Gmina Lubomia | Published September 24, 2015  -  Deadline November 6, 2015
cpvs
45000000, 45200000, 45100000, 45400000, 45300000, 39000000, 71500000

The present tender procedure is the realization of the investment project involving the construction of municipal infrastructure in the village Syrynia in the Municipality Lubomia. The new village will provide replacement land for the villagers Nieboczowy liquidated in connection with the construction of polder. The intention is to build n. Objects in the areas parts purchased by converting land used by the villagers Nieboczowy. The scope of the contract will include: - construction of a building of Rural House of Culture of the fire station TSO stage roofed canopies terrain and the market with a children's aquatic - construction of the building Rural Sports and Recreation Centre with a team of pitches multifunctional football field with a system of fences, piłkochwytów and stands roofed, - construction of single-family dwellings (6 teams Z1-Z6 of 19 buildings in a compact), - construction of the park from the island - the construction of bicycle paths, - construction of technical infrastructure (ports and water networks, sewage and stormwater networks CCTV monitoring municipal and green economy) in Nowa Wies. A detailed description of the contract was included in Parts III and IV of the Terms of Reference.

Construction work

Gmina Lubomia | Published November 4, 2015
Winner
Konsorcjum: Lider: Bruki Trawiński Sp. z o.o., Partner: Remigiusz Trawiński, Partner: Firma Walicki Śląski Zakład Pogrzebowy
cpvs
45000000, 45111000, 45111200, 45111220, 45111300, 45215400, 45112714, 98370000, 98371110

The present tender procedure is - the construction and management of the cemetery, along with the transfer of graves from the cemetery in Nieboczowach and relocation or reconstruction (depending on the technical state) historical crosses and shrines of Nieboczów and Ligota Tworkowska to Nowa Wies or other designated place. A detailed description of the contract was included in Parts III and IV of the Terms of Reference.

Construction work

Gmina Lubomia | Published July 19, 2016
Winner
DOMBUD Anna Zadorożna Ryszard Zadorożny Sp.j.
cpvs
45000000, 45200000, 45111200, 45400000, 39000000, 71500000

The present tender procedure is the realization of the investment project involving the construction of municipal infrastructure in the village in the Municipality of Syrynia Lubomia. The new village will provide replacement land for the villagers Nieboczowy liquidated in connection with the construction of the Racibórz Reservoir. The intention is to build n. Objects on the land parts purchased by converting land used by the villagers Nieboczowy. The Employer shared investment in 5 Tasks.

The scope of the contract under particular Tasks will include the following ranges:

Task No. 1:

Rural construction of the building the House of Culture of the fire station OSP, a roof field and the market square with water;

Rural construction of the building of the Sports and Recreation;

the construction of the park along with objects;

construction of bicycle paths;

construction of technical infrastructure (ports and water mains, sanitary sewer

and rainwater network monitoring municipal CCTV and green economy) in Nowa Wies.

Task No. 2:

Construction of single-family dwellings: band Z4 (as developer) - two-bedroom apartments and three-room, the team Z5 - one bedroom apartment and one apartment for a disabled person, the team Z6 - 5 one-bedroom apartments.

Task 3:

Construction of the island in the park, including in particular island, walkways, gazebos, tables, barbecue, platforms for anglers.

Task 4:

Construction of a football field with a system of fences, piłkochwytów and roofed stands and construction of multifunctional court.

Problem # 5:

Construction streetwork, external gym, skate park and rope park.

A detailed description of the contract has been concluded:

for Task No. 1 - in Part III and IV of the Terms of Reference;

for Task No. 2 - in part IIIa and IVa of the Terms of Reference;

for Task No. 3 - in part IIIb and IVb of the Terms of Reference;

for Task No. 4 - in part IIIc and IVc Terms of Reference;

for Task No. 5 - in part IIId and IVd tender documents.

Construction work

Gmina Lubomia | Published July 26, 2016
Winner
Tamex Obiekty Sportowe
cpvs
45000000, 45200000, 45111200, 45400000, 39000000, 71500000

The present tender procedure is the realization of the investment project involving the construction of municipal infrastructure in the village in the Municipality of Syrynia Lubomia. The new village will provide replacement land for the villagers Nieboczowy liquidated in connection with the construction of the Racibórz Reservoir. The intention is to build n. Objects on the land parts purchased by converting land used by the villagers Nieboczowy. The Employer shared investment in 5 Tasks.

