Call +44 800 9755 164

Public tenders for construction in Katowice Poland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Structures construction work

Katowicka Infrastruktura Wodociągowo-Kanalizacyjna Sp. z o.o. | Published October 18, 2016  -  Deadline October 24, 2016
cpvs
45223000, 45233000, 45231000, 45310000, 45351000

Construction work for construction

Construction work

Kompania Węglowa S.A. | Published October 6, 2015
cpvs
45000000

Construction works of non-removal mining damages.

Engineering works and construction works

Zarząd Dróg Wojewódzkich w Katowicach | Published July 30, 2016
cpvs
45220000, 45110000, 45100000, 45200000, 45222000, 45233120

Engineering works and construction works

Engineering works and construction works

Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Katowicach | Published January 12, 2016  -  Deadline January 18, 2016
cpvs
45220000, 45233000, 45233142, 45233139, 45233223, 45233222, 45233290, 45233280, 90000000, 90511000, 90511300, 90610000, 90520000, 50230000, 50232000, 45232400, 45111200, 45112100, 45112200, 77211400, 77211500, 77211600, 77314100

Engineering works and construction works

Construction work

Generalna Dyrekcja Dróg Krajowych i Autostrad, ul. Wronia 53, 00-874 Warszawa. Prowadzącym postępowanie jest: Generalna Dyrekcja Dróg Krajowych i Autostrad, Oddział w Katowicach | Published October 10, 2015  -  Deadline November 19, 2015
cpvs
45000000, 45100000, 45110000, 45111000, 45112000, 45200000, 45220000, 45221000, 45221121, 45230000, 45232000, 45233110, 45233100, 45233125, 45233000, 45233140, 71300000

The length of a falling order - 9.722 km. The contract includes in particular: - The construction of the second carriageway - dwupasowej the emergency lane. - Construction work for situational links - altitude to an existing road in the area of ​​the node S1 and the node Podwarpie Airport. - Reconstruction of the node Mierzęcice involving the construction of belts switching on and off and adjusting situational - altitude sections of the ramps on the side of the road implemented. - Reconstruction of sections of access roads to the construction of conventions for fields and property. - The construction of 6 bridges within the S1 expressway, including five viaducts and one bridge. - Construction of culverts. - The construction of environmental protection facilities, including safeguards guaranteeing the protection of animals at the gabions and mattresses reticular - stone and security elements in wells and reservoirs. - Construction of lighting. - Reconstruction and extension of drainage system including storm sewer. - Reconstruction of existing reservoirs evaporating on retention and infiltration tanks. - Implementation of water facilities - drainage ditches, canals, hydraulic engineering. - Reconstruction of the existing technical infrastructure not connected with the road. - Felling of trees and existing plantings. - The construction of the fence roads and reservoirs retention - infiltration. - Implementation of road signs and markings. - The construction of protective barriers on the basis of documentation prepared in this regard by the Contractor. - The construction of noise barriers. - Execution of any other works and studies as may be necessary to carry out the contract.

Construction work

Generalna Dyrekcja Dróg Krajowych i Autostrad, Prowadzący postępowanie: Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Katowicach | Published September 15, 2015
Winner
Konsorcjum: Berger Bau Polska Sp. z o.o./Berger Bau GmbH
cpvs
45000000, 45233110, 45233125, 45221121, 45100000, 45221000, 45231000, 45233000, 71320000, 71322000, 71220000

