Call +44 800 9755 164

Public tenders for construction in Katowice Poland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Architectural, construction, engineering and inspection services

Tauron Ciepło Sp. z o.o. | Published January 31, 2017  -  Deadline March 8, 2017
cpvs
71000000

Development of design documentation construction / reconstruction of district heating networks in urban areas: Bedzin, Chorzow, Czeladź, Dabrowa Mining, Katowice, Siemianowice Slaskie, Sosnowiec, Świętochłowice Project entitled .: "The elimination of low emissions in the conurbation of Silesian" with all the arrangements , decisions, declarations uprawomocnionymi works or construction permits and the author's supervision.

Object of the contract was divided into 18 parts.

Development of design documentation construction / reconstruction of district heating networks in the city Bedzin together with the author's supervision, in accordance with the requirements specified in the tender documents.

Development of design documentation construction / reconstruction of district heating networks in the city Chorzow I (area of ​​Czestochowa and Baltic) and the author's supervision, in accordance with the requirements specified in the tender documents.

Development of design documentation construction / reconstruction of district heating networks in the area of ​​Chorzow II (area Insurgents and Truchana) with the author's supervision, in accordance with the requirements specified in the tender documents.

Development of design documentation construction / reconstruction of district heating networks in the city Chorzow III (area Konopnickiej) with the author's supervision, in accordance with the requirements specified in the tender documents.

Development of design documentation construction / reconstruction of district heating networks in the city Chorzów IV (area housing estate old and Świętochłowice) and the author's supervision, in accordance with the requirements specified in the tender documents.

Development of design documentation construction / reconstruction of district heating networks in the city Czeladź with the author's supervision, in accordance with the requirements specified in the tender documents.

Development of design documentation construction / reconstruction of district heating networks in the city Mining oak wood along with the author's supervision, in accordance with the requirements specified in the tender documents.

Construction work

Kompania Węglowa S.A. | Published February 17, 2017  -  Deadline March 2, 2017
cpvs
45000000

Works

Katowice: Reconstruction of the intersection provincial road No. 945 from the District road No. 1427 WITH Demolition and construction of the bridge and sidewalks IN A CITY Swinna.

Zarząd Dróg Wojewódzkich w Katowicach | Published July 22, 2016  -  Deadline November 30, 2017
cpvs
45000000, 45100000, 45200000, 45221100, 45233222, 45233280

Reconstruction of the intersection provincial road No. 945 from the District road No. 1427 WITH Demolition and construction of the bridge and sidewalks IN A CITY Swinna. This task encompasses the demolition and construction of a bridge, reconstruction of the intersection of roads and the construction of sidewalks. Details of the tasks described in the Description of the Contract, the Bill of Quantities and documentation ..

Katowice: Execution of design services in the framework of the Project: Construction of roads with accompanying infrastructure street salmon

 | Published July 13, 2016  -  Deadline October 31, 2018
cpvs
71320000, 71248000

Kamienska in Katowice with the author's supervision over the implementation of works and participation in the public consultation. As part of the contract, the contractor is obliged to Kamienska in Katowice and obtaining a decision to authorize the implementation of road investment in accordance with the Act of 10 April 2003. On special rules for the preparation and implementation of investments in public roads and the decision on the construction permit in accordance with the Construction Law of 7 July 1994. as amended. d. for the required scope of work. The scope of the project documentation includes: Kamienska in Katowice, b) the construction of the planned road lighting, c) construction of the drainage of the planned road. d) demolition of buildings colliding with the object of the contract, along with obtaining a demolition permit for the elements of this demanding e) the target traffic organization, f) spacers network and technical infrastructure colliding with the designed solutions, g) channel technology - for submission by interested parties request for access to the channel. Project documentation includes (according to the Regulation of the Minister of Infrastructure of 2 September 2004. On the detailed scope and form of design documentation, technical specifications for execution and acceptance of construction works and the functional - utility): - construction project in terms of taking into account the specificity of the works; - Implementing projects; - Bill of quantities; - Information on safety and health, where its study is required under separate provisions; The contractor that will complete the contract should: -opracować project documentation based on current law, -uzyskać all the necessary arrangements and required by law decisions, which will allow to carry out a tender procedure for the implementation of construction works on the basis of this documentation. -przekazać whole design projects in paper and electronic form (on CD in DWG, PDF). In addition, the documentation should be prepared taking into account the current provisions of statutes - construction law, spatial development, public procurement law and regulations related to the a / laws. Develop technical specifications for execution and acceptance of construction works. Execution of investment cost. Active participation in social consultations and the preparation of materials m. In .: visualization and presentation including answering queries residents. Performing the author's supervision over the implementation of works in the field developed project documentation (if the Purchaser in writing undertakes designer to supervise the author).