The scope of the contract under particular Tasks will include the following ranges:

Task No. 1:

Rural construction of the building the House of Culture of the fire station OSP, a roof field and the market square with water;

Rural construction of the building of the Sports and Recreation;

the construction of the park along with objects;

construction of bicycle paths;

construction of technical infrastructure (ports and water mains, sanitary sewer

and rainwater network monitoring municipal CCTV and green economy) in Nowa Wies.

Task No. 2:

Construction of single-family dwellings: band Z4 (as developer) - two-bedroom apartments and three-room, the team Z5 - one bedroom apartment and one apartment for a disabled person, the team Z6 - 5 one-bedroom apartments.

Task 3:

Construction of the island in the park, including in particular island, walkways, gazebos, tables, barbecue, platforms for anglers.

Task 4:

Construction of a football field with a system of fences, piłkochwytów and roofed stands and construction of multifunctional court.

Problem # 5:

Construction streetwork, external gym, skate park and rope park.

A detailed description of the contract has been concluded:

for Task No. 1 - in Part III and IV of the Terms of Reference;

for Task No. 2 - in part IIIa and IVa of the Terms of Reference;

for Task No. 3 - in part IIIb and IVb of the Terms of Reference;

for Task No. 4 - in part IIIc and IVc Terms of Reference;

for Task No. 5 - in part IIId and IVd tender documents.

Construction work

Gmina Lubomia | Published April 14, 2016  -  Deadline April 25, 2016
cpvs
45000000, 45200000, 45111200, 45400000, 39000000, 71500000

Works

Construction work

Gmina Lubomia | Published January 19, 2016
cpvs
45000000, 45200000, 45100000, 45400000, 45300000, 39000000, 71500000

Works

Construction work

Gmina Lubomia | Published November 24, 2015  -  Deadline December 7, 2015
cpvs
45000000, 45200000, 45100000, 45400000, 45300000, 39000000, 71500000

Roboty budowlane

Construction work

Gmina Lubomia | Published December 24, 2015  -  Deadline January 11, 2016
cpvs
45000000, 45200000, 45100000, 45400000, 45300000, 39000000, 71500000

Works

Construction work

Gmina Lubomia | Published October 23, 2015  -  Deadline November 12, 2015
cpvs
45000000, 45200000, 45100000, 45400000, 45300000, 39000000, 71500000

Roboty budowlane

Construction work

Gmina Lubomia | Published December 5, 2015  -  Deadline December 29, 2015
cpvs
45000000, 45200000, 45100000, 45400000, 45300000, 39000000, 71500000

Roboty budowlane

Construction work

Gmina Lubomia | Published November 10, 2015  -  Deadline November 25, 2015
cpvs
45000000, 45200000, 45100000, 45400000, 45300000, 39000000, 71500000

Roboty budowlane

Construction work

Gmina Lubomia | Published June 26, 2015  -  Deadline August 7, 2015
cpvs
45000000, 45111000, 45111200, 45111220, 45111300, 45215400, 45112714, 98370000, 98371110

The present tender procedure is - the construction and management of the cemetery, along with the transfer of graves from the cemetery in Nieboczowach (exhumation) and the transfer or reproduction (depending on the technical condition of the objects), historical crosses and shrines of Nieboczów and Ligota Tworkowska to Nowa Wies or in other specified place. A detailed description of the contract was included in Parts III and IV Terms of Reference.

"The construction of municipal infrastructure - building the fire station with a common room and their equipment together with the development of public land (around the firehouse and the device public square in the center of Nowa Wies), development of the park and the construction of the building facilities of the sports club with its equipment and disposal sports grounds (football, objects small architecture) multifamily buildings, bike paths "within the Basin flood Protection Project Oder component a" Construction of flood control reservoir Racibórz "Sub-A2" Acquiring the rights to dispose of land for the planned investment, "Contract A2 - 4 -budynek fire station with a common room and their equipment together with the development of public land (around the firehouse and the device public square in the center of Nowa Wies), development of the park and the construction of the building facilities of the sports club with its equipment and disposal sports grounds (football, landscape architecture) multifamily buildings, bike paths included in the Plan of Implementation Procurement Project under the heading ORFPP- A2-4.

