Construction work

Archidiecezja Lubelska | Published April 6, 2017  -  Deadline May 15, 2017
cpvs
45000000, 45453000, 45330000, 45310000, 92520000, 92522000, 92522100, 92522200, 30193800, 39100000, 38652100, 92110000

Object of the contract includes:

1 Restoration work - restoration of movable monuments.

2 Construction - renovation of the church building rektoralnego.

3 equipment to perform three exposures and delivery stairclimber.

4 Implementation of museum exhibitions.

As in point II.1.4).

Construction work for highways, roads

Zarząd Dróg i Mostów w Lublinie | Published April 26, 2017  -  Deadline June 14, 2017
cpvs
45233100, 45233000, 45200000, 45110000, 45231300, 45231400, 45233200, 45233300, 45316110, 45112710, 45112000, 45231000, 45230000

Krobmalna towards the railway viaduct, along with dehydration and lighting.

The Contractor will be obliged to:

Krochmalna,

- construction of Krochmalna Street - diamond engineering facility: flyovers - crossroads,

Concrete,

Krochmal towards the railway viaduct.

The scope of the contract includes execution of construction works, including:

A) preparatory work,

B) cutting of trees and shrubs,

C) introducing temporary traffic organization for existing roads in the construction area, providing pedestrian communication in the reconstruction area,

D) demolition of existing road and paved road constructions,

E) the necessary reconstruction of the colliding networks: telecommunications, water supply, electricity, gas, heat, rain, sanitation, etc.

F) construction of flyovers and retaining walls,

G) construction of embankments on access to the flyover with retaining structures,

H) construction of rain drainage, street lighting, traffic lights, telecommunication network, technological channel,

I) construction of road traffic lights,

J) construction / extension of trolleybus traction,

K) making troughs for new road surfaces,

L) building new construction layers of roads, bus bays

M) construction / reconstruction of congresses,

N) construction of pavements, bicycle paths,

O) organization of horizontal and vertical movement,

P) road safety equipment,

R) development of green areas.

Construction work for highways, roads

Zarząd Dróg i Mostów w Lublinie | Published April 27, 2017  -  Deadline June 12, 2017
cpvs
45233100, 45233000, 45200000, 45110000, 45231300, 45231400, 45233200, 45233300, 45316110, 45112000, 45231000, 45230000

Under the subject of the contract, the Contractor will be obliged to perform the following tasks:

Task I - construction of a new section of road connecting ul. Kunickiego z ul. Wrotkowska in Lublin with the construction of a collision-free intersection with railway siding,

Task II - construction of a water supply system with connections / branches (within the boundaries of the future lane), section of the sanitary sewage network and removal of the collision course of the water supply network in the area of ​​ul. Smoluchowski.

Construction work for highways, roads

Zarząd Dróg i Mostów w Lublinie | Published April 26, 2017  -  Deadline June 13, 2017
cpvs
45233100, 45233000, 45110000, 45231300, 45231400, 45233200, 45233300, 45316110, 45112710, 45112000, 45231000, 45230000

Full name of the subject of the order:

Abramowicka Street in Lublin on the section from Sadowa Street to the border of the city together with the construction of networks connected with road infrastructure, sanitary sewage system, water supply network:

Sadowa to the city boundary);

Distant to the beginning of the development of the road industry (Task I) and the construction of new tracks within the future lane for the newly designed network and the existing sanitary sewer network - in the area covered by the road industry;

Task III - construction and reconstruction of the water supply network with connections to individual properties within the limits of the redeveloped road lane.

Task I:

Distance-Powojowa Strojnowskiego, Podleśna.

2. Bus traffic loop with service road and parking places.

3. Construction and construction: sidewalks, bicycle paths, bus bays, individual and public conventions.

4.Complete target traffic organization.

5.Removal of cubature objects, fences, gates.

6. Remove existing green areas that interfere with the planned development of the site.

7.Construction and reconstruction can. Rainy with the cleaning equipment.

8.Construction of technological channel.

9.Construction of the water supply network with hydrants.

10. Renovation and protection of the gas network.

11. Construction of the Street.

Architectural, construction, engineering and inspection services

Samodzielny Publiczny Szpital Kliniczny nr 1 w Lublinie | Published April 30, 2016  -  Deadline May 30, 2016
cpvs
71000000

Architectural, construction, engineering and inspection services

Architectural, construction, engineering and inspection services

Muzeum Lubelskie w Lublinie | Published March 22, 2016  -  Deadline April 11, 2016
cpvs
71000000, 71200000, 71220000, 71221000, 71242000, 71250000, 71251000

Architectural, construction, engineering and inspection services

Architectural, construction, engineering and inspection services

Muzeum Lubelskie w Lublinie | Published April 7, 2016  -  Deadline April 13, 2016
cpvs
71000000, 71200000, 71220000, 71221000, 71242000, 71250000, 71251000

