Adaptation of rooms of the building club Energetyk the needs of Youth Culture in Konin - Phase I.

 | Published October 6, 2014  -  Deadline October 23, 2014
cpvs
45212300

The contract involves the reconstruction of the building at ul. Industrial 3D in Konin to the needs of Youth Culture including: 1. in thermomodernization: - demolition of the exterior of the existing facade - demolition of the balconies - the demolition of steel screens on the roof - insulation of the walls and the construction of a new façade, - insulation and roofing along with treatments plumber, - installation of the necessary windows and doors - making the missing bands in the building. 2.dobudowę closed in the rough back-stage, 3.przystosowanie building to the new features: - demolition and construction of new stairs, - the implementation of headroom elevator - smoke exhaust damper assembly, 4.przebudowę flyover communication between the street and Industry and the main entrance to the building in terms of - demolition of part of the flyover and auxiliary room in the basement - the demolition of other elements of the wharf, - construction of flyovers, - surface flyover. 5.przygotowanie room at the substation - making a new entrance and walled existing door - finishing works of walls, ceiling and floors, - plumbing: water supply, sanitary sewer, sump Cooling. 6.If electrical installations - construction of a new lightning protection system - the execution of the facade lighting - lighting performance flyover ..

Reconstruction of drainage ditches within the Konin-Międzylesie.

 | Published October 9, 2014  -  Deadline October 28, 2014
cpvs
45240000, 45232130, 45112100, 90470000

The subject of the contract is works related to reconstruction and restoration of existing drainage ditches within Konin Międzylesie. Scope of the contract; 1.Przebudowa ditch No 0010.R.KWG-D6A - Episode D21 - W1 (C12) - involving the construction of the pipeline as an extension of the existing pipeline fi800 mm - channel of PVC pipe with a diameter of 800mm and length. 134,5m and the introduction of water outlet fi1000mm to ditch 0008.R.KWG-D4 channel of PVC pipe with a diameter of 1000mm and length. 179m. The total length of the pipeline trench 313,5m 2.Przebudowa No 0010.R.KWG-D6 - involving the diversion ditch section C12 - A7 and the construction of a new section of the ditch of dł.146,5m and the elimination of the existing route of the ditch section section C12 - A7 length. 155m. 3.Przebudowa ditch No 0010.RKWG-D5 - involves the diversion ditch section section F2 - D13 and the construction of a new section of the ditch of dł.169m and the elimination of the existing route of the ditch section F2 - D13 length. 223m 4.Odtworzenie ditches No 07 ÷ 02 for length. 141m, No. 02 ÷ 0008.R.KWG-D7 and D5 No 0008.RKWG-sections A7-F2 and D13-RD7 length. 188m - Works for cleaning and removing namułu from the bottom of ditches and culverts, odmulanej thickness of 20cm, hand mowing grass and lichen from the bottom and slopes, shear and grubbing of woods ..

CONSTRUCTION OF THE SECONDARY pitch No. 7 in Konin.

 | Published October 17, 2014  -  Deadline November 4, 2014
cpvs
45212221, 45231300

Object of the contract includes the execution of: 1) field for team games (handball, tennis, volleyball, basketball) with a polyurethane synthetic surface, with dimensions of 30.0 x 42.0 m; 2) football field with synthetic grass surface, with dimensions of 36.0 x 66.0 m; 3) piłkochwytów - fencing around the fields; 4) drainage fields - by French drainage and drainage channels to the drainage channels of the retention system - rozsączającym; 5) demolition and preparation and planting of trees.

Design and construction of photovoltaic panels on the roof of the building of the Provincial Road Traffic Centre in Konin.

 | Published October 17, 2014  -  Deadline November 3, 2014
cpvs
71320000, 71323100, 71523000, 45000000, 45260000, 45261215

Implementation of a comprehensive project documentation and construction of the photovoltaic system to the needs of the Provincial Road Traffic Centre in Konin part of the task design and construction of photovoltaic panels on the roof of the Provincial Road Traffic Centre in Konin ..