Gmina Lubomia | Published March 2, 2016  -  Deadline April 18, 2016
cpvs
45000000, 45200000, 45111200, 45400000, 39000000, 71500000

The present tender procedure is the realization of the investment project involving the construction of municipal infrastructure in the village in the Municipality of Syrynia Lubomia. The new village will provide replacement land for the villagers Nieboczowy liquidated in connection with the construction of the Racibórz Reservoir. The intention is to build n. Objects on the land parts purchased by converting land used by the villagers Nieboczowy. The Employer shared investment in Task 5 (hereinafter referred to as parts).

The scope of the contract under particular Tasks will include the following ranges:

Task No. 1:

Rural construction of the building the House of Culture of the fire station OSP, a roof field and the market square with water;

Rural construction of the building of the Sports and Recreation;

the construction of the park along with objects;

construction of bicycle paths;

construction of technical infrastructure (ports and water mains, sanitary sewer

and rainwater network monitoring municipal CCTV and green economy) in Nowa Wies.

Task No. 2:

Construction of single-family dwellings: band Z4 (as developer) - two-bedroom apartments and three-room, the team Z5 - one bedroom apartment and one apartment for a disabled person, the team Z6 - 5 one-bedroom apartments.

Task 3:

Construction of the island in the park, including in particular island, walkways, gazebos, tables, barbecue, platforms for anglers.

Task 4:

Construction of a football field with a system of fences, piłkochwytów and roofed stands and construction of multifunctional court.

Problem # 5:

Construction streetwork, external gym, skate park and rope park.

A detailed description of the contract has been concluded:

for Task No. 1 - in Part III and IV of the Terms of Reference;

for Task No. 2 - in part IIIa and IVa of the Terms of Reference;

for Task No. 3 - in part IIIb and IVb of the Terms of Reference;

for Task No. 4 - in part IIIc and IVc Terms of Reference;

for Task No. 5 - in part IIId and IVd tender documents.

Lubomia: Construction of municipal infrastructure - building the fire station with a common room and their equipment together with the development of public land (around the firehouse and the device public square in the center of Nowa Wies), development of the park and the construction of the building facilities of the sports club with its equipment and disposal sports grounds (football, landscape architecture) multifamily buildings, bike paths

Gmina Lubomia | Published July 15, 2016  -  Deadline July 14, 2016
Winner
DOMBUD Anna Zadorożna Ryszard Zadorożny Sp.J., ul. Chorzowska 64, 44-100 Gliwice, kraj/woj. śląskie.
cpvs
45000000, 45000000, 45111200, 45400000, 45300000, 39000000, 71500000

This will be achieved by: (i) reducing extreme flood peaks by collecting water in the dry polder located on the Odra River above the town of Racibórz for reducing flood flows below the reservoir and better control of the river system; This project consists of the following components: Component includes the construction of facilities, consulting services, real estate acquisition and resettlement of residents from the reservoir. Work on the project will be conducted by two implementing agencies: (i) Regional Water Management Board in Wroclaw (RZGWWL) in the case of sub-component B2 and Lower Silesia Board of Amelioration and Water (DZMiUW) in the case of Sub B1 and B3. In addition, this component will include support for measures aimed at flood forecasts and conducting supporting environmental activities in the Odra river basin. This will be done through consultants. The Employer shared investment in 5 Tasks. The scope of the contract under particular Tasks will include the following areas: Task 1: Construction of the Rural House of Culture of the fire station OSP, a roof field and the market square with water; Rural construction of the building of the Sports and Recreation; the construction of the park along with objects; construction of bicycle paths; construction of technical infrastructure (connections and networks of water, sewage and stormwater, municipal monitoring network CCTV and green economy) in Nowa Wies. Task No. 2: Construction of single-family dwellings: band Z4 (as developer) - two-bedroom apartments and three-room, the team Z5 - one bedroom apartment and one apartment for a disabled person, the team Z6 - 5 one-bedroom apartments. Task 3: Construction of the islands in the park, including in particular island, walkways, gazebos, tables, barbecue, platforms for anglers. Task 4: Construction of a football field with a system of fences, piłkochwytów and roofed stands and construction of multifunctional court. Problem # 5: Build streetwork, external gym, skate park and rope park. A detailed description of the contract was signed: for the Task No. 1 - in Part III and IV of the Terms of Reference; for Task No. 2 - in part IIIa and IVa of the Terms of Reference; for Task No. 3 - in part IIIb and IVb of the Terms of Reference; for Task No. 4 - in part IIIc and IVc Terms of Reference;

