Call +44 800 9755 164

Public tenders for construction in Sosnowiec Poland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Gmina Sosnowiec | Published February 16, 2017  -  Deadline February 24, 2017
cpvs
45000000, 45200000, 71320000

The subject of the contract in the 'Modernisation of infrastructure, bus and tram in Sosnowiec - construction and expansion of small interchanges and connecting cycle paths "is:" Adapting an existing object nieużytkowanego viaduct turn the former sand on the street. May 3 and tram lines 15 for bicycle paths. "

Construction work

Gmina Sosnowiec | Published February 22, 2017  -  Deadline March 10, 2017
cpvs
45000000, 45200000, 71320000

The subject of the contract in the 'Modernisation of infrastructure, bus and tram in Sosnowiec - construction and expansion of small interchanges and connecting cycle paths "is:" Adapting an existing object nieużytkowanego viaduct turn the former sand on the street. May 3 and tram lines 15 for bicycle paths. "

Road construction works

Gmina Sosnowiec | Published February 17, 2017  -  Deadline March 1, 2017
cpvs
45233120, 45111200, 45111240, 45231400

Object of the contract is "Reconstruction of parts of streets in the city center of Sosnowiec - ul. Modrzejowska, ul. Warsaw, ul. May 3 - Part I ".

1. The Employer w / in the scope of work has Receipt of notification works does not require a building permit dated 29.08.2016 r. Issued by the Administration of Architecture and Construction of the Municipal Office in Sosnowiec.

2. A detailed description of the contract specifies:

- Construction project.

- Executive project.

- The project of temporary traffic organization.

- Project constant traffic organization.

- Technical specification of the Workmanship and the Receipt of Work.

- Bills of quantities

developed by "ABS Environmental Protection" Sp. z oo, ul. Wierzbowa 14, 40- 169 Katowice. These documents constitute the Annex 8 to the Terms of Reference.

Construction work for school buildings

Gmina Sosnowiec – reprezentowana przez Prezydenta Miasta pana Arkadiusza Chęcińskiego | Published February 4, 2017  -  Deadline March 14, 2017
cpvs
45214200

Kilińskiego 31 Sosnowiec, along with installations: water and sewerage, drainage system, which, electrical, construction of mechanical ventilation and air conditioning systems with the delivery of equipment rooms. 

A detailed description of the object of the contract is contained in Annex 3 hereto.

The minimum required guarantee period is 60 months.

The contractor, which refers to measures equivalent described by the Employer is obliged to point out that it offered the object of the contract meets the requirements set by the Employer.

Kilińskiego 31 Sosnowiec, along with installations: water and sewerage, drainage system, which, electrical, construction of mechanical ventilation and air conditioning systems with the delivery of equipment rooms.

The scope of work also includes the performance of both pedestrian and road with parking spaces, and along the walls of the building execution bands of gravel and the construction of an elevator shaft with the delivery and installation of elevators.

Given that the project has been divided into two phases of work, and the second phase of work will not be soon implemented, all the work and works on a combination of stage I and II should be so finished that objects and spaces constructed in the first stage may function independently and fulfill their utilitarian functions.

Technical data object:

4 113,00 m3

- Maximum height: 12.00 m

733.91 m2

68.30 m2

The detailed scope of the contract includes:

Demolition works.

Earthworks.

Construction and building work.

Painting and decorating.

Insulation work.

Installation of connection / installation.

Robots road-rail.

Delivery.

A detailed description of the object of the contract is contained in Annex 3 hereto.

Road construction works

Gmina Sosnowiec – reprezentowana przez Prezydenta Miasta Arkadiusza Chęcińskiego | Published February 17, 2017  -  Deadline March 28, 2017
cpvs
45233120, 45233142, 45233223, 71320000

1. The contract is for the reconstruction of bicycle paths - supplement varies.

2. A detailed description of the order is attached as Appendix 3 hereto. - The functional and utility

3. If the purchaser in the order specification pointed trademarks, patents, origin or source and standards, technical approvals and reference systems, allows to offer equivalent solutions described, provided that by at least the minimum technical parameters, quality and functional etc. Contractor , which refers to measures equivalent described by the Employer is obliged to point out that it offered the object of the contract meets the requirements set by the Employer.