Architectural, construction, engineering and inspection services

Construction work for highways, roads

Zarząd Dróg i Mostów w Lublinie | Published April 27, 2017  -  Deadline June 13, 2017
cpvs
45233100, 45233000, 45110000, 45231300, 45231400, 45233200, 45233300, 45316110, 45112710, 45112000, 45231000, 45230000

Full name of the subject of the order:

Expansion of ul. Abramowicka Street in Lublin on the section from Sadowa Street to the border of the city together with the construction of networks connected with road infrastructure, sanitary sewage system, water supply network:

Task I - reconstruction of ul. Abramowicka Street in Lublin (section from Sadowa Street to the city border);

Task II - construction of sanitary sewage network Ø 200 - within the scope of the existing sanitary sewage network in ul. Distant to the beginning of the development of the road industry (Task I) and the construction of new tracks within the future lane for the newly designed network and the existing sanitary sewer network - in the area covered by the road industry;

Task III - construction and reconstruction of the water supply system with connections to individual properties within the limits of the redeveloped road lane.

Construction work

Rejonowy Zarząd Infrastruktury w Lublinie | Published September 12, 2015
Winner
Skanska Spółka Akcyjna
cpvs
45000000

The contract is: Building a warehouse flights material resources in Deblin. The range of investments: The investment includes the construction of: a) Storage LSM with the social part of the floor area 4 m2 and capacity 566.42 42 908.84 m3 including some social-office - 656.23 m2 and storage area - 3627.37 m2. b) Storage of hazardous materials of the area. Built 301.85 m2 and capacity of 1 780.92 m3. c) Magazine compressed gases of the area. Built 159.58 m2 and capacity of 941.52 m3. d) external storage - sheds of the area. building 210,00 m2. e) the external infrastructure: the surface of roads and squares of the area. 995.0 m2 with connections: water and sewage, technological, what, electrical and technical outdoor lighting and fencing. Current state: Under construction area occurs underground utilities (water mains, storm water drainage, sanitary network which, mains and teletype). The needs and requirements: Completed facilities will ensure proper conditions for storing and managing military material. The scope of the order: scope of the contract includes m.in .: demolition: the liquidation of the existing facility off-road embankment and part of the existing pavement, earthworks: excavations for the foundations, excavations under line connections, korytowanie for roads and maneuvering, performance benches and footings including insulation, execution of the supporting structure of reinforced concrete and steel with the filling of walls, installation of windows and doors and garage doors, construction of the roof structure and the roofing with thermal insulation, technological equipment, execution of connections: water supply from hydrants, sanitary sewer, rain and technology with a tank bezodpływowym, heating network and telecommunication,

Construction work for highways, roads

Zarząd Dróg i Mostów w Lublinie | Published April 27, 2017  -  Deadline June 14, 2017
cpvs
45233100, 45233000, 45200000, 45110000, 45231300, 45231400, 45233200, 45233300, 45316110, 45112710, 45112000, 45231000, 45230000

1. Construction of the intersection of ul. Diamond in Lublin with the proposed extension of ul. Lubelskie Lipca "80 and ul. Krobmalna, including min. Construction of Krochmalna Street - diamond engineering facility: flyovers - crossing, reconstruction of ul. Krochmalna - from junction with ul. Diamond to Bystrzyca River and towards ul. Concrete, reconstruction of the ul. Diamond - from the intersection of ul. Krobmalna towards the railway viaduct, along with dehydration and lighting.

2. The contractor will be obliged to:

- the intersection of ul. Diamond with extension of ul. Lubelskie Lipca "80 and ul. Krochmalna,

- construction of Krochmalna Street - diamond engineering facility: flyovers - crossroads,

- reconstruction of ul. Krochmalna - from junction with ul. Diamond to Bystrzyca River and towards ul. Concrete,

- reconstruction of the ul. Diamond - from the intersection of ul. Krochmal towards the railway viaduct.

Construction work

Zarząd Dróg Wojewódzkich | Published April 17, 2015
Winner
Skanska S.A
cpvs
45000000, 45100000, 45111100, 45111300, 45111200, 45230000, 45233000, 45233100, 45233200, 45233300, 45221000, 45221100, 45231400, 45316110, 45231300, 45231600, 45112710, 45233120, 45233150, 45233280, 45233290

