Gmina Stalowa Wola | Published December 17, 2016  -  Deadline January 9, 2017
cpvs
45000000, 45100000, 45110000, 45111200, 45111220, 45111290, 45111300, 45112210, 45112710, 45200000, 45231300, 45232130, 45232451, 45233120, 45233220, 45233221, 45233222, 45233290, 45233320, 45310000, 45314200, 45111213, 45230000, 45231400, 45232100, 45232400, 45231220, 45232310, 45231000, 45233000, 45316110, 45220000, 45221120, 45221121, 45221122

1. The contract is for the construction and reconstruction of the municipal road ul. Solidarity in Stalowa Wola together with the intersection of ul. Grabski, and the construction of the connector road between ul. Grabski, and ul. Energetyków.

Construction work

Gmina Stalowa Wola | Published January 3, 2017  -  Deadline January 24, 2017
cpvs
45000000, 45100000, 45110000, 45111200, 45111220, 45111290, 45111300, 45112210, 45112710, 45200000, 45231300, 45232130, 45232451, 45233120, 45233220, 45233221, 45233222, 45233290, 45233320, 45310000, 45314200, 45111213, 45230000, 45231400, 45232100, 45232400, 45231220, 45232310, 45231000, 45233000, 45316110, 45220000, 45221120, 45221121, 45221122

1. The contract is for the construction and reconstruction of the municipal road ul. Solidarity in Stalowa Wola together with the intersection of ul. Grabski, and the construction of the connector road between ul. Grabski, and ul. Energetyków.

Construction work

Gmina Stalowa Wola | Published October 12, 2017
Winner
PBI Infrastruktura S.A.
cpvs
45000000, 45100000, 45110000, 45111200, 45111220, 45111290, 45111300, 45112210, 45112710, 45200000, 45231300, 45232130, 45232451, 45233120, 45233220, 45233221, 45233222, 45233290, 45233320, 45310000, 45314200, 45111213, 45230000

Power Engineers.

The scope of works includes:

Solidarity from km 1 + 828.68)

- construction of rain drainage,

- reconstruction of water supply networks,

- reconstruction of the heating network,

- construction of road lighting,

- reconstruction of energy networks and equipment,

- reconstruction of telecommunication networks,

Actions performed during the execution of the contract requiring employment on the contractor's part for the contract of employment:

- works related to construction of pavement construction layers

The key part of the contract which the contractor will undertake to perform independently: works related to the execution of the bituminous pavement.

A detailed description of the object of the contract can be found in the technical documentation, ie quotations, design and detailed technical specifications.

Power Engineers.

The scope of works includes:

Road construction works

Gmina Stalowa Wola | Published November 11, 2017
Winner
PBI Infrastruktura S.A.
cpvs
45233120, 71000000, 71320000, 71330000, 71351910, 71354000, 45000000, 45220000, 45100000, 45110000, 45111200, 45111220, 45111290, 45111300, 45112210, 45112710, 45200000, 45231300, 45232130, 45232451, 45233220, 45233221, 45233222, 45233290, 45233320, 45310000, 45111213, 45232100, 45232400, 45232310, 45231000, 45316000, 45316110

COP in Stalowa Wola.

Workshops:

Stage I:

Drawing on the basis of the functional and utility program of the construction project and the executive design, obtaining the required agreements and decisions required by the law, and preparing the application for the decision on the Permit for the Implementation of Road Investments.

Stage II:

On the basis of the developed design documentation - execution of construction works and obtaining a permit to use.

COP in Stalowa Wola.

Workshops:

Stage I:

Drawing on the basis of the functional and utility program of the construction project and the executive design, obtaining the required agreements and decisions required by the law, and preparing the application for the decision on the Permit for the Implementation of Road Investments.

Stage II:

On the basis of the developed design documentation - execution of construction works and obtaining a permit to use.

The scope of works includes:

2015.2031 jt).

Executing projects and STWiORB require acceptance of the Ordering Party.

Design and approval of the Project of permanent organization of traffic, and temporary projects of organization of traffic for the duration of the works.

Developing and agreeing with the Ordering Party the schedule of works.

Organization of construction backdrop

Complete demolition of existing road construction.

Removing trees that interfere with the projected expansion.

Reconstruction or protection of existing underground armor networks colliding with the road

Reconstruction and construction of rain drainage

Reconstruction and construction of street lighting

Construction of a new road construction and cycle tracks, including crossings and exits.