Waste collection from property owners from the area of ​​the Commune Brzeżno.

 | Published October 31, 2014  -  Deadline November 14, 2014
cpvs
90500000, 90512000, 60513100

1. The contract is for the provision of comprehensive services consisting in the delivery of municipal waste from property owners living in the commune Brzeżno and their transport to the transfer station in Mielenku Drawskie functioning in the framework of the Regional Department of Waste Management in Słajsinie in accordance with applicable national laws and enactments of local law. 2. The service referred to in paragraph. 1 include in particular: 1) waste collection from property owners, resulting in residential real estate from the community Brzeżno and transport to the station the following types of waste: a) non-selective municipal waste (mixed); b) separately collected municipal waste: processing and paper and paperboard; -tworzywa Plastics, metals; -opakowania multimaterial; -szkło white and color; -odpady biodegradable; -zużyte batteries and accumulators; -zużyty electrical and electronic equipment; -przeterminowane drugs and chemicals (paints, solvents, waste oil, etc.). -Furniture and other bulky waste; -zużyte tires; -odpady construction and renovation, and demolition. 2) equipment outlets: Team Health and pharmacy point located in the commune Brzeżno in containers for collection of overdue medicines and their evacuation and transportation to the nearest point of disposal; 3) updating the data collection centers (PGO), PGO equipment in containers, or containers and bags, or bags (to be agreed between the Employer and the Contractor) for the collection of municipal waste, and maintaining the containers in good sanitary condition, order and technical ; 4) development of Permanent Schedules municipal waste collection; 5) maintaining documentation related to the contract. 3. A detailed description of the implementation of the contract contains Annex 8 hereto.

Site supervision IMPLEMENTATION OF INVESTMENT OBJECTIVES PN. CONSTRUCTION OF ROADS - SWITCH FROM ul.Przemysłowa TO UL.KLECZEWSKIEJ In KONIN

 | Published November 14, 2014  -  Deadline December 9, 2014
cpvs
71247000

The contract is to perform multi-discipline construction supervision company for road construction, sanitation, electricity, telecommunications over the implementation of the investment task. Construction of the road - the connector from the street. Industrial to the street. Kleczewska in Konin. The scope of work of contractors that are subject to supervision inwestorskiemu, m.in .: - preparatory works, including the felling of trees, - earthworks for the proposed pavement - road construction - construction of pavement, - construction of pedestrian and bicycle, - the construction of street lighting - Construction of storm water drainage - drainage ditch surface to the road, - rebuilding a drainage ditch, - construction of culverts double rectangular 2 x150x150 - construction of culvert fi 600, - construction of collectors, - reconstruction of telecommunication cable, - the construction of a technological channel with control wells, - protection of high-pressure pipeline - construction maneuvering site - demolition fence - demolition of garage sheet, - installation of nesting boxes for birds.

Construction work for roads

Urząd Miejski | Published November 19, 2014  -  Deadline December 11, 2014
cpvs
45233120, 45100000, 45110000, 45112710, 45200000, 45232440, 45232310, 45213311, 45231400, 45316110, 34922100

Roboty w zakresie budowy dróg

Reconstruction of drainage ditches within the Konin-Międzylesie.

 | Published December 4, 2014  -  Deadline December 19, 2014
cpvs
45240000, 45232130, 45112100, 90470000