4. The minimum required guarantee period is 60 months.

5. Employer does not provide the order referred to in Article. 67 paragraph. 1 item 6 of the Public Procurement Law.

I. The contract includes the following range:

a) area. bicycle lanes 3097 m2, the red asphalt thickness of approx. 4 cm;

b) area. a pedestrian 12455 m2, black asphalt thickness of 4 cm;

c) area. treadmill of the area. 800 m2, asphalt covered with black polyurethane with green spray;

d) places renovated recreational places 15 pcs. of size 2x3 to figure szer.1 mb hardening of tiles of dimensions. 50x50x8 on the foundation of the execution of the rim;

e) 2 sets of hydraulic dam. 2 pcs. of connection with a total length of approx. 180 m;

f) parking spaces 10 pcs. including 1 for disabled persons;

g) slice or replanting trees 14 pcs., which the circumference at a height of 1.3 m is from 15 to 18 cm.

Paving and asphalting works

Gmina Sosnowiec – reprezentowana przez Prezydenta Miasta Sosnowca Arkadiusza Chęcińskiego | Published February 22, 2017  -  Deadline March 29, 2017
cpvs
45233222, 45233223, 71000000

1.1. The contract is to modernize the infrastructure bus and tram in Sosnowiec involving the construction and development of small interchanges and connecting cycle paths. Construction of paths

Object of the contract has been divided into 7 parts:

Part I of the contract includes the construction of a bicycle path in the street. Andres May 1, Mościckiego;

Part II of the contract includes the construction of a bicycle path in the street. 3rd of May;

Part III of the contract includes the construction of a bicycle path in the street. Wawel Narutowicz;

Part IV of the contract includes the construction of a bicycle path in the street. Kresowa - Pilsudski;

Part V of the contract includes the construction of a bicycle path in the street. Oil - Church, Zegadłowicza, Jagiellonian;

Part VI of the contract includes the construction of a bicycle path in the street. Grota-Roweckiego, Orla - Zeromskiego;

Part VII of the contract includes the construction of a bicycle path in Al. Mirecki.

A detailed description of the contract Part I - VII constitutes Appendix 3 hereto.

Supervision of building work

Gmina Sosnowiec | Published February 9, 2017  -  Deadline March 21, 2017
cpvs
71247000, 71630000

1.Przedmiotem order was divided into four parts:

I.Usługa involving the exercise of the author's supervision of the construction;

II.Usługa involving the performance of their duties inspector investor in the installation specialty in the network, installation and electrical equipment and power;

III.Usługa involving the performance of their duties inspector investor in the installation specialty in the network, installation and telecommunications equipment;

Oil - Theatre in Sosnowiec - Stage II ".

3 Maja in Sosnowiec between small hubs. "

2.Szczegółowy description of the contract - Annex No. 3 hereto.

The scope of works, which will be exercised supervision of the project documentation was placed on the BIP Municipal Office in Sosnowiec at: http://www.bip.um.sosnowiec.pl/Article/get/id,519003.html

Object of the contract includes the surveillance author: author's supervision of the construction to ensure the achievement of high quality of the works and their timely implementation, in particular:

a) a statement in the course of construction works compliance of the implementation of the project, indicating irregularities, giving opinions on the applications the construction manager for possible changes, evaluation of the results of research carried out on site,

b) request the suspension of construction work in a situation of potential danger, or the execution of works contrary to the design or construction permit,

c) agree on the possibility of introducing alternative solutions to those provided for in the draft submitted by the investor's supervision inspector.

It is expected to complete 14 stays at the construction site inspector's supervision and 2 stays in the field of completing documents to PINB and WINB. A total of 16 visits.

Handshake possibility of introducing alternative solutions to those provided for in the project, reported by the head of the construction will be contracted separately by the Contractor.

The actual start date of the contract - in accordance with the model contract (Annex No. 11 hereto).

Oil - Theatre in Sosnowiec - Stage II ".

