to carry out mining operations, 5) provide machinery and equipment necessary for the implementation of mining operations, 6) provide persons with appropriate permissions and qualifications for supervision over mining works. 3.Wykonanie mine work safety. 3.1 Mining operations must be done in accordance with: 1) the design documentation under the name: "The technical project security Gaisruck chamber - Update" - which is attached as Annex 1 to the specifications, 2) permit the restoration No. 66/13 Malopolska Regional Conservator in Krakow 28.1 .2013 sign: OZKr.5142.20.2013.JCh - a copy of which is attached as Annex 2 to the specifications. 3) The recommendations of conservators from 8.6.2010, the sign: OZKr.JCH.562-830 / 10, a copy of which is attached as Appendix 3 to the contract, 4) "Instructions for fire protection impregnation of wooden parts of the housing and interior workings KS 'Wieliczka' SA material inflammatory difficult "introduced to the use of Ordinance Head of mining plant from 8.3.2011 - a copy of which is attached as Annex 4 to the specifications, 5)» Instructions for safe performance of ripping roofs and side walls in underground workings and caverns Salt Mine "Wieliczka" - a copy of which is Annex 5 to specifications Estimated range of mining specifies the following Takeoff: Takeoff Type of works Unit Max CHAMBER GAISRUCK Installation of fiber glass anchors of dł.10,0m in the corner of the roof and side wall of the northern zone of west grid of rectangular 0.6-0.8 x1,0m with washer and nut on the adhesive KL / anchors in parts of podstropowych built as a combined sections of the 1.5 m - System connectors anchor m 540.00 robbing old housing truss / L elements. to 7.5m / near existing kasztu in the central part of the chamber / stabilization kasztu / with deportation wood with robbing rash m3 11.70 17.00 Wkopy under the pylons of the main frame and pylons north - ripping side wall next to the pylons and spągowych bays and slots for building cross-beams with the placement of excavated material in kaszcie openwork (manual transport uphill with pouring in to kasztu) m3 32,00 Installation kasztu openwork of wygrodzonym transition (bxh = 1,2 to 2,0m x 2,0m) (beams facing and pillows chipped) 1620.00 m3 Pobierka the floor along with the placement of excavated material in kaszcie openwork (manual transport uphill with pouring in to kasztu) 1220.00 m3 superstructure stands przyociosowych and the old kaszcie along the pavement in kaszcie (9 stands fi 20cm h = 4m and 6 stands fi 20cm h = 2 5m) (elements chipped) 15.00 superstructure girders on the sidewalk in kaszcie supported bilaterally or unilaterally kaszcie 47.00 Buildings wykładki the pavement slab kaszcie (balls planed and milled) 98,00 117,00 122,00 m2 truss superstructure - Level III - 102 elements of vertical, horizontal and struts (25cmx25cm sawn, planed and pegged) 102.00 truss superstructure - Level IV - 28 elements vertical, horizontal and braces (squares 25cmx25cm) 28.00 36.00 Installation of fiber glass anchors of length. 6.0 m in the northern ociosie slung beams combination of a truss construction of housing casing with washer and nut on the adhesive KL / anchors in parts of podstropowych built as a combined sections of the 1.5 m - System connectors anchor m 1152.00 96.00 Installation of fiber glass anchors dł.6,0m in the roof and overhanging ociosie northern beams supporting structure with washer and nut on the adhesive KL / anchors in parts of podstropowych built as a combined sections of the 1.5 m - System connectors anchor m 1536.00 Installation wykładki in the housing casing northern side wall (balls planed and milled) 231,00 27,00 m2 Installation of anchors fiber glass of dł.6,0m in northern ociosie slung beams supporting structure with washer and nut on the adhesive KL / anchors in parts of podstropowych built as a combined sections of the 1,5m - System connectors anchor m 270.00 Installation of fiber glass anchors slung ociosie dł.3,0m in the north and floor beams supporting structure with washer and nut on the adhesive KL m 96.00 wykładki Buildings housing the curtain belt nadspągowego the northern side wall (balls planed and milled) 146,00 m2 Installation of anchors fiber glass of dł.6,0m in northeastern ociosie slung beams supporting structure with washer and nut on the adhesive KL / anchors in parts of podstropowych built as a combined sections of the 1.5 m - System connectors anchor m 108,00 From