Finishing works, marking, greenery.

Obtaining on behalf of and on behalf of the Ordering Party the permission to use.

The detailed scope of the works to be performed under the obligations of the Contractor is presented in the Functional-Functional Program (PFU), which is attached to this specification.

The schedule will have to be approved by the Ordering Party.

Transport infrastructure, Measure 5.1 Road infrastructure.

The contractor will be obliged to:

1) Employment on the basis of the employment contract of persons performing the following actions during the execution of the contract:

Works connected with the construction of the main rainwater collector,

Works related to construction of pavement construction layers.

1) should be updated each time.

1) to the subcontractor, the employment contract for the persons carrying out these activities will also apply to the subcontractor.

2 (1-3).

5) In the event of non-fulfillment by the contractor (subcontractor) from the obligations referred to in p.

Construction work

Gmina Stalowa Wola | Published April 20, 2017  -  Deadline June 6, 2017
cpvs
45000000, 45100000, 45110000, 45111200, 45111220, 45111290, 45111300, 45112210, 45112710, 45200000, 45231300, 45232130, 45232451, 45233120, 45233220, 45233221, 45233222, 45233290, 45233320, 45310000, 45314200, 45111213, 45230000, 45231400, 45232100

Power Engineers.

The scope of works includes:

Solidarity from km 1 + 828.68)

- construction of storm water drainage,

- reconstruction of water supply networks,

- reconstruction of the district heating network,

- Construction of road lighting,

- reconstruction of networks and power equipment,

- reconstruction of telecommunication networks,

Activities performed during the execution of employment contracts requiring employees to the contractor on the contract of employment:

- Works for performing structural layers of paving

A key part of the contract that the contractor undertakes to perform yourself: works related to the execution of layers of bituminous road surfaces.

A detailed description of the order is in the technical documentation, ie. Przedmiarach, project and detailed technical specifications.

Power Engineers.

The scope of works includes:

Road construction works

Gmina Stalowa Wola | Published April 15, 2017  -  Deadline April 20, 2017
cpvs
45233120, 71000000, 71320000, 71330000, 71351910, 71354000, 45000000, 45220000, 45100000, 45110000, 45111200, 45111220, 45111290, 45111300, 45112210, 45112710, 45200000, 45231300, 45232130, 45232451, 45233220, 45233221, 45233222, 45233290, 45233320, 45310000, 45314200, 45111213, 45232100, 45232400

Design and construction of municipal roads within the project entitled .: improvement of the local transport system through the development of local road involving a direct connection to the existing investment areas situated at ul. COP in Stalowa Wola.

1. The contract is for design and construction of municipal roads within the project entitled .: improvement of the local transport system through the development of local road involving a direct connection to the existing investment areas situated at ul. COP in Stalowa Wola.

2. Stages of the work:

Stage I:

Drawing up on the basis of the functional - utility construction design and detailed design, obtaining required by law approvals and decisions, and to prepare an application for a decision on the Permit for the realization of the Road Investments.

Stage II:

Developed on the basis of project documentation - construction works and obtaining a decision on the permit to use.

Construction work

Elektrociepłownia Stalowa Wola S.A. | Published February 14, 2017  -  Deadline March 27, 2017
cpvs
45000000

The subject of procurement is the implementation of the project titled "Implementation for newly built CCGT Power Plant in Stalowa Wola SA, a new pipeline cooling water using micro-tunneling," which is an integral part of the investment project on the completion of construction of CCGT Power Plant in Stalowa Wola SA

The terms of reference included in the tender documents.

Construction work for sports facilities

Gmina Stalowa Wola | Published September 29, 2017
Winner
Budimex S.A.
cpvs
45212200, 45111200, 45262300, 45262310, 45320000, 45262500, 45262400, 45261000, 45421100, 45410000, 45421146, 45421152, 45431200, 45430000, 45421153, 45321000, 45323000, 45324000, 45223800, 45330000, 45331100, 45331200, 45331210, 45315000, 45310000, 45314310, 45315700, 45112700, 45212221, 45233140, 45233220, 45233290, 45233320, 45262410, 45233253, 45232451, 45342000, 37451000

Podkarpackie Football Center in Stalowa Wola will serve as a sports and training center for youth football and coaching staff.

Scope of the task The establishment of the Podkarpackie Football Center in Stalowa Wola includes:

Reconstruction of 68 mx 105 m football pitch with plate heating system, lighting, handles and equipment in accordance with UEFA and PZPN regulations.

