Call +44 800 9755 164

Public tenders for construction in Katowice Poland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Samodzielny Publiczny Szpital Kliniczny nr 7 Śląskiego Uniwersytetu Medycznego Górnośląskie Centrum Medyczne im. Leszka Gieca | Published January 14, 2017  -  Deadline February 6, 2017

The contract is:

Execution of works

Croup. 1 - Performance of mechanical ventilation - exhaust brudownikach buildings of the Upper Silesian Centre of Cardiology Specialist Hospital multiprofile

A detailed description of the order contained in Appendix 4 to the ToR.

3.3. Employer's Requirements concerning the subject matter of the contract:

The contractor undertakes to carry out the object of the contract in accordance with the description contained

in the tender documents, contract and in accordance with:

a) the bill of quantities constituting the enclosure 3 to SIWZ

b) Documentation design constituting Appendix No. 4 to the SETC

c) the conditions resulting from the applicable technical regulations and the Construction Law;

d) requirements under the applicable Polish Standards, Technical Conditions Execution and Acceptance of Works and related regulations;

e) the principles of sound technical expertise and established usages.

In the implementation of the contract the Contractor any finishing materials necessary to implement objects.

Construction supervision services

Miasto Katowice | Published December 30, 2016  -  Deadline February 9, 2017
The scope of the task includes the construction of swimming pools in locations: 

Recreation.

The building will consist in particular: main pool - sports, trough which supports the needs of learning to swim with, attractive facilities and a children's pool, water slides externally - internal, spa tubs, auditorium, gymnasium with gym, rooms of sauna,

Additionally, the investment includes, among others, execution of land development, roads, car parks, networks and connections of utilities.

The detailed scope of the contract defines the Terms of Reference and the draft contract.

The scope of the task includes the construction of swimming pools in locations:

Recreation.

The building will consist in particular: main pool - sports, trough which supports the needs of learning to swim with, attractive facilities and a children's pool, water slides externally - internal, spa tubs, auditorium, gymnasium with gym, rooms of sauna,

Additionally, the investment includes, among others, execution of land development, roads, car parks, networks and connections of utilities.

3) It must be demonstrated by the contractor that employs at least one person in full-time employment, under a contract of employment with at least the minimum monthly wage, ie the person performing the work kancelaryjno- administration.

Way of documenting their employment:

Submission of the Employer declaration of employment of that person in full-time employment, under a contract of employment with at least the minimum monthly payment, at the stage of the public procurement and on every call the Employer at the stage of performance of the contract.

4) The detailed scope of the contract defines the Terms of Reference and the draft contract.

Construction work

Kompania Węglowa S.A. | Published January 6, 2017  -  Deadline January 19, 2017
Works

Katowice: Reconstruction of the intersection provincial road No. 945 from the District road No. 1427 WITH Demolition and construction of the bridge and sidewalks IN A CITY Swinna.

Zarząd Dróg Wojewódzkich w Katowicach | Published July 22, 2016  -  Deadline November 30, 2017
Reconstruction of the intersection provincial road No. 945 from the District road No. 1427 WITH Demolition and construction of the bridge and sidewalks IN A CITY Swinna. This task encompasses the demolition and construction of a bridge, reconstruction of the intersection of roads and the construction of sidewalks. Details of the tasks described in the Description of the Contract, the Bill of Quantities and documentation ..

