Call +44 800 9755 164

Public tenders for construction in Konstancin-jeziorna...

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Konstancin-Jeziorna: Construction of both pedestrian and road from the street. Electricity to the Spa Park in Konstancin-Jeziorna

 | Published July 13, 2016  -  Deadline November 30, 2016
1. The contract is for the construction of pedestrian and trolley in Konstancin basis of works is the following technical documentation: a) The decision of the district administrator Piaseczyński building permit No. 957/2016 dated 06.24.2016 r, b) Tom and project construction executive road c) Volume II project construction executive electric d) technical specifications for execution and acceptance of construction works (STWiORB) of all trades, e) Geotechnical. f) design of small architectural elements to the Spa Park, in Konstancin-Jeziorna. Bills of quantities do not constitute a basis for the valuation of the offer. Electrical, and about the possible difficulties associated with the construction should notify residents in advance. 4. All construction industry must be in accordance with the issued technical conditions set out in the project documentation. 5. The Contractor will provide full support for geodesic works, including geodetic perform as-built inventory of all the works. 6. The Contracting Authority requires the guarantee of quality for the completed construction works which are the subject of a contract for a minimum of 48 months the period from the date of final acceptance or final acceptance of the removal of defects, if any are found. 7. It is recommended that contractors have made their own detailed inspection of the field. 8. Each of the Contractor bears full responsibility for the consequences of missing or erroneous diagnosis of the conditions of this contract. 9. Purchaser does not provide for granting an advance on the performance of the contract. In case of conflict between the individual elements of the technical documentation Purchaser requests that identifying these discrepancies at the stage of the tender procedure, to be able to make a proper interpretation in the form of answers to the question. After signing the contract, during its implementation, in the event of a discrepancy, the Employer will interpret them on the fly, without the possibility of increasing the lump sum. 1-3 Public Procurement Law. In these circumstances, ordering a possibility of submitting the offer equivalent solutions, indicating that the minimum requirements to be met equivalents, this requirement is not worse than the parameters (materials and manufacturing technology) specified in the design documentation and STWiORB. The Contracting Authority will evaluate the equivalence of the materials on the basis of documents (maintenance manual, material card, etc.) Issued / published by the manufacturer of the material. 12. Lighting both pedestrian and road, benches and litter bins should be completed with the use of identical terms of visual design and quality, the effects of the nearby spa park. Benches and litter bins should be made in accordance with the documentation referred to 1 point f).
  • 1