Call +44 800 9755 164

Public tenders for construction in Jaworzno Poland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Works for complete or part construction and civil engineering work

Miejskie Przedsiębiorstwo Wodociągów i Kanalizacji Sp. z o.o. | Published April 21, 2017  -  Deadline June 7, 2017
cpvs
45200000, 45100000, 45111000, 45112000, 45231300, 45232410, 45233140, 71322200

The subject of the order is "Construction of a sanitary sewage system in ul. Chopin, ul. Bee, ul. Marusarzowny, ul. Resin and Shellfish and the design and construction / reconstruction of the water supply network with connections to buildings in ul. Szelonka i Żywicznej in Jaworzno Part III: Construction of the sanitary sewage system and design and construction / reconstruction of the water supply system with connections to ul. Szelonka and ul. Reservoirs in Jaworzno. "

The subject of the order will be executed in accordance with the provisions of the Construction Law, the design documentation, the description of the subject matter of the Order, the technical specification of the execution and acceptance of construction works, the functional and practical program, the safety and health regulations, and the contract, the model of which will be included in the second part of the SIWZ.

When using device type documentation, the manufacturer's name should be considered as an example and only to indicate the quality standard of adopted systems and components and the supply of equipment.

Construction of a sanitary sewage system in ul. Chopin, ul. Bee, ul. Marusarzowny, ul. Resin and Shellfish and the design and construction / reconstruction of the water supply network with connections to buildings in ul. Szelonka i Żywicznej in Jaworzno Part III: Construction of the sanitary sewage system and design and construction / reconstruction of the water supply system with connections to ul. Szelonka and ul. Reservoirs in Jaworzno. "

The subject of the order will be executed in accordance with the provisions of the Construction Law, the design documentation, the description of the subject matter of the Order, the technical specification of the execution and acceptance of construction works, the functional and practical program, the safety and health regulations, and the contract, the model of which will be included in the second part of the SIWZ.

Engineering works and construction works

Gmina Miasta Jaworzno, Urząd Miejski w Jaworznie | Published April 13, 2017  -  Deadline May 30, 2017
cpvs
45220000, 45221110, 45221113, 45222300, 45233162, 45233220, 45232451

Part 1: Structures

In the frame of this contract, the contractor will perform: building a bridge at km 1+ 801.64 Velostrady - as a single-span reinforced concrete arch structure with a drive upside, supported perpendicular to the abutments.

engineering structure in km 2 + 338.46 Velostrady - a tunnel in the perpendicular cross-section includes: band (0.25 m) during the pedestrian (2.00 m), during cycling (2.25 m), the dividing strip (0.50 m), during cycling (2.25 m) and the band (0.45 m), a total width of 7.70 m;

building a bridge at km 223.85 3+ Velostrady - as a single-span beam with prestressed concrete cross-section H, perpendicular abutments supported on monolithic reinforced concrete support sited directly.

Part 2: Road infrastructure

The contract is for the construction of bicycle paths with drainage, traffic categories KR-1, Class D technology, the 2x2 dual carriageway width. 1.12 m lanes each with a bituminous pavement.

Part 1: Structures

Piłsudskiego 4.50 m;

The floor tunnel 45 BE of concrete reinforced with steel A-III, N, ceiling thickness 0.55 m, the side walls of the killed steel sheet pile.

Cross section of a viaduct: beam nośnaz cornice and balustrade (0.5 m), a string of pedestrians (1.50 m), a sequence of cycling (2 x 1.50 m) to a strap for keeping the gauge cycling (0.20 m), the supporting beam of the cornice and a balustrade ( 0.50 m), the total width - 5.70 m, the total length of 32.60 m.

Episode 1

Horizontal and vertical signaling should be performed as part of the existing bicycle path from km 3 + 388.25 to km 3 + 558.54 and the existing bike path section from km 3 + 558.54 ending in the area of ​​the bus shelter in Chrzanów.

CPV 45 220 000-5; 45 221 000-2; 45 221 113-7; 45 221 243-7; 45 223 200-8

Episode 2

1.50 m, Class D traffic categories

3 + 014 to the end of the substrate provides for the strengthening of hydraulic binders.