Katowice: Execution of design services in the framework of the Project: Construction of roads with accompanying infrastructure street salmon

 | Published July 13, 2016  -  Deadline October 31, 2018
Kamienska in Katowice with the author's supervision over the implementation of works and participation in the public consultation. As part of the contract, the contractor is obliged to Kamienska in Katowice and obtaining a decision to authorize the implementation of road investment in accordance with the Act of 10 April 2003. On special rules for the preparation and implementation of investments in public roads and the decision on the construction permit in accordance with the Construction Law of 7 July 1994. as amended. d. for the required scope of work. The scope of the project documentation includes: Kamienska in Katowice, b) the construction of the planned road lighting, c) construction of the drainage of the planned road. d) demolition of buildings colliding with the object of the contract, along with obtaining a demolition permit for the elements of this demanding e) the target traffic organization, f) spacers network and technical infrastructure colliding with the designed solutions, g) channel technology - for submission by interested parties request for access to the channel. Project documentation includes (according to the Regulation of the Minister of Infrastructure of 2 September 2004. On the detailed scope and form of design documentation, technical specifications for execution and acceptance of construction works and the functional - utility): - construction project in terms of taking into account the specificity of the works; - Implementing projects; - Bill of quantities; - Information on safety and health, where its study is required under separate provisions; The contractor that will complete the contract should: -opracować project documentation based on current law, -uzyskać all the necessary arrangements and required by law decisions, which will allow to carry out a tender procedure for the implementation of construction works on the basis of this documentation. -przekazać whole design projects in paper and electronic form (on CD in DWG, PDF). In addition, the documentation should be prepared taking into account the current provisions of statutes - construction law, spatial development, public procurement law and regulations related to the a / laws. Develop technical specifications for execution and acceptance of construction works. Execution of investment cost. Active participation in social consultations and the preparation of materials m. In .: visualization and presentation including answering queries residents. Performing the author's supervision over the implementation of works in the field developed project documentation (if the Purchaser in writing undertakes designer to supervise the author).

Construction work for swimming pool

Miasto Katowice | Published December 13, 2016  -  Deadline January 19, 2017
The Upper Silesia, the transition to the municipal sewage system and the position of the fiber to the building UM, c) Part III (Ligota Zadole) - connection point located in the Park Zadole the amfiteatrze.4) Each of the designed object is a building storey, basement, detached. 

29 section 3 ustawy- - the contracting authority considers the condition to be fulfilled if the contractor makes a statement on employment as described in paragraph 10.10) the ToR.

29 section 3 ustawy- - the contracting authority considers the condition to be fulfilled if the contractor makes a statement on employment as described in paragraph 10.10) the ToR.

3a ustawy- - the contracting authority considers the condition to be fulfilled if the contractor makes a statement on employment as described in paragraph 10.10) the ToR.

Parts of machinery for mining, quarrying and construction

Polska Grupa Górnicza Sp. z o.o. | Published January 4, 2017  -  Deadline January 23, 2017

Proceedings procurement sector is conducted in an open tender under the provisions of the Act of 29.1.2004 r. Public Procurement Law (Journal of Laws of 2015. Item. 2164, as amended.), Hereinafter the contents of this Terms of Reference of the Public Procurement Act or law, and based on the appropriate implementing rules. The contract is: "Supply of spare parts for centrifuges for dewatering Branches Polish Group Mining sp. Z oo in 2017" in an open tender - no group 292-15.

According to the tender documents.

Katowice: Design and execution of construction works on the renovation of toilets, including replacement of installations on the vertical projection of the located at the intersection of ul. Reymont and ul. Ligonia in the building of the Silesian Provincial Office in Katowice, ul. Jagiellońska 25 in system design and build - II proceedings.

Śląski Urząd Wojewódzki w Katowicach | Published July 27, 2016  -  Deadline April 30, 2017
Subject of the contract - design and execution of construction works on the renovation of toilets, including replacement of installations on the vertical projection of the located at the intersection of ul. Reymont and ul. Ligonia in the building of the Silesian Provincial Office in Katowice, ul. Jagiellońska 25 in system design and build. Stage I: preparation of design documentation (PB) obtaining all required arrangements with the submission of a complete application for a permit to conduct restoration works at the monument - until 30.09.2016r, Phase II: obtaining final decision: Silesian Provincial Conservator and the building permit , execution of the remaining technical documentation (PW, STWiORB), construction works and as-built documentation - to 30.04.2017r ..

