Public tenders for construction in Gliwice Poland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Modernization - hydrant.

 | Published March 6, 2015  -  Deadline March 23, 2015
cpvs
45000000, 45330000, 42131160, 45310000, 45315700, 45400000

The subject of the contract is works. 59. Tarnogórska in the following areas: - works - electrical works - works - Complementary construction and installation works related to the performance of the contract - other associated works for completeness and readiness for use of the contract As a result of the contract purchaser has obtained the object of the contract in are complete, ready-to-use. The Contractor shall, in addition, in the execution of the contract and within the price offered: - perform the scope of work required for proper use, even not specified in the bill of quantities, and necessary for the proper use of the contract, - provide all the equipment, the equipment necessary for the proper use, even not specified in the bill of quantities, and necessary for the proper use of the contract, - cover the costs of water, electricity, a flat rate: water - 25 PLN gross per week of work, energy - 25 PLN gross per week - Floor and perform security floors from damage in connection with the execution of the works, - protect against dust adjacent spaces in connection with the execution of the works, - on a regular basis will maintain order and perform maintenance work - and surrender exported from waste disposal, - submits a utility scrap from demolition in the place indicated by the contracting authority , exported from and selling scrap derived from the demolition and return the funds received to the contracting authority - Draft a work organization BIOZ plan and submit it to the contracting authority to be arranged, if required - to communicate: built documentation, all approvals for materials and equipment, Short description of the contract ( extract from the project documentation) Description of planned-industry installation old hydrant box must be removed and the cavity hollow brick to brick, plaster and paint. Plugging the renovated fire protection system shall be set wodomierzowym. In this way, only the internal hydrant installation is the water supply and the water flow is directed to it. The advantage of this solution is the ability to isolate the circuit automatic existentially - business, no need for electricity control and the fact that at work in normal idle valve is not only works as a pressure reducer in plumbing livelihood. Due to the lack of pressure in the existing hydrant systems in the building should be placed in the basement of the school in the pom. storage (next exchanger) Tank Unit ZH-ICL / S 2.4.7B / 1.1 kW + OT50Z. The conducted calculations show that the pressure loss hydrant p for two hydrants placed in the most unfavorable place are 470 kPa (hydronic calculations were made using the Instal San Geberit and are available in the archives office). OT50Z damper is equipped with electric actuator, water meter to the transmitter and the throttle. Description of the planned-electric industry Electrical installations: Due to the lack of pressure, and the capacity of the existing hydrant systems in a building designed to place in the basement of the school in the pom. storage (next exchanger) hydrophore set ZH-ICL / S 2.4.7B / 1.1 kW + OT50Z. The conducted calculations show that the required pressure p for two hydrants located in the worst place should be 470 kPa. The pumps are equipped with a set of standard (normalized) electric motor 1.1 kW / 2880 rev / min, the total installed capacity (2 x 1.1 kW) = 2.2 kW. T-ZH hydrophore set located in the pom. storage (next exchanger). Route cable placement is shown in Figures throws basement and ground floor. With the array powered T-ZH is powered by the control board TS-ZH ICL, compact power cord hydrophore set YDY 5x4mm2, n / t. The storehouse - hydroforowi - electric table will be located. T-ZH, equipped with a switch fuse - 25A. PE rail must be connected pipelines of other installations as ground lightning protection, heating cables, metal water installation, etc. A detailed description of the object of the contract is contained in the following publications: - bills of quantities - Annex 9 to the SETC - design documentation - Appendix 10 to this Terms of Reference (ToR) - Technical Specifications and Acceptance of Performance - Annex 11 to the Terms of Reference - application works - Appendix 12 to the ToR Contractor, which refers to equivalent solutions described by the Employer is obliged to prove that offered by the materials, equipment, components meet the requirements specified by the Employer, through eg. adding catalogs, brochures, technical descriptions, certificates, approvals offered disbanded

Gliwice: Modernization of objects - adaptation of school premises for the archive in the building of the Primary School No. 5 in Gliwice, ul. Wigury Street 85

Zespół Szkolno-Przedszkolny nr 3 w Gliwicach | Published July 27, 2016  -  Deadline October 10, 2016
cpvs
45000000, 45110000, 45311100, 45311200, 45314000, 45331100, 45330000, 45400000

