Call +44 800 9755 164

Public tenders for construction in Katowice Poland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Katowice: Construction of the fountain in the Square Fish in Katowice.

Zakład Zieleni Miejskiej | Published July 26, 2016  -  Deadline December 12, 2016
The contract is for the execution of works titled .: Construction of the fountain in the Square Fish in Katowice. Investment object is located: 1). Szopienicka, plot No. 693/86), and from the southern borders of the plot No. 1405/86, from which cordoned off the fence. It is a green area, including the decorated square, where plantings are located in the form of trees and shrubs, lawns, sidewalks with concrete blocks, landscaping elements, such as benches, litter bins, elements of the playground. BALANCE OF LAND Fountain 2 x 9.57 = 19.14 m2 fragment of pavement that divides the two parts of the fountain of 5.25 m2 Cobble around the fountain 2 x 11.39 = 22.78 m2 19.04 m2 Technical Chamber FORM AND FUNCTION OF THE OBJECT The aim of the investment is creating a friendly and accessible public space in which the main attraction is a fountain with a basin, in line with expectations and the originators of the Investor. FOUNTAIN. Details of the project documentation. TECHNICAL CHAMBER. The surfaces of the ceiling to secure insulation in both rooms provide gravitational ventilation. Details of the project documentation. PAVEMENT. After the completion of the works related to the construction of the fountain should play a portion of sidewalk separating the two parts of the fountain while maintaining the following arrangement of layers (from top): - concrete tiles 50x50x7cm 3,0cm 15,0cm 15,0cm - subsoil. DISC STONE AROUND THE FOUNTAIN. Around the fountain lay stone slabs with a decrease in the direction of the trough (3%) while maintaining the following arrangement of layers (from top): 4.0 cm 3,0cm 15,0cm 15,0cm - subsoil.

Construction work

Kompania Węglowa S.A. | Published November 18, 2016  -  Deadline December 1, 2016
Works

Katowice: Reconstruction of the intersection provincial road No. 945 from the District road No. 1427 WITH Demolition and construction of the bridge and sidewalks IN A CITY Swinna.

Zarząd Dróg Wojewódzkich w Katowicach | Published July 22, 2016  -  Deadline November 30, 2017
Reconstruction of the intersection provincial road No. 945 from the District road No. 1427 WITH Demolition and construction of the bridge and sidewalks IN A CITY Swinna. This task encompasses the demolition and construction of a bridge, reconstruction of the intersection of roads and the construction of sidewalks. Details of the tasks described in the Description of the Contract, the Bill of Quantities and documentation ..

Katowice: Execution of design services in the framework of the Project: Construction of roads with accompanying infrastructure street salmon

 | Published July 13, 2016  -  Deadline October 31, 2018
Kamienska in Katowice with the author's supervision over the implementation of works and participation in the public consultation. As part of the contract, the contractor is obliged to Kamienska in Katowice and obtaining a decision to authorize the implementation of road investment in accordance with the Act of 10 April 2003. On special rules for the preparation and implementation of investments in public roads and the decision on the construction permit in accordance with the Construction Law of 7 July 1994. as amended. d. for the required scope of work. The scope of the project documentation includes: Kamienska in Katowice, b) the construction of the planned road lighting, c) construction of the drainage of the planned road. d) demolition of buildings colliding with the object of the contract, along with obtaining a demolition permit for the elements of this demanding e) the target traffic organization, f) spacers network and technical infrastructure colliding with the designed solutions, g) channel technology - for submission by interested parties request for access to the channel. Project documentation includes (according to the Regulation of the Minister of Infrastructure of 2 September 2004. On the detailed scope and form of design documentation, technical specifications for execution and acceptance of construction works and the functional - utility): - construction project in terms of taking into account the specificity of the works; - Implementing projects; - Bill of quantities; - Information on safety and health, where its study is required under separate provisions; The contractor that will complete the contract should: -opracować project documentation based on current law, -uzyskać all the necessary arrangements and required by law decisions, which will allow to carry out a tender procedure for the implementation of construction works on the basis of this documentation. -przekazać whole design projects in paper and electronic form (on CD in DWG, PDF). In addition, the documentation should be prepared taking into account the current provisions of statutes - construction law, spatial development, public procurement law and regulations related to the a / laws. Develop technical specifications for execution and acceptance of construction works. Execution of investment cost. Active participation in social consultations and the preparation of materials m. In .: visualization and presentation including answering queries residents. Performing the author's supervision over the implementation of works in the field developed project documentation (if the Purchaser in writing undertakes designer to supervise the author).

