Public tenders for construction in Tychowo Poland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Reservoir construction works

Skarb Państwa PGL LP Nadleśnictwo Tychowo reprezentowany przez pełnomocnika Radcę Prawnego Janusza Adamiaka – Kancelaria Radcy Prawnego J. Adamiak, ul. J. Ordona 8/1, 78-400 Szczecinek | Published July 21, 2015
Winner
Przedsiębiorstwo Wodno-Inżynieryjne „PEKUM” S.A.
cpvs
45247270, 45247230, 45247220, 45243510, 45243600, 45000000

The contract consists of 2 parts: 1.1) part of lot 1: construction of water storage tank in the forestry branch Babnič 127n, 128g. The scope of the intended use of the water includes: - construction of dikes damming with permanent transfer and a basin from which 74.13 m - the normal level of damming - NPP - the reservoir area - 0.22 ha - tank capacity - 2.21 thousand. m3 - range impact of damming - L = 204 m. This will increase water resources in both basins (retention ground) and groundwater resources. 1.2) part of the order No. 2: construction of the reservoir to retain water in the forest Czarnikowo branch 232c Intended use of surface waters includes construction of dikes damming with permanent transfer and impoundment and retention of surface water in the trough ditch K-10. By reducing water runoff, it will raise the groundwater level, increasing soil moisture natural habitats, biodiversity of species of plants, restoration of degraded non-forest habitats, as well as minimizing the effects of drought occurrence. The scope of the intended use of the water includes: - construction of dikes damming with permanent transfer and a basin from which 79.50 m - the normal level of damming - NPP - the reservoir area - 0.45 ha - tank capacity - 5.71 thousand. m3 - range impact of damming - L = 360 m.

Reservoir construction works

Skarb Państwa PGL LP Nadleśnictwo Tychowo reprezentowany przez pełnomocnika Radcę Prawnego Janusza Adamiaka – Kancelaria Radcy Prawnego J. Adamiak, ul. J. Ordona 8/1, 78-400 Szczecinek | Published May 7, 2015  -  Deadline June 16, 2015
cpvs
45247270, 45247230, 45247220, 45243510, 45243600, 45000000

The contract consists of two parts: 1.1) part of lot 1: construction of water storage tank in the forestry branch Babnič 127n, 128g. The scope of the intended use of the water includes: - construction of dikes damming with permanent transfer and basin from which 74.13 m - the normal level of damming - NPP - the reservoir area - 0.22 ha - tank capacity - 2.21 thousand. m3, - range impact of damming - L = 204 m. This will increase water resources in both basins (retention ground) and groundwater resources. 1.2) part of the order No. 2: construction of water storage tank in the forestry branch 232c Czarnikowo Intended use of surface waters includes construction of dikes damming with permanent transfer and impoundment and retention of surface water in the trough ditch K-10. By reducing water runoff, it will raise the groundwater level, increasing soil moisture natural habitats, biodiversity of species of plants, restoration of degraded non-forest habitats, as well as minimizing the effects of drought occurrence. The scope of the intended use of the water includes: - construction of dikes damming with permanent transfer and basin from which 79.50 m - the normal level of damming - NPP - the reservoir area - 0.45 ha - tank capacity - 5.71 thousand. m³ - headwater catchment - L = 360 m.

Reservoir construction works

Skarb Państwa PGL LP – Nadleśnictwo Tychowo reprezentowany przez pełnomocnika Radcę Prawnego Janusza Adamiaka – Kancelaria Radcy Prawnego J. Adamiak, ul. J. Ordona 8/1, 78-400 Szczecinek | Published November 24, 2015
Winner
Henryk Religa Zakład Ogólnobudowlany Rel-Bud
cpvs
45247270, 45247230, 45247220, 45243510, 45243600, 45000000