Construction work for the oil and gas industry

Katowicki Holding Węglowy S.A. | Published January 27, 2017  -  Deadline March 8, 2017
cpvs
45255000

"Execution of preparatory excavations for the slot wall 108 in the seam 401/1 in the S of 500 m for KHW SA KWK Murcki-Staszic".

Katowice: Design and execution of construction works on the renovation of toilets, including replacement of installations on the vertical projection of the located at the intersection of ul. Reymont and ul. Ligonia in the building of the Silesian Provincial Office in Katowice, ul. Jagiellońska 25 in system design and build - II proceedings.

Śląski Urząd Wojewódzki w Katowicach | Published July 27, 2016  -  Deadline April 30, 2017
cpvs
45000000, 71320000, 45400000

Subject of the contract - design and execution of construction works on the renovation of toilets, including replacement of installations on the vertical projection of the located at the intersection of ul. Reymont and ul. Ligonia in the building of the Silesian Provincial Office in Katowice, ul. Jagiellońska 25 in system design and build. Stage I: preparation of design documentation (PB) obtaining all required arrangements with the submission of a complete application for a permit to conduct restoration works at the monument - until 30.09.2016r, Phase II: obtaining final decision: Silesian Provincial Conservator and the building permit , execution of the remaining technical documentation (PW, STWiORB), construction works and as-built documentation - to 30.04.2017r ..

Katowice: Execution of design services in the framework of the project entitled: Road links ul. Common of the street. tunnel

Miasto Katowice | Published July 22, 2016  -  Deadline October 31, 2018
cpvs
71320000, 71248000

Tunnel in Katowice with the author's supervision over the implementation of works and participation in the public consultation. The scope of the project documentation should include: tunneling, with unilateral sidewalk with reserve land for future bicycle path, 2. construction of the planned road lighting, 3. construction of the drainage of the planned road. 4. demolition of buildings colliding with the object of the contract, along with obtaining a demolition permit for items that require 5. target traffic organization 6. spacers network and technical infrastructure colliding with the designed solutions, 7. channel technology - for submission by interested parties request for access to the channel. Project documentation includes (according to the Regulation of the Minister of Infrastructure of 2 September 2004. On the detailed scope and form of design documentation, technical specifications for execution and acceptance of construction works and the functional - utility): - construction project in terms of taking into account the specificity of the works; - Implementing projects; - Projects division of property; - Bill of quantities; - Information on safety and health, where its study is required under separate regulations. Contractor who will execute the order shall: - develop project documentation on the basis of current law - to get all the necessary arrangements and required by law decisions, which will allow to carry out a tender procedure for the implementation of construction works on the basis of this documentation. In addition, the documentation should be prepared taking into account the current provisions of statutes - construction law, spatial development, public procurement law and regulations related to the a / laws. Develop technical specifications for execution and acceptance of construction works. Execution of investment cost. Active participation in social consultations and the preparation of materials m. In .: visualization and presentation including answering queries residents. Performing the author's supervision over the implementation of works in the field developed project documentation (if the Purchaser in writing undertakes designer to supervise the author).

