Construction work

Gmina Miasto Tychy | Published October 28, 2017  -  Deadline December 12, 2017
cpvs
45000000, 45443000, 45321000, 45421100, 45300000, 45310000, 45330000, 45331100, 09331100, 45400000, 45430000, 45442100, 45111240

Tolstoy

The design documentation is enclosed in Annex 4 to the SIWZ.

The subject of the order includes:

1. disassembly, removal, disposal;

2. modernization works:

- construction,

- water and sewage installations

- low current installations,

- ventilation and air conditioning,

- Electrical Installations;

3. thermo-modernization works:

- construction (thermal insulation, window and door replacement)

- energy-saving lighting,

- solar installation,

- installation of what,

- lightning protection.

Detailed scope of works, technologies, implementation methods and characteristics of materials

Lutycka 6 and Technical Specifications of Construction and Acceptance of Works.

The Purchaser reserves the right to adjust and make changes to the schedule of investment execution to the requirements of the subsidy unit.

The contractor reserves that work inside the building can be carried out only after the heating season and during the holiday (July, August).

3a of the Public Procurement Law requires that depending on the task construction workers performing construction works under the direction of the Construction Manager are employed by the contractor or subcontractor on the basis of a contract of employment of at least 15 persons.

If the bidder submits more than one job, the above mentioned persons can not repeat themselves.

It is required that the employment contract be concluded at least for the duration of performance of the contract.

The contract must be completed within the period from the date of signing the contract to 30.11.2018.

The contract will be negotiated with the selected contractor.

The subject of the order includes:

1. in the field of thermo-modernization of the building:

- dismantling work,

- warming of external and foundation walls,

- thermal insulation of attic ceilings, gymnasium and connector,

- installation of hygrothermal diffusers,

- execution of the lighting installation,

- replacement of lightning protection system,

- installation of power supply,

- replacement of the heating system,

- water installation;

2. in the field of building modernization:

- renovation of the gym floor,

- renovation of corridors,

- repair of bathrooms,

- liquidation of the passage between classrooms 16 and 17,

- renovation of cellars,

- painting of rooms,

- outdoor lighting.

Detailed scope of works, technologies, implementation methods and characteristics of materials

Szewczyk 43B and Technical Specifications of Construction and Acceptance of Works.

The Purchaser reserves the right to adjust and make changes to the schedule of investment execution to the requirements of the subsidy unit.

The contractor reserves that work inside the building can be carried out only after the heating season and during the holiday (July, August).

3a of the Public Procurement Law requires that depending on the task construction workers performing construction works under the direction of the Construction Manager are employed by the contractor or subcontractor on the basis of a contract of employment of at least 9 persons.

If the bidder submits more than one job, the above mentioned persons can not repeat themselves.

It is required that the employment contract be concluded at least for the duration of performance of the contract.

The contract must be completed within the period from the date of signing the contract to 30.11.2018.

Construction management services

Gmina Miasto Tychy – Miejski Zarząd Ulic i Mostów | Published March 17, 2017  -  Deadline April 25, 2017
cpvs
71540000, 71520000

290, as amended. d.] on the principles defined in the specification.

290, as amended. d.] on the principles defined in the specification.

The scope of works under the supervision of copyright includes in particular:

2,497 m

- Construction of engineering structures, including:

- Construction of culverts (11 pcs.), To walk-cycle (2 pcs.) And retaining walls (2 pcs.)

- Construction of the road junction WB-type diamonds with 2 roundabouts and the 4 ramps and roundabouts link,

887 m

- Construction of energy-efficient LED lighting,

- Reconstruction of the existing intersections with local roads: Long Urbanowicka, Cheerful, Main, Church, Auschwitz, Mysłowicka and internal roads,

- Construction of the flyover WD-1 in the node collision with a span of 26.5 m,

- Construction of sidewalks and bicycle paths along the reconstructed roads,

- Construction of technical equipment of the road, including road signs powered by solar energy, safety equipment (guardrails, traffic organization), bus bays, disabled access (down gradients, lowering curbs)

- Building a network of utilities associated with the road (dehydration)

- Reconstruction of the existing infrastructure utilities (sanitary sewage system, rain, water, mining, water, gas, electricity LV, MV and HV network telecommunications)

- Reconstruction of drainage ditches,

- Demolition of colliding objects,

- Reconstruction of the greens.