Katowice: Construction of the fountain on the Square of Twin Cities in Katowice Ligota BO.

Zakład Zieleni Miejskiej | Published July 22, 2016  -  Deadline December 9, 2016
Construction of the fountain on the Square of Twin Cities in Katowice Ligota BO. Investment object is located: Fountain in terms of the architecture located on a plot of the registration number 24/40, which is owned by the City of Katowice and is in the permanent board of the Department of Greenery in Katowice based on Decision No. GM-V.6844.4.8.2011.KK Mayor of Katowice of 24 October 2013. BALANCE OF AREA Before work will be drawn up a protocol state 0. cadastral plot No. 24/40: 2,8786ha area in terms of development: 167m2 Surface hardened: 90,82m2 Trough Fountain: 51,31m2 hatch: 1m2 Planting shrubs: 3,72m2 Lawn park: 12,74m2 Dishes under the trees: 7,08m2 FORM aND FUNCTION oF tHE OBJECT the aim of the investment is to create a friendly and accessible public space in which the main attraction is a fountain with a basin, in line with expectations and the originators of the Investor. PAN FOUNTAIN planned to fill the basin with water fountains at + 0.3m in relation to the level of 0.00m accordance with the design process plant industry. The lining trough perform all the transitions and tight installation approach and embed the necessary fittings according to industry of technological installations, to finish cladding was aesthetic. Surface finish tiles to grouting lining blocks of granite, use flexible mortar joints for outdoor use, waterproof and resistant to the process of freezing and thawing, resistant to shock and biological washing under pressure, showing resistance to chemicals (according to. The technology industry) in the basin fountains, adapted for use in the basins of pool, holding the NIH study. CHAMBER TECHNICAL MACHINERY layers of inheritance should be made of cement mortar waterproof and water-resistant. Technical engine compartment must be equipped with a manhole and ladder system solution according to the manufacturer, installed according to the manufacturer's instructions. The hatch should be warm and apply a protective grille with additional closure. Installation carried out on masonry anchors according to manufacturer's recommendations. Paved Particular attention was paid to the aesthetic finishing of the surface around the basin fountains, protective grilles on the tree and connecting with the existing surface. GREEN Use of plant specimens with well-educated root balls and above-ground part - according to the following parameters and characteristics of the species and varieties of Chaenomeles x superba Nicoline - The size seedlings C2, H20-40cm. Park benches Assembly benches made according to the manufacturer's instructions. GRILLE PROTECTION UNDER THE TREE

Katowice: Execution of design services in the framework of the Project: Construction of four separators pre-treatment rainwater and snowmelt

