Call +44 800 9755 164

Public tenders for construction in Sosnowiec Poland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Gmina Sosnowiec – reprezentowana przez Prezydenta Miasta Arkadiusza Chęcińskiego | Published November 16, 2016  -  Deadline December 2, 2016

Coach and modernization of infrastructure - tram in Sosnowiec - construction and expansion of small interchanges and connecting cycle paths - Construction of bike rental, Box ticket machines within the small interchanges in the city of Sosnowiec.

Construction work

Gmina Sosnowiec – reprezentowana przez Prezydenta Miasta Arkadiusza Chęcińskiego | Published November 18, 2016  -  Deadline December 1, 2016

The contract is to modernize the infrastructure bus and tram in Sosnowiec - construction and expansion of small interchanges and connecting cycle paths involving the construction of bus lane Facilities in the street. 3 Maja in Sosnowiec between small hubs.

Construction work

Gmina Sosnowiec – reprezentowana przez Prezydenta Miasta Pana Arkadiusza Chęcińskiego | Published November 26, 2016  -  Deadline December 12, 2016

The contract is to modernize the infrastructure bus and tram in Sosnowiec - construction and expansion of small interchanges and connecting cycle paths involving the construction of bus lane Facilities in the street. 3 Maja in Sosnowiec between small hubs.

Construction work

Gmina Sosnowiec – reprezentowana przez Prezydenta Miasta Arkadiusza Chęcińskiego | Published November 29, 2016  -  Deadline December 9, 2016

Coach and modernization of infrastructure - tram in Sosnowiec - construction and expansion of small interchanges and connecting cycle paths - Construction of bike rental, Box ticket machines within the small interchanges in the city of Sosnowiec.

Sosnowiec: Development of design documentation for the project .: Construction of signaling pedestrian street. Polish Army in Sosnowiec in the area of ​​the intersection of ul. Zagłębiowska

Gmina Sosnowiec - miasto posiadające prawa powiatu - reprezentowana przez Prezydenta Miasta | Published July 27, 2016  -  Deadline December 23, 2016
1. Object of the contract include: Development of design documentation for the project .: Construction of signaling pedestrian street. Polish Army in Sosnowiec in the area of ​​the intersection of ul. Zagłębiowska. 2.Przedmiot order includes the preparation of project documentation containing: project documentation, bill of quantities with current codes CPV, investment cost estimate, technical specifications of the workmanship and the receipt of work permits needed for the job, including obtaining the application works does not require a building permit or a permit for construction. 3.Szczegółowy description of the contract is attached as Appendix 8 hereto ..

Sosnowiec: Thermal insulation building on Czołgistów 5 in Sosnowiec along with the adaptation of the building to the needs of nursery

Miejski Zakład Zasobów Lokalowych - Zakład Budżetowy | Published July 26, 2016  -  Deadline December 31, 2016
The contract (within the meaning of the Act of 7 July 1994. - Construction Law) is to make insulation building on Czołgistów 5 in Sosnowiec along with the adaptation of the building to the needs of the nursery. The scope of works is described in the technical specifications of performance and acceptance of works and project documentation and includes m.in .: demolition (forging loose plaster, dismantling flashings, forge window and door frames), bricklaying and plastering, replacement of windows and doors, insulation of external walls above ground level, construction insulation of external walls below ground level, warming the flat roof the upper part of the building, insulation of ceilings in parts of the lower building, roofing torching membrane, installation of flashings, paving work and the fabrication and installation of the roof with mounting the stairs steel.

Sosnowiec: Reconstruction of the building at street Mikołajczyka 25 in Sosnowiec

 | Published July 12, 2016  -  Deadline December 31, 2016
The contract (within the meaning of the Act of 7 July 1994. - Construction Law) is to make reconstruction of the street Mikołajczyka 25 in Sosnowiec, to amend the usage of the service building at the apartment building (social housing). The scope of works is described in the technical specifications of performance and acceptance of works and project documentation and includes m.in .: demolition (removal of window grilles, window sills, part of the window frames, radiators, parts of chimneys over a flat roof, demolition of walls and fragments bearing walls ), earthwork, masonry works, fabrication and erection of steel structure under the partitions, concrete works and reinforced concrete, construction of chimneys, installation of windows and doors, plaster works interior, installation of system components in the technology gk, construction insulation of external walls of the building and the roof over arcade, fabrication and installation of steel railings on the stairs, the execution of floor coverings, painting, installation of the lift system for the disabled, shelter entrance, paving the execution of works, hydraulic works, sewage works, in terms of sanitation and work in the field of electrical installations.

Sosnowiec: Development of project documentation for the reconstruction of roads, streets and bridges in the city of Sosnowiec

Gmina Sosnowiec - miasto posiadające prawa powiatu - reprezentowana przez Prezydenta Miasta | Published July 26, 2016  -  Deadline April 28, 2017
The Employer divided the contract into three parts: Part I: Kukułek in Sosnowiec. The scope of services includes: 1. Preparation of maps for design purposes. 2. Preparation of materials and design data in the bore hole and the concept of reconstruction of the road. 3.Opracowanie project documentation; construction projects and implementing industry: a) road: -jezdni; -ciągów pedestrian and cycling and walking; -odwodnienia street - street inlets along the drains, ditches, incorporation into the existing sewer; b) street lighting; c) the organization of traffic for the duration of the works; d) the constant traffic organization. 4.Przedmiary works. 5.Szczegółowe technical specifications of performance and acceptance of works. 6.Kosztorys investor. 7.Plan BIOZ. 8.Nadzór author. Part II: The contract is to develop the project documentation for the project: Construction of a footbridge over the River Brynica (supplement varies) in Sosnowiec. The scope of services includes: 1. Preparation of maps for design purposes. 2. Working out of project documentation; construction projects and implementing object that meets the requirements for pedestrian and bicycle with lighting. 3. Any agreements and permits for obtaining a building permit. 4.Projekt traffic organization for the duration of the works. 5.Przedmiary works. 6.PRECISE technical specifications of performance and acceptance of works. 7.Kosztorys investor. 8.Plan BIOZ. 9.Nadzór author. Part III: Stefan Grot - Roweckiego in Sosnowiec - part. The scope of services includes: 1. Preparation of maps for design purposes. 2. Preparation of materials and design data in the bore hole and the concept of reconstruction of the road. 3.Opracowanie project documentation; construction projects and implementing industry: a) road: -jezdni; -ciągów pedestrian and cycling and walking; -odwodnienia street - street inlets along the drains, ditches, incorporation into the existing sewer; b) street lighting; c) the organization of traffic for the duration of the works; d) the constant traffic organization. 4.Przedmiary works. 5.Szczegółowe technical specifications of performance and acceptance of works. 6.Kosztorys investor. 7.Plan BIOZ.
  • 1