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Miejskie Przedsiębiorstwo Wodociągów i Kanalizacji Sp. z o.o. | Published April 20, 2017  -  Deadline June 7, 2017
cpvs
45230000, 45100000, 45111000, 45231300, 45232410, 45112000, 45233140

The contract "Construction of sewage in the street. Chopin Street. Pszczelnik Street. Marusarzówny Street. Resin and Szelonka and the design and construction / reconstruction of water supply network with connections to the buildings in the street. Szelonka and resin in Jaworzno -Part II: Construction of sewage in the street. Pszczelnik Street. Marusarzówny in Jaworzno. "

Object of the contract will be executed in accordance with the provisions of the building, project documentation, description of the subject, the technical specification of the Workmanship and the acceptance of construction works, safety and health regulations, and the agreement, a specimen of which will be contained in the second part of the Terms of Reference.

If you use the documentation of device types, manufacturers' names should be treated as exemplary and intended to identify only accepted quality standard systems and actuators, and the supply of equipment.

Construction of sewage in the street. Chopin Street. Pszczelnik Street. Marusarzówny Street. Resin and Szelonka and the design and construction / reconstruction of water supply network with connections to the buildings in the street. Szelonka and resin in Jaworzno -Part II: Construction of sewage in the street. Pszczelnik Street. Marusarzówny in Jaworzno.

Object of the contract will be executed in accordance with the provisions of the building, project documentation, description of the subject, the technical specification of the Workmanship and the acceptance of construction works, safety and health regulations, and the agreement, a specimen of which will be contained in the second part of the Terms of Reference.

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Miejskie Przedsiębiorstwo Wodociągów i Kanalizacji Sp. z o.o. | Published April 13, 2017  -  Deadline April 27, 2017
cpvs
45230000, 45100000, 45111000, 45112000, 45231300, 45232410, 45233140

Construction of sanitary sewage system in the street. Scuba Diving in Jaworzno.

Jaworzno: Reconstruction ul. Sobieski Jaworzno in the framework of the project entitled .: / Construction of the northern bypass of the city with the street. Szczakowska and stage III and IV from the street. Defenders of the Gdansk Post Street. Chełmońskiego along with the course ul. St. Wojciech Street. And Bukowska Street. Sobieski / with the construction of a roundabout at the intersection of ul. Sobieski and Bukowska

 | Published July 13, 2016  -  Deadline June 30, 2017
cpvs
45233140, 45231300, 45316000, 45314000, 45315300, 45233129, 45315700, 45232200

1. The contract is for the execution of works for the task Reconstruction ul. Sobieski Jaworzno in the framework of the project entitled .: Construction of the northern bypass of the city with the street. Szczakowska and stage III and IV from the street. Defenders of the Gdansk Post Street. Chełmońskiego along with the course ul. St. Wojciech Street. And Bukowska Street. Sobieski, together with the construction of a roundabout at the intersection of ul. Sobieski and Bukowska. 2. These orders include the reconstruction of the district road No. 6800S - ul. Sobieski Jaworzno consisting of: the reconstruction of the road - ul. Sobieski together with reconstruction of the intersection. Sobieski Street. Bukowska the intersection roundabout, reconstruction and construction of pavements and pedestrian and bicycle routes, reconstruction conventions of individual and public reconstruction come to the gates, reconstruction of intersections, reconstruction of bus stops, construction of bus bays, execution elements of dehydration in the form of drains rainwater, drains, adjusting the existing trench construction and reconstruction of storm water drainage, construction lighting, construction of traffic lights, reconstruction of telecommunication network, reconstruction of the existing network of underground infrastructure, renovation and construction of new pavement construction, felling of green, execution of the target traffic organization with the means of road safety, repair the culvert under the street . Sobieski.

Construction work for mining and manufacturing

Tauron Wydobycie S. A. | Published April 8, 2017  -  Deadline May 22, 2017
cpvs
45254000

"Drilling services excavations in the layers 364, 510

TAURON SA Mining ".

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Miejskie Przedsiębiorstwo Wodociągów i Kanalizacji Sp. z o.o. | Published March 31, 2017
cpvs
45230000, 45100000, 45111000, 45112000, 45232440, 45232410, 45233140

Expansion of sewage system in the street Wanda in Jaworzno.

  • 1