The contractor will be required throughout the duration of the Subject of the agreement to maintain the status of continuity of employment under a contract of employment above. person / persons.

Construction management services

Gmina Miasto Tychy – Miejski Zarząd Ulic i Mostów | Published April 14, 2017  -  Deadline May 5, 2017
cpvs
71540000, 71520000

The aim of the contract is to provide services during the implementation of the Project Engineer "Construction of collision-free road junction in the area of. Turin and ul. Auschwitz along with the reconstruction Street. Auschwitz in Tychy "according to FIDIC Conditions of Contract and investor's supervision according to the Polish Construction Law [Dz.U. 2016. pos. 290, as amended. d.] on the basis of specifications.

Construction work for swimming pool

Regionalne Centrum Gospodarki Wodno-Ściekowej S.A. | Published November 22, 2016
Winner
Mostostal Warszawa S.A.
cpvs
45212212

Construction of the Water Park in Tychy.

Enlargement is the scope of the general contract, following entrusting the Contractor for execution by the Purchaser certain supplementary contracts.

Construction, foundation and surface works for highways, roads

Gmina Miasto Tychy – Miejski Zarząd Ulic i Mostów | Published October 7, 2017
Winner
Eurovia Polska S.A.
cpvs
45233000, 45111000, 45112000, 45231000, 45232000

Auschwitz in Tychy.

Auschwitz in Tychy.

The scope of works includes in particular:

2,497 m,

- construction of engineering facilities, including:

- construction of culverts (11 pcs), pedestrian-bicycle crossings (2 pcs) and retaining walls (2 pcs)

- construction of a road corridor type WB with 2 roundabouts and 4 bridges and a roundabout,

887 m,

- construction of energy-saving LED lighting,

- reconstruction of existing intersections with local roads: Długa, Urbanowicka, Pogodna, Główna, Koscielna, Oświęcimska, Mysłowicka and internal roads,

- construction of a WD-1 road viapass within a collision-free 26.5 m span,

- construction of sidewalks and cycle paths along redeveloped roads,

- construction of road technical equipment, including: road signs powered by solar energy, traffic safety equipment (protective barriers, traffic organization), bus gates, adaptation for people with disabilities (longitudinal inclination, lowering curbs)

- construction of road network related to the road (dehydration),

- reconstruction of the existing infrastructure of the area (sanitary, rainwater, mine, water, gas, electricity nN, SN and WN, telecommunications network)

- reconstruction of drainage ditches,

- demolition of colliding objects,

- redevelopment of greenery.

Contract terms for construction works for engineering and construction projects designed by the Contracting Authority, fourth edition of English-Polish unchanged 2008, publisher: SIDIR.

Construction, foundation and surface works for highways, roads

Gmina Miasto Tychy – Miejski Zarząd Ulic i Mostów | Published May 10, 2017  -  Deadline June 19, 2017
cpvs
45233000, 45111000, 45112000, 45231000, 45232000

Auschwitz in Tychy.

Auschwitz in Tychy.

The scope of works includes in particular:

2,497 m,

- construction of engineering facilities, including:

- construction of culverts (11 pcs), pedestrian-bicycle crossings (2 pcs) and retaining walls (2 pcs)

- construction of a road corridor WB type with 2 roundabouts and 4 bridges and connectors roundabout,

887 m,

- construction of energy-saving LED lighting,

- reconstruction of existing intersections with local roads: Długa, Urbanowicka, Pogodna, Główna, Koscielna, Oświęcimska, Mysłowicka and internal roads,

- construction of a WD-1 road viaduct within a collision-free 26.5 m span,

- building sidewalks and bicycle paths along redeveloped roads,

- construction of road technical equipment, including: traffic signs powered by solar energy, traffic safety equipment (protective barriers, traffic organization), bus gates, adaptation for people with disabilities (longitudinal inclination, curb)

- construction of road network related to the road (dehydration),

- reconstruction of the existing infrastructure of the area (sanitary, rain water, sewage, water, gas, electricity nN, SN and WN networks, telecommunications network);

- reconstruction of drainage ditches,

- demolition of the colliding objects,

- redevelopment of greenery.