Construction of two reservoirs in the area of ​​forestry Glinka in partisan 333h, 329b on plots registration No. 333, 329/1 cadastral 82 Wojęcino. The contract includes construction of two reservoirs at the drainage ditch which is a tributary of the river Chotli to damming and retention of surface waters in the catchment area of ​​forest. The intended use of surface waters includes construction of two dikes damming with permanent transfers and basins wypadowymi in place of the natural valley unnamed watercourse. Lay slopes along the shore tank remains in its original state, without the work associated with profiling slopes. The scope of the intended use of the water includes: - construction of two (A, B) dikes damming with fixed weirs and basins wypadowymi, Tank A: 1. Surface vessel 5310,07m²; 2. tank capacity 10342,5m³; 3. The elevation above sea level crown of the dike 97,50m; 4. The amount of damming 4,97m; 5. The length of the causeway 25,50m; 6. The maximum height of the dike 5,91m; 7. The width of the dike crown 3,50m; 8. The width of the transfer 3,80m; 9. The length of the transfer in the dike and slope 23,34m; 10. Length of the basin entrance point 10,0M; 11. The width of the basin entrance point 3,80m; 12. The range of damming 166,00m. Tank B: 1. Surface vessel 95399,44m²; 2. tank capacity 169246,69m³; 3. The elevation above sea level crown of the dike 99,50m; 4. The amount of damming 4,47m; 5. The length of the causeway 146,00m; 6. The maximum height of the dike 5,56m; 7. The width of the dike crown 3,50m; 8. The width of the transfer 3,80m; 9. The length of the transfer in the dike and slope 21,76m; 10. Length of the basin entrance point 10,0M; 11. The width of the basin entrance point 3,80m; 12. The range of damming 733,00m. At runtime, the dike and filling of reservoirs is necessary to ensure the reserved flow in the stream. For this purpose is expected to make for each dike steel pipeline with adjustable water flow in the performance of dykes and during refilling.

Reservoir construction works

Skarb Państwa – PGL LP Nadleśnictwo Tychowo reprezentowany przez pełnomocnika Radcę Prawnego Janusza Adamiaka – Kancelaria Radcy Prawnego J. Adamiak, ul. J. Ordona 8/1, 78-400 Szczecinek | Published September 19, 2015  -  Deadline October 27, 2015
cpvs
45247270, 45247230, 45247220, 45243510, 45243600, 45000000

The contract includes construction of two reservoirs at the drainage ditch which is a tributary of the river Chotli to damming and retention of surface waters in the catchment area of ​​forest. The intended use of surface waters includes construction of two dikes damming with permanent transfers and basins wypadowymi in place of the natural valley unnamed watercourse. Lay slopes along the shore tank remains in its original state, without the work associated with profiling slopes. The scope of the intended use of the water includes: - construction of two (A, B) dikes damming with fixed weirs and basins wypadowymi, Tank A: 1. Surface tank 5 310.07 m2 2. tank capacity of 10 342.5 m3 3. ordinate dyke crown 97.50 m 4 Height 4.97 m 5. impoundment dike length 25.50 m 6. The maximum height of the dikes 5.91 m 7. The width of the crown dikes 3.50 m Width transfer 8. 9. The length of 3.80 m transfer of dykes and embankment 23,34 m 10. Length of the basin entrance point 10 m 11. The width of the basin entrance point range 3.80 m 12. impoundments 166 m Reservoir B: 1. Surface vessel of 95 399.44 m2 2. tank capacity 169 246, 69 m3 3. ordinate dyke crown 4. 99.50 m Height 4.47 m 5. impoundment dike length 146 m 6. The maximum height of the dikes 5.56 m 7. The width of the crown dikes 3.50 m Width transfer 8. 3 80 m 9. The length of the transfer in the dike and slope length of 21.76 m 10. basin entrance point 10 m 11. The width of the basin entrance point range 3.80 m 12. impoundments 733 m in the performance of the dike and filling of reservoirs is necessary to ensure the reserved flow in the stream . For this purpose is expected to make for each dike steel pipeline with adjustable water flow in the performance of dykes and during refilling.

Tychowo: Execution of additional works on the construction of forest road No. 119 in forestry Glinka involving the draining of rainwater.

Państwowe Gospodarstwo Leśne Lasy Państwowe Nadleśnictwo Tychowo | Published August 12, 2016
cpvs
45233120

Additional works for the construction of forest road No. 119 in forestry Glinka involving the draining of rainwater ..