Miasto Katowice | Published July 25, 2016  -  Deadline December 15, 2016
Development of the four project documentation in the framework of the investment task entitled .: Construction of four separators pre-treatment rainwater and snowmelt along with participation in the public consultation. As part of the contract, the contractor is obliged to: Execution of comprehensive design documentation for implementation of the pre-treatment facilities rainwater and snowmelt (separator with sludge trap and bypass) with obtaining an administrative decision pursuant to the Law Construction Law of 7 July 1994. As amended. d. for the required scope of work (for each location separately) in the indicated four locations by. attachments mapping (attached) airport - well K97 channel real-DN 400/500, rain water discharged into the channel connecting the pond with swimming pond Canoe in Katowice Forest Park - attachments No. 9A, 9B; Oat and ul. Meadow - located behind the well k113 channel real-DN 1000 rain water discharged into the watercourse Ślepiotka - no attachments 10A, 10B; separator 3 - (plot no. 85/7 km 18) in the area of ​​the settlement of the Millennium in the direction of the joint Morocco - a new location on channel real-DN 800, rain water discharged into the pond Morocco - no attachments 11A, 11B; separator 4 - (plot no. 1/67 51 km) from the area of ​​the Valley of the Three Ponds in the direction of the pond meadow - located behind the well collective K53 channel real-DN 1000 rain water discharged into the pond Meadow Valley of the Three Ponds - attachments No. 12A, 12B. Project documentation includes (according to the Regulation of the Minister of Infrastructure of 2 September 2004. On the detailed scope and form of design documentation, technical specifications for execution and acceptance of construction works and the functional - utility): - construction project in terms of taking into account the specificity of the works; - Implementing projects; - Bills of quantities by industry; - Information on safety and health, where its study is required under separate regulations. Contractor who will execute the order shall: - develop project documentation on the basis of current law - to get all the necessary arrangements and required by law decisions, which will allow to carry out a tender procedure for the implementation of construction works on the basis of this documentation. - To pass all design projects in paper and electronic form (on CD in DWG, PDF). In addition, the documentation should be prepared taking into account the applicable statutory provisions - construction law, spatial development, public procurement law and regulations related to the a / laws. Develop technical specifications for execution and acceptance of construction works. Execution of investment cost. Participate in public consultations and the preparation of materials m. In .: visualization and presentation including answering queries residents.

Parts of machinery for mining, quarrying and construction

Polska Grupa Górnicza Sp. z o.o. | Published November 22, 2016  -  Deadline December 6, 2016

Proceedings procurement sector is conducted in an open tender under the provisions of the Act of 29.1.2004 the Public Procurement Law (OJ 2015 item. 2164, as amended.) And based on the appropriate implementing rules.

The contract is for the supply of the drive wheels friction to drive locomotives and monorail hoists, hydraulic Branches for Polish Mining Group Sp. z oo in 2017.

Friction wheel drive according to the range set out in Annex 2 hereto.

ROLL propellants by the range set out in Annex 2 hereto.

Roll propellants by the range set out in Annex 2 hereto.

Katowice: Design and execution of construction works on the renovation of toilets, including replacement of installations on the vertical projection of the located at the intersection of ul. Reymont and ul. Ligonia in the building of the Silesian Provincial Office in Katowice, ul. Jagiellońska 25 in system design and build - II proceedings.

Śląski Urząd Wojewódzki w Katowicach | Published July 27, 2016  -  Deadline April 30, 2017
Subject of the contract - design and execution of construction works on the renovation of toilets, including replacement of installations on the vertical projection of the located at the intersection of ul. Reymont and ul. Ligonia in the building of the Silesian Provincial Office in Katowice, ul. Jagiellońska 25 in system design and build. Stage I: preparation of design documentation (PB) obtaining all required arrangements with the submission of a complete application for a permit to conduct restoration works at the monument - until 30.09.2016r, Phase II: obtaining final decision: Silesian Provincial Conservator and the building permit , execution of the remaining technical documentation (PW, STWiORB), construction works and as-built documentation - to 30.04.2017r ..

Hire of construction and civil engineering machinery and equipment with operator

Katowicki Holding Węglowy S.A. | Published November 4, 2016  -  Deadline December 13, 2016
Provision of services related to KHW SA KWK Wujek Ruch "Silesia" of heavy equipment in the service piles of coal

Miscellaneous structures

Polska Grupa Górnicza Sp. z o.o. | Published November 18, 2016  -  Deadline December 6, 2016

Delivery roadway of special steel with increased technical and operational parameters of the branches of the Polish Group Mining Sp. z oo in 2017 in the amount of 6 111 tons.

Purchase.

Task No. 1

1.1 Housing Pavement Special arc susceptible of the section V29 four-fold without stirrups made of high-strength steels S550W or equivalent 239.343 tons

1.2 Housing Pavement Special arc susceptible of the section V29 four-fold without stirrups made of high-strength steels S550W or equivalent to 774.874 tons.

Purchase.

Title: Constantly micro-to sections and accessories mining or equivalent tons 25.010

Title: Constantly micro-to sections and accessories mining or equivalent 180.511 tons

Title: Constantly micro-to sections ii accessories mining or equivalent tons 3,750

Title: Constantly micro-to sections and accessories mining or equivalent tons 25.154.