The subject of this contract is the construction of the A1 motorway Tuszyn - Pyrzowice section Gwęzeł Blachownia (without node) - Profession node (the hub). The contract will be executed using the "Design and Build". Within the object of the contract should be performed, in particular: - Develop (based on submitted by the investor of the construction project, obtained arrangements, conditions of permits and decisions, inter alia, a decision allowing for the implementation of road investment, environmental approval, permits water law) detailed designs for construction of Motorway section of the A1 Tuszyn - Pyrzowice section G node Blachownia (without node) - node Profession (with a junction, from km 437 + 800do km 442 + 500, for all industries, technical specifications performance and acceptance of works, bill of quantities and other necessary papers for the construction and use SafeGuard entering the order, enabling the realization of the investment. - Development of economic analysis for the A1 motorway Rząsawa - Pyrzowice 4.7 km of cement concrete pavement - construction of a road junction: Profession. - The construction elements toll collection system. - Construction and reconstruction of existing roads in the area of ​​highway collisions. - Construction of roads serving the area adjacent to the proposed roadway. - Construction of roads in technology. - Construction of engineering structures, including two overpasses in the vicinity of a Natura 2000 "Meadows in Walaszczykach". - Strengthening the ground, the body and embankment slopes and excavations. - Fill any voids after the mining of ores and other work to treat for the site of the former ore mine. - The construction of the road drainage system of the body. - Reconstruction of watercourses and drainage ditches. - Reconstruction of agricultural drainages. - The construction of environmental protection facilities. - Construction of road lighting. - Construction of the infrastructure for facilities located within the highway. - Reconstruction and the elimination of existing weapons colliding with the planned investment. - Organization of traffic, road safety equipment. - A full reclamation of land occupied by the technical and social facilities, construction sites, roads during construction and any other areas transformed by the Contractor during construction and during the removal of defects and faults. - Restoration of public roads used by the Contractor during construction, to the state it was before the start of construction. - All works related to reconstruction and demolition elements colliding with the investment. - Ensure Access to all parcels adjacent to the planned belt road throughout the duration of construction. - Felling colliding with an investment of green. - Development of the area planted. - Any other work as may be necessary for the performance of the contract.

Construction work

Zarząd Dróg Wojewódzkich w Katowicach | Published April 13, 2017  -  Deadline May 26, 2017
cpvs
45000000, 45231000, 45233000, 45221000, 45100000, 45110000, 45230000, 45231300, 45233142, 45310000

This task has been divided into 2 parts A and B, ie:

Part A of the division:

task 1

"Rebuilding the provincial road No. 793 on the section Zarki - Myszków"

Exercise 2

"Construction of sanitary sewage system in the street. Kosciuszko Street. Rye in Myszków, and the construction of roads in st. Rye, together with the drainage system, which is accessible to the proposed sewage pumping station "

Hello B

Exercise 3

"Rebuilding the provincial road No. 793 on the section Janow - Golden Stream".

A detailed description of the terms of reference.

Construction work

Miasto Katowice | Published May 18, 2017  -  Deadline May 24, 2017
cpvs
45000000, 45233100, 45231400, 45231600, 45262400, 45223500, 45232423, 45232400, 45231220, 45231300, 45300000, 45331000

The contract involves the construction of an interchange in Katowice, in the Zawodzie district on the right bank of the Rawa River, between the following streets: Bagni, Krakowska, Łączna and May 1, with lighting, dehydration and accompanying infrastructure, as well as the necessary redevelopment of existing networks. Scope of the City of Katowice - it is described in point 10 SIWZ. The scope of Silesian Trams - is described in point 10 SIWZ.

Detailed description of the object of the contract includes - design documentation (Annex No. 8 to SIWZ),

Technical specifications of workmanship and acceptance of construction works.

Requirements for employment by contractor or subcontractor under contract of employment of persons - art. 29 sec. 3a of the Act - the contracting authority considers the condition to be fulfilled when the contractor submits a statement of employment as described in Section 10.6 of the SIWZ.

Construction work

Miasto Katowice | Published May 3, 2017  -  Deadline May 19, 2017
cpvs
45000000, 45233100, 45231400, 45231600, 45262400, 45223500, 45232423, 45232400, 45231220, 45231300, 45300000, 45331000

The contract involves the construction of an interchange in Katowice, in the Zawodzie district on the right bank of the Rawa River, between the following streets: Bagni, Krakowska, Łączna and May 1 with lighting, dehydration and accompanying infrastructure, as well as the necessary redevelopment of existing networks. Scope of the City of Katowice - it is described in point 10 SIWZ. The scope of Silesian Trams - is described in point 10 SIWZ.

Detailed description of the object of the contract includes - design documentation (Annex No. 8 to SIWZ),

Technical specifications of workmanship and acceptance of construction works.