Katowice: Reconstruction of drainage system on the national road No. 81 in the town of Ochaby

 | Published July 12, 2016  -  Deadline June 30, 2017
cpvs
71320000, 45000000, 45113000, 45112000, 45230000, 45233130, 45231300

The scope of the tasks include: Development of formal documentation, design and the technical specification of the Workmanship and the acceptance of construction works, in compliance with the requirements set out in the functional and operational program (hereinafter referred to as PFU) with all opracowaniami design and arrangements necessary to complete the documentation - hereafter Documentation design with obtaining the legally required decisions, permits, opinions, conditions, agreements and other documents necessary for the execution of works covered by the agreement and described in the PFU, b) the exercise of due diligence works hereinafter Robots based on approved by the Employer Documentation project in accordance with the principles of technical knowledge and respect for the provisions contained in the resulting decisions, permits, conditions, opinions and arrangements and other documents associated with the construction process for the works performed; c) supervising the copyright in the period of execution of works on the basis of the developed design documentation ..

Miscellaneous medical devices and products

Samodzielny Publiczny Szpital Kliniczny nr 7 Śląskiego Uniwersytetu Medycznego Górnośląskie Centrum Medyczne im. Leszka Gieca | Published February 14, 2017  -  Deadline March 1, 2017
cpvs
33190000

The contract: Construction of the Surgical Teaching Hospital for the No. 7 University of Silesia, Upper Silesian Medical Centre them. prof. Leszek bends - Task No. 13 (Supply of medical equipment) Package 1 - Head lamp operating detailed order contain Annex 2b and Annex 3 of the Terms of Reference. Description of criteria which the awarding entity will apply in selecting a tender, together with the weights of the criteria and method of evaluation of tenders the price criterion weight: 60% Criterion delivery weight: 20% criterion warranty weight: 20%.

Katowice: TECHNICAL DOCUMENTATION FOR THE TASKS: SZOPIENICE-CENTRE. REPAIR AND ADAPTATION OF PREMISES BUILDING STREET. Bednorz 14 KATOWICE FOR THE IMPLEMENTATION OF ACTION WITH seigniorial perform comprehensive supervision COPYRIGHT

Komunalny Zakład Gospodarki Mieszkaniowej | Published July 26, 2016  -  Deadline March 31, 2018
cpvs
71000000, 71242000, 71320000, 79421100

Works will include ground floor of the building - to make a change of use of premises and adapt them to the current rules in accordance with their intended purpose. The contract covers: 1) Technical documentation (AD), including: a) the construction design drawings regulations, including technical expertise in the field of fire protection (including obtaining the provisions of the Provincial Commandant of the State Fire Service in Katowice) (A) b) bill of quantities (B) c) investment cost estimate (C) d) technical specifications for execution and acceptance of construction works (d) 2) execution of a feasibility study (E) 3) Performing a comprehensive author's supervision over the implementation of works within the scope of the project documentation (F) Detailed description the order shall specify: model agreement and its annexes (Annex 7 to SIWZ - in particular Appendix 1 to the agreement). The Contracting Authority to finance the contract intends to allocate the amount of: 104,183.45 zł gross. In the absence of a written undertaking to the Contractor by the Employer to perform author's supervision salary will be reduced accordingly by the amount of supervision resulting from the Contractor's bid.

Refrigerators

Samodzielny Publiczny Szpital Kliniczny nr 7 Śląskiego Uniwersytetu Medycznego Górnośląskie Centrum Medyczne im. Leszka Gieca | Published January 21, 2017  -  Deadline March 3, 2017
cpvs
39711130

The contract is:

Construction of the Surgical Teaching Hospital for the No. 7 University of Silesia, Upper Silesian Medical Centre them. Prof. Leszek bends - Task 12

(Delivery of medical equipment)

Package 1 - Refrigerator for storage of medicines - refrigerated for recovery room

A detailed description of the contract contains an Appendix 2b and Annex 3 of the Terms of Reference.

The Contracting Authority requires the implementation of the contract under the terms of the agreement, a specimen of which is attached hereto.