1. Reconstruction of the trench No. 0010.R.KWG-D6A - Episode D21 - W1 (C12) - involving the construction of the pipeline as an extension of the existing pipeline fi 800 mm - channel with plastic pipes class SN greater or equal to 10 kN / m2 with a diameter of 800mm and length. 134,5m and the introduction of water outlet fi 1000mm to 0008.R.KWG-D4 ditch, channel, plastic pipes class SN greater or equal to 10 kN / m2 with a diameter of 1000mm and length. 179m. The total length of the pipeline trench 313,5m 2.Przebudowa No. 0010.R.KWG-D6 - involving the diversion ditch section 12 - A7 and the construction of a new section of the trench and the elimination of dł.146,5m ditch the current route section, section 12 - A7 length. 155m. 3.Przebudowa ditch No. 0010.R.KWG-D5 - involves the diversion ditch section section F2 - D13 and the construction of a new section of the trench and the elimination of dł.169m ditch the current route section F2 - D13 length. 223m 4.Odtworzenie Ditch No. 07 ÷ 02 for long. 141m, No. 02 ÷ 0008.R.KWG-D7 and no 0008.RKWG-D5 on the sections of the A7-F2 and D13-RD7 length. 188m - Works for the treatment and removal of the bottom namułu ditches and culverts, odmulanej thickness of 20cm, manual mowing grass and lichen from the bottom and slopes, shear and grubbing woods ..

STREET CONSTRUCTION NASTURCJOWEJ in Konin.

 | Published December 23, 2014  -  Deadline January 8, 2015
cpvs
45233120, 45100000, 45231300, 45310000, 45316110

The contract is for the construction of street Nasturcjowej in Konin with complex lighting and drainage. The material scope of the contract includes the execution: 1.Robót traffic - foot building -jezdni - L. 0.079 km Works 1.1 measurements. 1.2 Construction and demolition and preparatory. 1.3 Works of earth. 1.4 Installation of the ducts on the existing gas network. 1.5 Setting the curb and beads. 1.6 paving the road with bkb (gray) - 411.3 m². 1.7 paving the road with bkb (red) - 47.10 m². 1.8 paving with bkb (graphite) -228.20 m². 1.9 Conversion of existing weapons - wells and control valves. 1.10 Reconstruction of the existing pavement. 1.11 Connections of the existing road. 1.12 Green Road - 43.90 m² 1.13 Vertical markings. 2.Odwodnienia measuring Works 2.1. 2.2 Works of earth. 2.3 Channel PVC Ø 315 mm - 61.2 m. 2.4 Channels of PVC Ø 200 mm - 4.72 m. 2.5 Well inspection of concrete rings Ø 1200 mm - 2 sets. 2.6 Spline drains cast iron D400 - 2 sets. 3. Electrical Works 3.1 Pose YAKY cable 4x25 mm² - 33,00 m 3.2 Installation of galvanized steel columns height. 9.0 m with 1.0 m boom arc 60W LED luminaire with the regulator and the programmer mocy.- 1 set.

Road construction works

Urząd Miejski | Published March 10, 2015
Winner
COPROSA POLSKA Sp. z o.o.
cpvs
45233120, 45100000, 45110000, 45112710, 45200000, 45232440, 45232310, 45213311, 45231400, 45316110, 34922100

The contract includes the construction of n. sections of road - switch - segment AB - from km 0 + 1 + 000.00 to 161.85, - Episode BC - from km 0 + 1 + 000.00 to 076.66, - Episode CM - from km 0 + 000 00 to 0 + 013.55 - BD section - from km 1 + 2 + 076.66 to 564.98, - section EF - from km 0 + 0 + 840.50 to 395.00, - section GH - from km 2 + 2 + 200.95 to 540.00, - Episode KL - from km 1 + 2 + 860.00 to 193.14, Scope of work: - preparatory works including felling of trees, - works for the designed surfaces - road construction - construction of pavement sections: BD; BC; EF; GH; KL; CM - Construction of pedestrian and bicycle sections: AB; BD; BC; CM - Construction of street lighting connector sections: AB; BC; BD; EF; GH; KL; CM, - construction of storm water drainage connector sections: AB; BC; BD; EF; GH; KL; CM - surface drainage into the ditch on the stretch of road BD, GH - rebuilding a drainage ditch on the section BC rain collector Ø 800, - construction of culverts double rectangular section 2 x150x150 BD - construction of the culvert diameter section 600 BD - construction of collectors BD section, - rebuilding telecommunication cable segment AB, - construction of a technological channel with control wells on sections AB; BCM; BD - securing high-pressure pipeline DN-100 on the segment AB; BD - the construction site of the natural surface maneuvering of 0/25, - the demolition of the fence - the demolition of the garage with metal, - installation of 100 nesting boxes for birds.