Contract terms for construction work for engineering and construction projects designed by the Purchaser, fourth edition of English-Polish unchanged 2008, publisher: SIDIR.

Construction work for pipelines, communication and power lines

Przedsiębiorstwo Energetyki Cieplnej Spółka z ograniczoną odpowiedzialnością | Published November 4, 2017  -  Deadline December 14, 2017
cpvs
45231000, 45231100, 45231110, 45314000, 45331100, 45442200, 45111200, 45262300

The scope of work to be performed includes:

Part I

Browarowa to point Y in the area of ​​the Wilkowy River in Tychy,

civic,

c) construction of branch 2 * Dn 65/160 and 2 * Dn 100/225,

d) construction of an underground reinforced concrete chamber,

e) reconstruction of the existing hydrant under task 1,

f) reconstruction of existing rain drainage under task 1.

Part II

Brewery in Tychy,

b) Rain drainage under task 3A-part II.

Within the scope of realization of the subject of the order, the following should be performed in particular:

Part I

a) preparatory works for starting the construction, ie geodetic design of the heating network route and management of the construction site,

b) Order and delivery of pre-insulated fittings and heating pipes and other materials and equipment necessary for the realization of the object of the contract,

c) installation of a pre-insulated heating network together with an alarm system according to the design documentation and the technical specification of the construction and reception of construction works (STWiORB) from single insulated fittings and pipes with bold insulation series 2 (plus) 2xDN65-250 ~ 700mb.

d) along the network of heating pre-insulated pipes, place a 2xRHDPE DN40 / 3.7 for the data transfer cables according to the "Guidelines for the construction of a secondary distribution network for district heating networks", enclosed in Appendix 5 to the SIWZ, and make a detailed installation as-built diagram with geodesic measurement .

e) testing of all (100% of) welds by radiographic method with seal tightness tests prior to polyurethane foam filling,

Resistance measurement results, as-built documentation must be performed on a regular basis, as the installation progress of the district heating network,

g) subcontracted subprogram documentation with geodetic measurement,

h) close documentation of the geodetic heating network, ie the positions of all welds, elevations of elevations, ordinates of the heating pipes and the spacing of their axes, field sketches with appropriate marks for easy connection; geodetic documentation must be carried out on a regular basis as network installation progresses. heating.

Two solid lines shall be defined as single pipe axes,

i) road traffic program and setting traffic signs, information boards, lighting alarm system according to this program,

j) securing the technical infrastructure at intersections or close proximity to district heating pipes according to the requirements of the owners / managers of the infrastructure and the written technical acceptance of the works performed,

k) waste management in accordance with applicable regulations in this area;

l) execution and coordination of works in accordance with the Agreement concluded on September 27, 2017. between PEC Tychy and MZUiM Tychy constituting enclosure 10 to SIWZ,

m) reconstruction of the surface in accordance with Annex No. 11 to SIWZ,

n) at the latest within 14 days after the conclusion of the contract the Contractor is obliged to submit to the Purchaser Schedule of works.

Part II

a) preparatory works for starting the construction, ie geodetic design of the heating network route and development of the construction site,

b) Order and delivery of pre-insulated fittings and heating pipes and other materials and equipment necessary for the realization of the object of the contract,

c) installation of a pre-insulated heating network together with an alarm system according to the design documentation and the technical specification of the construction and reception of construction works (STWiORB) from single insulated fittings and pipes with bold insulation series 2 (plus) 2xDN50-250 ~ 590mb.

d) along the network of heating pre-insulated pipes, place a 2xRHDPE DN40 / 3.7 for the data transfer cables according to the "Guidelines for the construction of a secondary distribution network for district heating networks", enclosed in Appendix 5 to the SIWZ, and make a detailed installation as-built diagram with geodesic measurement .

e) testing of all (100% of) welds by radiographic method together with tightness test of muff links before filling with polyurethane foam,

Resistance measurement results, as-built documentation must be performed on a regular basis, as the installation progress of the district heating network,

g) subcontracted subprogram documentation with geodetic measurement,

h) close documentation of the geodetic heating network, ie the positions of all welds, elevations of elevations, ordinates of the heating pipes and the spacing of their axes, field sketches with appropriate marks for easy connection; geodetic documentation must be carried out on a regular basis as network installation progresses. heating.