Tychowo: Execution of additional works on the construction of forest road No. 119 in forestry Glinka involving the draining of rainwater

Państwowe Gospodarstwo Leśne Lasy Państwowe Nadleśnictwo Tychowo | Published August 12, 2016  -  Deadline August 12, 2016
Winner
Remont i Budowa Dróg Władysław Łuczkanin, Kliszno 3/B, 76-015 Manowo, kraj/woj. zachodniopomorskie.
cpvs
45233120

Additional works for the construction of forest road No. 119 in forestry Glinka involving the draining of rainwater.

Reservoir construction works

Skarb Państwa PGL LP, Nadleśnictwo Tychowo, reprezentowany przez pełnomocnika Radcę Prawnego Janusza Adamiaka – Kancelaria Radcy Prawnego J. Adamiak, ul. J. Ordona 8/1, 78-400 Szczecinek | Published June 25, 2015
Winner
Krzysztof Religa Zakład Ogólnobudowlany
cpvs
45247270, 45247230, 45247220, 45243510, 45243600, 45000000

The contract is: water storage tank construction and modernization of dikes damming with permanent transfer in the form of a culvert located in the forestry Glinka, district of Koszalin, Bobolice commune, precinct Wojęcino plot No. 332, 333, 336 and Białogard district, municipality Tychowo, precinct Warnino Plot No. 135 . Object Code 11-27-07-01. The aim of the contract is to increase the retention and preventing floods and drought in forest ecosystems in the lowlands of Forestry Glinka. The overall objective of the investment is restoration areas in the Forest District Tychowo by slowing runoff of surface waters and their retention in areas which are found phytocoenoses drying processes while providing stability for local flooding low areas. The scope of the implementation of the construction of the reservoir with a water surface area of ​​3.5 hectares and retention potential 99 600 m3. Impoundment of water on the dike with a height of damming up to 3.5 m and a length of 83.8 m with a permanent transfer in the form of a concrete culvert together with the outlet basin ended in town. This task is carried out under the project "Increasing retention possibilities and preventing floods and drought in forest ecosystems in the lowlands".

Reservoir construction works

Skarb Państwa PGL LP Nadleśnictwo Tychowo reprezentowany przez pełnomocnika Radcę Prawnego Janusza Adamiaka – Kancelaria Radcy Prawnego J. Adamiak, ul. J. Ordona 8/1, 78-400 Szczecinek | Published February 14, 2015  -  Deadline March 24, 2015
cpvs
45247270, 45247230, 45247220, 45243510, 45243600, 45000000

The contract is: water storage tank construction and modernization of the causeway with a permanent transfer looming in the form of a culvert located in forestry Glinka, district of Koszalin, Bobolice municipality, precinct Wojęcino plot No. 332, 333, 336 and Białogard district, municipality Tychowo, precinct Warnino plot No. 135 . 11-27-07-01 object code. The purpose of the contract is to increase the retention and preventing the possibility of flooding and drought in forest ecosystems in the lowlands of Forestry Glinka. The overall objective of the investment is restoration areas in the Forest District Tychowo by slowing runoff of surface waters and their retention in areas which are found phytocoenoses drying process while providing stability for local waterboarding low areas. The scope of the implementation of the construction of a storage reservoir with a water surface area of ​​3.5 hectares and capacity retention of 99 600 m3. Impoundment of water on the dike with a height of damming up to 3.5 m and a length of 83.8 m with a permanent transfer in the form of a concrete culvert with ending basin outlet in town. This task is carried out in the framework of the project "Increasing retention possibilities and preventing floods and drought in forest ecosystems in the lowlands".

