Public tenders for construction in Konin Poland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Sanitary works

Przedsiębiorstwo Wodociagów i Kanalizacji Sp. z o.o. w Koninie | Published March 14, 2017  -  Deadline April 24, 2017
cpvs
45232460, 45231300

Gajowa, Witkiewicz, Matejko and Malczewski)

Subject of this contract is the execution and completion of the Works and remove them any defects within the meaning of the Conditions of Contract for Construction work for engineering works designed by the Employer ".

The scope of the proposed investment includes the following works:

160 / 9.5 L = 601.50

110 / 6.6 L = 286.50

63 / 5.8 mm L = 9.50 m

- Construction of water supply connections leads to the lane-PE SDR 80 - 11

32/3 mm = 271.50 m

- Installation nawiertek EGM / PE 160/63 - for connection of terminals - 1 set.

- Installation nawiertek EGM / PE 160/32 - for connecting leads - 17 kpl.

- Installation nawiertek EGM / PE 110/32 - for connecting leads - 23 kpl.

- Construction of a sanitary sewage system DN 600 L = 87 m

- Construction of a sanitary sewage system DN 500 L = 169

- Construction of a sanitary sewage system DN 200 L = 832 m

- Construction of a sanitary sewage system DN 160 L = 300

- Building wells expansion SR1, SR2 - 2 pcs.

- Position of casing pipe HDPE OPTO 40 L = 888 m.

A detailed description of the contract are presented in Volume II (OPZ) Terms of Reference, which is an integral part of the technical documentation placed on the website of the Employer.

Sanitary works

Przedsiębiorstwo Wodociagów i Kanalizacji Sp. z o.o. w Koninie | Published March 10, 2017  -  Deadline April 19, 2017
cpvs
45232460, 45231300

Subject of this contract is the execution and completion of the Works and remove them any defects within the meaning of "Conditions of Contract for Construction work for engineering works designed by the Employer".

The investment includes:

The construction of a sanitary sewage system with PVC pipes SN 8:

- Ø 200 L = 1323 m

- Ø 160 L = 1092 m

Construction of five sewage pumping stations with energy supply, lighting area, system control and monitoring and land development (main pumping PG; pumping Network PS1, PS2, PS3, PS4)

The construction of the discharge pipe

156 m - double trenchless crossing (at the bottom of a ditch on the plot 641/6; beneath the Canal Square, beneath the Channel Serious-Topiec and route Warsaw) made drilling controlled assembly of PE - 100 Ø 110/10 mm

400 m.

Positioning the casing pipe HDPE 40 mm for the purpose of the fiber length L = 1360 m.

A detailed description of the contract are presented in Volume II (OPZ) Terms of Reference, krórej integral part of the technical documentation is placed on the website of the Employer.

Works for complete or part construction and civil engineering work

Przedsiębiorstwo Wodociagów i Kanalizacji Sp. z o.o. w Koninie | Published March 18, 2017
cpvs
45200000, 71310000, 45230000, 71300000, 45232000, 71320000

Object of the contract is the design, execution and completion of the Works and remove them any defects in accordance with FIDIC Conditions of Contract according to rehabilitate the water main.

The scope of works includes the design and construction of:

Reconstruction of water main ø 500 on the section crossing the railway tracks Poznan and Warsaw (trenchless method) - approx. 275 m.

The contract involves the design and execution of renovation of the bus segment with a length of 275 m with a built-up on her chambers. Basic information and parameters of the pipeline to be built on the restoration, and the chambers are given in Volume III, "The functional and Utility" annexed hereto. The scope of works covered by PFU is located in a strip of public roads in the open, private land and the ground station.

Sanitary works

Przedsiębiorstwo Wodociagów i Kanalizacji Sp. z o.o. w Koninie | Published March 21, 2017  -  Deadline May 4, 2017
cpvs
45232460, 45231300

Subject of this contract is the execution and completion of the Works and remove them any defects within the meaning of "Conditions of Contract for Construction work for engineering works designed by the Employer".

The investment includes the construction of:

- Sanitary sewer pipes internally glazed stoneware socket DN 200 with a length L = 1909 m

- Sanitary sewer pipe jacking on both sides glazed stoneware DN 200 with a length L = 212 m

160 × 4.7 L = 415.5 m

200 x 5.9 mm, length L = 1.5 m

- Underground sewage pumping stations with energy supply, lighting area, system control and monitoring and land development

90 × 5.4 mm, length L = 1287 m.

