Construction work

Zespół Opieki Zdrowotnej | Published January 11, 2017  -  Deadline January 29, 2017

* Construction "pn. Expansion of Hospital Health Care Team in Gniezno, along with the necessary technical infrastructure pn. "Improving the quality of health services and increase access to medical services including electronic services to health care institutions Gniezno to increase the efficiency and availability of ongoing medical services" - Adaptation and equipment Building General Hospital at ul. 3 Maja 37, for the proper functioning of the health care team in Gniezno .

The present proceedings are works carried out on the basis of the construction project replacement building extension Hospital Health Care Team in Gniezno, along with the necessary technical infrastructure on the plot number 109/6 Street. 3 Maja 37 in Gniezno. Changes to the approved construction design result from the revised Investor functional program and purpose of the building of the hospital.

Construction work

Zespół Opieki Zdrowotnej | Published January 18, 2017  -  Deadline February 2, 2017

* Construction "pn. Expansion of Hospital Health Care Team in Gniezno, along with the necessary technical infrastructure pn. "Improving the quality of health services and increase access to medical services including electronic services to health care institutions Gniezno to increase the efficiency and availability of ongoing medical services" - Adaptation and equipment Building General Hospital at ul. 3 Maja 37, for the proper functioning of the health care team in Gniezno .

The present proceedings are works carried out on the basis of the construction project replacement building extension Hospital Health Care Team in Gniezno, along with the necessary technical infrastructure on the plot number 109/6 at ul.3 Maja 37 in Gniezno. Changes to the approved construction design result from the revised Investor functional program and purpose of the building of the hospital.

Construction work

Zespół Opieki Zdrowotnej | Published January 20, 2017  -  Deadline February 5, 2017

* Construction "pn. Expansion of Hospital Health Care Team in Gniezno, along with the necessary technical infrastructure pn. "Improving the quality of health services and increase access to medical services including electronic services to health care institutions Gniezno to increase the efficiency and availability of ongoing medical services" - Adaptation and equipment Building General Hospital at ul. 3 Maja 37, for the proper functioning of the health care team in Gniezno .

The present proceedings are works carried out on the basis of the construction project replacement building extension Hospital Health Care Team in Gniezno, along with the necessary technical infrastructure on the plot number 109/6 Street. 3 Maja 37 in Gniezno. Changes to the approved construction design result from the revised Investor functional program and purpose of the building of the hospital.

Construction work

Gmina Gniezno | Published December 22, 2016  -  Deadline February 1, 2017
The building is designed without architectural barriers and all the rooms in the building have been designed to move around them for people with disabilities. 

The building is designed without architectural barriers and all the rooms in the building have been designed to move around them for people with disabilities.

Functional and utility program

Functional and utility program implemented based on separate dedicated spaces and communication areas:

area of ​​sports

secondary surface

Specific guidelines rooms

Conference room

floor - carpet roll type of market in eversion on the wall,

walls - painted with emulsion paint in pastel colors,

windows blinds, vertical,

Fluorescent lighting

Sports hall, fitness, rehabilitation

4 mm, not requiring additional maintenance, with parameters conforming to EN 14904, single-layer, single sports surface with linoleum according to DIN 18171 and EN 548, without factory finish overall thickness of 4 mm (top layer 3.6 mm)

3m all corners must be secured system mattress antykontuzyjnym,

windows blinds, vertical,

fluorescent lighting,

passageways

floor-floor tiles,

walls - painted with emulsion paint in pastel colors,

fluorescent lighting,

suspended ceilings systemically,

sanitary facilities

floor-floor tiles,

walls - tiles to a height of 205 cm,

fluorescent lighting,

levels and risers covered,

shut-off valves under the tiles glaze (indoor, glaze plate mounted in the frame for the metal - mounted using a magnet)

Storage facilities, technical, economic

floor-tiles

sprzątaczki- room for a sink, apron with glaze at the sink to a height of 150 cm,

fluorescent lighting,

boiler room

floor-floor tiles,

ściany- washable and protected dusting,

fluorescent lighting,

Features object on solutions to construction and engineering and economic indicators.

Network equipment in the period of not less than 30 years, and fittings and accessories Installation should ensure the smooth functioning of the period, at least 15 years.

5.Wielkości numerical.

specification of the facility:

Ground floor area of ​​1,708.67

Floor space 647.36

Technical parameters

Building length 49.98 m

building width 37.50 m

number of rooms 42

storey height in the light of 2,70-7,70 m

the number of staircases 2

The usable area of ​​356.03 m 2

Cubic capacity of 11 932.82 m.

  • 1