Purchase.

Title: Constantly micro-to sections and accessories mining or equivalent 570.335 tons

Title: Constantly micro-to sections and accessories mining or equivalent 185.131 tons

Title: Constantly micro-to sections and accessories mining or equivalent 356.604 tons.

Purchase.

Title: Constantly micro-to sections and accessories mining or equivalent 194.640 tons

Title: Constantly micro-to sections and accessories mining or equivalent 377.073 tons

Title: Constantly micro-to sections and accessories mining or equivalent tons 32.098.

Purchase.

Title: Constantly micro-to sections and accessories mining or equivalent 148.317 tons

Title: Constantly micro-to sections and accessories mining or equivalent tons 12.875

Title: Constantly micro-to sections and accessories mining or equivalent 208.594 tons

Title: Constantly micro-to sections and accessories mining or equivalent 737.655 tons

Title: Constantly micro-to sections and accessories mining or equivalent tons 43.055

Title: Constantly micro-to sections and accessories mining or equivalent 197.400 tons.

Purchase.

Title: Constantly micro-to sections and accessories mining or equivalent 747.118 tons

Title: Constantly micro-to sections and accessories mining or equivalent 340.054 tons

Title: Constantly micro-to sections and accessories mining or equivalent tons 18.253

Title: Constantly micro-to sections and accessories mining or equivalent 402.245 tons

Title: Constantly micro-to sections and accessories mining or equivalent tons 24.748

Title: Constantly micro-to sections and accessories mining or equivalent tons 13.043

Title: Constantly micro-to sections and accessories mining or equivalent tons 13.539

Title: Constantly micro-to sections and accessories mining or equivalent tons 14.044

Title: Constantly micro-to sections and accessories mining or equivalent tons 32.088

Title: Constantly micro-to sections and accessories mining 6,660 tons or equivalent

Title: Constantly micro-to sections and accessories mining or equivalent tons 34.815.

task 7

Title: Constantly micro-to sections and accessories mining or equivalent tons 68.904

Title: Constantly micro-to sections and accessories mining or equivalent tons 83.090.

Katowice: Execution of design services in the framework of the project entitled: Road links ul. Common of the street. tunnel

Miasto Katowice | Published July 22, 2016  -  Deadline October 31, 2018
Tunnel in Katowice with the author's supervision over the implementation of works and participation in the public consultation. The scope of the project documentation should include: tunneling, with unilateral sidewalk with reserve land for future bicycle path, 2. construction of the planned road lighting, 3. construction of the drainage of the planned road. 4. demolition of buildings colliding with the object of the contract, along with obtaining a demolition permit for items that require 5. target traffic organization 6. spacers network and technical infrastructure colliding with the designed solutions, 7. channel technology - for submission by interested parties request for access to the channel. Project documentation includes (according to the Regulation of the Minister of Infrastructure of 2 September 2004. On the detailed scope and form of design documentation, technical specifications for execution and acceptance of construction works and the functional - utility): - construction project in terms of taking into account the specificity of the works; - Implementing projects; - Projects division of property; - Bill of quantities; - Information on safety and health, where its study is required under separate regulations. Contractor who will execute the order shall: - develop project documentation on the basis of current law - to get all the necessary arrangements and required by law decisions, which will allow to carry out a tender procedure for the implementation of construction works on the basis of this documentation. In addition, the documentation should be prepared taking into account the current provisions of statutes - construction law, spatial development, public procurement law and regulations related to the a / laws. Develop technical specifications for execution and acceptance of construction works. Execution of investment cost. Active participation in social consultations and the preparation of materials m. In .: visualization and presentation including answering queries residents. Performing the author's supervision over the implementation of works in the field developed project documentation (if the Purchaser in writing undertakes designer to supervise the author).

Conveyors

Polska Grupa Górnicza Sp. z o.o. | Published November 24, 2016  -  Deadline December 7, 2016

Finance leases with the delivery of a brand new conveyor belt with a special belt width 1400mm (with the construction of the route, tape) from the power supply system and control and its buildings for the needs of the Polish Group Mining Sp. z oo KWK ROW Movement Chwałowice.