Engineering design services

Urząd Miejski | Published April 18, 2015  -  Deadline May 26, 2015
cpvs
71320000

The contract is for: to develop project-estimate documentation under the name: New course of national road No. 25 in Konin. The aim of the study is to perform a conceptual design, construction project execution, regulatory, obtaining all the necessary opinions, agreements and checks design solutions to the extent arising from the provisions, speech on behalf of the contracting authority for a decision ZRID and the development of tender documents for the job named "New national road mileage No. 25 in Konin ". This documentation is intended to make a call with the investment already made on the basis of project documentation; "The construction of the Warta river crossing - a new course of national road No. 25" within the limits of the town of Konin with particular emphasis on collision-free connection of the existing transportation system.

Credit granting services

Miejskie TBS Sp. z o.o. w Koninie | Published October 31, 2015  -  Deadline December 10, 2015
cpvs
66113000

Granting of long-term loan in the amount of 5 000 000 PLN to finance the project entitled: Construction of two residential buildings with land development at ul. Pilsudski in Konin - Bud. 1 and 2.

"The granting of long-term loan in the amount of PLN 5 000 000 to finance the project entitled" Construction of two residential buildings with land development at ul. Pilsudski in Konin - Bud. 1 and 2.. "

Miejskie TBS Sp. z o.o. w Koninie | Published February 17, 2016
Winner
Bank Spóldzielczy w Koninie
cpvs
66113000

"The granting of long-term loan in the amount of PLN 5 000 000 to finance the project entitled" Construction of two residential buildings with land development at ul. Pilsudski in Konin - Bud. 1 and 2 ".

Reconstruction of Kosciuszko Street with lighting and drainage - Phase II

 | Published April 13, 2016  -  Deadline May 5, 2016
cpvs
45233000, 45112000, 45111000, 45231000, 45231300, 45316110

The contract is for reconstruction of Kosciuszko Street in Konin on the section from the street. Z. Urbanowska to the street. A. Mickiewicz length of approx. 260 m, including m.in .: 1. Implementation of road construction as traffic KR3 and the surface of the MMA - approx. 1,550 m2. 2. Implementation sidewalks with concrete paving bezfazowej gr. 8 cm - approx. 1,440 m2. 3. Execution exits concrete paving bezfazowej gr. 8 cm - approx. 215 m2. 4. Execution of the parking lot with concrete paving bezfazowej gr. 8 cm - approx. 986 m2. 5. Execution of storm water drainage pipes, reinforced concrete Ø 500 - approx. 336m along the grooves of storm water drainage, drains Ø 200 and concrete inspection chambers Ø 1200. 6. Implementation of the inlet concrete pond located in the city park them. F. Chopin and connection to drainage system Ø 300. PVC pipe 7. The construction of street lighting: steel poles, galvanized, round-conical - 9units., LED luminaires 71W- 8 pcs, LED luminaire 108W - 1 pc., Cable YAKY 4x25 mm2 - approx. 314m, 8. Implementation of labeling constant traffic organization - the posts of road signs - 10 discs road signs - 13 pcs., markings approx. 30 m2. 9. Execution of works associated m.in .: demolition, earthworks, steel grille protection of trees, humus and sow grass, regulation of underground ..