The contract involves the following works: a) adaptation of school rooms in the basement of an archive of design documentation and building permits Basic range of works: - demolition and dismantling of all trades - exchanges and execution of new doors, installation, plaster, floors, - demolition part of the partition walls of brick and construction of new - painting rooms - waterproof insulation of external walls parts of the premises from the inside by injection - to make a roof over the entrance to the premises - installation of plumbing - installation of central heating - electrical installations - contracting authority reserves the right to change the scope of work of the Contractor when entrusting the work to students from high school within the practice of professional contractor, in addition, as part of the order and within the offered price - will cover the cost of water consumption, electricity, at a flat rate $ 1,000 gross protection of floors, floor should be made of a material resistant to damage and ensuring proper protection of floors, flooring throughout the entire period of work - protect neighboring areas from dust in connection with the execution of works - on a regular basis will maintain order and perform maintenance work - perform professional cleaning works (complete vacuuming, washing and cleaning - room ready to use). - Exported from and surrender disposal of all waste, including light sources - perform all: testing, inspection, acceptance official stipulated by the regulations - will cover all costs required by authorities, institutions, owners of network utilities, etc.. - Communicate: built documentation, all approvals materials and devices - will commission reviews chimney indoor archive before performing the works and arrange for an inspection chimney after the work of adapting premises to archive detailed order is contained in the following publications: - bill of quantities - Annex 9 to present the Terms Contract (SETC) - design documentation - appendix 10 to the present Terms of Reference (TOR) - Technical Specification Workmanship and the Receipt of Work - appendix 11 to the present Terms of Reference (ToR) 29 to 31. the contractor, which refers to equivalents described by the Employer is obliged to prove that offered by its materials, equipment, components meet the requirements defined by the Employer, through eg. attach the catalogs, brochures, technical descriptions, certificates, approvals offered solution equivalent and obtain all possible arrangements . 72 months from the date of final acceptance of the works and 72 months from the date of final acceptance of the works. The Purchaser requires that offered warranty period and warranty was the same. Purchaser is permitted to carry out by the Contractor (before bidding) inspection of the work site covered by the contract after a prior appointment with the Employer. Other requirements: a) the contractor will apply to the execution of the contract only with new materials, devices and equipment b) the preparation of tender and execution of the works the Contractor should take into account the specific nature of work in active educational facilities. c) performance of works is available from Monday to Friday, from 7.00 to 16.00. d) work on Saturdays and public holidays requires the consent of the customer. e) to perform the work must be carried out so that it ensured the continuity of the work centers f) noisy work can be performed while not colliding with school activities At the request of the Contractor, for an additional payment, the Employer shall prepare a photocopy of the design documentation, the technical specification of the Workmanship and the Receipt of Work. The documents listed in the previous sentence are available free of charge on the website

Modernization of the building-renovation of damp insulation along with the implementation of works associated.

 | Published October 16, 2014  -  Deadline October 31, 2014
cpvs
45000000, 45110000, 45320000, 45400000, 45310000, 45330000

The contract is the execution of repair damp proof and associated building works schools- phase II of Part 1 of the Contractor, in addition, in the implementation of the contract and within the quoted price: - carry out all: testing, inspection, commissioning official under the rules - pay all costs required by offices, institutions, owners, public utilities, will cover the cost of supervision owners of utilities, etc.. - Submits a utility scrap from demolition in the place indicated by the customer, exported from and selling scrap derived from the demolition and return the funds derived contracting - will draft organization of work BIOZ plan and submit it to the contracting arrangements - will hold its own facilities for the construction in a location agreed with the Employer - cover the costs of water, electricity, a lump sum based on the following: the cost of fuel water- PLN 50 gross / week, the cost of energy consumption - 50 PLN gross / week - will lead works respecting the legitimate interests of third parties, and any damage arising in the course of the works the Contractor will remove on their own and at their own expense. - Provide appropriate conditions for the execution of the works, adequate security technical material including the impact of weather conditions on the execution of the work and cover the costs involved detailed order this part is contained in the following publications: - bills of quantities - Annex 7 to the Terms Orders - technical description of works including the annexes of drawings and technical specifications - Annex 8 to the Terms of Reference 29 to 31 contractor, which refers to equivalent solutions described by the Employer is obliged to prove that offered by the materials, equipment, their components comply with the requirements specified by the Employer, through, for example. join catalogs, brochures, technical descriptions, certificates, approvals offered solution equivalent and get all the possible arrangements. Required warranty period: The contractor will provide the subject matter of the contract warranty period of 3 years from the date of final acceptance of the works. Contractor shall provide to the object of the contract warranty for a period of three years from the date of final acceptance. Employer allows the Contractor to carry out (before bidding) inspection of the place of work covered by the contract after prior appointment with the Employer. Other requirements: a) the contractor will apply to the execution of the contract only with new materials, devices and equipment b) the preparation of the tender and execution of the works the Contractor shall take into account the specific nature of work in active educational facilities.