The contract is:

Finance leases with the delivery of a brand new conveyor belt with a special belt width 1400mm (with the construction of the route, tape) from the power supply system and control and its buildings for the needs of the Polish Group Mining Sp. z oo KWK ROW Movement Chwałowice.

Engineering design services

Generalna Dyrekcja Dróg Krajowych i Autostrad; prowadzącym postępowanie jest Generalna Dyrekcja Dróg Krajowych i Autostrad, Oddział w Katowicach | Published November 16, 2016  -  Deadline December 29, 2016
Employer allows partial bids. 

The details of the order was described in Volume II - III Terms of Reference.

Improvements in road safety in the province. Silesia on the DK 45 on section Roszków - Tworków within PBDK - PLMN includes preparation of documentation for the task: Improving road safety in the province. Silesia on the DK 45 on section Roszków - Tworków within PBDK - PLMN along with the implementation activities necessary to prepare the task and support the Purchaser at the stage of the tender procedure for the construction and during the execution of works.

Improvements in road safety in the province. Silesia on the DK 11 on section Sieraków Silesian-Tight within PBDK - PLMN includes preparation of documentation for the task: "Improving road safety in the province. Silesia on the DK 11 on section Sieraków Silesian-Tight within PBDK - PLMN "with the performance of activities necessary to prepare the task and support the Purchaser at the stage of the tender procedure for the construction and during the execution of works.

Lisowice within PBDK - PLMN "with the performance of activities necessary to prepare the task and support the Purchaser at the stage of the tender procedure for the construction and during the execution of works.

Improvements in road safety in the province. Silesia on the DK 78 on section Turza Slaska - Gorzyce within PBDK - PLMN includes preparation of documentation for the task: Improving road safety in the province. Silesia on the DK 78 on section Turza Slaska - Gorzyce within PBDK - PLMN along with the implementation activities necessary to prepare the task and support the Purchaser at the stage of the tender procedure for the construction and during the execution of works.

Improvements in road safety in the province. Silesia on the DK 44 on section Paniówki - Mikołów within PBDK - PLMN includes preparation of documentation for the task: Improving road safety in the province. Silesia on the DK 44 on section Paniówki - Mikołów within PBDK - PLMN along with the implementation activities necessary to prepare the task and support the Purchaser at the stage of the tender procedure for the construction and during the execution of works.

Nieborowice within PBDK - PLMN "with the performance of activities necessary to prepare the task and support the Purchaser at the stage of the tender procedure for the construction and during the execution of works.

Katowice: Reconstruction of drainage system on the national road No. 81 in the town of Ochaby

 | Published July 12, 2016  -  Deadline June 30, 2017
The scope of the tasks include: Development of formal documentation, design and the technical specification of the Workmanship and the acceptance of construction works, in compliance with the requirements set out in the functional and operational program (hereinafter referred to as PFU) with all opracowaniami design and arrangements necessary to complete the documentation - hereafter Documentation design with obtaining the legally required decisions, permits, opinions, conditions, agreements and other documents necessary for the execution of works covered by the agreement and described in the PFU, b) the exercise of due diligence works hereinafter Robots based on approved by the Employer Documentation project in accordance with the principles of technical knowledge and respect for the provisions contained in the resulting decisions, permits, conditions, opinions and arrangements and other documents associated with the construction process for the works performed; c) supervising the copyright in the period of execution of works on the basis of the developed design documentation ..