Two solid lines shall be defined as single pipe axes,

i) road traffic program and traffic signs, arrays

Construction work for pipelines, communication and power lines

Przedsiębiorstwo Energetyki Cieplnej Spółka z ograniczoną odpowiedzialnością | Published September 26, 2017  -  Deadline November 2, 2017
cpvs
45231000, 45111000, 45112000, 45233000

The scope of work to be performed includes:

Reconstruction of the existing high-temperature district heating network in the traditional - duct technology into a high-capacity residential heating network 2xDn600 in the technology of single-insulated pipes together with the telecommunication sewerage.

1) In execution of the subject of the order, the following should be performed in particular:

a) preparatory works for commencement of construction, ie surveying the route of the district heating network and management of the construction site,

b) ordering and delivery of pre-insulated fittings and heating pipes and other materials and equipment necessary for the realization of the object of the contract,

c) excavation and dismantling of existing heating ducts and pipes in accordance with the design documentation, including, for example, fixed points, thermal insulation and removal of generated waste in accordance with the applicable laws in force,

d) installation of a pre-insulated heating network together with an alarm system in accordance with the design documentation and the technical specification of the construction and reception of construction works (STWiORB) from single insulated fittings and pipes with bold insulation series 2 (plus) 2xDN600 / Dzewn800 ~ 598mb,

2xDN65 / Dzewn160 ~ 10mb.

e) along the network of pre-insulated heating pipes, arrange a 2xRHDPE DN40 / 3.7 for the data transfer cables according to the "Guidelines for the construction of a secondary distribution network for the construction of district heating networks" (Annex No. 5 to the SIWZ), and make a detailed installation diagram

ascendant with geodetic measurement,

f) testing of all (100%) of non-destructive welds together with seal tightness test before polyurethane foam filling,

Results of resistance measurements, as-built documentation must be carried out on a regular basis, as the installation progress of the heating network is progressing,

h) close documentation of the geodetic heating network, ie positions of all welds, elevations of elevations, ordinates of the heating pipes and their axes spacing, field sketches with appropriate marks for easy connection, geodetic documentation must be kept up to date.

heating network installation work.

Two solid lines shall be designated as single pipe axes,

i) road traffic program and traffic signs, information boards, lighting alarm system according to this program,

j) securing the technical infrastructure at intersections or close proximity to district heating pipelines in accordance with the requirements of the owners / managers of that infrastructure and the written technical acceptance of the works performed,

(k) waste management in accordance with applicable regulations in this area;

We suggest that for the period of performance of the works build electric heaters at the heat recipients or build a source

The above should be agreed with the orderer and the recipient

warm.

Sosnowa 6a Tychy 43-100.

Tychy: Execution of construction works within the framework of the project entitled .: Construction of the playground at ul. Sikorski

Prezydent Miasta Tychy | Published July 21, 2016  -  Deadline August 10, 2016
cpvs
45000000, 45111291, 45112723

