Call +44 800 9755 164

Public tenders for construction in Legnica Poland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Legnica: Selection of Contractor's works: Design and construction of the roof grandstands B, C, D city stadium in Legnica in the formula design and build - as part of the investment -Rozbudowa Stadium Sports them. White Eagle.

Prezydent Miasta Legnicy | Published July 21, 2016  -  Deadline July 10, 2017
The stadium is located in the city park the register of monuments - the decision of the Regional Conservator A / 1712 dated 30.03.2010r. Object of the contract includes: designing roofing grandstands B, C, D, ie .: 4, paragraph 4) of the draft contract; 2) a reconciliation of design solutions designers of the Company above. in connection with the copyright designers to design the roof; 3) Presentation of and agreement with the Employer and the User - Sport and Recreation Center in Legnica, the design concept, which will be the basis for the design documentation for the execution of the tasks - 2 copies. + Electronic version on CD - within two months from the date of agreement, 4) Obtaining all necessary for the development of complete design documentation required by laws and regulations, administrative decisions, technical conditions, agreements, opinions and checks, including, inter alia: a) agreed with the Lower Silesian Provincial Conservator of monuments Delegation in Legnica, b) permits Regional Conservator to conduct the work, c) the building permit until 30.01.2017r. 5) Development of design documentation according to the agreed design concept - to 20.12.2016r. a) construction project - 5 copies. b) draft regulations - 4 copies; c) the technical specification of the workmanship and the receipt of work - 3 copies. d) project documentation in an electronic version on CD - 2 copies. 2. Performing the author's supervision. The scope of works related to roofing of the stands: B (west), C (south), D (north), with a total building area of ​​about 3.400m2, includes the construction, among other things: a) to make a roof stands on the roof of the pattern A and the works related to based on the made and approved by the Employer and the user design documentation, and 4. the contractor will design and execute also provides the following scope of work: 1) the performance of the rear guard stands to protect against jamming of rain, for example. wiatroprzepuszczalne banners, to use visual advertising, in addition to securing the stands for ie visiting fans. D stands before transmission or retraction grandstand prohibited from the parking lot for buses and cars guests; 2) decommissioning located on the stands of steel lighting poles, stand B - 6 pieces, stand C - 4 pieces, stand D - 4 pieces, and speakers and light fixtures, two speakers, two light fixtures on each; 3) installation of new speakers on the roof structure stands with parameters not worse than the existing ratio and low voltage electrical installations, commissioning; 4) performance of LED lighting on the roof structure, the impact of electrical and low voltage, commissioning; 5) execution of pipes from the roofs of the stands, the inclusion of storm sewer; 6) removal scoreboard located in the grandstand C and its reassembly in the grandstand D or other agreed place on a separate design, supply and installation of power control, start-up; 24m2 active screen mounted to the construction of the roof of the C or in a separate structure at another agreed place, 8) resurfacing przeciwwodnej grandstands B, C - upper level, a total of about 1350 m2 of replacing flashings, gutters and downpipes from the upper level of the stands; 9) surface repairs stands D - about 540 m2. Employer informs that the works will be performed on active sports facility on the pitch -I will held training sessions and league matches. 10 of this manual. If a description of the contract indicated any trademark, patent, or pochodzenie- be assumed that those patents, trademarks, origin define the technical parameters, operational utility, which means that the Purchaser is permitted bid in this part of the contract with the technical parameters, operational and functional not worse than those proposed by the Employer.

Legnica: Selection of Contractor for the development of project-estimate documentation in the framework of the investment project called Revitalization of the historic City Park in Legnica.

Prezydent Miasta Legnicy | Published July 25, 2016  -  Deadline December 15, 2016
Revitalization of the historic City Park in Legnica, including a concept Revitalization of the historic City Park, the execution of the construction project and the executive, and the investment cost estimate for Stage I, developed on the basis of the functional program annexed No. 9 to the Instructions to Bidders - Section 2 siwz. City Park is entered in the register of monuments decision of the Lower Silesian Heritage Conservator in Wroclaw of 30.03.2010r. under the number A / 1712. Object of the contract includes: a) the execution dendrological inventory of trees within the former channel Młynówka provided to the discovery and its surroundings, b) conducting surveys of archaeological research in the area of ​​the planned intake Młynówka to Goat Pond, near the relic bastion of the seventeenth century., C ) execution of the comprehensive concept of revitalization Park divided into stage I and stage II on the basis of the functional program constitutes Annex No. 9 to this manual, including obtaining the approval of the Mayor and the Lower Silesian Heritage Conservator, d) obtaining a decision on establishing the location of investment public purpose for phase I and II, e) to obtain a new water permit for water abstraction from Kaczawa Młynówka after the discovery of her bed and the drainage of the Goat Pond to Kaczawa, f) performance maps for design purposes to the extent necessary for the construction project and step g) the execution of the construction project and executive for the first stage by industry with przedmiarami works developed by KNR, by industry, h) the preparation of information on safety and health due to the nature of the proposed facility construction to include in the plan safety and health protection for the first stage, i) preparation of technical specifications for execution and acceptance of construction works for the first stage, j) drawing up the investment cost estimate by industry for the first stage, k) to obtain on behalf of the Municipality of Legnica technical conditions for connection to the media, the removal of collision for stage I, l) obtaining the required opinions, agreements, checks design solutions in the scope resulting from the provisions of the law, including an approved project of temporary traffic organization and approved project constant traffic organization for stage I, m) to obtain permission Lower Silesian Heritage Conservator for I step n) to obtain a building permit for the first stage. 1389). Organizing at the Purchaser at least once a month, working meetings and coordination with the presentation of the completed work and proposed design solutions. During the development of the Documentation Contractor is obliged to agree on a date designed solutions with the Departments of Municipal Infrastructure of the City of Legnica, Municipal Roads, Road Traffic Management Department of the City of Legnica, and owners and users of underground utilities. 5.Przygotowanie concept in electronic form and its visual presentation at the Purchaser.
  • 1