Requirements for employment by the contractor or subcontracting under the contract of employment - Art. 29, item 3a of the Act - the contracting authority shall consider the condition fulfilled when the contractor submits a declaration of employment as described in clause 10.6 of the SIWZ.

Construction work

Miasto Katowice | Published May 3, 2017  -  Deadline May 26, 2017
cpvs
45000000, 45233100, 45112710, 45231400, 45231600, 45262400, 45223500, 45232400, 45231300, 45300000, 45331000, 45332300, 45332400

The contract involves the construction of an interchange node in Katowice, in the Brynów district of the existing tram loop, along with lighting, dehydration and associated infrastructure and the necessary redevelopment of existing networks.

Scope of the City of Katowice - described in item 10 of the Terms of Reference. Range of Silesian Trams - described in item 10 of SIWZ.

Detailed description of the object of the contract includes - design documentation (Annex No. 8 to SIWZ),

Technical specifications for the execution and acceptance of construction works (attach No. 7 to SIWZ), drafts of works (attach No. 6a and 6b to SIWZ), conditions for realization of the object of the order (attach No. 4 to SIWZ).

Requirements for employment by contractor or subcontracting under the employment contract - Art. 29, item 3a of the Act - the contracting authority shall consider the condition fulfilled when the contractor submits a declaration of employment as described in paragraph 10.7 of the SETC.

Construction work

Miasto Katowice | Published May 23, 2017  -  Deadline June 2, 2017
cpvs
45000000, 45233100, 45112710, 45231400, 45231600, 45262400, 45223500, 45232400, 45231300, 45300000, 45331000, 45332300, 45332400

The contract involves the construction of an interchange node in Katowice, in the Brynów district of the existing tram loop, along with lighting, dehydration and associated infrastructure and the necessary redevelopment of existing networks.

Scope of the City of Katowice - described in item 10 of the Terms of Reference. Range of Silesian Trams - described in item 10 of SIWZ.

Detailed description of the object of the contract includes - design documentation (Annex No. 8 to SIWZ),

Technical specifications for the execution and acceptance of construction works (attach No. 7 to SIWZ), bill of quantities (attach No. 6a and 6b to SIWZ), conditions for realization of the object of the order (attach No. 4 to SIWZ).

Requirements for employment by contractor or subcontractor on the basis of an employment contract. 29 sec. 3a of the Act - the contracting authority considers the condition to be fulfilled when the contractor submits a statement of employment as described in Section 10.7 of the SETCPP.

Construction work

Samodzielny Publiczny Szpital Kliniczny nr 7 Śląskiego Uniwersytetu Medycznego Górnośląskie Centrum Medyczne im. Leszka Gieca | Published December 6, 2016  -  Deadline January 13, 2017
cpvs
45000000, 45262500, 45300000, 45400000, 45410000, 45317000, 45311000, 45315700, 45314310

The contract is:

Execution of works

Croup. 1 - Replacement of switchgear RNN station S2

A detailed description of the contract includes design documentation, bill of quantities, Technical performance and acceptance of works, which are annexed to the tender documents.

The contract is:

Execution of works

Croup. 1 - Replacement of switchgear RNN station S2

A detailed description of the contract includes design documentation, bill of quantities, Technical performance and acceptance of works, which are annexed to the tender documents.

3.2. Employer's Requirements concerning the subject matter of the contract:

The contractor undertakes to carry out the object of the contract in accordance with the description contained

in the tender documents, contract and in accordance with:

a) Takeoff attached as Annex 3 to the SETC

b) conditions resulting from the applicable technical regulations and the Construction Law;

c) requirements under the applicable Polish Standards, Technical Conditions Execution and Acceptance of Works and related regulations;

d) the principles of sound technical expertise and established usages.

In the implementation of the contract the Contractor any finishing materials, necessary for the implementation of the tasks, purchase their own as part of the costs referred to in this agreement. The materials used by the Contractor must be approved for use in the construction industry within the meaning of the Act of 7.7.1994 Construction Law (Journal of Laws of 2000, No. 106, item. 1126, as amended) and the Act of 16.4.2004 on construction products (Journal .u. 04.92.881) and accepted by the Purchaser.