Construction of the western (main) stand with sports and dressing facilities.

Construction of the cash register pavilion

Construction of a gastronomic-sanitary building

Building a deposit building

Construction of 2 football pitches with natural grass surface

Construction of a football field with synthetic grass surface along with a pneumatic hall

Construction of the trafo station

Build a scoreboard on the motherboard and change the location of the existing scoreboard

Construction of the fence

Construction of parking lots and communication lines.

Podkarpackie Football Center in Stalowa Wola will serve as a sports and training center for youth football and coaching staff.

Scope of the task The establishment of the Podkarpackie Football Center in Stalowa Wola includes:

Construction of the cash register pavilion 4.Budowa building gastronomic-sanitary

Construction of 2 football pitches with natural grass surface

Build a scoreboard on the motherboard and change the location of the existing scoreboard

Construction of parking lots and communication lines

The detailed scope of works is defined by the design documentation, the bill of quantities and the detailed technical specifications of the construction and acceptance of construction works.

The contractor will have to agree with the user of the object and ordering the performance of the works and conduct the works in such a way that it was possible to use existing MOSiR objects.

The schedule will have to be approved by the Ordering Party.

Materials obtained during the demolition showing useful or material value will be provided to the Purchaser.

26/9 and 26/8, 26/94, 26/2

Accessibility conditions for the disabled.

The elements of land development including the constructed objects are adapted for the disabled and allow for their non-collateral use.

Scope of works to be performed by employees on the contract of employment:

- works

- installation works for sanitary, central heating, ventilation and electrical installations

- road works

The contractor is obliged to perform the following objects independently (reservation key part):

Reconstruction of the main football pitch of 68 mx 105 m with the plate heating system, lighting, handles and equipment

Construction of the western (main) stand with sports and dressing facilities.

Construction work for sports facilities

Gmina Stalowa Wola | Published April 29, 2017  -  Deadline May 17, 2017
cpvs
45212200, 45111200, 45262300, 45262310, 45320000, 45262500, 45262400, 45261000, 45421100, 45410000, 45421146, 45421152, 45431200, 45430000, 45421153, 45321000, 45323000, 45324000, 45223800, 45330000, 45331100, 45331200, 45331210, 45315000, 45310000, 45314310, 45315700, 45112700, 45212221, 45233140, 45233220, 45233290, 45233320, 45262410, 45233253, 45232451, 45342000, 37451000

I. The Podkarpackie Football Center in Stalowa Wola will serve as a sports and training center for youth football and coaching staff.

Scope of the task The establishment of the Podkarpackie Football Center in Stalowa Wola includes:

1. Reconstruction of 68 mx 105 m football pitch with plate heating system, lighting, handles and equipment in accordance with UEFA and PZPN regulations.

2. Construction of the west (main) grandstand with sports and dressing facilities.

3. Construction of the cash register pavilion.

4. Building a gastronomic-sanitary building.

5. Building a deposit building.

6. Construction of 2 football pitches with natural grass surface.

7. Construction of a football field with synthetic grass surfaces including a pneumatic hut.

8. Construction of the TRAFO station.

9. Build a scoreboard on the motherboard and change the location of the existing scoreboard.

10. Construction of the fence.

11. Construction of parking lots and communication lines.

Waste disposal site construction work

Gmina Stalowa Wola | Published June 9, 2016  -  Deadline June 20, 2016
cpvs
45222110, 45110000, 45100000, 45112330, 45112100, 45247270, 45342000, 45121000, 45112300, 45212120, 71510000

Construction work for landfills

Waste disposal site construction work

Gmina Stalowa Wola | Published May 27, 2016  -  Deadline May 27, 2016
cpvs
45222110, 45110000, 45100000, 45112330, 45112100, 45247270, 45342000, 45121000, 45112300, 45212120, 71510000

Construction work for landfills

Waste disposal site construction work

Gmina Stalowa Wola | Published May 31, 2016  -  Deadline June 8, 2016
cpvs
45222110, 45110000, 45100000, 45112330, 45112100, 45247270, 45342000, 45121000, 45112300, 45212120, 71510000

Construction work for landfills

Construction management services

Elektrociepłownia Stalowa Wola S.A. | Published October 21, 2017
Winner
Zakłady Pomiarowo – Badawcze Energetyki Energopomiar Sp. z o.o. – Lider Konsorcjum
cpvs
71540000, 71318000, 71320000, 71541000, 71630000, 71520000