Katowice: Execution of design services in the framework of the project entitled: Road links ul. Common of the street. tunnel

Miasto Katowice | Published July 22, 2016  -  Deadline October 31, 2018
Tunnel in Katowice with the author's supervision over the implementation of works and participation in the public consultation. The scope of the project documentation should include: tunneling, with unilateral sidewalk with reserve land for future bicycle path, 2. construction of the planned road lighting, 3. construction of the drainage of the planned road. 4. demolition of buildings colliding with the object of the contract, along with obtaining a demolition permit for items that require 5. target traffic organization 6. spacers network and technical infrastructure colliding with the designed solutions, 7. channel technology - for submission by interested parties request for access to the channel. Project documentation includes (according to the Regulation of the Minister of Infrastructure of 2 September 2004. On the detailed scope and form of design documentation, technical specifications for execution and acceptance of construction works and the functional - utility): - construction project in terms of taking into account the specificity of the works; - Implementing projects; - Projects division of property; - Bill of quantities; - Information on safety and health, where its study is required under separate regulations. Contractor who will execute the order shall: - develop project documentation on the basis of current law - to get all the necessary arrangements and required by law decisions, which will allow to carry out a tender procedure for the implementation of construction works on the basis of this documentation. In addition, the documentation should be prepared taking into account the current provisions of statutes - construction law, spatial development, public procurement law and regulations related to the a / laws. Develop technical specifications for execution and acceptance of construction works. Execution of investment cost. Active participation in social consultations and the preparation of materials m. In .: visualization and presentation including answering queries residents. Performing the author's supervision over the implementation of works in the field developed project documentation (if the Purchaser in writing undertakes designer to supervise the author).

Katowice: Reconstruction of drainage system on the national road No. 81 in the town of Ochaby

 | Published July 12, 2016  -  Deadline June 30, 2017
The scope of the tasks include: Development of formal documentation, design and the technical specification of the Workmanship and the acceptance of construction works, in compliance with the requirements set out in the functional and operational program (hereinafter referred to as PFU) with all opracowaniami design and arrangements necessary to complete the documentation - hereafter Documentation design with obtaining the legally required decisions, permits, opinions, conditions, agreements and other documents necessary for the execution of works covered by the agreement and described in the PFU, b) the exercise of due diligence works hereinafter Robots based on approved by the Employer Documentation project in accordance with the principles of technical knowledge and respect for the provisions contained in the resulting decisions, permits, conditions, opinions and arrangements and other documents associated with the construction process for the works performed; c) supervising the copyright in the period of execution of works on the basis of the developed design documentation ..

Katowice: TECHNICAL DOCUMENTATION FOR THE TASKS: SZOPIENICE-CENTRE. REPAIR AND ADAPTATION OF PREMISES BUILDING STREET. Bednorz 14 KATOWICE FOR THE IMPLEMENTATION OF ACTION WITH seigniorial perform comprehensive supervision COPYRIGHT

Komunalny Zakład Gospodarki Mieszkaniowej | Published July 26, 2016  -  Deadline March 31, 2018
Works will include ground floor of the building - to make a change of use of premises and adapt them to the current rules in accordance with their intended purpose. The contract covers: 1) Technical documentation (AD), including: a) the construction design drawings regulations, including technical expertise in the field of fire protection (including obtaining the provisions of the Provincial Commandant of the State Fire Service in Katowice) (A) b) bill of quantities (B) c) investment cost estimate (C) d) technical specifications for execution and acceptance of construction works (d) 2) execution of a feasibility study (E) 3) Performing a comprehensive author's supervision over the implementation of works within the scope of the project documentation (F) Detailed description the order shall specify: model agreement and its annexes (Annex 7 to SIWZ - in particular Appendix 1 to the agreement). The Contracting Authority to finance the contract intends to allocate the amount of: 104,183.45 zł gross. In the absence of a written undertaking to the Contractor by the Employer to perform author's supervision salary will be reduced accordingly by the amount of supervision resulting from the Contractor's bid.