The contract is:

Construction of the Surgical Teaching Hospital for the No. 7 University of Silesia, Upper Silesian Medical Centre them. Prof. Leszek bends - Task 12

(Delivery of medical equipment)

Package 1 - Refrigerator for storage of medicines - refrigerated for recovery room

A detailed description of the contract contains an Appendix 2b and Annex 3 of the Terms of Reference.

The Contracting Authority requires the implementation of the contract under the terms of the agreement, a specimen of which is attached hereto.

Description of criteria which the Employer will apply in selecting a tender, together with the weights of the criteria and method of evaluation of tenders

Criterion Price (Pn) weight: 60%

The term of the contract (Tn) weight: 20%

Criterion Warranty (Gn) weight: 20%.

Katowice: ZP-2380-167-50 / 2016 Retrofitting of the building Transport Service Station No. 7 in the complex of the Regional Police Headquarters at ul. Lompy 19

Komenda Wojewódzka Policji w Katowicach | Published July 20, 2016  -  Deadline October 30, 2017
cpvs
45216110, 45321000, 45331100, 45331210, 45310000

Lompy 19, thermomodernization facility along with accompanying work. 2. A detailed description of the object of the contract: 2.1 bill of quantities - Annex 4 to the Terms of Reference 2.2 Technical Specifications execution and acceptance of works - Annex 5 to the Terms of Reference 2.3 Technical Documentation - Annex 6 to the Terms of Reference 2.4 Principles of marking projects co-financed by the Regional Fund for Environmental Protection and Water Management in Katowice - Annex 7 to the Terms of Reference values ​​needed to show on the boards will be submitted to the Contractor after the conclusion of the contract. Guarantee documents should include a review of the free warranty for indoor installation of central heating, process heat and hot water and making the adjustment settings on the devices automatic regulation and control devices and heating systems with a frequency of every 12 months, ie. Once a year. The proposed systems and materials equivalent should have the legally required certificates, certificates, approvals for use in construction, and meet the requirements specified in the documentation. 5. Employer determines that a key part of the order, reserved to make own forces without the participation of sub-contractors or subcontractors further construction works are thermo-building partitions, ie. Insulation of walls and flat roof. All persons for the implementation of key parts of the contract should be employed on the basis of a work contract or temporary work. These individuals must have at least 3 years of professional experience and relevant valid licenses, if regulations require such authorizations. 8. By the date of signing the contract the Contractor shall submit to the Employer a list of persons to carry out the crucial part of the contract (Annex 9 to the Terms of Reference annexed to the agreement) of the Contractor and / or subcontractor who will be employed under a contract of employment or temporary work at least for the duration of the contract. Copies of the agreements should be signed (to be true) by the Contractor. 8, the Contractor shall notify the Contracting Authority within three days of the change. 11. The changes referred to in Section 10 requires the submission to the Employer of new employment contracts or temporary work for the employees of the Contractor and / or subcontractor and / or further subcontractors. 12. Common Procurement Vocabulary CPV: 45 21 61 10-8 - Construction work for buildings relating to law and order; 45 32 10 00-3 - Thermal insulation; 45 33 11 00-7 - installation of central heating; 45 33 12 10-1 - ventilation installation;

Katowice: Rebuilding provincial road No 919 WITH sidewalks FROM KM 0 + 000 to km 1 + 915 RACIBÓRZ IN A CITY DIVIDED INTO TWO STAGES. STAGE AND FROM KM 0 + 000 TO KM 0 + 923.72. STAGE II FROM KM 0 + 923.72 to km 1 + 915.