It provides for a total of 12 full stay of the construction inspector investor.

General obligations of the Investor's Supervision in Annex No. 3 hereto.

The actual start date of the contract - in accordance with the model contract (Annex No. 12 hereto).

Oil - Theatre in Sosnowiec - Stage II ".

It provides for a total of 12 full stay of the construction inspector investor.

General obligations of the Investor's Supervision in Annex No. 3 hereto.

The actual start date of the contract - in accordance with the model contract (Annex No. 12 hereto).

3 Maja in Sosnowiec between small hubs. "

General obligations of the Investor's Supervision in Annex No. 3 hereto.

The actual start date of the contract - in accordance with the model contract (Annex No. 13 hereto).

Sosnowiec: Development of project documentation for the reconstruction of roads, streets and bridges in the city of Sosnowiec

Gmina Sosnowiec - miasto posiadające prawa powiatu - reprezentowana przez Prezydenta Miasta | Published July 26, 2016  -  Deadline April 28, 2017
cpvs
71320000, 71322000

The Employer divided the contract into three parts: Part I: Kukułek in Sosnowiec. The scope of services includes: 1. Preparation of maps for design purposes. 2. Preparation of materials and design data in the bore hole and the concept of reconstruction of the road. 3.Opracowanie project documentation; construction projects and implementing industry: a) road: -jezdni; -ciągów pedestrian and cycling and walking; -odwodnienia street - street inlets along the drains, ditches, incorporation into the existing sewer; b) street lighting; c) the organization of traffic for the duration of the works; d) the constant traffic organization. 4.Przedmiary works. 5.Szczegółowe technical specifications of performance and acceptance of works. 6.Kosztorys investor. 7.Plan BIOZ. 8.Nadzór author. Part II: The contract is to develop the project documentation for the project: Construction of a footbridge over the River Brynica (supplement varies) in Sosnowiec. The scope of services includes: 1. Preparation of maps for design purposes. 2. Working out of project documentation; construction projects and implementing object that meets the requirements for pedestrian and bicycle with lighting. 3. Any agreements and permits for obtaining a building permit. 4.Projekt traffic organization for the duration of the works. 5.Przedmiary works. 6.PRECISE technical specifications of performance and acceptance of works. 7.Kosztorys investor. 8.Plan BIOZ. 9.Nadzór author. Part III: Stefan Grot - Roweckiego in Sosnowiec - part. The scope of services includes: 1. Preparation of maps for design purposes. 2. Preparation of materials and design data in the bore hole and the concept of reconstruction of the road. 3.Opracowanie project documentation; construction projects and implementing industry: a) road: -jezdni; -ciągów pedestrian and cycling and walking; -odwodnienia street - street inlets along the drains, ditches, incorporation into the existing sewer; b) street lighting; c) the organization of traffic for the duration of the works; d) the constant traffic organization. 4.Przedmiary works. 5.Szczegółowe technical specifications of performance and acceptance of works. 6.Kosztorys investor. 7.Plan BIOZ.

Sewerage work

Gmina Sosnowiec – reprezentowana przez Prezydenta Miasta Arkadiusza Chęcińskiego | Published January 26, 2017
cpvs
45232410, 45200000, 45111240, 45000000, 45453000, 45261900, 45262522, 45332200, 45421132, 45210000, 45110000, 45220000, 45400000, 45342000, 45316110, 45111200, 45233294, 45233221, 45233150, 45233222, 45233220, 45230000, 45213312, 71220000, 71320000, 45233120, 45232411, 45112710, 71322000, 45231400, 45232310, 71322500, 34922100, 45233223, 71000000

Legions - Phase I. 

The contract will contract 1, contract 2 Contract 3 Project "Water and sewage management in Sosnowcu- Stage III".

The contract will be 1 contract under the Project "Water and sewage management in Sosnowcu- Stage III".

The contract will contract 2 of the Project "Water and sewage management in Sosnowcu- Stage III".

The contract will contract 3 in the framework of the project "Water and sewage management in Sosnowcu- Stage III".