The contract is for the robot building consisting in: Expanding the provincial road No. 808 Arches - Serokomla - Kock on the section from km 8 + 000 to km 20 + 100 SCOPE OF WORKS INCLUDES: The scope of work includes: Development of the road (in the plan of correction road axis correction longitudinal profile , widening the roadway provincial road to 7,00m, execution or performance of reinforcement of the existing road surface new design adapted to the regional road traffic load KR4, demolition of the existing bridge and construction of a new bridge over the river Bystrica in m. Fusilli, Wojcieszków, construction detours and temporary bridges at construction w / in building bridges road culverts, construction of sidewalks in towns and Wojcieszków Fusilli, construction of a bicycle path in Wojcieszków, construction of bus bays, performing roadside ditches, storm sewer construction along with outlets, construction of road lighting, channel construction technology, building or secure existing supporting infrastructure (power grid, gas, telecommunication), which occurs in a collision with rozbudowywanymi sections of the road, felling and development of greenery in the boundaries of the roadway, the execution of the vertical label, horizontal and road safety devices. INDUSTRY ROAD WORKS WORKS PREPARATORY GROUND SURFACES FINISHING WORKS FRAME MARK VERTICAL, HORIZONTAL AND TRAFFIC SAFETY DEVICES OTHER ITEMS STREET WORKS SUPERVISION ARCHAEOLOGICAL PROJECT SUPERVISION ornithological PROMOTION (Information and memorial boards) INDUSTRY WORKS BRIDGE BRIDGE - BRIDGE WORKS Wojcieszków Fusilli culverts INDUSTRY ROAD NO STRAIN 1 STRAIN ROAD NO 2 NO 3 STRAIN STRAIN ROAD ROAD NO WAY NO STRAIN 4 5 6 STRAIN STRAIN ROAD NO WAY NO WAY NO STRAIN 7 8 9 STRAIN STRAIN ROAD NO WAY NO WAY NO STRAIN 10 11 STRAIN ROAD NO 12 CHANNEL TECHNOLOGY INDUSTRY teletechnical PRZRBUDWA EXISTING NETWORK Teletechnical WITH SECURITY LIGHTING electricity sector RESPIRATORY HEALTH INDUSTRY SEWAGE DISPOSAL OF RAIN TREE BRANCH GREEN and GREEN ROAD KREWÓW - OTHER MEETINGS plantings WORKS WORKS IN THE FRENCH DRAIN SURVEILLANCE SURVEILLANCE ARCHAEOLOGICAL ornithological CONTROL DEVICE amphibian protection GATES PROMOTION PROJECT 2 (two-sided), and the implementation and setting tables memorial after construction 2 pieces (two-sided) according to the rules set out in the Guidelines for the beneficiary in terms of information and promotion within the Regional Operational Programme of Lublin. The Contractor shall dispose of units of equipment and means of transport, ensuring the implementation of the contract in accordance with the Terms of Reference and project documentation within the contractual period. The Contractor shall develop and approve: - security plan and health and quality assurance programs, - traffic organization plan for the duration of the works together with the arrangements and approval by the traffic management in accordance with the provisions of the applicable-provided for, if the Contractor does not intend to in the course of work benefit from the traffic organization plan for the duration of the works forming part of the project documentation. Contractor is obliged to keep clean public roads, which will take place after the movement of vehicles and transport construction materials, construction Inwenta-structuring and review the status of zero for the transport routes and to determine the relevant managers agreed how to use the roads. In case of any claims administrators and managers for the destruction of roads and streets by transportation construction contractor is obliged to repair them at his own expense, which will not be subject to separate payment and is included in the contract price. Contractor is obliged to, perform inventory and review of the property in the vicinity of the works. In the event of any claims for compensation of property owners Contractor is obliged to repair them at his own expense, which will not be subject to separate payment and is included in the contract price. Detailed scope of work is included in construction projects and regulations, Detailed Technical Specifications and the bill of quantities forming part of the auxiliary determine the amount of work. Due to the fact that the contract works will contract lump sum in the event during the execution of the works of more works in any position does not it could be considered as additional work requested additional compensation. Any lack in the bill of quantities or in the model offer cost estimate required some work to be performed under doku¬mentacji design (including detailed design) does not relieve the Contractor from the obligation to lecture

Construction work

Zarząd Dróg Wojewódzkich | Published January 31, 2015  -  Deadline March 10, 2015
cpvs
45000000, 45100000, 45112000, 45111100, 45111300, 45111200, 45230000, 45233000, 45233100, 45233200, 45233300, 45221000, 45221100, 45231400, 45316110, 45231300, 45231600, 45112710, 45233120, 45233150, 45233280, 45233290

