Call +44 800 9755 164

Public tenders for construction in Sosnowiec Poland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Gmina Sosnowiec | Published December 29, 2016  -  Deadline February 7, 2017
May 3 and tram lines 15 for bicycle paths. " 

Preparation of design documentation, together with arrangements, permits obtaining a valid building permit; The introduction, maintenance and liquidation of temporary traffic organization, tram and walking along the drafting of temporary traffic organization; Development of as-built documentation and obtaining construction permits; Dismantling of railings; Dismantling of steel shields przeciwporażeniowych; Removal of humus layer and aggregate residual on the platform; Removing layers of concrete overlay of the deck; Removal of corroded concrete supports; Execution of paint coating steel structure; Supplementing cavities in concrete supports PCC mortars; Filling of concrete supports with painting; Repair of corrosion protection of supports; Replacing metal joints; Execution of insulation boards bridging epoxy resin; Executing the foundation of the aggregate path on the object; Performance of bituminous pavement in two colors; Execution of fillings acoustic screens in aluminum frames; The steel structure of the pillars of the screen with anti-corrosion protection; Execution of line drain; Execution of drainage bridge - collecting pipes fi 200; Bridge drains; Demolition of existing pavement; Photo humus; Korytowanie the construction of walking paths - cycling; Executing the foundation of aggregate stabilized mechanically; Execution of bituminous pavement path in two colors; Finishing concrete edges; Restore the humus layer.

1, item 6 of the PPA, which concern: preparatory works, demolition, renovation works, track cycling and pedestrians.

Road construction works

Gmina Sosnowiec | Published January 12, 2017  -  Deadline January 23, 2017

Object of the contract is "Reconstruction of parts of streets in the city center of Sosnowiec - ul. Modrzejowska, ul. Warsaw, ul. May 3 - Part I ".

1. The Employer w / in the scope of work has Receipt of notification works does not require a building permit dated 08/29/2016 issued by the Administration of Architecture and Construction of the Municipal Office in Sosnowiec.

2. A detailed description of the contract specifies:

- Construction design,

- Executive project,

- The project of temporary traffic organization,

- Project constant traffic organization,

- Technical specification of the Workmanship and the Receipt of Work,

- Bills of quantities

developed by "ABS Environmental Protection" Sp. z oo, ul. Wierzbowa 14, 40-169 Katowice. These documents constitute the Annex 8 to the Terms of Reference.

Road construction works

Gmina Sosnowiec | Published January 19, 2017  -  Deadline February 6, 2017

Object of the contract is "Reconstruction of parts of streets in the city center of Sosnowiec - ul. Modrzejowska, ul. Warsaw, ul. May 3 - Part I ".

1. ordering for the / in the scope of work has Receipt of notification works does not require a building permit dated 29.08.2016 r. Issued by the Administration of Architecture and Construction of the Municipal Office in Sosnowiec.

2.Szczegółowy description of the contract specifies:

- Construction design,

- Executive project,

- The project of temporary traffic organization,

- Project constant traffic organization,

- Technical specification of the Workmanship and the Receipt of Work,

- Bills of quantities

developed by "ABS Environmental Protection" Sp. z oo, ul. Wierzbowa 14, 40- 169 Katowice. These documents constitute the Annex 8 to the Terms of Reference.

Sosnowiec: Development of project documentation for the reconstruction of roads, streets and bridges in the city of Sosnowiec

Gmina Sosnowiec - miasto posiadające prawa powiatu - reprezentowana przez Prezydenta Miasta | Published July 26, 2016  -  Deadline April 28, 2017
The Employer divided the contract into three parts: Part I: Kukułek in Sosnowiec. The scope of services includes: 1. Preparation of maps for design purposes. 2. Preparation of materials and design data in the bore hole and the concept of reconstruction of the road. 3.Opracowanie project documentation; construction projects and implementing industry: a) road: -jezdni; -ciągów pedestrian and cycling and walking; -odwodnienia street - street inlets along the drains, ditches, incorporation into the existing sewer; b) street lighting; c) the organization of traffic for the duration of the works; d) the constant traffic organization. 4.Przedmiary works. 5.Szczegółowe technical specifications of performance and acceptance of works. 6.Kosztorys investor. 7.Plan BIOZ. 8.Nadzór author. Part II: The contract is to develop the project documentation for the project: Construction of a footbridge over the River Brynica (supplement varies) in Sosnowiec. The scope of services includes: 1. Preparation of maps for design purposes. 2. Working out of project documentation; construction projects and implementing object that meets the requirements for pedestrian and bicycle with lighting. 3. Any agreements and permits for obtaining a building permit. 4.Projekt traffic organization for the duration of the works. 5.Przedmiary works. 6.PRECISE technical specifications of performance and acceptance of works. 7.Kosztorys investor. 8.Plan BIOZ. 9.Nadzór author. Part III: Stefan Grot - Roweckiego in Sosnowiec - part. The scope of services includes: 1. Preparation of maps for design purposes. 2. Preparation of materials and design data in the bore hole and the concept of reconstruction of the road. 3.Opracowanie project documentation; construction projects and implementing industry: a) road: -jezdni; -ciągów pedestrian and cycling and walking; -odwodnienia street - street inlets along the drains, ditches, incorporation into the existing sewer; b) street lighting; c) the organization of traffic for the duration of the works; d) the constant traffic organization. 4.Przedmiary works. 5.Szczegółowe technical specifications of performance and acceptance of works. 6.Kosztorys investor. 7.Plan BIOZ.
  • 1