The contract will be managing the rainwater from the area Kindergarten No. 20 in Sosnowiec.

Victory 20.

The contract will be ongoing minor renovation and restoration carried out around the buildings administered by the WAG.

Victory 20.

The contract will strengthen the breaking pillar in the room 003, and repair telephone.

Mościckiego 14.

The contract will be replacement of windows in the building of the Municipal Office in Sosnowiec at Victory Avenue 20.

Kilińskiego 31 Sosnowiec.

1 park.

Dry in Sosnowiec. "

Prusa in Sosnowiec.

The contract will be works for the investment task: "Adaptation Castle Sieleckiego in Sosnowiec for cultural purposes."

Kuron in Sosnowiec.

Victory 20 ".

Grota Roweckiego 66 in Sosnowiec.

The contract will be change of use of former Szpiala Municipal No. 2 - Pavilion II.

Jagiellońska 13 in Sosnowiec Club for the needs of children within the ESF project "I can do anything."

Krakow 26 Project No. (XVII / 1).

Piotrkow 23 ".

The contract will be performing the fence Kindergarten No. 47 in Sosnowiec.

The contract will be demolition, demolition, security buildings.

The contract will generalization of new sections of street lighting and replacement of existing poles threatening the security.

The contract repair of streets in the city of Sosnowiec.

Tankers.

The contract is for the expansion of South Street along with Szymanowski Street in Sosnowiec.

Adam Plums in Sosnowiec.

Commerce in Sosnowiec - Stage II.

Jabłoniowa.

Dlugosz.

Starfleet.

Forest - the second part of the street.

Franciscan.

Kilińskiego - Stage II.

Radom.

Kalinowa.

The contract will include the construction of parking for the residents of the Old weight.

Weight (cars in parking lots, not on the sidewalks).

The contract will include the construction of parking, pavement and installation of the lighthouse - ul. Iron.

Wybickiego with access to the newly created playground.

Zagłębiowska.

Guerrilla.

The contract will be the performance of road markings in thick film technology and characters najezdniowych.

The contract is the construction of a bicycle path and alejeki walking along the shore of the Black rzeki- Bulawr Przemsza.

The contract will be ongoing maintenance marking horizontal, vertical and traffic safety in the city of Sosnowiec.

The contract will include the construction of alleys to the park.

Villa in Sosnowiec.

Anders in Sosnowiec.

Francis Blachnickiego in Sosnowiec.

The contract will be the modernization of the tram infrastructure autobusowo- in Sosnowca- the construction and expansion of small interchanges and connecting paths rowerowych- construction of bicycle paths.

The contract will be assembly / installation of energy efficient street lighting on terenier Commune Sosnowiec.

On-road in Sosnowiec.

Street-lighting maintenance services

Gmina Sosnowiec – reprezentowana przez Prezydenta Miasta Arkadiusza Chęcińskiego | Published January 27, 2017
cpvs
50232100, 66110000, 71320000, 71322500, 71220000, 71247000, 71310000, 71520000, 77211600, 90600000, 50870000, 90641000, 66113000, 71242000, 71621000, 71530000, 71540000, 71318000, 71630000, 71541000, 71500000, 77310000, 77211500, 90910000, 90642000

The contract will service maintenance of street lighting owned by the Commune Sosnowiec.

The contract will be banking service budget of the Commune Sosnowiec.

Zaruskiego with intersections. "

The contract will be to develop the project documentation for the reconstruction of roads, streets and bridges in the city of Sosnowiec.

The contract will design services for the investment task .: "Construction of the sewage system in the Park Środula."

Dlugosz. "

The contract will be to coordinate the work of traffic lights in the streets Pilsudski and Sienkiewicz in Sosnowiec.

The contract będziewsparcie multimodal European transport area by building a bridge between S1-DK94 to combine investment areas Basin Dabrowski Euroterminal in Sławkowie- Stage 1: Construction of a node in the path S1 design documentation.

The contract will support multi-modal European transport area by building a bridge between S1-DK94 to combine investment areas Basin Dabrowski Euroterminal in Sławkowie- Stage 1: Construction of a node in the path S1 design documentation.