The following changes in relation to the construction project:

- Withdraws from the construction of wells DN 1200: S2, S3, S4, S6, S9, S10, S12, S13, S28, S31, S34, S35, S47, S48, S50, S54, S58, S76, S80, S89,

- In place of the liquidated wells fitted tee Stoneware cup-glazed DN 200x160 45 degrees with a fitting transition - PVC-stoneware for the pin sections of sanitary sewage DN160 with lane: O1, O2, O3, O5, O6, O7, O10, O11, O31, A35, A36, O40, o41, O55, O56, Ø58, o61, O65, Ø66, O80, O81, O93, O94,

- At the end w / the pin DN160 pipeline from the roadway build in the well connection DN425 plastic support with telescopic adapter for cast iron manhole Heavy D400, reinforced concrete ring relief and cast iron manhole type D400.

Designation of inspection chambers and the pin was adopted as indicated in the building project.

A detailed description of the contract is contained in Volume II (OPZ), which is an integral part of the technical file placed on the website of the Employer.

Damage or loss insurance services

Miejski Zakład Gospodarki Odpadami Komunalnymi Sp. z o.o. w Koninie | Published February 3, 2017
Winner
Uniqa Towarzystwo Ubezpieczeń S.A.
cpvs
66515000, 66516000, 66516100

Part 01 of the contract:

a) property insurance against all risks,

b) insurance loss of profit,

c) insurance of machinery breakdown,

d) insurance loss of profit due to machine failure,

e) Insurance of construction equipment and the like,

f) Third party liability insurance associated with the activity and owned property.

Part 02 of the contract:

a) Cover the extended liability for damage to the environment,

Part 03 of the contract:

a) Compulsory insurance of motor vehicle owners,

b) insurance on hull,

c) Personal accident insurance,

d) Insurance Assistance travel assistance.

A) property insurance against all risks (CPV -66,515,000) covering the whole property Employer-based system for all contingencies estimated sum insured at the level of 334 265 053.04 PLN established mainly on the basis of gross book value,

b) loss of earnings insurance (CPV - 66515000) from the estimated sum insured at the level of 78 101 800 PLN,

c) insurance of machinery breakdown (CPV - 66515000) based on the system all risks, including selected assets, based on the system all risks to the estimated sum insured at the level of 225 936 894.64 PLN established mainly on the basis of gross book value,

d) insurance loss of profit due to machine failures (CPV - 66515000) from the estimated sum insured at the level of 78 101 800 million PLN,

e) Insurance of construction and the like (CPV - 66515000) based on the system all risks to the estimated sum insured at 5 305 522.73 PLN (Continued section II.2.14 - additional information).

1789, as amended. d. and to secure claims arising from adverse consequences in the environment and damage to the environment within the meaning of the Act of 13.4.2007 on preventing environmental damage and its repair, in connection with the landfill.

A) Compulsory insurance of civil liability of vehicle owners (CPV - 66516100-1)

b) Insurance hull (CPV - 66514110)

c) Personal accident insurance (CPV - 66512100-3)

d) insurance travel assistance Assistance (CPV - 66514110).

Including a fleet of 30 vehicles, 5 of which are covered by hull insurance.

Works for complete or part construction and civil engineering work

Przedsiębiorstwo Wodociągów i Kanalizacji Sp. z o.o. w Koninie | Published February 4, 2017  -  Deadline March 14, 2017
cpvs
45200000, 71310000, 45230000, 71300000, 45232000, 71320000

Object of the contract is the design, execution and completion of the Works and remove them any defects in accordance with FIDIC Conditions of Contract according to rehabilitate the water main.

The scope of works includes the design and construction of:

Reconstruction of water main ø 500 on the section crossing the railway tracks Poznan and Warsaw (trenchless method) - approx. 275 m.

The contract involves the design and execution of renovation of the bus segment with a length of 275 m with a built-up on her chambers.

Basic information and parameters of the pipeline to be built on the restoration, and the chambers are given in Volume III "Functional Utility Program" annexed hereto.