Katowice: ZP-2380-167-50 / 2016 Retrofitting of the building Transport Service Station No. 7 in the complex of the Regional Police Headquarters at ul. Lompy 19

Komenda Wojewódzka Policji w Katowicach | Published July 20, 2016  -  Deadline October 30, 2017
Lompy 19, thermomodernization facility along with accompanying work. 2. A detailed description of the object of the contract: 2.1 bill of quantities - Annex 4 to the Terms of Reference 2.2 Technical Specifications execution and acceptance of works - Annex 5 to the Terms of Reference 2.3 Technical Documentation - Annex 6 to the Terms of Reference 2.4 Principles of marking projects co-financed by the Regional Fund for Environmental Protection and Water Management in Katowice - Annex 7 to the Terms of Reference values ​​needed to show on the boards will be submitted to the Contractor after the conclusion of the contract. Guarantee documents should include a review of the free warranty for indoor installation of central heating, process heat and hot water and making the adjustment settings on the devices automatic regulation and control devices and heating systems with a frequency of every 12 months, ie. Once a year. The proposed systems and materials equivalent should have the legally required certificates, certificates, approvals for use in construction, and meet the requirements specified in the documentation. 5. Employer determines that a key part of the order, reserved to make own forces without the participation of sub-contractors or subcontractors further construction works are thermo-building partitions, ie. Insulation of walls and flat roof. All persons for the implementation of key parts of the contract should be employed on the basis of a work contract or temporary work. These individuals must have at least 3 years of professional experience and relevant valid licenses, if regulations require such authorizations. 8. By the date of signing the contract the Contractor shall submit to the Employer a list of persons to carry out the crucial part of the contract (Annex 9 to the Terms of Reference annexed to the agreement) of the Contractor and / or subcontractor who will be employed under a contract of employment or temporary work at least for the duration of the contract. Copies of the agreements should be signed (to be true) by the Contractor. 8, the Contractor shall notify the Contracting Authority within three days of the change. 11. The changes referred to in Section 10 requires the submission to the Employer of new employment contracts or temporary work for the employees of the Contractor and / or subcontractor and / or further subcontractors. 12. Common Procurement Vocabulary CPV: 45 21 61 10-8 - Construction work for buildings relating to law and order; 45 32 10 00-3 - Thermal insulation; 45 33 11 00-7 - installation of central heating; 45 33 12 10-1 - ventilation installation;

Katowice: Rebuilding provincial road No 919 WITH sidewalks FROM KM 0 + 000 to km 1 + 915 RACIBÓRZ IN A CITY DIVIDED INTO TWO STAGES. STAGE AND FROM KM 0 + 000 TO KM 0 + 923.72. STAGE II FROM KM 0 + 923.72 to km 1 + 915.

Zarząd Dróg Wojewódzkich w Katowicach | Published July 27, 2016  -  Deadline September 29, 2017
Rebuilding provincial road No 919 WITH sidewalks FROM KM 0 + 000 to km 1 + 915 RACIBÓRZ IN A CITY DIVIDED INTO TWO STAGES. STAGE AND FROM KM 0 + 000 TO KM 0 + 923.72. STAGE II FROM KM 0 + 923.72 to km 1 + 915. This task encompasses the reconstruction of provincial road No. 919, along with sidewalks on the stretch of 1915 m. In the framework of the reconstruction assumed full exchange of road construction, reconstruction of individual meetings and public building parking bays and bus, rebuilding sidewalks. The aim of the reconstruction of the road is to improve traffic safety on the road involving the introduction of geometry correction of vertical and horizontal road crown and the restoration of equal transverse and longitudinal surface. Details of the tasks described in the Description of the Contract, the Bill of Quantities and documentation ..