Konin: Construction of the pavement in the district road No. 3219P Genevieve - Kuna

Zarząd Dróg Powiatowych | Published July 14, 2016  -  Deadline July 13, 2016
Winner
Kolbet Sp. z o.o., Police Średnie 48, 62-604 Kościelec, kraj/woj. wielkopolskie.
cpvs
45233222

1) performance of preparatory works and demolition 2) execution of drainage, 3) execution of earthworks, 4) laying curbs and concrete edges on the bench of concrete, 5) execution of bus bay, conventions and pavement, 6) performance play surface, 7) execution guardrails, 8) execution of vertical signage, 9) finishing works ..

Konin: Construction of county road No. 3180P section Kaliska - Gogolin - Wielkopole (municipality Kleczew and Wilczyn commune) in the construction during the foot - bicycle

Zarząd Dróg Powiatowych | Published July 14, 2016  -  Deadline September 30, 2016
cpvs
45233140

1) performance of preparatory work, 2) the execution of earthworks, 3) laying curbs and concrete edges on the bench in concrete with sewage with concrete cobblestones, 4) the implementation of elements of dehydration 5) carrying the surface with asphalt concrete, 6) performance of vertical signage . The planned project includes the construction of over foot - bicycle along by ongoing construction of county road No. 3180P. Construction work will be carried out within the site passed Contractor works related to the construction of the county road. Transfer of the construction site will take place with the participation of a contractor to build the county road ..

Konin: Development of project - costing FOR THE TASKS: 1. Reconstruction of the county road No. 3180P section Wilczyn - Kownaty 2. Redevelopment of the district road No. 3220P Brzeźno - Krzymów 3. Reconstruction of the county road No. 4313P Bystrica - Czarnybród

Zarząd Dróg Powiatowych | Published July 20, 2016  -  Deadline July 28, 2016
cpvs
71240000

The contract is for the development of the design - cost estimate for the job: PART I: Reconstruction of the county road No. 3180P section Wilczyn - Kownaty including: 1.1. The update map situational - height on a scale of 1: 500 or 1: 1000 1.2. Maps of land records, along with excerpts from the land register 1.3. Development of photographic documentation and inventory of the existing 1.4. Develop an inventory of greenery 1.5. Building and implementing reconstruction of the road with intersections - between the intersection of DP3176P to the county boundary 1.6. Construction project and the refurbishment of the drainage 1.7. Project constant traffic organization together with the arrangements and the opinions and approval of 1.8. Bills of quantities and cost estimates for each industry investor; bills of quantities and estimates Investor should be developed with the division into two phases investment (range of individual stage will be agreed at the stage of preparation of documentation) 1.9. Detailed technical specifications of the workmanship and the receipt of work for every industry 1.10. Obtaining all necessary decisions, opinions, agreements and checks design solutions in the field resulting from the applicable provisions 1.11. Obtaining a water permit to drain rainwater from the roadway, if required 1.12. Preparation of documents necessary for filing works does not require a building permit or obtaining a decision on the building permit / ZRID 1.13. Preparation of construction documentation and the executive in PDF format. Basic technical parameters of the reconstruction of the road - category road - district - Length of the road - about 2.0 km from the intersection with county road No. 3176P to the border district of Konin - class road - L - Widening of existing road - intersections with existing roads channeled or ordinary execution of new and reconstruction of the existing culverts, if necessary. - The sidewalks along the entire length of the road (reconstruction of existing and construction on the missing section) PART II: Reconstruction of the county road No. 3220P Brzeźno - Krzymów including: 2.1. The update map situational - height on a scale of 1: 500 or 1: 1000 2.2. Maps of land records, along with excerpts from the land register 2.3. Development of photographic documentation and inventory of the existing 2.4. Building and implementing reconstruction of the road with intersections 2.5. Construction project and the refurbishment of the drainage 2.6. Project constant traffic organization together with the arrangements and the opinions and approval of 2.7. Bills of quantities and cost estimates for each industry investor; bills of quantities and estimates Investor should be developed with the division into two phases investment (range of individual stage will be agreed at the stage of preparation of documentation) 2.8. Detailed technical specifications of the workmanship and the receipt of work for every industry 2.9. Obtaining all necessary decisions, opinions, agreements and checks design solutions in the field resulting from the applicable provisions 2.10. Obtaining a water permit to drain rainwater from the roadway, if required 2.11. Preparation of documents necessary for filing works does not require a building permit or obtaining a decision on the building permit / ZRID 2.12. Preparation of construction documentation and the executive in PDF format. Basic technical parameters of road reconstruction particular - category road - district - Length of the road - about 1.5 kilometers - class road - L - Widening of existing road - intersections with existing roads channeled or normal execution of new and reconstruction of existing culverts, if necessary. - Sided walkway along the entire length of the road PART III: Reconstruction of the county road No. 4313P Bystrica - Czarnybród including: 3.1. The update map situational - height on a scale of 1: 500 or 1: 1000 3.2. Maps of land records, along with excerpts from the land register 3.3. Development of photographic documentation and inventory of the existing 3.4. Develop an inventory of greenery 3.5. Building and implementing reconstruction of the road with intersections 3.6. Construction project and the refurbishment of the drainage 3.7. Project constant traffic organization together with the arrangements and the opinions and approval of 3.8. Bills of quantities and cost estimates for each industry investor; bills of quantities and estimates Investor should be developed with the division into two phases investment (range of individual stage will be agreed at the stage of preparation of documentation) 3.9. Detailed technical specifications of the workmanship and the receipt of work for every industry 3.10. Obtaining all necessary decisions, opinions, agreements and checks design solutions in the field resulting from the applicable provisions 3.11. Obtaining a water permit to discharge wó