Reservoir construction works

Skarb Państwa PGL LP Nadleśnictwo Tychowo reprezentowany przez pełnomocnika Radcę Prawnego Janusza Adamiaka – Kancelaria Radcy Prawnego J. Adamiak, ul. J. Ordona 8/1, 78-400 Szczecinek | Published July 30, 2015
Winner
Krzysztof Religa Zakład Ogólnobudowlany
cpvs
45247270

Additional works on water storage tank built and modernized dikes damming with permanent transfer in the form of a culvert located in the town of Clay, district Koszalin, Bobolice commune, precinct Wojęcino, plot no 332, 333, 336, and district Bialogard Tychowo municipality, precinct Warnino, plot No. 135 - consisting of: - an increase of 15 cm side walls at the basin entrance point, - laying drain in place exudates and bottom of the dike, - strengthening gabions unstable ground at the basin entrance point, - protection of the stairs with gabions and palisade with pins - made drainage of rainwater flowing from the forest path - execution trigger street in order to drain water from the crown of the road on the dike.

Site preparation and clearance work

Gmina Tychowo | Published May 13, 2015
Winner
Zakład Remontowo-Budowlany Zbigniew Kubaczyk
cpvs
45111200

Execution of construction works - Reclamation of municipal waste landfill in Warninie, the municipality Tychowo.

Supervision of building work

Skarb Państwa PGL LP Nadleśnictwo Tychowo reprezentowany przez pełnomocnika Radcę Prawnego Janusza Adamiaka – Kancelaria Radcy Prawnego J. Adamiak, ul. J. Ordona 8/1, 78-400 Szczecinek | Published May 20, 2015  -  Deadline June 30, 2015
cpvs
71247000

The contract is: "Investor's supervision over the construction of water storage tank in the forestry branch Babnič 127n, 128g and construction of water storage tank in the forestry branch 232c Czarnikowo" The scope of the intended water use includes: - construction of dikes damming with permanent transfer and basin point 74.13 m above sea level - normal damming level - NPP - the reservoir area - 0.22 ha - tank capacity - 2.21 thousand. m3, - range impact of damming - L = 204 m. This will increase water resources in both basins (retention ground) and groundwater resources. The intended use of surface waters includes construction of dikes damming with permanent transfer and impoundment and retention of surface water in the trough ditch K-10. By reducing water runoff, it will raise the groundwater level, increasing soil moisture natural habitats, biodiversity of species of plants, restoration of degraded non-forest habitats, as well as minimizing the effects of drought occurrence. The scope of the intended use of the water includes: - construction of dikes damming with permanent transfer and basin from which 79.50 m - the normal level of damming - NPP - the reservoir area - 0.45 ha - tank capacity - 5.71 thousand. m3, - range impact of damming - L = 360 m.

Supervision of building work

Skarb Państwa PGL LP – Nadleśnictwo Tychowo reprezentowany przez pełnomocnika Radcę Prawnego Janusza Adamiaka – Kancelaria Radcy Prawnego J. Adamiak, ul. J. Ordona 8/1, 78-400 Szczecinek | Published November 27, 2015
Winner
Zbigniew Bruski Biuro Techniczne AGROPARTNER
cpvs
71247000

The contract is: "Investor's supervision over the construction of two reservoirs in the area of ​​forestry Glinka in partisan 333h, 329b on plots registration No. 333, 329/1 cadastral 82 Wojęcino" The contract involves the construction of two reservoirs at the drainage ditch which is a tributary of the river Chotli to damming and retention of surface waters in the catchment area of ​​forest. The scope of the intended use of the water includes: - construction of two (A, B) dikes damming with fixed weirs and basins wypadowymi, Tank A: The surface of the tank 5310,07m2 tank capacity 10342,5m3 ordinate the crown dikes damming 97,50m 4,97m height above sea level Length 25,50m dikes maximum height of 5,91m dike dike crown width 3.50 m width 3.80 m length transfer transfer in the dike and slope length 23,34m basin entrance point 10,0M Width 3.80 m trough entrance point range 166,00m impoundment reservoir B: 95399,44m2 surface of the container tank capacity 169246,69m3 ordinate the crown dikes damming height above sea level 99,50m 4,47m length 146,00m dikes maximum height of 5,56m dike dike crown width 3.50 m width 3.80 m length transfer transfer in the dike and slope 21,76m length of the trough entrance point 10,0M Width 3.80 m trough entrance point range impoundments 733,00m