Miscellaneous general and special-purpose machinery

Instytut Metali Nieżelaznych | Published November 11, 2017  -  Deadline December 28, 2017
cpvs
42900000, 73100000, 71320000, 45220000

The subject of the order is the design and implementation of a pilot test bed for the new innovative way of managing the sulfur stream from the technological processes of KGHM, including the delivery, placement and installation of experimental elements and the execution of the necessary work related to the installation and start- Pilot installation ").

Order scope:

Documentation of Pilot Installation, including, in particular, design and as-built documentation; preparing and assembling and then transferring to the competent authorities or institutions all documents (reports, applications, information cards and so forth) and taking all other actions necessary to obtain and obtain in the name and on behalf of the Ordering Party all the permits and decisions required the law in order to:

a) commencing execution of the Order (in particular obtaining building permits for and on behalf of the Purchaser);

b) start use of the Pilot Plant after the completion of the Order (in particular obtaining a Pilot License or equivalent permit for and on behalf of the Ordering Party).

Delivery of machines and equipment necessary for the following components of the Pilot Plant:

a) supply and precooling and moistening of feed gas;

b) lime scale slurry preparation node;

c) sulfur dioxide absorption node and calcium sulphate crystallization;

d) the pressure filtration node of the reaction product - calcium sulphate together with the temporary storage site;

e) the purge of purified gases;

f) piping with fittings; valves and control and measurement systems for process parameters control;

g) control system.

Pilot Installation:

a) execution of geodetic and cartographic works, provision of geodetic service during the execution of investment and repair works by the surveyor, transfer of the results of geodetic and cartographic works to the Purchaser.

b) delivery of materials and construction of foundations for installed and installed machinery and equipment, insulated shelters necessary for the proper functioning of the Pilot Plant and gypsum storage;

c) connection of necessary media and process gases;

d) the execution of the individual components of the Pilot Installation referred to in point b above; Installation and installation of machinery and equipment indicated in b above; to connect these Pilot Components to a complete technological line; Installation of Pilot Installation

e) pilot control system installation.

Start-up of the pilot installation by mechanical and technological start-up.

Execution of pilot tests (operational) of Pilot Installation.

Conducting instruction of the personnel indicated by the Ordering Party in the field of Pilot Operation.

Gliwice: Reconstruction of drainage in the street. long

Miasto Gliwice | Published September 7, 2016  -  Deadline July 4, 2016
Winner
PRZEDSIĘBIORSTWO REMONTÓW ULIC I MOSTÓW SPÓŁKA AKCYJNA, ul. Nad Bytomką 1, 44-100 Gliwice, kraj/woj. śląskie.
cpvs
45231300, 45112730

The task includes the construction, among others: - 150 mb channels rainwater from PVC pipe SDR34 SN8 DN500; - 10 mb channels rainwater from PVC pipe SDR34 SN8 DN250; - 16 mb channels rainwater from PVC pipe SDR34 SN8 DN200; - 179 mb channels rainwater from PVC pipe SDR34 SN8 DN160; - 75 mb channels rainwater from PE-PP SN16 DN315; - 20 manholes DN1500; - 3 wells cascading DN1500 equipment; - 36 wells connection DN425; - Roadworks. Please note that road works will be carried out along the entire length of the street to half its width with the adjustment of existing curbs stone. A detailed description of the contract includes: design documentation constituting APPENDIX 5 to the ToR. Takeoffs should be treated as an auxiliary element. Presented above. Documents indicate on the technical equipment and materials giving the manufacturer should be considered as an example because of the rules of the Public Procurement Law (ie Journal of Laws of 2015., pos. 2164), and in particular article. 29 to 31. The Employer allows equivalent answers described in the above. documents, by the standards, approvals, technical specifications and reference systems. This means that the contractor may propose other than those specified in the documentation solutions with appropriate equivalent technical specifications, standards, approvals, technical specifications and reference systems to achieve the expected functionality of the entire system which is the subject of the contract ensuring obtain all possibly required arrangements.