Lubomia: Construction of municipal infrastructure - building the fire station with a common room and their equipment together with the development of public land (around the firehouse and the device public square in the center of Nowa Wies), development of the park and the construction of the building facilities of the sports club with its equipment and disposal sports grounds (football, landscape architecture) multifamily buildings, bike paths

Gmina Lubomia | Published July 22, 2016  -  Deadline July 21, 2016
Winner
Tamex Obiekty Sportowe, Ul. Rydygiera 8/3a, 01-793 Warszawa, kraj/woj. mazowieckie.
cpvs
45000000, 45111200, 45400000, 45300000, 39000000, 71500000

This will be achieved by: (i) reducing extreme flood peaks by collecting water in the dry polder located on the Odra River above the town of Racibórz for reducing flood flows below the reservoir and better control of the river system; This project consists of the following components: Component includes the construction of facilities, consulting services, real estate acquisition and resettlement of residents from the reservoir. Work on the project will be conducted by two implementing agencies: (i) Regional Water Management Board in Wroclaw (RZGWWL) in the case of sub-component B2 and Lower Silesia Board of Amelioration and Water (DZMiUW) in the case of Sub B1 and B3. In addition, this component will include support for measures aimed at flood forecasts and conducting supporting environmental activities in the Odra river basin. This will be done through consultants. The Employer shared investment in 5 Tasks. The scope of the contract under particular Tasks will include the following areas: Task 1: construction of the building Rural House of Culture of the fire station OSP, a roof field and the market square with water; Rural construction of the building of the Sports and Recreation; the construction of the park along with objects; construction of bicycle paths; construction of technical infrastructure (connections and networks of water, sewage and stormwater, municipal monitoring network CCTV and green economy) in Nowa Wies. Task No. 2: Construction of single-family dwellings: band Z4 (as developer) - two-bedroom apartments and three-room, the team Z5 - one bedroom apartment and one apartment for a disabled person, the team Z6 - 5 one-bedroom apartments. Task 3: Construction of the islands in the park, including in particular island, walkways, gazebos, tables, barbecue, platforms for anglers. Task 4: Construction of a football field with a system of fences, piłkochwytów and roofed stands and construction of multifunctional court. Problem # 5: Build streetwork, external gym, skate park and rope park. A detailed description of the contract was signed: for the Task No. 1 - in Part III and IV of the Terms of Reference; for Task No. 2 - in part IIIa and IVa of the Terms of Reference; for Task No. 3 - in part IIIb and IVb of the Terms of Reference; for Task No. 4 - in part IIIc and IVc Terms of Reference;

Construction of sewage system in the area of ​​ul. Oak with the incorporation of the planned sanitary sewage system in the complex urban Nowa Wies Nieboczowy.

 | Published November 26, 2014  -  Deadline December 11, 2014
cpvs
45231200, 45233220

A detailed description of the contract specifies the technical documentation, bills of quantities, STWiOR Design Solutions: The proposed sanitary sewage effluent will be discharged from existing single-family houses, and then through the sanitary sewer system designed in a complex urban Nowa Wies Nieboczowy to a sewage treatment plant in Nowa Wies. Cross-channel is designed to accommodate: - existing or projected building, - roads and fences, - the technical conditions of underground infrastructure owners - agreed with the owners of the property are designed channel diameters - gravity sewer with a diameter of 160-200 mm fi PVC-U pipes SDR17 SN8 with full core / tube homogeneous, solid /, with extended chalice, and sealed with elastomeric seals, buildings on the MV network 2. The space between the ring relief, and the chimney should be sealed well. Railway and oak wood must be in accordance with the conditions issued by the Municipality Lubomia no RK720.00033.2014.BB of 06/16/2014. Due to the necessity middle of the road works designed a new road surface across the entire width of the roadway to traffic KR2 ie. 5cm, 7cm,

Lubomia: Construction of the Roman Catholic Church in New Rural Municipality Lubomia with land development - additional work entitled. Renovation and repair the church organ.

Rzymsko-Katolicka Parafia św. Józefa Robotnika | Published July 15, 2016  -  Deadline July 15, 2016
Winner
Przedsiębiorstwo Usługowe Borbud sp.z o.o., ul. Wodna 21, 47-400 Racibórz, kraj/woj. śląskie.
cpvs
37311300

According to the opinion of experts should perform, in addition to the work covered by the contract additional works such as: the renovation of the table games (counter), the renovation windchest, reconstruction tracker tube, renovated air system, revitalization team tone and expanding the organ ..