Zarząd Dróg Wojewódzkich w Katowicach | Published July 27, 2016  -  Deadline September 29, 2017
cpvs
45233140, 45231300, 45233222, 45233225, 45111230, 45233220

Rebuilding provincial road No 919 WITH sidewalks FROM KM 0 + 000 to km 1 + 915 RACIBÓRZ IN A CITY DIVIDED INTO TWO STAGES. STAGE AND FROM KM 0 + 000 TO KM 0 + 923.72. STAGE II FROM KM 0 + 923.72 to km 1 + 915. This task encompasses the reconstruction of provincial road No. 919, along with sidewalks on the stretch of 1915 m. In the framework of the reconstruction assumed full exchange of road construction, reconstruction of individual meetings and public building parking bays and bus, rebuilding sidewalks. The aim of the reconstruction of the road is to improve traffic safety on the road involving the introduction of geometry correction of vertical and horizontal road crown and the restoration of equal transverse and longitudinal surface. Details of the tasks described in the Description of the Contract, the Bill of Quantities and documentation ..

Mobile hydraulic-powered mine roof supports

Polska Grupa Górnicza Sp. z o.o. | Published February 10, 2017  -  Deadline February 24, 2017
cpvs
43140000

Renovation of the Production Department in 2017. "(No. assortment group 295-27-02). 

Supply of hydraulic support in 31.003-14E / 5 to mine roof - GLINIK

Spare parts involved are intended for use in underground mines explosive methane and coal dust.

Spare parts constituting the object of the contract must be brand new, complete, free from defects in design, materials and workmanship.

Product offered must meet the requirements of PN-EN 1804-2 + A1: 2012

The product which is the subject of the contract must be marked by permanent and legible application numbers.

Equivalence section applies to both functions, properties and methods of installation (size, arrangement of mounting holes, connections, etc.). This connection is not equivalent replacement part may require additional adapters or interfering with the construction of the machine / device.

Cardiovascular devices

Samodzielny Publiczny Szpital Kliniczny nr 7 Śląskiego Uniwersytetu Medycznego Górnośląskie Centrum Medyczne im. Leszka Gieca | Published February 15, 2017  -  Deadline March 1, 2017
cpvs
33123000

3.1. The contract is:

Delivery of coronary stents coated with the drug:

Croup. 1 - drug-eluting stents antiproliferative - Sirolimus or Evorolimus

Croup. 2 - drug-eluting stents or Rapamycin derivatives

Croup. 3 - a drug-eluting stent Sirolimus or derivatives of the platform cobalt - chrome

Croup. 4 - Stent DES steel construction spiral-sine mounted on the balloon

Croup. 5 - drug-eluting stents antiproliferative - Sirolimus the polymer biodegradalnym

Croup. 6 - Stentry release the drug sirolimus or derivatives of the structure nitynolowej

Croup. 7 - Stents for biodegradable scaffold releasing analog of the drug Sirolimus

Croup. 8 - stentgrafts chrome - cobalt covered with passive coating of silicon carbide

A detailed description of the contract contains an Appendix 2b and Appendix 3 hereto.

3.3. Employer's Requirements concerning the subject matter of the contract:

1) offered a medical device must have certificates and be registered under.

Miscellaneous medical devices and products

Samodzielny Publiczny Szpital Kliniczny nr 7 Śląskiego Uniwersytetu Medycznego Górnośląskie Centrum Medyczne im. Leszka Gieca | Published February 14, 2017  -  Deadline February 27, 2017
cpvs
33190000

Construction of the Surgical Teaching Hospital for the No. 7 University of Silesia, Upper Silesian Medical Centre them. prof. Leszek bends - Task 11

(Delivery of medical equipment)

Zad.1 - Apparatus for coagulation

Zad.2 - trolley for transporting patients

Zad.3 - trucks with chassis, hydraulic lift, barriers

Zad.4 - heating device infusion

Zad.5 - a treatment table with chassis anesthetic

Zad.6 - drip stand with chassis

A detailed description of the contract contain Annex 2b to the ToR.

3.3. Employer's Requirements concerning the subject matter of the contract:

1) offered a medical device must have certificates and be registered in accordance with the legislation requiring ownership certificates, certificates and registration,

2) offered a medical device must be placed on the market and use as

with the requirements of the Act of 20.5.2010 r. on medical devices (OJ 2.

  • 1