Construction work for mining

Kopalnia Soli „Wieliczka” Spółka Akcyjna | Published January 6, 2016
Winner
p. Andrzej Ciszewski prowadzący działalność gospodarczą pod nazwą Zakład Robót Górniczych i Wysokościowych AMC Andrzej Ciszewski
cpvs
45254100

1. The contract is for the execution of mine work safety Margielnik chamber on the item. III underground part of the Mine Mine "Wieliczka" Salt, hereinafter referred to as "mining works." 2. In implementing the mining contractor is required: 1) organize children's works, 2) to take technology to the work, 3) carry out mining works, 4) provide the materials necessary to carry out mining operations, 5) provide machinery and equipment necessary to carry out the works mining, 6) provide persons with appropriate permissions and qualifications for supervision over mining works. 3. Mining work must be done in accordance with: 1) the design documentation under the name "Updating the technical design of the chamber Margielnik security", developed by the Foundation for Science and Earth-based traditions Faculty of Mining and Geo-engineering of AGH - Appendix 1 hereto, 2) the "Instruction impregnation of wood fire protection casing elements and interior workings KS "Wieliczka" SA to the material it is difficult to inflammation, "introduced to the use of Ordinance Head of the Traffic Department of Mining of 8.3.2011 - a copy of which is attached as Annex 2 to the specifications, 3)" Instructions for safe performance and ripping roofs side walls in underground workings and caverns Salt Mine "Wieliczka" - a copy of which is attached as Annex 3 to the specification. 4) The permit No. 223/11 of the Malopolska Regional Conservator of 21.3.2011 mark: OZKr.500-105 / 11 - Annex 4 to the specifications.

Construction work for mining

Kopalnia Soli „Wieliczka” Spółka Akcyjna | Published November 7, 2015  -  Deadline November 30, 2015
cpvs
45254100

Roboty budowlane dla górnictwa

Construction work for mining

Kopalnia Soli „Wieliczka” Spółka Akcyjna | Published November 10, 2015  -  Deadline December 1, 2015
cpvs
45254100

Roboty budowlane dla górnictwa

Construction work for mining

Kopalnia Soli „Wieliczka” Spółka Akcyjna | Published October 2, 2015  -  Deadline November 5, 2015
cpvs
45254100

Roboty budowlane dla górnictwa

Construction work for mining

Kopalnia Soli „Wieliczka” Spółka Akcyjna | Published October 3, 2015  -  Deadline November 10, 2015
cpvs
45254100

1. The contract is for the execution of mine work safety Margielnik chamber on the item. III underground part of the Mine Mine "Wieliczka" Salt, hereinafter referred to as "mining works." 2. In implementing the mining contractor is required: 1) organize children's works, 2) to take technology to the work, 3) carry out mining works, 4) provide the materials necessary to carry out mining operations, 5) provide machinery and equipment necessary to carry out the works mining, 6) provide persons with appropriate permissions and qualifications for supervision over mining works. 3. Mining work must be done in accordance with: 1) the design documentation under the name "Updating the technical design of the chamber Margielnik security", developed by the Foundation for Science and Earth-based traditions Faculty of Mining and Geo-engineering of AGH - Appendix 1 hereto, 2) the "Instruction impregnation of wood fire protection casing elements and interior workings KS "Wieliczka" SA to the material it is difficult to inflammation, "introduced to the use of Ordinance Head of the Traffic Department of Mining of 8.3.2011 - a copy of which is attached as Annex 2 to the specifications, 3)" Instructions for safe performance and ripping roofs side walls in underground workings and caverns Salt Mine "Wieliczka" - a copy of which is attached as Annex 3 to the specification. 4) The permit No. 223/11 of the Malopolska Regional Conservator of 21.3.2011 mark: OZKr.500-105 / 11 - Annex 4 to the specifications.

