Call +44 800 9755 164

Public tenders for construction in Stalowa-wola Poland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!
ConstructionPolandstalowa-wola

Stalowa Wola: Construction of crossing railway tracks between the railway station - ua building Metalowiec in Stalowa Wola

Gmina Stalowa Wola | Published July 26, 2016  -  Deadline May 30, 2017
1.Przedmiotem order: - construction of pedestrian crossings in the category of E 105.382 km railway line No. 68 Lublin - Przeworsk in Stalowa Wola; -made accompanying infrastructure: turnpike, sound system and monitoring and power supply line - control; - Shortening the existing platform of 50 m, the elimination of the existing rise to the platform; - Reconstruction of the existing lighting platform; - Regulation of track 1 and 41; - Execution come to a pedestrian crossing the culvert in the ditch station; - Reconstruction of the existing urban area lighting; - Execution of the fence of the track 41 from the urban areas; - Demolition of the existing footbridge over the railway at 105,353 km of railway line No. 68 Lublin - Przeworsk in Stalowa Wola. 2.Before starting the works the Contractor at his own expense, and the effort, obtains the right to dispose of the area necessary for the task. 3.Wykonawca is obliged to develop the technology works execution and execution schedule and agreed with the railway authorities and operators colliding gas networks and energy in accordance with any conditions. 4.Przyjęta technology works, should minimize impediments to rail 5.Koszty related to conducting work in the area of ​​railway track closures and changes in rail borne by the Contractor. 6.Wykonawca is obliged to prepare - in the range of executed works - all legally required documents necessary to obtain a use permit and obtain permission to use the facility made by the deadline of final acceptance of the Works. 7.Szczegółowy scope of work determines the design documentation, detailed technical specifications for execution and acceptance of works and bills of quantities and annexed to this specification ..

Stalowa Wola: Reconstruction of road L22P in Forestry Żupawa called / Zone / o length. 3360 mb

Nadleśnictwo Rozwadów | Published July 26, 2016  -  Deadline June 30, 2017
The scope of works includes the construction according to the bill of quantities:-robots-robots preparatory earthworks, -karczowanie trunks, -profilowanie trough and compacting the ground, -made macadam base course, the bottom layer with a thickness of 18 cm after uwałowaniu. -made macadam, the top layer with a thickness of 9cm after uwałowaniu, -made passing places, -made downhill ducts forest -made roadsides. -Repair - reconstruction of the culvert under the road descents and crown -made maintenance of ditches on both sides by Takeoff detailed scope of the contract is described in the attached project documentation and technical specification of the workmanship and the receipt of work ..

Stalowa Wola: Reconstruction of the existing sports field at the School Complex in Stalowa Wola at ul. Staszica 5

 | Published July 13, 2016  -  Deadline June 30, 2017
Science and Technology 5. The scope of work also includes the execution of fencing off with a gate, furtkami input and piłkochwytami, construction lighting field with naświetlaczami and installation of lightning protection, drainage of storm sewer connection, and assembly seats. 2.Zakres contract includes the construction: 2.1.Robót excavation and demolition, paving the field including: profiling the substrate, a filtering layer, foundation of broken aggregate paving with grass syntetycznej- 1590 m2, the characteristics and the laying of technology specified in the project documentation ie: 97.000 fibers / m2 fence fields, including: foundations, fence panel system 107 m, with 61 m piłkochwytami, gate and furtkami, 2.4.Chodniki with cobblestones - 67.1 m2 Seats modułowe- installation of 40 units of modular seats installation of electric lighting off , the drainage networks sewer drainage 3.Szczegółowy extent of work needed to do was described in the project documentation, przedmiarach works and detailed technical specifications for execution and acceptance of works annexed hereto. 4.Zakres tangible project also includes all operations and costs resulting from the project documentation, bill of quantities, technical specifications of performance and acceptance of works, building art, obtaining approval for use of installed equipment, the cost of surveying, and costs associated with the device, maintenance and security the construction site. 5.Materiały obtained during the works of the utility value or material is the property of the Employer and will be transferred to the Purchaser. Director of the School Complex in Stalowa Wola and approved by the Employer. 7.Roboty will be carried out on the property, on which there are objects School Complex, which in the course of construction works will be used.

Stalowa Wola: Investor's supervision over the tasks of the project: Part I Reconstruction and renovation of the gymnasium in the Team Secondary School No. 2 in Stalowa Wola, part II Reconstruction of the existing sports field at the School Complex in Stalowa Wola at ul. Staszica 5

Powiat Stalowowolski | Published July 14, 2016  -  Deadline June 30, 2017
The contract is for the execution of the service of the performance of the investment supervision above tasks: Part I Reconstruction and renovation of the gymnasium in the Team Secondary School No. 2 in Stalowa Wola, part II Reconstruction of the existing sports field at the School of Science and Technology 5 Scope of works subject to investment supervision includes: 1st of August 26, ie. sports arena and sports facilities, including toilets, storage for sports equipment, a toilet for the disabled, communication. Science and Technology 5. The scope of work also includes the execution of fencing off with a gate, furtkami input and piłkochwytami, construction lighting field with naświetlaczami and lightning protection, drainage of storm sewer connection, and assembly seats. All the activities carried out by project supervision must be in accordance with applicable law, including in particular the Building Law and the Civil Code.

Zabia Wola: Development of the documentation for the construction of energy-efficient street lighting Street. Chełmońskiego in Żelechów and supervision of copyright.