Zagłębiowskie Park Linearny- Revitalization of the functional area of ​​the river valley and Przemsza Brynicy through the development of green areas: Reconstruction of Exotarium.

Jacek Kuron in Sosnowiec. "

The contract will provide services contract engineer for the task "Zagłębiowski Linear Park - Revitalization of the functional areas of the river valley and Przemsza Brynicy through the development of green areas: Reconstruction of Exotarium in Sosnowiec.

The contract will provide services contract engineer for the task "Zagłębiowski Linear Park - Revitalization of the functional areas of the river valley and Przemsza Brynicy through the development of green areas: Creating Biodiversity Park in Sosnowiec.".

The contract will provide services contract engineer for the project entitled. "Water and sewage management in Sosnowcu- Stage III".

The contract will be planting trees and shrubs in the city of Sosnowiec.

The contract will be to plant trees and shrubs in the city of Sosnowiec with their care.

The contract will be to maintain order and cleanliness in the areas owned by municipalities located outside the traffic lanes in the city of Sosnowiec.

The contract will be year-round maintenance of the urban playgrounds and outdoor gym in the city of Sosnowiec.

The contract will maintain the storm water drainage system in the city of Sosnowiec.

Paving and asphalting works

Gmina Sosnowiec – reprezentowana przez Prezydenta Miasta Sosnowca Arkadiusza Chęcińskiego | Published February 11, 2017  -  Deadline March 22, 2017
cpvs
45233222, 45233223, 71000000

Construction of paths 

Object of the contract has been divided into 7 parts:

Andres May 1, Mościckiego;

3rd of May;

Wawel Narutowicz;

Kresowa - Pilsudski;

Oil - Church, Zegadłowicza, Jagiellonian;

Grota-Roweckiego, Orla - Zeromskiego;

Mirecki.

A detailed description of the contract Part I - VII constitutes Appendix 3 hereto.

A detailed description of the contract Part I is attached as Appendix 3 hereto.

A detailed description of the contract Part II constitutes Appendix 3 hereto.

A detailed description of the contract Part III constitutes Appendix 3 hereto.

A detailed description of the contract Part IV constitutes Appendix 3 hereto.

A detailed description of the contract Part V constitutes Appendix 3 hereto.

A detailed description of the contract Part VI constitutes Appendix 3 hereto.

A detailed description of the contract Part VII constitutes Appendix 3 hereto.

Installation of road lighting equipment

Gmina Sosnowiec | Published January 28, 2017  -  Deadline March 7, 2017
cpvs
45316110, 71320000

Object of the contract includes assembly / installation of energy-efficient street lighting in the Municipality of Sosnowiec.

A detailed description of the contract defines the functional and utility program constituting Appendix 3 hereto.

The minimum required guarantee period is 60 months.

The contractor, which refers to measures equivalent described by the Employer is obliged to point out that it offered the object of the contract meets the requirements set by the Employer.

The contract is for the development of the Project Executive and execution of construction works on the modernization of street lighting in the Municipality of Sosnowiec, in the framework of the project "Installation / installation of energy efficient lighting in the municipality of Sosnowiec" and achieve the ecological effect of reducing the calculation of the annual energy consumption for street lighting

a minimum of 3789.58 MWh / year, reducing CO2 emissions by at least 3.071 Mg / year - under the premise of the Audit energy efficiency

and network inventory of street lighting in the Municipality of Sosnowiec (hereinafter Audit) and an application for funding under the program ZIT.

Object of the contract includes:

1) Preparation of technical documentation, including the execution of projects photometric modernized sections of the lighting network in accordance with the requirements of DIN EN 13201.

2) Preparation of technical specifications for execution and acceptance of works (STWiOR).

3) The works in the supply and installation of street lighting luminaires in the amount of 7 694 on the basis of the approved Project Executive and STWiOR.

4) The works in the supply, installation and commissioning lighting management system in accordance with the Project Executive and STWiOR.

5) Execution of the measurements required by the regulations.

6) Reporting of results achieved power within the warranty period.

  • 1