The scope of works covered by PFU is located in a strip of public roads in the open, private land and the ground station.

Sanitary works

Przedsiębiorstwo Wodociągów i Kanalizacji Sp. z o.o. w Koninie | Published February 4, 2017  -  Deadline March 15, 2017
cpvs
45232460, 45231300

The contract "Construction of sewage in the street. Salt in Konin. " The project will be implemented on plots No. 846 and 781/2 precinct Old Town, which lane street. Salt, based on the building permit UA.6740.74.2015 dated 05.07.2015 r.

A detailed description of the contract are presented in Volume II (OPZ) Terms of Reference.

The investment includes the construction of a sanitary sewage system with PVC-U pipes with walls of solid:

Ø 200 with a length L = 282 m

Ø 160 with a length L = 20 m

NOTE: The amended as follows in relation to the construction project:

withdraws from the construction of wells DN 1000: S7 and S9

mounted on the manifold tees DN 200 × 160 × 45 degrees for the real estate at ul. Solna 61, 30A, 57, 28

sections leads pipeline DN 160 with a lane for the property located at ul. Solna 61, 30A, 57, 28 wells were build in connection Ø 425.

The detailed scope of the contract is specified in the technical documentation attached to the tender documents, placed on the website of the Employer.

Konin: Fabrication and installation of a platform for the disabled in the building PWSZ in Konin Street. Wyszynski 3c

Państwowa Wyższa Szkoła Zawodowa w Koninie | Published August 30, 2016  -  Deadline August 16, 2016
Winner
LIFT PLUS PL Kaczmarczyk Sp. Jawna, ul. Strażacka 33, 42-263 Wrzosowa, kraj/woj. śląskie.
cpvs
33196200, 42414100, 45310000

The contract is for construction and installation of the platform stairs to the transport of disabled people inside the building between floors 0, 1 and 2. The exact description of the contract is contained in Annex 1 to the Terms of Reference ..

Konin: Execution of construction works on the Provincial Hospital in Konin at Cardinal. S. Wyszynski 1

Wojewódzki Szpital Zespolony | Published September 8, 2016  -  Deadline September 1, 2016
Winner
PPUH REBO Bogumił Bartczak, ul. Wierzbowa 15, 62-571 Stare Miasto, kraj/woj. wielkopolskie.
cpvs
45000000

The contract is for the construction works at the Provincial Hospital in Konin Street. Card. S. Wyszynski 1 divided into 3 packages: Package No. 1 -Remont square (slab) under the solar collectors detailed order is design documentation - Appendix 2.1 hereto 45/2016. In the field Package No. 1 task is financed from the funds of the Wielkopolska Region under the Contract No. DZ.IV / 10/2016 concluded on 01.29.2016, the Package No. 2 - Renovation of roofs on buildings chlorination, pathology and garages detailed order is design documentation - appendix 2.2 hereto 45/2016. Package No. 3 - Replacing the launch of gravity in the building D, E detailed order is design documentation - Appendix 2.3 hereto 45/2016. Object of the contract also includes the execution of all temporary works, organizational security, the implementation of which will be necessary for carrying out the contract. The essential elements on the basis of which the present cost of the order is design documentation and takeoffs are an auxiliary material and can not be the sole basis for the preparation of the offer. Object of the contract includes the execution of all works specified in the studies of design attached hereto, together with the temporary works, organizational security, the implementation of which will be necessary for carrying out the contract.

Konin: Construction street Lily of the Valley and Malwowa in Konin.

Zarząd Dróg Miejskich w Koninie | Published September 7, 2016  -  Deadline September 7, 2016
Winner
Przedsiębiorstwo Robót Inżynieryjnych Sp. z o.o., ul. Komunalna 8, 62-700 Turek, kraj/woj. wielkopolskie.
cpvs
45233140, 45232440, 45316110, 45316213