Description of criteria which the awarding entity will apply in selecting a tender, together with the weights of the criteria and method of evaluation of tenders

The price criterion. Weight: 60%

Criterion warranty period. Weight: 40%.

Structures construction work

Katowicka Infrastruktura Wodociągowo-Kanalizacyjna Sp. z o.o. | Published October 6, 2016  -  Deadline October 19, 2016
cpvs
45223000, 45233000, 45231000, 45310000, 45351000

All costs to make the visit of the construction site shall be borne by the Contractor.

Construction work

Tauron Ciepło Sp. z o.o. | Published April 20, 2017  -  Deadline May 30, 2017
cpvs
45000000, 45231000, 42511100, 45111200, 45232142

The subject of the order is the execution of construction and assembly works for the implementation of the connection of new objects to the district heating network within the framework of the project. Low Emission Liquidation Program in the Silesian-Dabrowa Conurbation. The subject matter of the order will be implemented on the basis of a framework contract concluded with twenty Contractors who will submit bids with the lowest prices, unless the bids are not subject to rejection will submit fewer Contractors. After concluding a framework agreement with the Contractors selected as a result of the proceedings, the Awarding Entity will award execution contracts in accordance with the procedure specified in art. 101a. 1 pt 2b Pzp.

Construction work

Tauron Ciepło Sp. z o.o. | Published May 26, 2017  -  Deadline June 8, 2017
cpvs
45000000, 45231000, 42511100, 45111200, 45232142

The subject of the order is the execution of construction and assembly works for the implementation of the connection of new objects to the district heating network within the framework of the project. Low Emission Liquidation Program in the Silesian-Dabrowa Conurbation. The subject matter of the order will be implemented on the basis of a framework contract concluded with twenty Contractors who will submit bids with the lowest prices, unless the bids are not subject to rejection will submit fewer Contractors. After concluding a framework agreement with the Contractors selected as a result of the proceedings, the Awarding Entity will award execution contracts in accordance with the procedure specified in art. 101a. 1 pt 2b PZP.

Machinery for mining, quarrying, construction equipment

Polska Grupa Górnicza Sp. z o.o. | Published May 13, 2016
cpvs
43000000, 42000000, 31000000, 66114000

Machinery for mining, quarrying, construction equipment

Parts of machinery for mining, quarrying and construction

Polska Grupa Górnicza sp. z o.o. | Published May 31, 2016  -  Deadline June 17, 2016
cpvs
43600000

Parts of machinery for mining, quarrying and construction

Machinery for mining, quarrying, construction equipment

Kompania Węglowa S.A | Published December 15, 2015  -  Deadline December 28, 2015
cpvs
43000000

Machinery for mining, quarrying, construction equipment

Structures construction work

Katowicka Infrastruktura Wodociągowo-Kanalizacyjna Sp. z o.o. | Published December 24, 2016
Winner
HUSAR Budownictwo Inżynieryjne S.A.
cpvs
45223000, 45233000, 45231000, 45310000, 45351000

1. The subject of this contract is: Construction of mechanical grate before sewage pump station Giszowiec

2. A detailed description of the contract is located in Appendices 7-14 to the ToR.

Construction supervision services

Miasto Katowice | Published January 26, 2017  -  Deadline February 9, 2017
cpvs
71520000, 71530000, 71540000, 71541000

Acting as Contract Engineer for investment project called. "Construction of three pools in the neighborhoods." The scope of the task includes the construction of swimming pools in locations:

I- Katowice - ul. Haller Street. Riding, II Katowice - ul. Kosciuszko Street. Zgrzebnioka III - Katowice - Zadole - ul. Recreation.

The investment in all locations uprising storey building, basement includes an indoor swimming pool with all the necessary facilities and administrative - social. The building will consist in particular: main pool - sports, trough which supports the needs of learning to swim with, attractive facilities and a children's pool, water slides externally - internal, spa tubs, auditorium, gymnasium with gym, rooms of sauna,

Additionally, the investment includes, among others, execution of land development, roads, car parks, networks and connections of utilities.

The detailed scope of the contract defines the Terms of Reference and the draft contract.