Konin: Reconstruction ul. Konin in Rychwał within the county road No. 3321P

Zarząd Dróg Powiatowych | Published July 20, 2016  -  Deadline August 3, 2016
cpvs
45233142

1) construction measuring 2) milling of bituminous pavement 3) felling and grubbing stumps 4) demolition 5) execution of drainage 6) protection of existing utilities 7) laying concrete curbs 8) carrying the surface of the pavement 9) profiling the surface of the pavement 10) carrying the surface conventions and parking spaces 11) carrying the surface of the asphalt concrete 12) execution of marking the horizontal and vertical 13), finishing work.

Konin: Maintaining inland surface waters in the subregion of Konin in 2016. ITEM 1A

Wielkopolski Zarząd Melioracji i Urządzeń Wodnych w Poznaniu Rejonowy Oddział w Koninie | Published July 22, 2016  -  Deadline July 14, 2016
Winner
BUD-SERWIS Spółka z o.o. sp. k., Lisiec Wielki, ul. Rubinowa 57, 62-571 Stare Miasto, kraj/woj. wielkopolskie.
cpvs
45240000

The contract is for the execution of works related to maintenance (maintenance) in the proper condition of inland surface waters with hydro-technical structures located within the county Słupca. The contract includes the following tasks: buffalo buffalo It is located at km 6 + 890 is a weir with concrete abutments of the light 3.50 m closures szandorowymi of damming height of 1.20 m. The weir provides for the following work: manual mowing lichens from the slopes of the watercourse in the region works, measurements of excavation of the foundation, trenches and excavations carried out on the spoil Backhoes - the conduit recycle construction and demolition of the cofferdam earth, transfer the purchased material, profiling riverbed below the dam, pumping and maintenance of low water levels for a period of execution of works, demolition mechanical stone wall laid on cement mortar, demolition of hand laid stone walls in cement mortar, above 20 cm, cutting of heavy steel structures - dismantling the steel components of the weir, reinforcement of foundation slabs, vertical walls, abutments weir, reinforced concrete elements of the volume of the building 1,01-10 m3 - the execution of the bottom plate and the execution of the abutments, the rear guides closing, small locksmithing, installation railings and footbridges, the purchase of new guides, purification guides sealed by brushing manually cleaning by brushing the hand of steel structures, brushing steel structures primer for minium, brushing construction steel chlorinated rubber paint, along with re-numbering of buildings and character NPP, filling trenches with density bulldozer, construction, and we assume szandorów log with a thickness of 71 mm after ostruganiu, the execution of double ties with guts fascine with a diameter of 20 + 20 cm, strengthening the bowels and overhead fabric , the execution of rip-rap on the slopes and in the bottom of 10-12 cm, the purchase of land, land transport tractor trailer samowyład. purchased land and concrete, grading (finishing of purely) surface slopes of the area around the work, sow slopes in fertile soil, repair of roads and organize meadows (with grasses) connected with the transport of 200 