Gliwice: Reconstruction of the storm water drainage Street. Lukasiewicz

Miasto Gliwice | Published September 6, 2016  -  Deadline June 23, 2016
Winner
PRZEDSIĘBIORSTWO REMONTÓW ULIC I MOSTÓW S.A., NAD BYTOMKĄ 1, 44-100 GLIWICE, kraj/woj. śląskie.
cpvs
45231300, 45111200, 45232100, 45233100

The task includes the construction, among others: - storm water drainage gravity DN 400mm PVC-U S Class SN - 224 mb - drilling on section 111 m - drainage section 30 m - reservoirs of polyethylene pipes DN 1500-1513 kpl - inspection chambers, concrete DN 1000 - 4 kpl - inspection chambers with a plastic DN 1000 DN600, DN425, DN315 - 15 kpl - pumping rainwater and power - 1 set - sidewalks, roads and squares of concrete blocks - 632 m2 - roads with mineral-bituminous mixtures - 17 m2 detailed order includes technical documentation and the agreement annexed hereto. Takeoffs should be treated as an auxiliary element. Presented above. Documents indicate on the technical equipment and materials giving the manufacturer should be considered as an example because of the rules of the Public Procurement Law (ie Journal of Laws of 2015., pos. 2164), and in particular article. 29 to 31. The Employer allows equivalent answers described in the above. documents, by the standards, approvals, technical specifications and reference systems. This means that the contractor may propose other than those specified in the documentation solutions with appropriate equivalent technical specifications, standards, approvals, technical specifications and reference systems to achieve the expected functionality of the entire system which is the subject of the contract ensuring obtain all possibly required arrangements. The duties of the contractor must make all arrangements with the managers of the land on which the oprowadzone will work, including obtaining permission to occupy roadway and changing the organization of the movement ..

Gliwice: Works related to the modernization of the School Complex No. 13 in Gliwice - adaptation of the polling stations for people with disabilities

Zespół Szkół Ogólnokształcących Nr 13 | Published July 21, 2016  -  Deadline September 15, 2016
cpvs
45000000, 45214200, 45421000, 45450000, 45442100, 45453000

A public contract are covered by the repair and construction work related to: adaptation of rooms for the needs of polling stations along with the removal of barriers for people with disabilities and the execution of painting works on the modernization of the electrical installation on the ground floor in the segment IV. A detailed description of the contract is contained in: - design documentation: Adjust the ground segment IV in Building Schools for the needs of polling stations with disabled access, developed by RENSTUDIO - Simon Rendchen, constituting Appendix 3 hereto regarding substantive specified in the bill of quantities Annex No. 5 Terms of Reference - the technical specifications for execution and acceptance of works annexed No. 4 to the Terms of Reference - the bill of quantities, constituting Annex 5 to the ToR in preparing the offer and execution of works the Contractor should take into account the specific nature of work in active educational institutions. Execution of works must be carried out so that it ensured continuity of the institution. The contractor, in addition to the implementation of the contract will take the necessary measures to protect school property and to this end m.in .: - protect neighboring areas from dust during the works - on a regular basis will keep the order - make adequate security equipment of the building, in the area the work carried out in the above. Documents indicate on the technical equipment and materials giving the manufacturer should be considered as an example because of the rules of the Public Procurement Law, and especially Employer allows equivalent solutions described above. standards documents, approvals, technical specifications and reference systems. This means that the contractor may propose other than those specified in the documentation solutions with appropriate equivalent parameters of technical standards approvals, technical specifications and reference systems to achieve the expected functionality of the entire system which is the subject of the contract ensuring obtain all possibly required arrangements.

Portable computers

Politechnika Śląska | Published July 1, 2016  -  Deadline August 8, 2016
cpvs
30213100

A) 1. The contract is for the supply of computer equipment (laptop) for the Silesian University of Technology. Offered equipment must be CE marked. All equipment and components for construction equipment, which are object of the contract must be brand new.

2. Object of the contract is financed from the project "New tools dianostyki molecular imaging and individualized therapy in breast cancer, thyroid and prostate MILESTONE agreement no STRATEGMED2 / 267398/4 / NCBR / 2015 implemented under the program" Prevention

and treatment of diseases of civilization "

3. CPV 30.21.31.00-6 portable computers.

4. Delivery: 14 days from the date of the agreement.

B) The requirements for the order to be met by Artist:

1. Offering price and conditions of the contract in accordance with the requirements of the Purchaser.

2.Zaoferowanie object of the contract that meets the requirements of the Employer.

The required documents and attachments confirming meeting the requirements of the contract:

1.1. Price offer. 2.1. Table Technical Parameters.

C) The Contracting Authority will check whether the offered subject of the order meets the requirements set

by the Employer. Lack of any of the documents and attachments or submission of documents and

annexes containing errors will result in rejection of the offer pursuant to Art. 89 paragraph. 1 of the Act,

Subject respectively art. 87, paragraph 26. 4 and 26 paragraph. 3 of the Act.