Katowice: TECHNICAL DOCUMENTATION FOR THE TASKS: SZOPIENICE-CENTRE. REPAIR AND ADAPTATION OF PREMISES BUILDING STREET. Bednorz 14 KATOWICE FOR THE IMPLEMENTATION OF ACTION WITH seigniorial perform comprehensive supervision COPYRIGHT

Komunalny Zakład Gospodarki Mieszkaniowej | Published July 26, 2016  -  Deadline March 31, 2018
Works will include ground floor of the building - to make a change of use of premises and adapt them to the current rules in accordance with their intended purpose. The contract covers: 1) Technical documentation (AD), including: a) the construction design drawings regulations, including technical expertise in the field of fire protection (including obtaining the provisions of the Provincial Commandant of the State Fire Service in Katowice) (A) b) bill of quantities (B) c) investment cost estimate (C) d) technical specifications for execution and acceptance of construction works (d) 2) execution of a feasibility study (E) 3) Performing a comprehensive author's supervision over the implementation of works within the scope of the project documentation (F) Detailed description the order shall specify: model agreement and its annexes (Annex 7 to SIWZ - in particular Appendix 1 to the agreement). The Contracting Authority to finance the contract intends to allocate the amount of: 104,183.45 zł gross. In the absence of a written undertaking to the Contractor by the Employer to perform author's supervision salary will be reduced accordingly by the amount of supervision resulting from the Contractor's bid.

Katowice: Monitoring the settlement of Adam

Miasto Katowice | Published July 27, 2016  -  Deadline December 31, 2016
1. Name of the contract Monitoring the settlement of Adam 2. In the framework of the contract the Contractor is obliged to design and perform monitoring system consisting of 5 camera points located in the area of ​​ul. Adam and prepare them for integration into existing system monitoring KISMiA, including: a.wykonania project documentation including: -Projekt construction -Projekt Executive -STWiOR -Kosztorys Investor in the amount of the bid (Documentation must be supplied in 5 paper copies and 1 copy on electronic media ) a.wykonania author's supervision execution of the order according to the project, b.uzyskania relevant permits, approvals and all agreements and other documents necessary for the complete execution of the investment, c.wykonania construction and installation works in all industries covered in / in the project documentation, d.dostawy and configuration of devices for monitoring, e.wykonania fiber-optic network data transmission, f.montażu and commissioning of the system along with training staff in the use, control, video surveillance, the date agreed by the Parties, g.wykonania as-built documentation and forward it to the Employer in 3 copies . hard copy and 1 copy. electronic version on electronic media, h.serwisu repair equipment and components installed as part of the expansion of the system - under warranty. The detailed scope of the contract has been defined in the functional and operational program (Annex 8 to the Terms of Reference - ToR). Other conditions for the implementation of the order are set out in the draft contract (Annex 6 to the ToR) ..

Katowice: ZP-2380-167-50 / 2016 Retrofitting of the building Transport Service Station No. 7 in the complex of the Regional Police Headquarters at ul. Lompy 19

Komenda Wojewódzka Policji w Katowicach | Published July 20, 2016  -  Deadline October 30, 2017
Lompy 19, thermomodernization facility along with accompanying work. 2. A detailed description of the object of the contract: 2.1 bill of quantities - Annex 4 to the Terms of Reference 2.2 Technical Specifications execution and acceptance of works - Annex 5 to the Terms of Reference 2.3 Technical Documentation - Annex 6 to the Terms of Reference 2.4 Principles of marking projects co-financed by the Regional Fund for Environmental Protection and Water Management in Katowice - Annex 7 to the Terms of Reference values ​​needed to show on the boards will be submitted to the Contractor after the conclusion of the contract. Guarantee documents should include a review of the free warranty for indoor installation of central heating, process heat and hot water and making the adjustment settings on the devices automatic regulation and control devices and heating systems with a frequency of every 12 months, ie. Once a year. The proposed systems and materials equivalent should have the legally required certificates, certificates, approvals for use in construction, and meet the requirements specified in the documentation. 5. Employer determines that a key part of the order, reserved to make own forces without the participation of sub-contractors or subcontractors further construction works are thermo-building partitions, ie. Insulation of walls and flat roof. All persons for the implementation of key parts of the contract should be employed on the basis of a work contract or temporary work. These individuals must have at least 3 years of professional experience and relevant valid licenses, if regulations require such authorizations. 8. By the date of signing the contract the Contractor shall submit to the Employer a list of persons to carry out the crucial part of the contract (Annex 9 to the Terms of Reference annexed to the agreement) of the Contractor and / or subcontractor who will be employed under a contract of employment or temporary work at least for the duration of the contract. Copies of the agreements should be signed (to be true) by the Contractor. 8, the Contractor shall notify the Contracting Authority within three days of the change. 11. The changes referred to in Section 10 requires the submission to the Employer of new employment contracts or temporary work for the employees of the Contractor and / or subcontractor and / or further subcontractors. 12. Common Procurement Vocabulary CPV: 45 21 61 10-8 - Construction work for buildings relating to law and order; 45 32 10 00-3 - Thermal insulation; 45 33 11 00-7 - installation of central heating; 45 33 12 10-1 - ventilation installation;