Object of the contract includes: 1. Delivery and installation of equipment 1.1 1.2 Kit amusement big swing crow's nest swing double 1.3 1.4 1.5 arc swing dragonfly wall climbing 1.6 Elephant house - climbing wall drawing board 1.7 1.8 1.9 Low set carousel amusement sandpit 1.10 1.11 1.12 Kiwak crocodile Kiwak 1.13 Ladybug swing dragonfly 4 persons. 1.14 basket ball 1.15 bench - 8 pcs. 1.16 wastebasket - 3 pcs 1.17 a bike rack 3 + 3 status - 3 pcs., 1.18 Regulations 2. The construction of the fence 3. Surfaces Surfaces grassy sand 4. 5. cleanup work. The duties of the contractor must also provide geodetic services in the performance of the as-built surveying maps. The responsibilities of the Contractor under this contract includes: - obtaining facilities construction site, secure access and driveways - organize the site after the work - to restore the state of the building site (development of green areas, sow grass) ADDITIONAL NOTES: In addition, as part of the remuneration Contractor is obliged to take into account performance security and marking the construction site. - At the time of the task must be provided on the construction site due law and order, and in particular comply with health and safety regulations and ensure the necessary safeguards site. In terms of equivalence of playground equipment are hereby amended in the project documentation in the following areas: 1. For all devices provision is made that in terms of dimensions as equivalent will be considered the device smaller than specified max by 15% from those listed. 2. In terms of sets of playground equipment should be tropical in nature roof (green leaves). 3. The device called. Climbing wall elephant amended as follows: Not allowed black, gray, brown, beige. For 25 min and the vertical surfaces 10 on the top surface does not limit the use of climbing the walls of the orifice. - In terms of form and design: considered to be only the shape of an elephant. 4. For rocker crocodile is amended: - in terms of colors and forms of plastic are not permitted to apply a different animal than a crocodile. 5. For the rocker Ladybug is amended: - in terms of colors and forms of plastic are not permitted to apply a different animal than a ladybug. 6. For swings dragonflies 4 - person shall be amended: 2 people on one side sitting astride. To demonstrate equivalence must be provided: 1. the detailed technical data sheets in each unit 2. certificates issued by accredited bodies for each of the sets of playground equipment and containing the name and code of the equipment offered.

Architectural, construction, engineering and inspection services

Przedsiębiorstwo Komunikacji Miejskiej Sp. z o.o. | Published August 5, 2015  -  Deadline September 10, 2015
cpvs
71000000, 71220000, 71240000, 71248000

The contract is to develop a comprehensive modernization of the technical documentation bus depot PKM Sp. z oo Tychy Street. Commodity 1 with obtaining necessary administrative decisions and permits, including the final building permit, and the author's supervision over the implementation of investment and the development of a comprehensive documentation necessary to organize a tender in order to select a contractor for construction works and their implementation. Documentation will include: - reconstruction and development (spray booth and vehicle inspection station) bus repair hall; - Reconstruction of the main warehouse building; - Reconstruction and development workshop building; - Adaptation of administrative and office building for people with disabilities; - The expansion of space dispatchers in the administrative building; - Reconstruction of petrol stations ON; - Construction of the station LCNG with the entrance of the street. Goods; - The construction of the garage 4-Officer; - Reconstruction of the square postojowo-maneuvering with the communication system Depot; - Construction of new parking spaces for cars, trucks and buses; - Other (thermo facilities, minor remodeling, demolition objects). A detailed description of the contract is contained in Appendix No. 7 to the SETC - Assumptions for the concept. The detailed scope of the contract is attached as Appendix 6 to the SETC. Note: The value of construction works depot comprehensive modernization made on the basis of the project, which is the result of the proceedings shall not exceed the amount of 36.5 million zł gross. Developed documentation should enable the Employer award a contract for execution of works on the basis of project documentation drawn up in parts, in terms of individual objects.

Tychy: Construction of parking spaces at ul. Pure in Tychy

Miejski Zarząd Ulic i Mostów | Published August 24, 2016  -  Deadline August 23, 2016
Winner
FIL-BUD Sp. z o.o., ul. Sikorskiego 115A, 44-103 Gliwice, kraj/woj. śląskie.
cpvs
45233000, 45100000, 45110000, 45111000, 45232452, 45233161, 45233221, 45233290, 45112710, 45314310

The scope of the contract includes road works, including: - the development of a project of temporary traffic organization, assembly, maintenance and dismantling of temporary traffic organization; - Preparatory work (measuring robots including surveying inventory-built, demolition of road elements); - Earthworks (excavation); - Reconstruction of the pavement of a concrete sett stone with layers; - Construction of parking places with openwork concrete slabs with layers; - Elements of streets (concrete curbs, edging, concrete); - Adjustments of the nastudziennych; - Green Road; - Marking horizontal and vertical ..