The contract is for the robot building consisting in: The development of provincial road No. 808 Arches - Serokomla - Kock on the section from km 8 + 000 to km 20 + 100 SCOPE OF WORKS INCLUDES: The scope of work includes: Development of the road (in the plan of correction road axis correction longitudinal profile , widening the roadway provincial road to 7,00m, execution or performance of reinforcement of the existing road surface new design adapted to the regional road traffic load KR4, demolition of the existing bridge and construction of a new bridge over the river Bystrica in m. Fusilli, Wojcieszków, construction detours and temporary bridges at construction w / in building bridges road culverts, construction of sidewalks in towns and Wojcieszków Fusilli, construction of a bicycle path in Wojcieszków, construction of bus bays, performing roadside ditches, storm sewer construction along with outlets, construction of road lighting, channel construction technology, building or secure existing supporting infrastructure (power grid, gas, telecommunication), which occurs in a collision with rozbudowywanymi sections of the road, felling and development of greenery in the boundaries of the roadway, the execution of the vertical label, horizontal and road safety devices. INDUSTRY ROAD WORKS WORKS PREPARATORY GROUND SURFACES FINISHING WORKS FRAME MARK VERTICAL, HORIZONTAL AND TRAFFIC SAFETY DEVICES OTHER ITEMS STREET WORKS SUPERVISION ARCHAEOLOGICAL PROJECT SUPERVISION ornithological PROMOTION (Information and memorial boards) INDUSTRY WORKS BRIDGE BRIDGE - BRIDGE WORKS Wojcieszków Fusilli culverts INDUSTRY ROAD NO STRAIN 1 STRAIN ROAD NO 2 NO 3 STRAIN STRAIN ROAD ROAD NO WAY NO STRAIN 4 5 6 STRAIN STRAIN ROAD NO WAY NO WAY NO STRAIN 7 8 9 STRAIN STRAIN ROAD NO WAY NO WAY NO STRAIN 10 11 STRAIN ROAD NO 12 CHANNEL TECHNOLOGY INDUSTRY teletechnical PRZRBUDWA EXISTING NETWORK Teletechnical WITH SECURITY LIGHTING electricity sector RESPIRATORY HEALTH INDUSTRY SEWAGE DISPOSAL OF RAIN TREE BRANCH GREEN and GREEN ROAD KREWÓW - OTHER MEETINGS plantings WORKS WORKS IN THE FRENCH DRAIN SURVEILLANCE SURVEILLANCE ARCHAEOLOGICAL ornithological CONTROL DEVICE amphibian protection GATES PROMOTION PROJECT 2 (two-sided), and the implementation and setting tables memorial after construction 2 pieces (two-sided) according to the rules set out in the Guidelines for the beneficiary in terms of information and promotion within the Regional Operational Programme of Lublin. The Contractor shall dispose of units of equipment and means of transport, ensuring the implementation of the contract in accordance with the Terms of Reference and project documentation within the contractual period. The Contractor shall develop and approve: - security plan and health and quality assurance programs, - traffic organization plan for the duration of the works together with the arrangements and approval by the traffic management in accordance with the provisions of the applicable-provided for, if the Contractor does not intend to in the course of work benefit from the traffic organization plan for the duration of the works forming part of the project documentation. Contractor is obliged to keep clean public roads, which will take place after the movement of vehicles and transport construction materials, construction Inwenta-structuring and review the status of zero for the transport routes and to determine the relevant managers agreed how to use the roads. In case of any claims administrators and managers for the destruction of roads and streets by transportation construction contractor is obliged to repair them at his own expense, which will not be subject to separate payment and is included in the contract price. Contractor is obliged to, perform inventory and review of the property in the vicinity of the works. In the event of any claims for compensation of property owners Contractor is obliged to repair them at his own expense, which will not be subject to separate payment and is included in the contract price. Detailed scope of work is included in construction projects and regulations, Detailed Technical Specifications and the bill of quantities forming part of the auxiliary determine the amount of work. Due to the fact that the contract works will contract lump sum in the event during the execution of the works of more works in any position does not it could be considered as additional work requested additional compensation. Any lack in the bill of quantities or in the model offer cost estimate required some work to be performed under doku¬mentacji design (including detailed design) does not relieve the Contractor from the obligation of their performance

Warehouse stores construction work

Zarząd Dróg Wojewódzkich | Published April 15, 2017  -  Deadline April 27, 2017
cpvs
45213221, 71320000, 45100000, 45310000, 45400000

3 (for the storage of materials used in road maintenance, including those salts - sodium chloride, NaCl):

Task 1: Building the Circuit Magazine Road in Lukow Street. Łapiguz 112, plot No. 1236-1210

Hospital, plot no 55/42

600 years, plot No. 33/10 i29 / 1

CPV:

71320000-7 Services Engineering design

45213221-8 Construction work for warehouses

45100000-8 Site preparation work

45310000-3 Electrical installation work

45400000-1 Finishing works for buildings

2.Szczegółowy scope of the contract is included in the program functional and utilitarian.

It is recommended that the Contractor made a site visit in the execution of the works and its surroundings in order to verify the documents and information submitted in these proceedings by the Employer.

In the event of any claims for compensation administrators and managers for the destruction of roads and streets transport construction contractor is obliged to repair them at his own expense, which will not be subject to separate payment and is included in the contract price.

The Contractor is obliged to refer for managing staff indicated in the offer.

Geodetic and cartographic documentation prepared by the as-built geodesic inventory must contain the data needed to make any alteration to the essential map for land and buildings (a list of changes to groundwater) and the records of public utilities.

With the agreement signed unilaterally Contractor shall provide a statement of people, shown to perform the contract, which will act as independent technical functions in construction (building managers) to undertake the duties of the site manager.