The scope of works includes: 1.Nawierzchnia roadway MMA 491.20 m2 2.Nawierzchnia of concrete paving gr. 8cm 2,604.00 m2 3.Nawierzchnia of concrete paving gr. 6cm 625.40 m2 4.Nawierzchnia with openwork plates 112.00 m2 5.Nawierzchnia with concrete tiles 35x35 39.30 m2 6.Krawężnik concrete street 15x30 435,00 m 7.Krawężnik concrete street 15x22 265,00 m concrete 8.Opornik 12x25 259,00 m 9.Obrzeże concrete 6x30 401,00 m 10.Kanały PVC pipes of Wed. ext. 160 mm 25,20 m 11.Kanały PVC pipe diam. ext. 200mm 107,80 m 12.Kanały PVC pipe diam. ext. 250mm 45.40 m 13.Studzienki drain diam. 450mm 24 pcs. 14.Studnie revision diam. 1000mm 6 pcs. 15.Słupy lighting 20 pcs. 16.Oznakowanie horizontal 51,04m2 17.Oznakowanie vertical 18 pcs.

Konin: Reconstruction ul. Konin in Rychwał within the county road No. 3321P

Zarząd Dróg Powiatowych | Published August 25, 2016  -  Deadline August 24, 2016
Winner
Zakład Robót Inżynieryjnych inż. Stanisław Dropiński, ul. Królowej Marysieńki 12, 62-510 Konin, kraj/woj. wielkopolskie.
cpvs
45233142

2. Scope of the order: 1) construction measuring 2) milling of bituminous pavement 3) felling and grubbing stumps 4) demolition 5) execution of drainage 6) protection of existing utilities 7) laying concrete curbs 8) carrying the surface of the pavement 9) surface profiling pavement 10) carrying the surface exits and parking spaces 11) carrying the surface of the asphalt concrete 12) execution of marking the horizontal and vertical 13), finishing work.

Konin: Construction of county road No. 3180P section Kaliska - Gogolin - Wielkopole (municipality Kleczew and Wilczyn commune) in the construction during the foot - bicycle

Zarząd Dróg Powiatowych | Published August 11, 2016  -  Deadline August 10, 2016
Winner
SKANSKA S.A., ul. Generała Zajaczka 9, 01-518 Warszawa, kraj/woj. mazowieckie.
cpvs
45233140

1) performance of preparatory work, 2) the execution of earthworks, 3) laying curbs and concrete edges on the bench in concrete with sewage with concrete cobblestones, 4) the implementation of elements of dehydration 5) carrying the surface with asphalt concrete, 6) performance of vertical signage ..

Konin: Retrofitting of buildings with the construction of the heat pump Sewage Treatment Plant Right Bank in Konin

Przedsiębiorstwo Wodociągów i Kanalizacji Sp. z o.o. w Koninie | Published August 18, 2016  -  Deadline August 18, 2016
Winner
Tadeusz Bąkowski, Zakład Remontowo - Budowlany DANBUD, ul. Leśna 61, 62-540 Kleczew, kraj/woj. wielkopolskie.
cpvs
45200000, 45300000

The present contract is the execution of works covered by the task Retrofitting of buildings with the construction of the heat pump Sewage Treatment Plant Right Bank, according to. the attached Executive Project developed by INWEST-BUD ul. Begoniowa 14, 62-510 Konin, with the exception of the Executive No. 1.1. attached for information purposes only. The scope of this contract provides for thermo-modernization of buildings with the necessary installation works, preparation of documents to obtain the Employer's permission to use, the work will be performed on the active object. A detailed description of the object of the contract is presented in the attached Executive Projects. In the case describe the object of the contract with the standards, approvals, technical specifications and reference systems, referred to in art. 30 paragraph. 1-3 PPL, contracting allows the solution equivalent to those described ..

Konin: Construction of the pavement in the district road No. 3219P Genevieve - Kuna

Zarząd Dróg Powiatowych | Published July 14, 2016  -  Deadline July 13, 2016
Winner
Kolbet Sp. z o.o., Police Średnie 48, 62-604 Kościelec, kraj/woj. wielkopolskie.
cpvs
45233222

1) performance of preparatory works and demolition 2) execution of drainage, 3) execution of earthworks, 4) laying curbs and concrete edges on the bench of concrete, 5) execution of bus bay, conventions and pavement, 6) performance play surface, 7) execution guardrails, 8) execution of vertical signage, 9) finishing works ..