Tychy: Construction of parking spaces at ul. Pure in Tychy

Miejski Zarząd Ulic i Mostów | Published July 20, 2016  -  Deadline August 4, 2016
cpvs
45233000, 45100000, 45110000, 45111000, 45232452, 45233161, 45233221, 45233290, 45112710, 45314310

The scope of the contract includes road works, including: - the development of a project of temporary traffic organization, assembly, maintenance and dismantling of temporary traffic organization; - Preparatory work (measuring robots including surveying inventory-built, demolition of road elements); - Earthworks (excavation); - Reconstruction of the pavement of a concrete sett stone with layers; - Construction of parking places with openwork concrete slabs with layers; - Elements of streets (concrete curbs, edging, concrete); - Adjustments of the nastudziennych; - Green Road; - Marking horizontal and vertical ..

Construction work for pipelines, communication and power lines

Przedsiębiorstwo Energetyki Cieplnej Spółka z Ograniczoną Odpowiedzialnością | Published October 18, 2017  -  Deadline November 27, 2017
cpvs
45231000

Ordered object:

Part I

H in Tychy - stage I.

Scope of works for 2018.

Part II

H in Tychy - stage I.

Scope of works for 2019.

Part III

H in Tychy - stage I.

Scope of works for 2019.

In particular:

a) preparatory works for starting the construction, ie geodetic design of the heating network route and management of the construction site,

b) Order and delivery of pre-insulated fittings and heating pipes and other materials and equipment necessary for the realization of the object of the contract,

527mb. with bold insulation of the so-called. series 2 (plus) and series 3 (2xplus) with impulse alarm system,

d) Build the district heating network to the premises of the heating node and connect it to the heating node,

e) the existing ducts and the heating network together with the passage through the walls of the buildings, dismantle (the scope according to the enclosure 9a 9b 9c to SIWZ),

f) along the network, from the heating pre-insulated pipes (the range according to the project), arrange the 2xRHDPE DN40 / 3.7 for the data transfer cables according to the "Guidelines for the construction of a secondary sewer system for the construction of district heating networks" enclosure 5 to the SIWZ. detailed assembly as-built diagram with geodetic measurement,

g) testing of all (100% of) radiographic welds and testing of sealing joints prior to filling with polyurethane foam,

Resistance measurement results, as-built documentation must be performed on a regular basis, as the installation progresses for the district heating network,

i) close documentation of the geodetic heating network, ie the positions of all welds, elevations of elevations, ordinates of the heating pipes and the spacing of their axes, field sketches with appropriate marks enabling their easy connection, geodetic documentation must be carried out on a regular basis as network installation progresses. heating.

Two solid lines shall be defined as single pipe axes,

j) road traffic program and setting traffic signs, information boards, lighting alarm system according to this program

k) restoration of the surface and restoration of the site to a state not worse than the existing one,

l) securing the technical infrastructure at intersections or closures to district heating pipelines according to the requirements of the owners / managers of that infrastructure and the written technical acceptance of the works performed,

m) waste management in accordance with applicable regulations in this field,

Deadlines for heat supply interruptions should be agreed with the Purchaser.

o) reconstruction of district heating network from point 48 according to installation schedule no. 3 (from project documentation no. 16 / PECTY / 06) to all buildings supplied from this place (according to enclosure 10 to SIWZ)

(p) Technological work should be carried out during the heating season from 15.05.2018 to 31.08.2018.

Renovation works should be completed by 15.10.2018.

In particular:

a) preparatory works for starting the construction, ie geodetic route planning and land development

b) Order and delivery of pre-insulated fittings and heating pipes and other materials and equipment necessary for the realization of the object of the contract

1735mb. with bold insulation of the so-called. Series 2 (plus) and Series 3 (2xplus) together with an impulse alarm system

d) Build the heat distribution network to the heat exchange rooms and connect it to the heating node.

e) the existing ducts and the heating network together with the passage through the walls of the buildings, dismantle (the scope according to the enclosure 9a 9b 9c to SIWZ)

f) along the network of heating pre-insulated pipes (the range according to the project), arrange the 2xRHDPE DN40 / 3.7 multiplexer for data transfer cables in accordance with the "Guidelines for the construction of a secondary distribution pipeline for district heating networks" enclosure 5 to the SIWZ, Assembly as an as-built diagram with geodetic measurement

g) testing of all (100% of) welds by radiographic method and test of tightness of muff links prior to filling with polyurethane foam

Resistance measurement results, as-built documentation must be performed on a regular basis as the installation progresses for the district heating network.