D) ANNEXURE in printed form is available at the registered office

Employer - contact point specified in point I.1) of this notice, and in electronic form created

Principal's website, the date of opening of tenders.

Portable computers

Politechnika Śląska | Published July 1, 2016  -  Deadline August 8, 2016
cpvs
30213100

A) 1. The contract is for the supply of computer equipment for the Silesian University of Technology, ie. A single laptop. Offered equipment must be CE marked. All equipment and components for construction equipment, which are object of the contract must be brand new.

2. CPV 30.21.31.00-6 laptops

3. Delivery: 14 days from the date of the agreement.

B) The requirements for the order to be met by Artist:

1. Offering price and conditions of the contract in accordance with the requirements of the Purchaser.

2.Zaoferowanie object of the contract that meets the requirements of the Employer.

The required documents and attachments confirming meeting the requirements of the contract:

1.1. Price offer. 2.1. Table Technical Parameters.

C) The Contracting Authority will check whether the offered subject of the order meets the requirements set

by the Employer. Lack of any of the documents and attachments or submission of documents and

annexes containing errors will result in rejection of the offer pursuant to Art. 89 paragraph. 1 of the Act,

Subject respectively art. 87, paragraph 26. 4 and 26 paragraph. 3 of the Act.

D) ANNEXURE in printed form is available at the registered office

Employer - contact point specified in point I.1) of this notice, and in electronic form created

Principal's website, the date of opening of tenders.

Mainframe computer

Politechnika Śląska | Published June 30, 2016  -  Deadline August 8, 2016
cpvs
30211000, 30200000, 30233141, 30236110

A) 1. The contract is for the expansion of infrastructure server-matrix for the project "Platform remote hypothesis testing and analysis of biomedical data BioTest" co-financed by the National Research and Development Centre. Offered equipment must be CE marked. All equipment and components for construction equipment, which are object of the contract must be brand new.

2. 30.20.00.00-1 - Computer equipment

30.21.10.00-1 - Mainframe computer

30.23.31.41-1 - redundant array of independent disks (RAID)

30.23.61.10-6 - Random Access Memory (RAM)

3. Delivery time: up to 21 days from the date of the agreement.

B) The requirements for the order to be met by Artist:

1. Offering price and conditions of the contract in accordance with the requirements of the Purchaser.

2.Zaoferowanie object of the contract that meets the requirements of the Employer.

The required documents and attachments confirming meeting the requirements of the contract:

1.1. Price offer. 2.1. Table Technical Parameters.

C) The Contracting Authority will check whether the offered subject of the order meets the requirements set

by the Employer. Lack of any of the documents and attachments or submission of documents and

annexes containing errors will result in rejection of the offer pursuant to Art. 89 paragraph. 1 of the Act,

Subject respectively art. 87, paragraph 26. 4 and 26 paragraph. 3 of the Act.

D) ANNEXURE in printed form is available at the registered office

Employer - contact point specified in point I.1) of this notice, and in electronic form created

Principal's website, the date of opening of tenders.

Portable computers

Politechnika Śląska | Published April 23, 2016  -  Deadline May 31, 2016
cpvs
30211000

A) 1. The contract is for the supply of computer equipment for the Silesian University of Technology. Offered equipment must be CE marked. All equipment and components for construction equipment, which are object of the contract must be brand new. Delivery of the equipment is divided into two tasks:

task-1 portable computer (CPV 30.21.31.00-6 laptops).

task 2-servers (CPV 30.21.10.00-1 high-performance computers).

2. Delivery time: 1 task - to 14 days from the date of the contract, task 2 - 20 days from the date of the agreement.

B) The requirements for the order to be met by Artist:

1. Offering price and conditions of the contract in accordance with the requirements of the Purchaser.

2. Offering of the contract that meets the requirements of the Employer.

The required documents and attachments confirming meeting the requirements of the contract:

1.1. Price offer. 2.1. Table Technical Parameters.

C) The Contracting Authority will check whether the offered subject of the order meets the requirements set

by the Employer. Lack of any of the documents and attachments or submission of documents and

annexes containing errors will result in rejection of the offer pursuant to Art. 89 paragraph. 1 of the Act,

Subject respectively art. 87, paragraph 26. 4 and 26 paragraph. 3 of the Act.

D) ANNEXURE in printed form is available at the registered office

Employer - contact point specified in point I.1) of this notice, and in electronic form - on

Principal's website, the date of opening of tenders.