Konin: Construction of county road No. 3180P section Kaliska - Gogolin - Wielkopole (municipality Kleczew and Wilczyn commune) in the construction during the foot - bicycle

Zarząd Dróg Powiatowych | Published July 14, 2016  -  Deadline September 30, 2016
cpvs
45233140

1) performance of preparatory work, 2) the execution of earthworks, 3) laying curbs and concrete edges on the bench in concrete with sewage with concrete cobblestones, 4) the implementation of elements of dehydration 5) carrying the surface with asphalt concrete, 6) performance of vertical signage . The planned project includes the construction of over foot - bicycle along by ongoing construction of county road No. 3180P. Construction work will be carried out within the site passed Contractor works related to the construction of the county road. Transfer of the construction site will take place with the participation of a contractor to build the county road ..

Konin: Development of project - costing FOR THE TASKS: 1. Reconstruction of the county road No. 3180P section Wilczyn - Kownaty 2. Redevelopment of the district road No. 3220P Brzeźno - Krzymów 3. Reconstruction of the county road No. 4313P Bystrica - Czarnybród

Zarząd Dróg Powiatowych | Published July 20, 2016  -  Deadline July 28, 2016
cpvs
71240000

The contract is for the development of the design - cost estimate for the job: PART I: Reconstruction of the county road No. 3180P section Wilczyn - Kownaty including: 1.1. The update map situational - height on a scale of 1: 500 or 1: 1000 1.2. Maps of land records, along with excerpts from the land register 1.3. Development of photographic documentation and inventory of the existing 1.4. Develop an inventory of greenery 1.5. Building and implementing reconstruction of the road with intersections - between the intersection of DP3176P to the county boundary 1.6. Construction project and the refurbishment of the drainage 1.7. Project constant traffic organization together with the arrangements and the opinions and approval of 1.8. Bills of quantities and cost estimates for each industry investor; bills of quantities and estimates Investor should be developed with the division into two phases investment (range of individual stage will be agreed at the stage of preparation of documentation) 1.9. Detailed technical specifications of the workmanship and the receipt of work for every industry 1.10. Obtaining all necessary decisions, opinions, agreements and checks design solutions in the field resulting from the applicable provisions 1.11. Obtaining a water permit to drain rainwater from the roadway, if required 1.12. Preparation of documents necessary for filing works does not require a building permit or obtaining a decision on the building permit / ZRID 1.13. Preparation of construction documentation and the executive in PDF format. Basic technical parameters of the reconstruction of the road - category road - district - Length of the road - about 2.0 km from the intersection with county road No. 3176P to the border district of Konin - class road - L - Widening of existing road - intersections with existing roads channeled or ordinary execution of new and reconstruction of the existing culverts, if necessary. - The sidewalks along the entire length of the road (reconstruction of existing and construction on the missing section) PART II: Reconstruction of the county road No. 3220P Brzeźno - Krzymów including: 2.1. The update map situational - height on a scale of 1: 500 or 1: 1000 2.2. Maps of land records, along with excerpts from the land register 2.3. Development of photographic documentation and inventory of the existing 2.4. Building and implementing reconstruction of the road with intersections 2.5. Construction project and the refurbishment of the drainage 2.6. Project constant traffic organization together with the arrangements and the opinions and approval of 2.7. Bills of quantities and cost estimates for each industry investor; bills of quantities and estimates Investor should be developed with the division into two phases investment (range of individual stage will be agreed at the stage of preparation of documentation) 2.8. Detailed technical specifications of the workmanship and the receipt of work for every industry 2.9. Obtaining all necessary decisions, opinions, agreements and checks design solutions in the field resulting from the applicable provisions 2.10. Obtaining a water permit to drain rainwater from the roadway, if required 2.11. Preparation of documents necessary for filing works does not require a building permit or obtaining a decision on the building permit / ZRID 2.12. Preparation of construction documentation and the executive in PDF format. Basic technical parameters of road reconstruction particular - category road - district - Length of the road - about 1.5 kilometers - class road - L - Widening of existing road - intersections with existing roads channeled or normal execution of new and reconstruction of existing culverts, if necessary. - Sided walkway along the entire length of the road PART III: Reconstruction of the county road No. 4313P Bystrica - Czarnybród including: 3.1. The update map situational - height on a scale of 1: 500 or 1: 1000 3.2. Maps of land records, along with excerpts from the land register 3.3. Development of photographic documentation and inventory of the existing 3.4. Develop an inventory of greenery 3.5. Building and implementing reconstruction of the road with intersections 3.6. Construction project and the refurbishment of the drainage 3.7. Project constant traffic organization together with the arrangements and the opinions and approval of 3.8. Bills of quantities and cost estimates for each industry investor; bills of quantities and estimates Investor should be developed with the division into two phases investment (range of individual stage will be agreed at the stage of preparation of documentation) 3.9. Detailed technical specifications of the workmanship and the receipt of work for every industry 3.10. Obtaining all necessary decisions, opinions, agreements and checks design solutions in the field resulting from the applicable provisions 3.11. Obtaining a water permit to discharge wó