The subject of the Order is realization of the task under the name: "Execution of functions related to project works, engineering, consultancy, management and supervision of work required to complete the construction of the gas and steam unit in Stalowa Wola SA Heat and Power Plant", which is an integral part of the investment project, gas and steam in Stalowa Wola SA Heat and Power Plant

The Contractor is obliged to perform the function of the Contract Manager and to perform other Works necessary for the execution of the Project, within the scope and under the conditions specified in the Agreement and in Annex 1 of the Agreement; The Contractor's responsibilities include in particular:

1.1.1 execution of verification and design works required to complete the project implementation by the Ordering Party,

1.1.2 detailed planning of the completion process of the construction, including the scope of the required work to be performed, to ensure the completeness of the completed Block, obtain necessary administrative decisions, permits and approvals required in accordance with the applicable regulations to obtain the ability to operate the Block.

1.1.3 organization and handling of procurement procedures in order to select the Executors as a representative of the Employer, and to support the Employer in concluding contracts with the Executors,

1.1.4 management, administration, organization and supervision of services, construction works, deliveries and other work of the Executors,

1.1.5 fulfilling the duties of the Investor Supervision Inspectors,

1.1.6 Performing the duties of the Construction Manager,

1.1.7 delivery of documentation management system,

1.1.8 co-operation with the Purchaser and the Contractor's provision of advisory services to the Ordering Party in all matters related to the implementation of this Agreement, including economic and organizational decisions and technical decisions related to the completion of the Project,

<...

Stalowa Wola: Construction street Brave in Stalowa Wola

 | Published July 11, 2016  -  Deadline July 11, 2016
Winner
MATBUD Sikora Sylwia, ul.Grunwaldzka 40, 36-040 Boguchwała, kraj/woj. podkarpackie.
cpvs
45000000, 45100000, 45110000, 45111200, 45111220, 45111290, 45111300, 45112210, 45112710, 45200000, 45231300, 45232130, 45232451, 45233120, 45233220, 45233221, 45233222, 45233290, 45233320, 45310000, 45314200

1.Przedmiotem order: Construction street Brave in Stalowa Wola, along with the construction of storm water drainage and the necessary works related to the reconstruction of technical infrastructure colliding with the investment. 2.Zasadniczy scope of work includes: road works, electrical works: storm water drainage.

Waste disposal site construction work

Gmina Stalowa Wola | Published April 19, 2016  -  Deadline May 27, 2016
cpvs
45222110, 45110000, 45100000, 45112330, 45112100, 45247270, 45342000, 45121000, 45112300, 45212120, 71510000

CPV codes:

45222110-3 Construction work for landfill

45110000-1 Demolition work and demolition of buildings; digging

45100000-8 Site preparation work

45112330-7 Land reclamation

45112100-6 Construction work digging ditches

45247270-3 Construction of tanks

45342000-6 Erection of fencing

45121000-1 Test drilling

45112300-8 Soil Remediation

45212120-3 Construction work for theme parks

71510000-6 Services site survey.

Construction work for sports facilities

Gmina Stalowa Wola | Published May 11, 2017  -  Deadline May 26, 2017
cpvs
45212200, 45111200, 45262300, 45262310, 45320000, 45262500, 45262400, 45261000, 45421100, 45410000, 45421146, 45421152, 45431200, 45430000, 45421153, 45321000, 45323000, 45324000, 45223800, 45330000, 45331100, 45331200, 45331210, 45315000, 45310000, 45314310, 45315700, 45112700, 45212221, 45233140, 45233220, 45233290, 45233320, 45262410, 45233253, 45232451, 45342000, 37451000

I. The Podkarpackie Football Center in Stalowa Wola will serve as a sports and training center for youth football and coaching staff.

Scope of the task The establishment of the Podkarpackie Football Center in Stalowa Wola includes:

1. PLATEBUILDING BOARD FOR FOOTBALL BOARD OF DIMENSIONS 68 mx 105 m INCLUDING HEATING SYSTEM, LIGHTING, FLOORING AND EQUIPMENT, in accordance with the regulations of UEFA and PZPN.2. BUILDING THE WESTERN MODE (MAIN) WITH SALES - SPORTS SET. 3. BUILDING OF PAVILION CAUSES 4. BUILDING OF GASTRONOMIC AND SANITARY BUILDING

5. BUILDING OF DEPOSITS OF BUILDING 6. CONSTRUCTION OF 2 BOATS FOR TRAINING FOR FOOTBALL BALL OF NATURAL RAW 7. BUILDING OF FOOTBALL BOARD ON SYNTHETIC GRAPHITE WITH PNEUMATIC HANDLES8. CONSTRUCTION OF TRAFO9 STATION. BUILDING THE RESULTS OF THE MAIN PANEL AND CHANGING THE LOCATION OF THE EXISTING RESULTS SHEET

10. FENCING BUILDING 11. PARKING AND COMMUNICATIONS BUILDING.

Contract No. 09 - Construction Point Municipal Waste Selective Rebounds in Stalowa Wola.