i) close documentation of the geodetic heating network, ie the positions of all welds, elevations of elevations, ordinates of the heating pipes and the spacing of their axes, field sketches with appropriate marks enabling their easy connection, geodetic documentation must be carried out on a regular basis as network installation progresses. heat

Two single-line axes should be defined

j) road traffic program and traffic signs, information boards, lighting installations ala

Tychy: Execution of construction works within the framework of the project entitled .: Construction of a playground for children with intellectual disabilities and physical

Prezydent Miasta Tychy | Published July 21, 2016  -  Deadline August 12, 2016
cpvs
45000000, 45111291, 45112723

Object of the contract includes: 1. Delivery and installation of equipment 1.1 1.2 Integration Kit playful rope rotary cone 1.3 1.4 Interactive fence Swing steel Storks Nest 1.5 steel swing for children in wheelchairs 1.6 Sandbox on a platform 1.7 Cradle springs 1.8 Bongos - music device 1.9 Chimes Quartet - music device 1.10 Chimes - music device 1.11 Rainy wheel - music device 1.12 Drum - music device 1.13 Bench metal - wooden backrest - 5 pcs. 1.14 Bench chameleon - 1 pc. 1.15 Bench turtle - 1 pc. 1.16 Metal trash can - 2 pcs. 1.17 Table of Regulations - 1 pc. 2. surfaces sand 3. polyurethane surfaces 4. 5. surfaces paving work cleaning. The duties of the contractor must also provide geodetic services in the performance of the as-built surveying maps. The responsibilities of the Contractor under this contract includes: - obtaining facilities construction site, secure access and driveways - organize the site after the work - to restore the state of the building site (development of green areas, sow grass) ADDITIONAL NOTES: In addition, as part of the remuneration Contractor is obliged to take into account performance security and marking the construction site. - At the time of the task must be provided on the construction site due law and order, and in particular comply with health and safety regulations and ensure the necessary safeguards site. In terms of equivalence of playground equipment are hereby amended in the project documentation in the following areas: 1. For all devices provision is made that in terms of dimensions as equivalent will be considered the device smaller than specified max by 10%. 2. For the device cradle on the springs and all music devices in the range of colors as equivalent will be considered in any multi-device and vivid colors. To demonstrate equivalence must be provided: 1. the detailed technical data sheets in each unit 2. certificates issued by accredited bodies for each of the sets of playground equipment and containing the name and code of the equipment offered.

Tychy: Construction of road from the side street. Mąkołowskiej to premises No. 154-158 in Tychy

Miejski Zarząd Ulic i Mostów | Published July 26, 2016  -  Deadline July 25, 2016
Winner
FIL-BUD Spółka z o.o., ul. Sikorskiego 115A, 44-103 Gliwice, kraj/woj. śląskie.
cpvs
45233000, 45111000, 45111200, 45200000, 45231000, 45231300, 45232000, 45232130, 45233161, 45233221, 45233290, 45316110

1. Road construction, including: - the restoration and designation of routes and points of high and as-built inventory of all trades; - Removal of trees and shrubs; - Demolition of parts of roads and streets; - Earth moving: excavation and embankments; - Dehydration: drains, laterals, French drain; - The construction of roads and exits of paving concrete with layers; - Construction of pavement of concrete paving stones with layers; - Finishing works: humusowanie area adjacent; - Traffic safety devices: horizontal and vertical signaling; - Concrete curbs and concrete edges; - Altitude adjustment foreign devices; - Reconstruction works. 2. Work lighting with power cables protection, including: - earthworks; - Installation of street lighting (4 lamps). 3. Robots telecommunication, including: - earthworks; - Reconstruction of telecommunication network ..

Tychy: Development of the project to the execution of works designed pn .: Construction of gazebos rubbish between ul. Oak 26 - 28, 32 - 36 and ul. Dabrowski 17 - 19

 | Published July 11, 2016  -  Deadline November 30, 2016
cpvs
45000000

The contract: Development of a land development design and execution of works designed: - construction of gazebos garbage - construction come to garbage - site restoration - construction and installation of an information board dot. Participatory budget - color and content according to the model annexed hereto .. and perform all the necessary work associated with the contract.