Cardiovascular devices

Samodzielny Publiczny Szpital Kliniczny nr 7 Śląskiego Uniwersytetu Medycznego Górnośląskie Centrum Medyczne im. Leszka Gieca | Published January 11, 2017  -  Deadline February 2, 2017
The contract is: 

Delivery of coronary stents coated with the drug:

1 - drug-eluting stents antiproliferative - Sirolimus or Evorolimus

2 - drug-eluting stents or Rapamycin derivatives

3 - Sirolimus eluting stent or drug derivatives of the platform cobalt - chrome

4 - Stent DES steel construction spiral-sine mounted on the balloon

5 - drug-eluting stents antiproliferative - Sirolimus the polymer biodegradalnym

6 - Stentry drug release sirolimus or a derivative of the structure nitynolowej

7 - Stents for biodegradable scaffold releasing analog of the drug Sirolimus

8 - stentgrafts chrome - cobalt covered with passive coating of silicon carbide

A detailed description of the contract contains an Appendix 2b and Appendix 3 hereto.

Employer's Requirements concerning the subject matter of the contract:

1) offered a medical device must have certificates and be registered under.

The contract is:

Delivery of coronary stents coated with the drug:

1 - drug-eluting stents antiproliferative - Sirolimus or Evorolimus

2 - drug-eluting stents or Rapamycin derivatives

3 - Sirolimus eluting stent or drug derivatives of the platform cobalt - chrome

4 - Stent DES steel construction spiral-sine mounted on the balloon

5 - drug-eluting stents antiproliferative - Sirolimus the polymer biodegradalnym

6 - Stentry drug release sirolimus or a derivative of the structure nitynolowej

7 - Stents for biodegradable scaffold releasing analog of the drug Sirolimus

8 - stentgrafts chrome - cobalt covered with passive coating of silicon carbide

A detailed description of the contract contains an Appendix 2b and Appendix 3 hereto.

Employer's Requirements concerning the subject matter of the contract:

1) offered a medical device must have certificates and be registered in accordance with the legislation requiring ownership certificates, certificates and registration,

2) offered a medical device must be placed on the market and use as

876)

3) offered a medical device must conform to standards or technical specifications applicable for that product;

The contractor is obliged to perform such activities in terms of the applicable regulations and provide the Purchaser on these dates relevant documents confirming the execution of such activities.

The Contracting Authority requires the implementation of the contract under the terms of the agreement, a specimen of which is attached hereto.

- Criterion price - Weight 60%

- The term of the contract partial - Weighting 20%

- Criterion expiration date from the date of delivery - 20% weighting.

Electricity

Górnośląskie Towarzystwo Lotnicze S.A. | Published January 3, 2017  -  Deadline February 10, 2017

The contract is for the sale of electricity to the facilities of the Upper Silesian Aviation Group located in Pyrzowice, ul. Freedom 90.

Specification of the objects for which the Employer requires electricity:

- Transformer station ST 8A - hangar 1 and 2, KOL (complex of workshop, warehouse and social services operating airports), the center radar center radio runway, fuel storage, closer to the radio navigational facilities facilities catering, aprons planes, plate de-icing of aircraft, construction of power facilities, hangars, maintenance of aircraft, base CARGO;

- Transformer station ST 6A - passenger terminals A and B, and C (przylotowy) terminals CARGO, multi-purpose building, control tower, boiler, sewage treatment plants, sewage pumping stations, hydrophore, parking, driveway, technological routes and aircraft aprons.

Estimated energy consumption concerned, ie. From 01.03.2017 r. To 31.12.2017 r.

- ST ST 6A and 8A:

WI - 2 432 665 kWh

In the second - 1 532 698 kWh

In the third - 9 261 825 kWh

Total: 13 227 188 kWh

Tariff Group: B23.

The above mentioned values ​​are estimates and the Employer does not declare that it will recover this amount in full. The above amounts are estimates only and therefore can not be the basis for any property claims, including compensation.

Contractual capacity:

- RSO MEASUREMENT PI - 2 000 kW,

- RSO MEASUREMENT PII - 2 000 kW.

  • 1