The order made by the Contractor (works) will be covered by a pledge for a period of time resulting from the bid.

3a of the Public Procurement Act, requires the employment of the Contractor or Subcontractor under a contract of employment of persons performing, in terms of the contract (bricklayer, carpenter, steel fixer, roofer, electrician).

Contractor after signing the contract and before the task to submit to the Employer list above. persons employed to perform the above works according to the technology provided in the project construction - executive attaching evidence that these people are employed by the Contractor under the contract of employment.

Construction work

Rejonowy Zarząd Infrastruktury w Lublinie | Published June 3, 2015  -  Deadline July 9, 2015
cpvs
45000000

The contract is for: Construction flight magazine of material resources in Deblin. The investment includes the construction of: a) Storage LSM with the social part of building area 4 566.42 square meters and a volume of 42 908.84 m³ including: social-office part - 656.23 square meters and storage area - 3627.37 square meters. b) Storage of hazardous materials of the area. building size and volume of 301.85 1 780.92 m³. c) Store compressed gases of the area. Built 159.58 941.52 square meters and capacity m³. d) External Warehouse - sheds of the area. 210,00 m² building. e) external infrastructure: the surface of roads and squares of the area. 995.0 m² of connections: water and sewage, technological, what, electrical and telecommunication outdoor lighting and fencing. Current state: Under construction area occurs underground utilities (water mains, storm water drainage, sanitary, every network, power grid and teletype). The needs and requirements: Completed facilities will ensure proper conditions for storing and managing military material. The scope of the contract: The scope of the contract includes m.in .: - demolition: the liquidation of the existing facility off-road, embankment and part of the existing pavement, - earthworks: excavations for the foundations, excavations at the terminal linear, korytowanie for roads and yards. - execution of benches and footings including insulation, - making the supporting structure of reinforced concrete and steel with the filling of walls, installation of windows and doors and garage doors, - completion of the roof structure and the roofing with thermal insulation - technological equipment, execution of connections: water supply with hydrants, sanitary sewer, stormwater and technology with a tank bezodpływowym, heat and telecommunication networks,

Construction work

Gmina Lublin | Published January 28, 2017
cpvs
45000000

The contract is for the construction of multi-purpose building, which includes: a kindergarten, a community center, a primary school with a gymnasium Street. Beryllium in Lublin, along with land development, connections, internal installations, parking lots, driveways and dojściami, with children's pre-input and a playground and green elements.

The contract is to build a multi-purpose building, which includes: a kindergarten, a community center, a primary school with gym (room with facilities and auditorium for 337 people) Street beryllium in Lublin, along with land development, networks and connections of water, sewerage sanitary, stormwater external storage reservoirs with a flow regulator separator of petroleum substances and trap sand and sewage technological separator fat, installation of external lighting and monitoring the area and sewers teletechnical, roads, squares and parking spaces for cars and bikes, paved dojściami pedestrian and bicycle, ATV stairs and retaining walls of the square in front of the entrance and a children's playground and greenery elements and fence the area.

Four-storey building with the first floor is partially underground due to the large decline in the area - 4 m.

Architectural, construction, engineering and inspection services

Gmina Lublin | Published February 8, 2017  -  Deadline March 15, 2017
cpvs
71000000

The contract scope includes:

Stage I (concept):

1.1. obtaining current maps for design purposes,

1.2. develop the necessary inventory of urban (scale 1: 1000), architecture (scale 1: 200 or 1: 100), dendrological for design purposes and demolition,

1.3. develop two concepts (after 6 copies.)

1.4. agreeing on the concept of the customer.

Requirements for the concept:

Map for design purposes - the Contractor is required to obtain updated maps for design purposes (to a scale depending on the type of construction of the proposed facility for the area covered by the contract plus the statutory 30 m range, including areas adjacent to the border development).

The concept - a proposal geometry solutions, technical, technological, the basic infrastructure and accompanying allows to verify the vision of designer and her reference to the requirements of the Purchaser.

Krochmalna / Gas / Mill / Stadionowa, while the second is to include solutions targeted to the possible reconstruction of the roundabout to ensure proper communication service towards Wikia contributor to the LOF.

Stage II (Multi-documentation Design estimates).

Stage III (feasibility study):

- Feasibility study.

Requirements for the feasibility study:

1. A feasibility study should be drawn up in 3 copies.,

2. The feasibility study must be done for all the material scope of the project entitled .: "Integrated Communication Centre for Functional Lublin area."

The feasibility study should be developed in the generator applications available on the websites of the Marshal Office of Lublin and in hard copy.

Krochmalna / Diamond, for which a separate agreement is developed technical documentation.

It is the duty of the Contractor is also to make changes, corrections, additions feasibility study during the evaluation of the project by the Managing Authority for the signing of the financing agreement for the project.