Konin: Reconstruction ul. Konin in Rychwał within the county road No. 3321P

Zarząd Dróg Powiatowych | Published July 20, 2016  -  Deadline August 3, 2016
cpvs
45233142

1) construction measuring 2) milling of bituminous pavement 3) felling and grubbing stumps 4) demolition 5) execution of drainage 6) protection of existing utilities 7) laying concrete curbs 8) carrying the surface of the pavement 9) profiling the surface of the pavement 10) carrying the surface conventions and parking spaces 11) carrying the surface of the asphalt concrete 12) execution of marking the horizontal and vertical 13), finishing work.

Reconstruction of Kosciuszko Street with lighting and drainage - Phase II

 | Published April 13, 2016  -  Deadline May 5, 2016
cpvs
45233000, 45112000, 45111000, 45231000, 45231300, 45316110

The contract is for reconstruction of Kosciuszko Street in Konin on the section from the street. Z. Urbanowska to the street. A. Mickiewicz length of approx. 260 m, including m.in .: 1. Implementation of road construction as traffic KR3 and the surface of the MMA - approx. 1,550 m2. 2. Implementation sidewalks with concrete paving bezfazowej gr. 8 cm - approx. 1,440 m2. 3. Execution exits concrete paving bezfazowej gr. 8 cm - approx. 215 m2. 4. Execution of the parking lot with concrete paving bezfazowej gr. 8 cm - approx. 986 m2. 5. Execution of storm water drainage pipes, reinforced concrete Ø 500 - approx. 336m along the grooves of storm water drainage, drains Ø 200 and concrete inspection chambers Ø 1200. 6. Implementation of the inlet concrete pond located in the city park them. F. Chopin and connection to drainage system Ø 300. PVC pipe 7. The construction of street lighting: steel poles, galvanized, round-conical - 9units., LED luminaires 71W- 8 pcs, LED luminaire 108W - 1 pc., Cable YAKY 4x25 mm2 - approx. 314m, 8. Implementation of labeling constant traffic organization - the posts of road signs - 10 discs road signs - 13 pcs., markings approx. 30 m2. 9. Execution of works associated m.in .: demolition, earthworks, steel grille protection of trees, humus and sow grass, regulation of underground ..

Konin: Fabrication and installation of a platform for the disabled in the building PWSZ in Konin Street. Wyszynski 3c

Państwowa Wyższa Szkoła Zawodowa | Published July 25, 2016  -  Deadline November 15, 2016
cpvs
33196200, 42414100, 45310000

The contract is for construction and installation of the platform stairs to the transport of disabled people inside the building between floors 0, 1 and 2. The exact description of the contract is contained in Annex 1 to the Terms of Reference ..

Konin: Maintaining inland surface waters in the subregion of Konin in 2016. ITEM 1A

Wielkopolski Zarząd Melioracji i Urządzeń Wodnych w Poznaniu Rejonowy Oddział w Koninie | Published July 22, 2016  -  Deadline July 14, 2016
Winner
BUD-SERWIS Spółka z o.o. sp. k., Lisiec Wielki, ul. Rubinowa 57, 62-571 Stare Miasto, kraj/woj. wielkopolskie.
cpvs
45240000