Construction work for mining

Kopalnia Soli „Wieliczka" Spółka Akcyjna | Published June 2, 2015  -  Deadline July 9, 2015
cpvs
45254100

The contract is for the implementation of safeguards mining Sartory chamber and Level III. the underground part of the Wieliczka Salt Mine "Wieliczka" the mining robots ". As part of the implementation of the mining contractor is required: 1) organize children's works, 2) prepare the technology works execution; 3) carry out mining works, 4) provide the materials necessary to carry out mining works, 5) provide equipment and facilities necessary to carry out mining operations, 6) provide persons with appropriate permissions and qualifications for supervision over mining works. Mining operations must be done in accordance with: 1) the design documentation under the name: "Upgrading the technical design protection Sartory chamber and Level III for the filling of the chamber and backfilling dam building" which is attached as Annex 1 to the specifications, 2) Permit the Malopolska Regional Conservator Monuments in Krakow No. 470/13 of 10/06/2013 character: OZKr.J.Ch.497.2013.JCh - a copy of which is attached as Annex 2 to the specifications. 3) "Instructions for fire protection impregnation of wooden parts of the housing and interior workings in KS" Wieliczka "SA to the material it is difficult to inflammation," introduced the use of Ordinance Head of the Traffic Department of Mining of 8.3.2011 - a copy of which is attached as Appendix 3 to the specifications, 4) "Instruction safe perform ripping roofs and side walls in underground workings and caverns Salt Mine "Wieliczka" - a copy of which is attached as Annex 4 to the specifications.

Construction work for mining

Kopalnia Soli „Wieliczka” Spółka Akcyjna | Published June 19, 2015
Winner
Przedsiębiorstwa Rewitalizacji Obiektów Podziemnych Sp. z o.o.
cpvs
45254100

The contract is for the implementation of safeguards mining chambers Geramb - stage II located at IIn the underground part of the Wieliczka Salt Mine "Wieliczka" the mining robots ". 1. In the framework of the implementation of mining contractor is required: 1) organize children's works; 2) prepare the technology works execution; 3) carry out mining works; 4) provide the materials necessary to carry out mining operations; 5) provide equipment and facilities necessary to carry out mining operations; 6) provide persons with appropriate permissions and qualifications for supervision over mining works. 2. Mining operations must be done in accordance with: 1) the design documentation under the name of "security update technical design Geramb chambers" - which is attached as Annex 1 to the specification; 2) The conservators' recommendations Malopolska Regional Conservator in Krakow on 8.6.2010 r. Mark: OZKr.J.Ch.562-830 / 10 - a copy of which is attached as Annex 2 to the specification; 3) "Instructions for fire protection impregnation of wooden parts of the housing and interior workings in KS" Wieliczka "SA to the material it is difficult to inflammation," introduced the use of Ordinance Head of the Traffic Department of Mining of 8.3.2011 r. - A copy of which is attached as Annex 3 to the specification; 4) "Instructions for the safe conduct of ripping roofs and side walls in underground workings and caverns Salt Mine" Wieliczka "- a copy of which is attached as Annex 4 to the specifications.

Construction work for mining

Kopalnia Soli „Wieliczka” Spółka Akcyjna | Published July 31, 2015
Winner
Andrzej Ciszewski prowadzący działalność gospodarczą pod firmą Zakład Robót Górniczych i Wysokościowych AMC
cpvs
45254100

The contract is for the implementation of safeguards mining chamber Sartory and Level III. the underground part of the Wieliczka Salt Mine "Wieliczka" the mining works. " As part of the implementation of the mining contractor is required: 1) organize children's works; 2) prepare the technology works execution; 3) carry out mining works; 4) provide the materials necessary to carry out mining operations; 5) provide equipment and facilities necessary to carry out mining operations; 6) provide persons with appropriate permissions and qualifications for supervision over mining works.