Miejski Zakład Komunalny Sp. z o.o. | Published December 31, 2014  -  Deadline February 12, 2015
cpvs
45000000, 71220000, 45111200, 45111291, 45112710, 45200000, 45222000, 45231300, 45232410, 45233140, 45311000, 45315100, 45315300, 45330000, 45331000, 45400000, 45233200, 45223100, 71221000, 71242000, 79421200, 77211400

The contract is for the design and construction of Point Municipal Waste Selective Rebounds in Stalowa Wola, in the framework of projects: "Construction of Mechanical-Biological Municipal Waste Processing in Stalowa Wola". A detailed description of the contract is Functional Utility Program (PFU), which is the Annex hereto.

Contract No. 09 - Construction Point Municipal Waste Selective Rebounds in Stalowa Wola

 | Published January 16, 2015  -  Deadline February 13, 2015
cpvs
45000000, 71220000, 45111200, 45111291, 45112710, 45200000, 45222000, 45231300, 45232410, 45233140, 45311000, 45315100, 45315300, 45330000, 45331000, 45400000, 45233200, 45223100, 71221000, 71242000, 79421200

The contract is for the design and construction of Point Municipal Waste Selective Rebounds in Stalowa Wola, in the framework of projects: Construction of Mechanical-Biological Municipal Waste Processing in Stalowa Wola. A detailed description of the contract is Functional Utility Program (PFU), which is the Annex hereto. This order is carried out within the framework of the project entitled extension. Construction of Mechanical-Biological Municipal Waste Processing in Stalowa Wola. The value of the contract with a major order, ie. Construction of Mechanical-Biological Waste Treatment Municipal Stalowa Wola reaches the amount of which the Purchaser is obliged to publish a contract notice in the Official Journal of the European Union. Compulsory ad was published in the Official Journal of the European Union on 31.12.2014. Under the number 2014 / S 251-445749. This announcement is a public announcement elective published to disseminate information about the proceedings, as the estimated value (excluding VAT) is: 662.04 PLN 696.

Stalowa Wola: Construction of an access road along the building at ul. Dmowskiego 7 in Stalowa Wola

Gmina Stalowa Wola | Published July 26, 2016  -  Deadline July 22, 2016
Winner
Zakład Produkcyjno-Usługowy DROTECH Witold Waskiewicz, Turbia 460, 37-415 Turbia, kraj/woj. podkarpackie.
cpvs
45111300, 45100000, 45233120, 45310000

1. The contract is for construction of an access road along the building at ul. Dmowskiego 7 in Stalowa Wola 2. The principal scope of work includes: Construction of access road along the building at ul. Dmowskiego 7 of cobblestones with a length of approx. 100 m and the construction of part of the lighting. 3. The detailed scope of work determines the project documentation, bills of quantities and Detailed Technical Specifications Execution and Acceptance of Construction Works annexed to this specification. 4. The task will be implemented according to the schedule of works developed by the Contractor, who will be selected in this tender. The schedule will have to be approved by the Employer. 5. Materials obtained during demolition and soil from excavation to the value of utility or material will be transferred to the Purchaser. Contractor is obliged to carry them to the place indicated by the Purchaser. 6. Location of the contract: Land Reg. No. 260/9, 267 precinct 3 Center.

Stalowa Wola: construction of sports infrastructure in the Team of Schools No. 3 in Stalowa Wola - order extra.

Gmina Stalowa Wola | Published August 8, 2016  -  Deadline August 3, 2016
Winner
FPUH KRIS-BUD Krzysztof Śnieżek, Jasienica Rosielna 269, 36-220 Jasienica Rosielna, kraj/woj. podkarpackie.
cpvs
45112000, 45232451, 45232452

The contract is for the execution of works involving construction of additional drainage pitch, because that in the investment are impervious land, thus it is necessary to perform the drainage system.