Supervision of building work

Skarb Państwa PGL LP Nadleśnictwo Tychowo reprezentowany przez pełnomocnika Radcę Prawnego Janusza Adamiaka – Kancelaria Radcy Prawnego J. Adamiak, ul. J. Ordona 8/1, 78-400 Szczecinek | Published July 25, 2015
Winner
„DEVELOPMENT DESIGN” spółka z ograniczoną odpowiedzialnością
cpvs
71247000

The scope of the intended use of the water includes: - construction of dikes damming with permanent transfer and a basin from which 74.13 m - the normal level of damming - NPP - the reservoir area - 0.22 ha - tank capacity - 2.21 thousand. m3 - range impact of damming - L = 204 m. This will increase water resources in both basins (retention ground) and groundwater resources. The intended use of surface waters includes construction of dikes damming with permanent transfer and impoundment and retention of surface water in the trough ditch K-10. By reducing water runoff, it will raise the groundwater level, increasing soil moisture natural habitats, biodiversity of species of plants, restoration of degraded non-forest habitats, as well as minimizing the effects of drought occurrence. The scope of the intended use of the water includes: - construction of dikes damming with permanent transfer and a basin from which 79.50 m - the normal level of damming - NPP - the reservoir area - 0.45 ha - tank capacity - 5.71 thousand. m3 - range impact of damming - L = 360 m. This will increase water resources in both basins (retention ground) and groundwater resources.

Supervision of building work

Skarb Państwa PGL LP Nadleśnictwo Tychowo reprezentowany przez pełnomocnika Radcę Prawnego Janusza Adamiaka – Kancelaria Radcy Prawnego J. Adamiak, ul. J. Ordona 8/1, 78-400 Szczecinek | Published June 26, 2015
Winner
Zbigniew Bruski Biuro Techniczne Agropartner
cpvs
71247000

The contract is: "Investor's supervision over the construction of water storage tank and the upgrading of dykes looming with permanent transfer in the form of a culvert located in the forestry Glinka, district of Koszalin, Bobolice commune, precinct Wojęcino plot No. 332, 333, 336 and Białogard district, municipality Tychowo, Warnino precinct plot No. 135 ". Impoundment of water on the dike with a height of damming up to 3.5 m and a length of 83.8 m with a permanent transfer in the form of a concrete culvert together with the outlet basin ended in town.

Supervision of building work

Skarb Państwa PGL LP Nadleśnictwo Tychowo reprezentowany przez pełnomocnika Radcę Prawnego Janusza Adamiaka – Kancelaria Radcy Prawnego J. Adamiak, ul. J.Ordona 8/1, 78-400 Szczecinek | Published September 19, 2015  -  Deadline October 27, 2015
cpvs
71247000

The contract is: "Investor's supervision over the construction of two reservoirs in the area of ​​forestry Glinka in partisan 333h, 329b on plots registration No. 333, 329/1 cadastral 82 Wojęcino". The contract includes construction of two reservoirs at the drainage ditch which is a tributary of the river Chotli to damming and retention of surface waters in the catchment area of ​​forest. The scope of the intended use of the water includes: - construction 2 (A, B) dikes damming with fixed weirs and basins wypadowymi. Tank A: 1. surface of the container 5 310.07 m2; 2. tank capacity of 10 342.5 m3; 3. ordinate the crown dikes 97.50 m; 4. The stacking height of 4.97 m; 5. length of 25.50 m causeway; 6. The maximum height of 5.91 m causeway; 7. crown width 3.50 m causeway; 8. The transfer width 3.80 m; 9. The length of the transfer in the dike and slope 23.34 m; 10. length of the trough entrance point 10.0 m; 11. basin entrance point width 3.80 m; 12. reach impoundments 166.00 m. Tank B: 1. surface of the container 95 399.44 m2; 2. tank capacity 169 246.69 m3; 3. ordinate the crown dikes 99.50 m; 4. The stacking height of 4.47 m; 5. The length of the causeway 146.00 m; 6. The maximum height of 5.56 m causeway; 7. crown width 3.50 m causeway; 8. The transfer width 3.80 m; 9. The length of the transfer in the dike and slope 21.76 m; 10. length of the trough entrance point 10.0 m; 11. basin entrance point width 3.80 m; 12. reach impoundments 733,00 m.
  • 1