The contract is for the execution of works related to maintenance (maintenance) in the proper condition of inland surface waters with hydro-technical structures located within the county Słupca. The contract includes the following tasks: buffalo buffalo It is located at km 6 + 890 is a weir with concrete abutments of the light 3.50 m closures szandorowymi of damming height of 1.20 m. The weir provides for the following work: manual mowing lichens from the slopes of the watercourse in the region works, measurements of excavation of the foundation, trenches and excavations carried out on the spoil Backhoes - the conduit recycle construction and demolition of the cofferdam earth, transfer the purchased material, profiling riverbed below the dam, pumping and maintenance of low water levels for a period of execution of works, demolition mechanical stone wall laid on cement mortar, demolition of hand laid stone walls in cement mortar, above 20 cm, cutting of heavy steel structures - dismantling the steel components of the weir, reinforcement of foundation slabs, vertical walls, abutments weir, reinforced concrete elements of the volume of the building 1,01-10 m3 - the execution of the bottom plate and the execution of the abutments, the rear guides closing, small locksmithing, installation railings and footbridges, the purchase of new guides, purification guides sealed by brushing manually cleaning by brushing the hand of steel structures, brushing steel structures primer for minium, brushing construction steel chlorinated rubber paint, along with re-numbering of buildings and character NPP, filling trenches with density bulldozer, construction, and we assume szandorów log with a thickness of 71 mm after ostruganiu, the execution of double ties with guts fascine with a diameter of 20 + 20 cm, strengthening the bowels and overhead fabric , the execution of rip-rap on the slopes and in the bottom of 10-12 cm, the purchase of land, land transport tractor trailer samowyład. purchased land and concrete, grading (finishing of purely) surface slopes of the area around the work, sow slopes in fertile soil, repair of roads and organize meadows (with grasses) connected with the transport of 200 cm. Task No. 2 - Renovation of the siphon on Channel B Warta 374.1 km. Repair covered inlet chamber and the outlet siphon. On the siphon provided the following works: construction of the cofferdam of the bags filled with a squeal of dismantling the inlet and outlet, excavations and the excavations carried out on the spoil Backhoes - unearthing outposts, pumping and maintenance of low water levels for a period of execution of works, cleaning of concrete surfaces, jet water pressure above 500 bar concrete surfaces not painted, vertical and horizontal + clean concrete slab under the building and groom expansion joints, concrete elements of up to 1.0 m3 - filling defect in the chamber and the outlet on the slopes below and above, repair of concrete and reinforced concrete - manual reprofiling walls with cement-polymer INDUFLEX 6060, purification guides sealed by brushing manually cleaning by brushing the hand of steel structures, brushing steel structures primer for minium, brushing steel structures chlorinated rubber paint, along with the renewal of numbering buildings, grading (finishing of purely) surface slopes of the area around the work, sow slopes in fertile soil. Task No. 3 - Channel B (Struga Grabienicka B) - 4.38 km Zagórów. At the watercourse at km 1 + 900-5 + 175 5 + 250-5 + 655, 6 + 055-6 + 755 provides for the following work: manual mowing lichens from the slopes of the watercourse at km 1 + 900-5 + 175 5 250 + -5 + 655 6 + 055-6 + 755, wygrabienie wykoszonych lichens km above, the mechanical removal of bedload from the stream layer 10 cm locally on a length of 500 m, the mechanical grading of excavated backhoe bulldozer 80 m3, hacking at the overgrown water surface to 60% km 1 + 900-5 + 175 5 + 250-5 + 655, 6 + 055-6 + 755, manual shear shrubs growing on the slope of the watercourse at the surface of 0.20 ha, the fragmentation of cut branches and bushes wood splitter surface 0.20 ha. Task No. 4 - Meszna - 13.08 km Meszna entirely flows through the area of ​​District Słupca. Maintenance adopted section at km 10 + 840- 23 + 920 in the towns: Koszuty Large Koszuty Lots, Młodojewo, Marcewo, Mieczownica and Kochowo. At the watercourse at km 10 + 840 - 23 + 920 - 13.08 km provided the following works: mowing lichens from the slopes of the watercourse at km 10 + 840 - 23 + 920, and the slopes and crown the dike at km 17 + 150 - 17 + 380 , wygrabienie wykoszonych lichens at km 10 + 840 - 23 + 920, and the slopes and crown the dike at km 17 + 150 - 17 + 380, hacking at the overgrown water surface area of ​​up to 30% at km 17 + 150 - 23 + 920, hacking the overgrown water surface area of ​​up to 60% at km 10 + 840 - 17 + 150, manual shear shrubs growing on s