Lubomia: Construction of municipal infrastructure - building the fire station with a common room and their equipment together with the development of public land (around the firehouse and the device public square in the center of Nowa Wies), development of the park and the construction of the building facilities of the sports club with its equipment and disposal sports grounds (football, landscape architecture) multifamily buildings, bike paths

Gmina Lubomia | Published July 29, 2016  -  Deadline July 28, 2016
Winner
DOMBUD Anna Zadorożna Ryszard Zadorożny Sp.J., Ul. Chorzowska 64, 44-100 Gliwice, kraj/woj. śląskie.
cpvs
45000000, 45111200, 45400000, 45300000, 71500000

Rząd Polski wdraża Projekt Ochrony Przeciwpowodziowej Dorzecza Odry (Odra River Basin Flood Protection Project (ORBFPP)). Głównym celem projektu jest ochrona ludności zamieszkującej dorzecze rzeki Odry przed utratą życia, zniszczeniem własności, które mogą być powodowane wielką powodzią. Cel ten zostanie osiągnięty przez: (i) zmniejszenie ekstremalnych szczytów powodziowych poprzez gromadzenie wody w suchym polderze usytuowanym na rzece Odrze powyżej miasta Racibórz, umożliwiające redukcję przepływów powodziowych poniżej zbiornika i lepszą kontrolę działania systemu rzecznego; (ii) zwiększenie wydajności przepływowej kanałów rzeki Odry przez i wokół Wrocławia. Projekt przewiduje ochronę ponad 2,5 miliona ludzi przed powodzią w kilku miastach takich jak Racibórz, Kędzierzyn-Koźle, Krapkowice, Opole, Brzeg, Oława i Wrocław oraz w mniejszych miejscowościach w trzech województwach: śląskim, opolskim i dolnośląskim. Projekt ten składa się z następujących komponentów: Komponent A: Budowa suchego Zbiornika Racibórz Dolny. Suchy zbiornik zostanie zbudowany w dolinie rzeki Odry w pobliżu granicy z Republiką Czeską niedaleko miasta Racibórz w celu zredukowania wezbrań powodziowych. Całkowita pojemność powodziowa zbiornika wyniesie około 185 mln m3. Komponent obejmuje budowę obiektów, usługi konsultingowe, pozyskiwanie nieruchomości oraz przesiedlenie mieszkańców z czaszy zbiornika. Komponent B: Modernizacja Systemu Powodziowego Wrocławia. System ochrony przeciwpowodziowej Wrocławia zostanie zmodernizowany poprzez udrożnienie kanałów przeciwpowodziowych, zwiększenie wydajności urządzeń hydraulicznych, zwiększenie przepustowości kanału powodziowego rzeki Widawy. Działania podzielone są na podkomponenty: (B1) Modernizacja obwałowań Odry, (B2) Modernizacja koryta i kanałów Odry, (B3) Usprawnienie Kanału Ulgi Odra - Widawa, (B4) Projektowanie oraz nadzór budowlany oraz (B5) koszty przesiedlenia. Prace nad Projektem będą prowadzone przez dwie jednostki wdrażające: (i) Regionalny Zarząd Gospodarki Wodnej we Wrocławiu (RZGWWR) w przypadku podkomponentu B2 i Dolnośląski Zarząd Melioracji i Urządzeń Wodnych (DZMiUW) w przypadku podkomponentu B1 i B3. Komponent C: Poprawa systemu ochrony przeciwpowodziowej, monitorowanie, ocena i nadzór nad realizacją planu zarządzania środowiskiem i planu działań związanych z przesiedleniem (EMP&RAP). Dodatkowo, komponent ten będzie zawierał wsparcie działań mających na celu prognozowanie powodzi oraz prowadzenie wspomagających działań środowiskowych w dorzeczu Odry. Komponent D: Zarządzanie Kontraktem, Pomoc Techniczna i Szkolenie. Zadania te będą realizowane za pośrednictwem Konsultantów. Przedmiotem niniejszego postępowania przetargowego jest realizacja zadania inwestycyjnego polegającego na budowie infrastruktury gminnej we wsi Syrynia w Gminie Lubomia. Nowa Wieś stanowić będzie teren zamienny dla mieszkańców wsi Nieboczowy likwidowanej w związku z budową Zbiornika Racibórz. Zamierzenie ma na celu budowę nw. Obiektów na terenach zamiennych nabywanych w drodze zamiany gruntów przez mieszkańców wsi Nieboczowy. Zamawiający podzielił inwestycję na 5 Zadań. Zakres przedmiotu zamówienia w ramach poszczególnych Zadań będzie obejmować następujące zakresy: Zadanie nr 1: budowa budynku Wiejskiego Domu Kultury z Remizą OSP, zadaszeniem terenowym i rynkiem z placem wodnym; budowa budynku Wiejskiego Ośrodka Sportu i Rekreacji; budowa parku wraz z obiektami; budowa ścieżek rowerowych; budowa infrastruktury technicznej (przyłączy i sieci wody, kanalizacji sanitarnej i deszczowej, sieci monitoringu gminnego CCTV oraz gospodarki zielenią) na terenie Nowej Wsi. Zadanie nr 2: Budowa budynków mieszkalnych jednorodzinnych: zespół Z4 (stan deweloperski) - mieszkania dwupokojowe i trzypokojowe, zespół Z5 - jedno mieszkanie dwupokojowe oraz jedno mieszkanie dla osoby niepełnosprawnej, zespół Z6 - 5 mieszkań jednopokojowych. Zadanie nr 3: Budowa wyspy w parku, w tym w szczególności: wyspa, kładki, altany, stoły do grillowania, podesty dla wędkarzy. Zadanie nr 4: Budowa boiska do piłki nożnej z układem ogrodzeń, piłkochwytów oraz trybunami zadaszonymi oraz budowa boiska wielofunkcyjnego. Zadanie nr 5: Budowa streetwork, siłowni zewnętrznej, skateparku i parku linowego. Szczegółowy opis przedmiotu zamówienia został zawarty: dla Zadania nr 1 - w części III i IV SIWZ; dla Zadania nr 2 - w części IIIa i IVa SIWZ; dla Zadania nr 3 - w części IIIb i IVb SIWZ; dla Zadania nr 4 - w części IIIc i IVc SIWZ; dla Zadania nr 5 - w części IIId i IVd SIWZ..