Provision of ongoing maintenance and technical and twenty-four hour emergency repairs and construction works within the municipality of resources administered by the Municipal Management of residential buildings in Tychy

 | Published December 4, 2014  -  Deadline December 19, 2014
cpvs
45000000, 45300000, 45330000, 45333000, 45311200, 45261900, 45261320, 45262522, 45410000, 45440000, 45420000, 45421131, 45421132, 45233253, 50700000, 50870000

1 Subject-matter of the contract is to provide services for ongoing maintenance and technical and twenty-four hour emergency repairs and construction works within the resources of the municipality, which administers on behalf of the Employer Municipal Management of residential buildings in Tychy, through its business units hereinafter em ROMs, and include: 9c arcade Construction 41 43 La Boheme Independence Building 76 41 2. The contract is divided into five (5) sections called tasks: Task # 1 - Provision of ongoing maintenance and emergency-clock technical maintenance and repairs and construction works within the municipality resources administered by ROM No. I TASK No. 2 - Provision of ongoing maintenance and technical and twenty-four hour emergency repairs and construction works within the municipality of resources administered by the ROM No. II Task No. 3 - Provision of ongoing maintenance and emergency-clock technical and repairs and construction works within the municipality of resources administered by the ROM No. III TASK No. 4 - Provision of ongoing maintenance and emergency-clock technical maintenance and repairs and construction works within the municipality of resources administered by the ROM No. IV TASK No. 5 - Provision of services for ongoing maintenance and technical and twenty-four hour emergency repairs and construction works within the municipality of resources administered by the ROM No. V 3. Scope of the contract: 1) the current Maintenance consists in maintaining a full technical efficiency of internal installations: water and sewage, which, ccw, gas and electricity; 2) to provide twenty-four hour emergency technical activities; 3) carry out repairs and construction works beyond the scope of the current resource conservation within the community; Specific responsibilities includes (repeatable for all tasks) -załącznik No. 1 to the draft agreement. A detailed list of the addresses of the property by individual tasks include

Reconstruction of Sewage Treatment Plant Tychy Urbanowice construction of a new station sludge dewatering

 | Published March 25, 2016  -  Deadline April 25, 2016
cpvs
45252121, 45111200, 45111230, 45223500, 45320000, 45110000, 45233000, 45223820, 45262500, 45223100, 45442000, 45223800, 45261200, 45262300, 45432100, 45431000, 45430000, 45420000, 45410000, 45442100, 45432200

Construction on the existing wastewater treatment plant, the new station sludge dewatering installations external sewage sludge, drinking water and technology, power cables and other infrastructure support. The project involves the construction of the station building sludge dewatering with equipment and technological installations, which locates the hall main dewatering station storage, preparation and dispensing polieletrolitu room electrical switchboard room control a sanitary toilet and washroom total area of ​​the designed building 528 m2 Total usable area planned building 514.71 m2 Total building capacity dewatering 6 407.00 m3 sheds adjacent to the building receiving position dewatered sludge to transport building area of ​​216 m2 biofilter air-purifying ventilation installations with a building area of ​​88 m2 pumping sludge fermented in an existing building adjacent to the underground tank sludge cable digested sludge section of existing pipe in the area of ​​the old sewage works of the new station roads and building area 1 471,00 m2 Detailed description of the contract and the manner of its execution is specified in the Documentation project, the Bill of Quantities Specifications and technical performance and acceptance of works developed for the purposes of this order in Annex 8 to the Terms of Reference ..

Architectural, construction, engineering and inspection services

Przedsiębiorstwo Komunikacji Miejskiej Sp. z o.o. | Published August 28, 2015  -  Deadline September 14, 2015
cpvs
71000000, 71220000, 71240000, 71248000

Usługi architektoniczne, budowlane, inżynieryjne i kontrolne

Tychy: Development of design documentation and execution of construction works designed peripheral water supply network for fire needs a constant supply of water for extinguishing fires external administrative building - an office and utility buildings at ul. Filaret 31 Tychy

 | Published July 11, 2016  -  Deadline July 30, 2016
cpvs
45000000

1. The contract is: a. Elaboration of project documentation construction of water supply network perimeter fire, b. The execution of works consisting of: construction of water supply network perimeter fire ..