Stage IV (supervisions)

1. author's supervision at the stage of the tender process for selection of the contractor for construction work,

2. author's supervision during construction works.

Requirements for the author's supervision:

Changes)

2. clarifying doubts concerning the solutions included in the project documentation arising during the tendering procedure for the selection of the construction works and project implementation.

3. replenishing detail design documentation and explanation of doubts in this respect in the course of the investment,

4. cooperate closely with all participants of the construction process, in particular as regards:

a) agree on the possibility of introducing changes in the project documentation or replacement solutions,

b) assist the investor's supervision in the control (monitoring) the compliance of the works of construction of the project documentation,

c) participate in committees and meetings of technical acceptance at the construction site.

5. activities connected with the exercise of the author's supervision on every call the Employer

6. ongoing monitoring ongoing construction works and arrival of the construction site or to the place indicated by the Purchaser to his every call, in order to resolve any arising in the course of the works have concerns with the solutions adopted in the documentation (the arrival of the construction should take place within 2 days date of the communication - fax, phone, or in another agreed with the Purchaser date).

953, as amended. d.)

8. ensuring that the scope of the changes did not cause significant change in the approved project construction, which requires obtain a new building permit / not to permit the implementation of road investment,

9. The supervision will be exercised only in the case come into effect the tender procedure for the selection of the Contractor's works, execution of works covered by documents constituting the object of the contract.

II.1.4).

Architectural, construction, engineering and inspection services

Gmina Lublin | Published March 11, 2017  -  Deadline March 22, 2017
cpvs
71000000

The contract scope includes:

Stage I (concept):

1.1. obtaining current maps for design purposes,

1.2. develop the necessary inventory of urban (scale 1: 1000), architecture (scale 1: 200 or 1: 100), dendrological for design purposes and demolition,

1.3. develop two concepts (after 6 copies.)

1.4. agreeing on the concept of the customer.

Requirements for the concept:

Map for design purposes - the Contractor is required to obtain updated maps for design purposes (to a scale depending on the type of construction of the proposed facility for the area covered by the contract plus the statutory 30 m range, including areas adjacent to the border development).

The concept - a proposal geometry solutions, technical, technological, the basic infrastructure and accompanying allows to verify the vision of designer and her reference to the requirements of the Purchaser.

Krochmalna / Gas / Mill / Stadionowa, while the second is to include solutions targeted to the possible reconstruction of the roundabout to ensure proper communication service towards Wikia contributor to the LOF.

Stage II (Multi-documentation Design estimates).

Stage III (feasibility study):

- Feasibility study.

Requirements for the feasibility study:

1. A feasibility study should be drawn up in 3 copies.,

2. The feasibility study must be done for all the material scope of the project entitled .: "Integrated Communication Centre for Functional Lublin area."

The feasibility study should be developed in the generator applications available on the websites of the Marshal Office of Lublin and in hard copy.

Krochmalna / Diamond, for which a separate agreement is developed technical documentation.

It is the duty of the Contractor is also to make changes, corrections, additions feasibility study during the evaluation of the project by the Managing Authority for the signing of the financing agreement for the project.

Stage IV (supervisions)

1. author's supervision at the stage of the tender process for selection of the contractor for construction work,

2. author's supervision during construction works.

Requirements for the author's supervision:

Changes)

2. clarifying doubts concerning the solutions included in the project documentation arising during the tendering procedure for the selection of the construction works and project implementation.

3. replenishing detail design documentation and explanation of doubts in this respect in the course of the investment,

4. cooperate closely with all participants of the construction process, in particular as regards:

a) agree on the possibility of introducing changes in the project documentation or replacement solutions,

b) assist the investor's supervision in the control (monitoring) the compliance of the works of construction of the project documentation,

c) participate in committees and meetings of technical acceptance at the construction site.

5. activities connected with the exercise of the author's supervision on every call the Employer

6. ongoing monitoring ongoing construction works and arrival of the construction site or to the place indicated by the Purchaser to his every call, in order to resolve any arising in the course of the works have concerns with the solutions adopted in the documentation (the arrival of the construction should take place within 2 days date of the communication - fax, phone, or in another agreed with the Purchaser date).

953, as amended. d.);

8. ensuring that the scope of the changes did not cause significant change in the approved project construction, which requires obtain a new building permit / not to permit the implementation of road investment,

9. The supervision will be exercised only in the case come into effect the tender procedure for the selection of the Contractor's works, execution of works covered by documents constituting the object of the contract.

Architectural, construction, engineering and inspection services

Gmina Lublin | Published March 24, 2017  -  Deadline March 29, 2017
cpvs
71000000

The contract scope includes:

Stage I (concept):

1.1. obtaining current maps for design purposes,

1.2. develop the necessary inventory of urban (scale 1: 1000), architecture (scale 1: 200 or 1: 100), dendrological for design purposes and demolition,

1.3. develop two concepts (after 6 copies.)