Lubomia: Reconstruction of municipal roads: 1.Przebudowa the two side sections of the street. Main Street in Bukowie 2.Przebudowa. 3-go Maja side in Syryni on the sect. of pos. No. 70 pos. 66 3.Przebudowa ul. 3-go Maja side in Syryni on the sect. of pos. 28 to the street. Ecclesial 4.Przebudowa commune road ul. Side Dąbrowy in Syryni section from property to property 18 17 5. Reconstruction street Nepomuk in Lubomia.

Gmina Lubomia | Published July 26, 2016  -  Deadline November 30, 2016
cpvs
45233120, 45111200, 45233140, 45231300

Main Bukowie in the main poultry farm plot No. 148 dł.130,0 m szer.3,5m construction of pavements; 4 cm AC16 50 70 4 cm -podbudowa principal of broken aggregate gr. in-O 20 cm 103 cm Drainage surface on the adjacent areas to the border of the Main pos. 16 m dł.50,0 szer.3,0m 5 cm AC16 50 70 7 cm -podbudowa principal of broken aggregate gr. in-O 20 cm 23 cm curb Roadway framed 15 * 30 on the concrete bench with difficulty, at the entrances curb overrun. 66 D) and the municipal road for traffic category KR 1. The width of the roadway will amount to 3.0-3.5 m. Designed sided decrease roadway with a value of 2.0% was designed following layer construction on the roadway: 4.0 cm 4.0 cm 8.0 cm 15 cm 15.0 cm total thickness of the layers of construction amounted to be 46.0 cm. Drainage Rainwater and snowmelt will be accompanied by declines designed longitudinal and lateral side of the road of crushed stone, then the existing grass verge Church D) and the municipal road for traffic category KR 1. The width of the roadway will amount to 3.50 m. C12 15). Designed following layer construction on the roadway: 4.0 cm 4.0 cm 8.0 cm 15 cm 15.0 cm total thickness of the layers of construction amounted to be 46.0 cm. Dehydration S Ø160 mm. Reconstruction of the commune road ul. Side Dąbrowy in Syryni section from property to property 18 17 The length is 118,5m szer.3,0mNawierzchnia road will be limited curbs embedded 12x25 cm and 15x30 projecting the length of the slope. Designed following layer construction on the roadway: 4.0 cm 4.0 cm 8.0 cm 15 cm 15.0 cm total thickness of the layers of construction amounted to be 46.0 cm. Rainwater and snowmelt will be accompanied by declines designed longitudinal and lateral side of the road. 5. Reconstruction street Nepomuk in Nepomuk Lubomia as far as the reconstruction of the pavement with drainage system. Designs to make sidewalks sections as follows: Parkowa to KM 1 + 277 sec. Left on the remaining section of the pavement to perform a new inspection chambers on the existing sewer and adjust the existing grille. Asnyka the length 64,50m - designed pavement run in a straight line along the route of the existing) will be separated by a concrete curb 15x30cm laid on the concrete bench with difficulty, protruding 12 cm above the designed edge of the road at a pedestrian crossing the height of the curb will be 2cm from the area pavement will be reduced rim concrete 8x30cm on the concrete bench with difficulty. The construction of pavements designed as follows: 15cm 1,10m. On the surface under the bridge planned sidewalk perform insulation bitumen. The park. From the side of the road shoulder separated by a concrete curb overrun 15x22cm laid on the concrete bench with difficulty, protruding 4cm above the designed edge of the road, cross fall of 6.00% in the area on the straight sections on horizontal curves drop the shoulder on the outer side of the road as the decrease