Katowice: Rebuilding provincial road No 919 WITH sidewalks FROM KM 0 + 000 to km 1 + 915 RACIBÓRZ IN A CITY DIVIDED INTO TWO STAGES. STAGE AND FROM KM 0 + 000 TO KM 0 + 923.72. STAGE II FROM KM 0 + 923.72 to km 1 + 915.

Zarząd Dróg Wojewódzkich w Katowicach | Published July 27, 2016  -  Deadline September 29, 2017
Rebuilding provincial road No 919 WITH sidewalks FROM KM 0 + 000 to km 1 + 915 RACIBÓRZ IN A CITY DIVIDED INTO TWO STAGES. STAGE AND FROM KM 0 + 000 TO KM 0 + 923.72. STAGE II FROM KM 0 + 923.72 to km 1 + 915. This task encompasses the reconstruction of provincial road No. 919, along with sidewalks on the stretch of 1915 m. In the framework of the reconstruction assumed full exchange of road construction, reconstruction of individual meetings and public building parking bays and bus, rebuilding sidewalks. The aim of the reconstruction of the road is to improve traffic safety on the road involving the introduction of geometry correction of vertical and horizontal road crown and the restoration of equal transverse and longitudinal surface. Details of the tasks described in the Description of the Contract, the Bill of Quantities and documentation ..

Environmental improvement works

Polska Grupa Górnicza Spółka z o.o. | Published November 17, 2016  -  Deadline December 5, 2016

The scope of the task includes modernization of 2 pcs. Of electro - manufacturer ELWO, HE-15-125 / 3x3,3x5,6 / 275 year of construction in 1975, which co-operate with 4 grate boilers, ie. 2xOR-16 and 2xWR-10 installed in the EC "Jankowice "and they are connected to a common ceramic exhaust duct. Both electrostatic precipitators must be chosen for the same amount of exhaust gas due to the assumed possibility of booking. Not expected to cooperate one electrostatic precipitator with all boilers. It is assumed that the modernization will be based on a comprehensive reconstruction of the existing electrostatic precipitators No. 1 and No. 2 by exchanging internal equipment (collecting electrodes and corona, systems rappers etc.), Electrical power and instrumentation, so as to achieve the required new regulations, emission standards for installations . Dedusting system should ensure observance standard dust emission of less than 100.0 mg / Nm3 at an oxygen content in the flue gas at 6%, with the use of fuel - coal.

Engineering design services

Generalna Dyrekcja Dróg Krajowych i Autostrad; prowadzącym postępowanie jest Generalna Dyrekcja Dróg Krajowych i Autostrad Oddział w Katowicach | Published November 22, 2016  -  Deadline December 29, 2016

Improving the safety of pedestrians in selected places on the DK45, DK11, DK46, DK78, DK44 in the province. Silesian divided into 6 parts (tasks). Employer allows partial bids.

The Contractor may submit an offer for one or two or three or four or five or six lots. Shall not be accepted variants. Execution of the contract is subject to Polish law, in particular the law dated 7.7.1994, the Construction Law (ie. OJ 2016. Pos. 290 as amended.) Act of 23.04.1964 r. Civil Code (ie. Acts . Laws of 2016. pos. 380 as amended.) and the Act of 29.1.2004 r. public procurement Law (ie. Dz. U. of 2015. item. 2164, as amended.). Purchaser does not provide for the award of contracts referred to in art. 67 paragraph. 1, item 6 of the PPA, consisting in the repetition of similar services, consistent with the subject of the main contract. The details of the order was described in Volume II - III Terms of Reference.