Mainframe computer

Politechnika Śląska | Published June 8, 2016  -  Deadline July 20, 2016
cpvs
30211000

A) 1. The contract is for the delivery server to the Silesian University of Technology. Offered equipment must be CE marked. All equipment and components for construction equipment, which are object of the contract must be brand new.

2. CPV 30.21.10.00-1 high-performance computers

3. Delivery time: up to 20 days from the date of the agreement.

B) The requirements for the order to be met by Artist:

1. Offering price and conditions of the contract in accordance with the requirements of the Purchaser.

2.Zaoferowanie object of the contract that meets the requirements of the Employer.

The required documents and attachments confirming meeting the requirements of the contract:

1.1. Price offer. 2.1. Table Technical Parameters.

C) The Contracting Authority will check whether the offered subject of the order meets the requirements set

by the Employer. Lack of any of the documents and attachments or submission of documents and

annexes containing errors will result in rejection of the offer pursuant to Art. 89 paragraph. 1 of the Act,

Subject respectively art. 87, paragraph 26. 4 and 26 paragraph. 3 of the Act.

D) ANNEXURE in printed form is available at the registered office

Employer - contact point specified in point I.1) of this notice, and in electronic form created

Principal's website, the date of opening of tenders.

Research and experimental development services

ICHEMAD-Profarb Sp. z o.o. | Published May 21, 2016
Winner
Politechnika Warszawska – Wydział Inżynierii Chemicznej i Procesowej
cpvs
73100000

The contract is for the purchase of industrial research in the field of computational fluid dynamics to optimize the construction of chemical apparatus in the framework of the project entitled "Development of utility structure of the unit energy-saving equipment for the chemical industry, in particular the production of paints and varnishes", hereinafter referred to as Project implemented under the Operational Programme intelligent Development 2014-2020, sub-measure 1.1.1.

The project concerns product innovation. As a result, the band will be developed products with significantly improved functional performance than the products currently available on the market, characterized by process optimization and production operations in terms of energy efficiency and respect for the environment.

The aim of the project is to start production significantly improved products in plants Ichemad in Gliwice and the sale of products on the Polish market, as well as for international chemical companies.

The main goals of the project:

a. Obtaining 4 design solutions to optimize the work of dissolver, mill, dispersant and egalizatora, which will bear the characteristic features, to be protected as a new utility models.

b. Achieving through new design solutions and the use of composite materials, the low energy consumption of the above. device:

- Dissolver from the baseline 9.886 kWh to 5,536 kWh target;

- Mill kuleczkowego flow from baseline of 0.31 kWh / kg of the product to the target level of 0.24 kWh / kg of the product;

- Dispersant flow from the baseline 0.023 kWh / kg of the product to the target level of 0.01 kWh / kg of the product;

- Egalizatora to homogenize the substance from baseline 0.0005 kWh / kg of the product to the target 0.00025 kWh / kg product.

c. Trituration obtain increased product particle, efficient use of resources and reduction of waste generation.

Portable computers

Politechnika Śląska | Published July 22, 2016  -  Deadline September 1, 2016
cpvs
30213100

A) 1. The contract is for the supply of computer equipment for the Silesian University of Technology, ie. A single laptop. Offered equipment must be CE marked. All equipment and components for construction equipment, which are object of the contract must be brand new.

2. CPV 30.21.31.00-6 laptops.

3. Delivery: 14 days from the date of the agreement.

B) The requirements for the order to be met by Artist:

1. Offering price and conditions of the contract in accordance with the requirements of the Purchaser.

2. Offering of the contract that meets the requirements of the Employer.

The required documents and attachments confirming meeting the requirements of the contract:

1.1. Price offer. 2.1. Table Technical Parameters.

C) The Contracting Authority will check whether the offered subject of the order meets the requirements set

by the Employer. Lack of any of the documents and attachments or submission of documents and

annexes containing errors will result in rejection of the offer pursuant to Art. 89 paragraph. 1 of the Act,

Subject respectively art. 87, paragraph 26. 4 and 26 paragraph. 3 of the Act.

D) ANNEXURE in printed form is available at the registered office

Employer - contact point specified in point I.1) of this notice, and in electronic form - on

Principal's website, the date of opening of tenders.

Portable computers

Politechnika Śląska | Published April 6, 2016  -  Deadline May 13, 2016
cpvs
30213100

A) 1. The contract is for the supply of computer equipment for the Silesian University of Technology, ie. One

laptop T1 / 1. Offered equipment must be CE marked. All devices and

components for construction equipment, which are object of the contract must be brand new.