1.4. agreeing on the concept of the customer.

Requirements for the concept:

Map for design purposes - the Contractor is required to obtain updated maps for design purposes (to a scale depending on the type of construction of the proposed facility for the area covered by the contract plus the statutory 30 m range, including areas adjacent to the border development).

The concept - a proposal geometry solutions, technical, technological, the basic infrastructure and accompanying allows to verify the vision of designer and her reference to the requirements of the Purchaser.

Krochmalna / Gas / Mill / Stadionowa, while the second is to include solutions targeted to the possible reconstruction of the roundabout to ensure proper communication service towards Wikia contributor to the LOF.

Stage II (Multi-documentation Design estimates).

Stage III (feasibility study):

- Feasibility study.

Requirements for the feasibility study:

1. A feasibility study should be drawn up in 3 copies.,

2. The feasibility study must be done for all the material scope of the project entitled .: "Integrated Communication Centre for Functional Lublin area."

The feasibility study should be developed in the generator applications available on the websites of the Marshal Office of Lublin and in hard copy.

Krochmalna / Diamond, for which a separate agreement is developed technical documentation.

It is the duty of the Contractor is also to make changes, corrections, additions feasibility study during the evaluation of the project by the Managing Authority for the signing of the financing agreement for the project.

Stage IV (supervisions)

1. author's supervision at the stage of the tender process for selection of the contractor for construction work,

2. author's supervision during construction works.

Requirements for the author's supervision:

Changes)

2. clarifying doubts concerning the solutions included in the project documentation arising during the tendering procedure for the selection of the construction works and project implementation.

3. replenishing detail design documentation and explanation of doubts in this respect in the course of the investment,

4. cooperate closely with all participants of the construction process, in particular as regards:

a) agree on the possibility of introducing changes in the project documentation or replacement solutions,

b) assist the investor's supervision in the control (monitoring) the compliance of the works of construction of the project documentation,

c) participate in committees and meetings of technical acceptance at the construction site.

5. activities connected with the exercise of the author's supervision on every call the Employer

6. ongoing monitoring ongoing construction works and arrival of the construction site or to the place indicated by the Purchaser to his every call, in order to resolve any arising in the course of the works have concerns with the solutions adopted in the documentation (the arrival of the construction should take place within 2 days date of the communication - fax, phone, or in another agreed with the Purchaser date).

953, as amended. d.)

8. ensuring that the scope of the changes did not cause significant change in the approved project construction, which requires obtain a new building permit / not to permit the implementation of road investment,

9. The supervision will be exercised only in the case come into effect the tender procedure for the selection of the Contractor's works, execution of works covered by documents constituting the object of the contract.

Architectural, construction, engineering and inspection services

Gmina Lublin | Published March 23, 2017  -  Deadline March 28, 2017
cpvs
71000000

The contract scope includes:

Stage I (concept):

1.1. obtaining current maps for design purposes,

1.2. develop the necessary inventory of urban (scale 1: 1000), architecture (scale 1: 200 or 1: 100), dendrological for design purposes and demolition,

1.3. develop two concepts (after 6 copies.)

1.4. agreeing on the concept of the customer.

Requirements for the concept:

Map for design purposes - the Contractor is required to obtain updated maps for design purposes (to a scale depending on the type of construction of the proposed facility for the area covered by the contract plus the statutory 30 m range, including areas adjacent to the border development).

The concept - a proposal geometry solutions, technical, technological, the basic infrastructure and accompanying allows to verify the vision of designer and her reference to the requirements of the Purchaser.

Krochmalna / Gas / Mill / Stadionowa, while the second is to include solutions targeted to the possible reconstruction of the roundabout to ensure proper communication service towards Wikia contributor to the LOF.

Stage II (Multi-documentation Design estimates).

Stage III (feasibility study):

- Feasibility study.

Requirements for the feasibility study:

1. A feasibility study should be drawn up in 3 copies.,

2. The feasibility study must be done for all the material scope of the project entitled .: "Integrated Communication Centre for Functional Lublin area."

The feasibility study should be developed in the generator applications available on the websites of the Marshal Office of Lublin and in hard copy.

Krochmalna / Diamond, for which a separate agreement is developed technical documentation.

It is the duty of the Contractor is also to make changes, corrections, additions feasibility study during the evaluation of the project by the Managing Authority for the signing of the financing agreement for the project.

Stage IV (supervisions)

1. author's supervision at the stage of the tender process for selection of the contractor for construction work,

2. author's supervision during construction works.

Requirements for the author's supervision:

Changes)

2. clarifying doubts concerning the solutions included in the project documentation arising during the tendering procedure for the selection of the construction works and project implementation.

3. replenishing detail design documentation and explanation of doubts in this respect in the course of the investment,

4. cooperate closely with all participants of the construction process, in particular as regards:

a) agree on the possibility of introducing changes in the project documentation or replacement solutions,

b) assist the investor's supervision in the control (monitoring) the compliance of the works of construction of the project documentation,

c) participate in committees and meetings of technical acceptance at the construction site.