in the surface, and drop shoulders on the inner side of the road increased by 2% from the pitch and individual entrances to the property within the proposed sidewalks, will have a surface of concrete cobblestones color, a combination of entries from the edge of the road made with slants 1: 1. Entrances to individual property within the projected shoulder will be, will have a surface of asphalt concrete pavement as well as the paving of concrete, a combination of edge entry with the edge of the roadway arch R = 3,00m. The structure designed entries on the surface of the cobblestones: 20cm construction designed entries for paving asphalt concrete 15cm Limit entries from the side of the road and a concrete curb property overrun 15x22cm laid on the concrete bench with difficulty, protruding 4cm above the designed edge of the road. The outlets of the planned channel will be located in the existing slopes of the creek on the right side, outlets complete end walls (KPED 02.21) and docks outlet (KPED 02.20) in accordance with KPED 02.19. Execution of the channel sections of the well D27 and D28 to the proposed docks exit the slopes shall be done by drilling because of the location w / in sections of the canals on private plots. The inclusion of the proposed channel to the docks outlet in the collapse of sewage done with the knees erected on concrete blocks retaining C12 15 in order to protect the pipe from slipping out from his knees. Slopes at the inlet stream under a bridge on the length of 5,00m from the bridge structure will be reinforced prefabricated elements (dowels on a bed of gravel sand) in accordance with KPED KPED 01.07 and 02.19. On the slopes of the outlet stream due to the deformation, it is planned to profiling the surface slopes with a slope of 1: 1 and the existing spacer plates openwork which strengthen the length of 5,00m bridge structure. 10cm. After dismantling the existing outlet channel with concrete pipes Ø400mm in the wings building bridge

Cemetery works

Gmina Lubomia | Published September 1, 2016
Winner
Konsorcjum: Lider Bruki Trawiński sp.z o.o. Partner Remigiusz Trawiński Partner Firma Walicki Śląski Zakład Pogrzebowy
cpvs

The contract works are complementary exhumation and transfer of remains from the cemetery in Nieboczowach:

a) not shown / included in the inventory of the cemetery Contract base, and have legal guardians,

b) grave drowned in the D,

c) graves located between the burials,

d) children's graves in the B.

Ww. graves despite due diligence has not been included in the inventory because they do not have graves, human remains at the present time were buried below ground level, which form over the years probably has been changed considerably. The remains were also buried in the paths between the gravestones. Complementary exhumation works make sure you perform as part of the basic contract, using the same procedures. Contractor shall perform work and services in the amount necessary to achieve their goal resulting from legal documents and documentation. Works and services covered by the amendments in the contract are a repetition of works and services defined in the basic contract. According to the Notice of Contract point. II.1.5 "the scope of supplementary orders includes the execution of all the tasks necessary to make the exhumation and transfer of the construction or additional graves on identifying new bodies not covered previously in the description of the contract.".