2. CPV 30.21.31.00-6 laptops, notebooks, laptops.

3. Delivery: 14 days from the date of the agreement.

B) The requirements for the order to be met by Artist:

1. Offering price and conditions of the contract in accordance with the requirements of the Purchaser. 2.

Offering the object of the contract that meets the requirements of the Employer.

The required documents and attachments confirming meeting the requirements of the contract:

1.1. Price offer. 2.1. Table Technical Parameters.

C) The Contracting Authority will check whether the offered subject of the order meets the requirements set

by the Employer. Lack of any of the documents and attachments or submission of documents and

annexes containing errors will result in rejection of the offer pursuant to Art. 89 paragraph. 1 of the Act,

Subject respectively art. 87, paragraph 26. 4 and 26 paragraph. 3 of the Act.

D) ANNEXURE in printed form is available at the registered office

Employer - contact point specified in point I.1) of this notice, and in electronic form - on

Principal's website, the date of opening of tenders.

Delivery of computer equipment (2). The matter: OZ / D / 16/12 / EO.

Politechnika Śląska | Published February 23, 2016  -  Deadline March 31, 2016
cpvs
30213000

A) 1. The contract is for the supply of computer equipment for the Silesian University of Technology, ie. One desktop computer (VAT rate 0%). Offered equipment must be CE marked. All equipment and components for construction equipment, which are object of the contract must be brand new.

2. CPV 30.21.30.00-5 personal computers.

3. Delivery time: up to 20 days from the date of the agreement.

B) The requirements for the order to be met by Artist:

1. Offering price and conditions of the contract in accordance with the requirements of the Purchaser. 2.

Offering the object of the contract that meets the requirements of the Employer.

The required documents and attachments confirming meeting the requirements of the contract:

1.1. Price offer. 2.1. Table Technical Parameters.

C) The Contracting Authority will check whether the offered subject of the order meets the requirements set

by the Employer. Lack of any of the documents and attachments or submission of documents and

annexes containing errors will result in rejection of the offer pursuant to Art. 89 paragraph. 1 of the Act,

Subject respectively art. 87, paragraph 26. 4 and 26 paragraph. 3 of the Act.

D) ANNEXURE in printed form is available at the registered office

Employer - contact point specified in point I.1) of this notice, and in electronic form - on

Principal's website, the date of opening of tenders.

Research and experimental development services

Ichemad-Profarb Sp. z o.o. | Published January 21, 2016  -  Deadline February 29, 2016
cpvs
73100000

The contract is for the purchase of industrial research in the field of computational fluid dynamics to optimize the construction of chemical apparatus within the project "Development of utility structure of an energy-saving equipment for the chemical industry, in particular the production of paints and varnishes", hereinafter referred to as Project implemented under the Operational Programme Intelligent Development 2014-2020, sub-measure 1.1.1.

The project concerns product innovation. As a result, an assembly of products will be developed with significantly improved functional performance than products currently available on the market, characterized by process optimization and production operations in terms of energy efficiency and respect for the environment. The aim of the project is to start production significantly improved in the establishments Ichemad in Gliwice and sale of products on the Polish market and for international chemical companies.

The main objectives of the Project:

a. Obtaining 4 design solutions to optimize the work dissolver, mill, dispersant and egalizatora, which will bear the characteristic features, to be protected as a new utility models.

b. Achieving through new design solutions and the use of composite materials, the low energy consumption of the above. Device:

- Dissolver from baseline 9.886 kWh to 5,536 kWh target,

- Kuleczkowego mill flow from baseline of 0.31 kWh / kg of the product to the target of 0.24 kWh / kg of the product,

- The dispersion flow from the baseline 0.023 kWh / kg of the product to the target level of 0.01 kWh / kg product,

- Egalizatora to homogenize the substance from baseline 0.0005 kWh / kg of the product to the target 0.00025 kWh / kg product.

c. Obtaining increased trituration product particles, efficient use of resources and reduction of waste generation.

Personal computers

Politechnika Śląska | Published June 17, 2015  -  Deadline July 6, 2015
cpvs
30213100