5. activities connected with the exercise of the author's supervision on every call the Employer

6. ongoing monitoring ongoing construction works and arrival of the construction site or to the place indicated by the Purchaser to his every call, in order to resolve any arising in the course of the works have concerns with the solutions adopted in the documentation (the arrival of the construction should take place within 2 days date of the communication - fax, phone, or in another agreed with the Purchaser date).

953, as amended. d.)

8. ensuring that the scope of the changes did not cause significant change in the approved project construction, which requires obtain a new building permit / not to permit the implementation of road investment,

9. The supervision will be exercised only in the case come into effect the tender procedure for the selection of the Contractor's works, execution of works covered by documents constituting the object of the contract.

Construction work

Uniwersytet Medyczny w Lublinie | Published May 5, 2015  -  Deadline June 15, 2015
cpvs
45000000, 45100000, 45111200, 45200000, 45214000, 45214400, 45223000, 45231300, 45232140, 45300000, 45330000, 45331000, 45310000, 45311000, 45315100, 45311100, 45316000, 45333000, 45400000

Lot related to the implementation of the contract: 21/7, 21/6, 20/1, 12/13, 21/4, 5/7, 5/4, 5/6, 5/11 Basic data: Dimensions: 23,25m x 54,16m Height: 24,87m Building area: 1,212 m2 area: 3722.83 m2 including: - the base surface 1418.90 m2 - 2303.93 m2 5.1.8 Auxiliary standards ISO 9836: 1997): 3722 83 m2 motion: 1,957.31 m2 Volume: 44635 m3 The scope of works for a building project: Demolition works: - demolition of the building after canteen - demolition of existing concrete road surface with paving elements with substructures - the demolition of the existing cement concrete pavement - okrawężnikowań demolition of existing roads, sidewalks square and Construction: - earthworks, - making security excavation in the form of the Berlin wall - shuttering, reinforcement and concrete and slab preceded with installation - running under the plate, - formwork, reinforcement and concrete walls, stairs, - installation of ceilings, - installation of roof construction and roofing, - bricklaying - basement walls, ground floor, I - IV floors - installation of curtain walls, - making the facade of the building - finishing works: construction of partition walls, installation of joinery, manufacture of flooring, internal installations, painting works. - Execution of earthworks forming surface troughs execution of road - setting concrete curbs and edges on the benches of concrete - made of layers of aggregate pavement base courses stabilized with cement and lean concrete - execution of pavement wearing courses with concrete paving stones Sanitary: The proposed building will be fed with water from the municipal water mains, sanitary sewage disposal is expected to the municipal sanitary sewer, stormwater (rain) will be discharged into the municipal storm sewer system, heating medium is supplied to the building of the district heating network. - Installation of water and fire. - Installation of drainage system. - Installation of central heating and process heat. - Ventilation and air conditioning systems for medical gases and compressed air and low voltage electrical installations - main switchboard, distribution bunk, computer switchboards. As part of the backup power cogeneration system is expected to maintain the unit working in case of power failure. - Installation of basic lighting, emergency, specialist and exterior - electrical installations (installation of utility outlets 230V, 230V circuits installation of computer, installation of power and control of ventilation and air-conditioning. - Lightning protection, grounding, equalizing. - Installation of appliances - nurse call system - the system BMS - gas detection system - fire alarm system - CCTV system - installation of structured cabling Object of the contract does not include: - delivery of audiovisual equipment - delivery of kitchen equipment, - supply of medical furniture and medical equipment, F12, F13, F14), - supplies active CCTV system. Common Dictionary CPV 45000000-7 - Construction, 45100000-8 - Site preparation work, 45111200-0 - Construction work Site preparation and earthworks, 45200000-9 - Construction work for erection of complete buildings and work in civil engineering and water projects 45214000-0 - Construction work for buildings relating to education and research 45214400-4 - Construction work for buildings relating to higher education 45223000-6 - Construction work for construction, 45231300-8 - Construction work for construction of water supply and sewage pipelines, 45232140-5 - Construction work for local heating networks, 45300000-0 - Building installation work, 45330000-9 - Works Plumbing and sanitary 45331000-6 - installation of heating, ventilation and air-conditioning 45310000-3 - Electrical installation work 45311000-0 - Construction work for wiring and electrical installations 45315100-9 - electrical engineering installation works 45311100-1 - Construction work for electrical wiring, 45316000-5 - Installation work of illumination and signaling 45333000-0 - Gas installation work, 45400000-1 - Finishing works for buildings. The effects of any errors in the cost estimates prepared by the Contractor borne by the Contractor of the contract - must predict all circumstances that may affect the price of the contract and include them in the cost estimate. The Employer recommends a site visit to get acquainted with important