cm. Task No. 2 - Renovation of the siphon on Channel B Warta 374.1 km. Repair covered inlet chamber and the outlet siphon. On the siphon provided the following works: construction of the cofferdam of the bags filled with a squeal of dismantling the inlet and outlet, excavations and the excavations carried out on the spoil Backhoes - unearthing outposts, pumping and maintenance of low water levels for a period of execution of works, cleaning of concrete surfaces, jet water pressure above 500 bar concrete surfaces not painted, vertical and horizontal + clean concrete slab under the building and groom expansion joints, concrete elements of up to 1.0 m3 - filling defect in the chamber and the outlet on the slopes below and above, repair of concrete and reinforced concrete - manual reprofiling walls with cement-polymer INDUFLEX 6060, purification guides sealed by brushing manually cleaning by brushing the hand of steel structures, brushing steel structures primer for minium, brushing steel structures chlorinated rubber paint, along with the renewal of numbering buildings, grading (finishing of purely) surface slopes of the area around the work, sow slopes in fertile soil. Task No. 3 - Channel B (Struga Grabienicka B) - 4.38 km Zagórów. At the watercourse at km 1 + 900-5 + 175 5 + 250-5 + 655, 6 + 055-6 + 755 provides for the following work: manual mowing lichens from the slopes of the watercourse at km 1 + 900-5 + 175 5 250 + -5 + 655 6 + 055-6 + 755, wygrabienie wykoszonych lichens km above, the mechanical removal of bedload from the stream layer 10 cm locally on a length of 500 m, the mechanical grading of excavated backhoe bulldozer 80 m3, hacking at the overgrown water surface to 60% km 1 + 900-5 + 175 5 + 250-5 + 655, 6 + 055-6 + 755, manual shear shrubs growing on the slope of the watercourse at the surface of 0.20 ha, the fragmentation of cut branches and bushes wood splitter surface 0.20 ha. Task No. 4 - Meszna - 13.08 km Meszna entirely flows through the area of ​​District Słupca. Maintenance adopted section at km 10 + 840- 23 + 920 in the towns: Koszuty Large Koszuty Lots, Młodojewo, Marcewo, Mieczownica and Kochowo. At the watercourse at km 10 + 840 - 23 + 920 - 13.08 km provided the following works: mowing lichens from the slopes of the watercourse at km 10 + 840 - 23 + 920, and the slopes and crown the dike at km 17 + 150 - 17 + 380 , wygrabienie wykoszonych lichens at km 10 + 840 - 23 + 920, and the slopes and crown the dike at km 17 + 150 - 17 + 380, hacking at the overgrown water surface area of ​​up to 30% at km 17 + 150 - 23 + 920, hacking the overgrown water surface area of ​​up to 60% at km 10 + 840 - 17 + 150, manual shear shrubs growing on s

Konin: Fabrication and installation of a platform for the disabled in the building PWSZ in Konin Street. Wyszynski 3c

Państwowa Wyższa Szkoła Zawodowa | Published July 25, 2016  -  Deadline November 15, 2016
cpvs
33196200, 42414100, 45310000

The contract is for construction and installation of the platform stairs to the transport of disabled people inside the building between floors 0, 1 and 2. The exact description of the contract is contained in Annex 1 to the Terms of Reference ..