1. The contract is for the supply of computer equipment for the Silesian University of Technology. Offered equipment must be CE marked. All equipment and components for construction equipment, which are the subject of the contract must be brand new. Delivery is divided into 6 tasks: Task 1 - Desktop (CPV 30.21.30.00-5 personal computers) Task 2 - Systems (CPV 30.21.30.00-5 personal computers) Task 3 - PCs (personal computers CPV 30.21.30.00-5 ) Task 4 - A laptop computer (CPV 30.21.31.00-6 portable computers) Task 5 - Tablets (CPV 30.21.31.00-6 portable computers) Task 6 - Notebooks (CPV 30.21.31.00-6 laptops) 2. Delivery time: task 1, 2, 3 - to 20 days from the date of conclusion of the contract, task 4 - to 35 days from the date of conclusion of the contract, task 5, 6 to 14 days from the date of the agreement. B) The requirements for the order to be met by the Contractor: 1. The offering price and terms of the contract in accordance with the requirements of the Purchaser. 2. Offering of the contract that meets the requirements of the Employer. Required documents and attachments confirming the fulfillment of requirements for the object of the contract: 1.1. Price Offer. 2.1. Technical Parameters table. C) The Contracting Authority will check whether the offered object of the contract meets the requirements set by the Employer. Lack of any of the documents and attachments or submission of documents and attachments that contain errors will result in rejection of the offer pursuant to Art. 89 paragraph. 1 of the Act, subject to, respectively Art. 87, paragraph 26. 4 and 26 paragraph. 3 of the Act. D) ANNEXURE in printed form is available at the Purchaser - contact point specified in point I.1) of this notice, in electronic form - on the website of the Employer, until the opening of tenders.

Desktop computer

Politechnika Śląska | Published March 4, 2015  -  Deadline April 9, 2015
cpvs
30213300

A) 1. The contract is for the supply of computer equipment for the Silesian University of Technology. Offered equipment must be CE marked. All equipment and components for construction equipment, which are the subject of the contract must be brand new. Supply of equipment is divided into 5 tasks. Task 1 - Set Computer (CPV 30.21.33.00-8 desktop). Task 2 - Set Computer (CPV 30.21.33.00-8 desktop). Task 3 - Set Computer (CPV 30.21.33.00-8 desktop). Task 4 - Set Computer (CPV 30.21.33.00-8 desktop). Task 5 - Set Computer (CPV 30.21.33.00-8 desktop). 2. Delivery time - up to 20 days from the date of the contract, in all tasks. B) requirements of the contract, to be met by the Contractor: 1. The offering price and terms of the contract in accordance with the requirements of the Employer. 2. Offering the object of the contract that meets the requirements of the Employer. Required documents and attachments confirming the fulfillment of requirements for the object of the contract: 1.1. Quotation. 2.1. Technical Parameters table. C) The Purchaser shall check whether the object of the contract offered meets the requirements set by the Employer. Lack of any of the documents and attachments or submission of documents and annexes containing errors will result in rejection of the offer pursuant to Art. 89 paragraph. 1 of the Act, subject respectively. 87, paragraph 26. Paragraphs 4 and 26. 3 of the Act. D) ANNEXURE in printed form is available at the Purchaser - contact point specified in point I.1) of this notice, and in electronic form - on the website of the Employer, the date of opening of tenders.

Portable computers

Politechnika Śląska | Published January 31, 2015  -  Deadline March 10, 2015
cpvs
30213100

A. 1. The contract is for the supply of computer equipment for the Silesian University of Technology. Offered equipment must be CE marked. All equipment and components for construction equipment, which are the subject of the contract must be brand new. Supply of equipment is divided into 5 tasks. Task 1 - portable computer (CPV 30.21.31.00-6 laptops). Task 2 - Notebooks (CPV 30.21.31.00-6 laptops). Task 3 - Notebooks (CPV 30.21.31.00-6 laptops). Task 4 - Set Computer (CPV 30.21.30.00-5 personal computers) Task 5 - U1 Laptop computer (CPV 30.21.31.00-6 laptops). 2. Delivery time: - task 1, 2, 3, 5 - 14 days from the date of the contract, - the task 4 - to 20 days from the date of the contract. B. Requirements of the contract, to be met by the Contractor: 1. The offering price and terms of the contract in accordance with the requirements of the Employer; 2. The object of the contract offer that meets the requirements of the Employer. Required documents and attachments confirming the fulfillment of requirements for the object of the contract: 1.1. quotation; 2.1. technical parameter table. C) The Purchaser shall check whether the object of the contract offered meets the requirements set by the Employer. Lack of any of the documents and attachments or submission of documents and annexes containing errors will result in rejection of the offer pursuant to Art. 89 paragraph. 1 of the Act, subject respectively. 87, paragraph 26. Paragraphs 4 and 26. 3 of the Act. D) ANNEXURE in printed form is available at the Purchaser - contact point specified in point I.1) of this notice, and in electronic form - on the website of the Employer, the date of opening of tenders. E). Previous publication specified in point. IV.3.2 regarding the task of Conduct 4 OZ / D / 134 / BL / 14.