Gmina Żabia Wola | Published July 27, 2016  -  Deadline December 16, 2016
Development of project-estimate used to describe the object of contract for construction works of construction of street lighting to the extent necessary to carry out energy-efficient street lighting Street. Chełmońskiego in Żelechów on a stretch of about 3 km and the supervision of the author. Street Chełmońskiego is partially illuminated. The study covers the replacement of existing street lighting. The Employer has a connection conditions of PGE Distribution. The project should take energy-saving technology solutions that will result in significant improvement of energy efficiency, taking into account modernizacji- renovation of existing lighting Street. Chełmońskiego, in order to reduce the cost of ongoing maintenance of lighting. The introduction of intelligent lighting control system, which consists in adjusting the lighting levels natężania to current users' needs and requirements established by applicable standards. Installation of motion sensors, weather sensors in order to select the appropriate algorithm for system lighting control to achieve the optimum level of savings. The range of tasks includes: a) Development of a construction project taking into account the specificity of works with information regarding the safety and protection of health- 5 copies. B) Develop detailed design - 4 copies. C) Develop the workers' Takeoff 2 copies. D) Development of cost calculation - 2 copies. e) Development of the project of temporary traffic organization for the duration of the workers' 4 copies. f) Development STWiOR - 2 copies. and the electronic version w / in the papers (PDF files, files with max. volume of up to 9 MB) g) supervising author The details of the order defines the Terms of Reference.

Zduńska Wola: Restoration of the City Park in Zdunska Wola

Miasto Zduńska Wola | Published July 22, 2016  -  Deadline August 31, 2020
Restoration of the Municipal Park in Zdunska Wola: 1) reconstruction and construction of new pedestrian and paved squares leisure and stairs, 2) construction, purchase, delivery and installation of small garden architecture including gazebos, pavilions, picnic, pergolas, benches, information boards, baskets garbage, pots for plants, grids and supports under the trees, bicycle racks and a house for swans, 3) reconstruction of joint replacement of the seal from the ground in the shape of a sealed bottom of the joints and execution tight filter mineral-plant with the construction of the installation of their treatment ie. the pump, filter mineral (construction chamber bridge the technical-large pond) with the necessary installations and equipment, water pipes, drainage and wells and the purchase, delivery and installation of the fountain aeration, construction of bridges / terrace, construction chamber deck of a small, 4) construction connection water and sewerage systems and connection of power to the designed building public toilets, 5) the construction of wells for the installation retrofitting of public toilets, 6) the construction of electrical installations, lighting the park (assembly lantern lighting along with foundations, fixtures and light sources), together with the accompanying infrastructure (cable lines, cable connectors, cabinets, boxes distribution and control), Church, 8) development and renovation of the green, 9) execution of demolition of concrete fortifications within the embankments park, stairs and lighting, 10) construction of storm water drainage, 11) remaining works demolition, 12) planting and care of settling trees, shrubs, perennial plants, plant bulb lawns park, park undergrowth and grass), Note: build public toilets and the installation of monitoring equipment does not fall within the scope of this contract. A detailed description of the order is included in the project documentation and the Technical Specifications Execution and Acceptance of Construction Works, przedmiarach works and the decision to authorize the felling of trees No. SR.6120.42.2015 dated 12.09.2015 r. Issued by the Prefect of Zduńska Wola. The scope of works that make up the felling of trees. 12 m2. The Contractor shall pay for the timber on the basis of the invoice issued by the Employer and the payment to the designated account Employer. Parties allow the possibility of set-off of receivables from the sale of wood from the Contractor's remuneration. Measurement, calculation and thickness gauging. Contractor replenish humus site of the removed tree trunks, 5) clearing land within the removed trees and shrubs along with the disposal of waste arising from the implementation of the contract (branches, wood chips, stumps and residues from removed stumps), 6) Protection przejazdowości with motion control , possible exclusion of traffic; 7) Notification of the difficulties property owners adjacent to the area of ​​works, protection against destruction of fences, etc .; 8) Coverage of damage in case of damage; 52 of the said Act - applies to the felling of trees and shrubs in the period from 01 March to 15 October. Conditions of execution of substitute planting: Planting replacement realize later than 15 November 2016 year. The Contractor is obliged to carry out min. a three-year maintenance plantings substitute, ie until 15 November 2019 year. The implementation of economic trees to adhere strictly to the provisions of the design documentation for the specific conditions of the investment within the impact on natural monuments and Detailed technical specifications - arrangement of greenery. The base of the works. 1) Decision No 632.2015 of 09.12.2015 r. Approving the project and granting construction permit issued by the Prefect of Zduńska Wola. 2) Decision SR.6120.42.2015 of 09.12.2015 r. To authorize the removal of trees and shrubs issued by the Prefect of Zduńska Wola. 3) design documentation. 4) The technical specifications of performance and acceptance of works. Additional information. 1) Employer informs that the indirection will be performed in public space and its regeneration, modernization, construction, reconstruction and expansion. Submitted bills of quantities and estimates with way may not be detailed and are indicative and should therefore include all not included for takeoff elements resulting from the project or not included in the project and necessary for the proper performance of the task. The aim of the description of the embodiments of equivalent terms of the construction project Purchaser shall executive project. The materials and products used for the execution of the contract must meet the requirements of Polish law, have certificates or certificates of ITB allowing their use in public buildings and the declaration of conformity. 5) The selected contractor to sign the contract, the Purchaser shall provide: cost estimate together with a table of merged elements and material and financial schedule takes into account the entire scope of work required to imple
  • 1