Modernization of the building-renovation of damp insulation along with the implementation of works associated.

 | Published October 16, 2014  -  Deadline October 31, 2014
cpvs
45000000, 45110000, 45320000, 45400000, 45310000, 45330000

The contract is the execution of repair damp proof and associated building works schools- phase II of Part 1 of the Contractor, in addition, in the implementation of the contract and within the quoted price: - carry out all: testing, inspection, commissioning official under the rules - pay all costs required by offices, institutions, owners, public utilities, will cover the cost of supervision owners of utilities, etc.. - Submits a utility scrap from demolition in the place indicated by the customer, exported from and selling scrap derived from the demolition and return the funds derived contracting - will draft organization of work BIOZ plan and submit it to the contracting arrangements - will hold its own facilities for the construction in a location agreed with the Employer - cover the costs of water, electricity, a lump sum based on the following: the cost of fuel water- PLN 50 gross / week, the cost of energy consumption - 50 PLN gross / week - will lead works respecting the legitimate interests of third parties, and any damage arising in the course of the works the Contractor will remove on their own and at their own expense. - Provide appropriate conditions for the execution of the works, adequate security technical material including the impact of weather conditions on the execution of the work and cover the costs involved detailed order this part is contained in the following publications: - bills of quantities - Annex 7 to the Terms Orders - technical description of works including the annexes of drawings and technical specifications - Annex 8 to the Terms of Reference 29 to 31 contractor, which refers to equivalent solutions described by the Employer is obliged to prove that offered by the materials, equipment, their components comply with the requirements specified by the Employer, through, for example. join catalogs, brochures, technical descriptions, certificates, approvals offered solution equivalent and get all the possible arrangements. Required warranty period: The contractor will provide the subject matter of the contract warranty period of 3 years from the date of final acceptance of the works. Contractor shall provide to the object of the contract warranty for a period of three years from the date of final acceptance. Employer allows the Contractor to carry out (before bidding) inspection of the place of work covered by the contract after prior appointment with the Employer. Other requirements: a) the contractor will apply to the execution of the contract only with new materials, devices and equipment b) the preparation of the tender and execution of the works the Contractor shall take into account the specific nature of work in active educational facilities.

Repair of toilets in Building A of the Institute of Ferrous Metallurgy in Gliwice.

 | Published October 22, 2014  -  Deadline November 7, 2014
cpvs
45400000, 45332000, 45431000

Object of the contract includes replacement of floor and wall coverings, a new arrangement of each room bathroom. Will be demolished brick partitions, walls replaced system. Construction of new plumbing and mechanical ventilation. Install new fixtures and appliances. The scope of work was defined in detail in the documentation attached hereto ..

Reconstruction of the electrical system in the branch GCOP Street. Barlickiego 3 in Gliwice. STAGE II. In the reconstruction of the main substation grounding and power gatehouse, entrance and pom. No. 8 and the reconstruction of the electrical system in the room 3a, 3c, 3d, 3e, 2a, 2b, 2c, corridor. Repair of building space 3a.

 | Published October 23, 2014  -  Deadline November 7, 2014
cpvs
45310000, 45311100, 45316000, 45000000, 45453000, 45262500, 45430000

The contract is part 1 reconstruction of the electrical system in the branch GCOP Street. Barlickiego 3 in Gliwice, reconstruction of the main substation grounding and power gatehouse, entrance and pom. No. 8 and the reconstruction of the electrical system in the room 3a, 3c, 3d, 3e, 2a, 2b, 2c, corridor. In part 2 Building Renovation room 3a. A detailed description of the contract is the design documentation, technical specifications performance and acceptance of the works and takeoffs attached to SIWZ- (included in Appendix 5 hereto) Project construction executive and technical specification of the performance and acceptance of work applies to the entire electrical system in the branch GCOP Street. Barlickiego 3 in Gliwice. Estimates of the contract should be based on the attached przedmiarów including its scope reconstruction of the electrical system in the room 3a, 3c, 3d, 3e, 2a, 2b, 2c, hallway and reconstruction of the main substation grounding and power gatehouse, entrance and pom. 8. I also according to Takeoff on the renovation construction pom. 3a NOTE! The pre found room 3b is not subject to reconstruction and should be excluded from the estimate of the cost ..

RENOVATION AND ADAPTATION OF SPACE OFFICE BUILDING SOCIAL ROOM AI BUILDING B District Office in GLIWICE

 | Published November 12, 2014  -  Deadline November 26, 2014
cpvs
45215000, 45310000, 45330000, 45331000, 45331100, 45453000

1. The contract is for the execution of works involving the renovation and adaptation of office premises No. 204, 205, 206 and 208 on the second floor of Building A, and a social room 162 on the first floor of building B District Office in Gliwice, in accordance with the technical documentation prepared by the office Design CONTOUR Bogda Matoga and construction practices. The works will include m.in .: demolition, remodeling of floors, electrical installation spaces and installations as water and sewerage. and mechanical ventilation exhaust with accompanying works. 2. The object of the contract described in detail, which is an integral part of the tender documents, design documents and technical specifications, performance and acceptance of works (STWiOR), which list (specification) are listed in Annex 1 to this specification ..

Network infrastructure

Politechnika Śląska | Published January 10, 2015
Winner
<CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME><ORGANISATION><OFFICIALNAME>Evdic Sp. z o.o.</OFFICIALNAME></ORGANISATION><ADDRESS>Droginia 79</ADDRESS><TOWN>Myślenice</TOWN><POSTAL_CODE>32-400</POSTAL_CODE><COUNTRY VALUE="PL"/></CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME>
cpvs
32424000, 32420000, 48517000, 30200000, 34971000, 42961100, 31625200, 71320000, 45453000, 45300000

1. The purpose of the contract is to modernize facilities and equipment for the needs of the Laboratory of the Upper Silesian Centre for Scientific and Engineering Calculations. The contract is for preparation of project documentation and supply the necessary equipment to equip the existing premises for the purposes of the Laboratory of the Upper Silesian Centre for Scientific and Engineering Calculations with accompanying infrastructure, including power supply system with an uninterruptible power supply UPS, precision air-conditioning system, fire alarm system, structured cabling systems CCTV and access control systems and the implementation of an integrated monitoring and management of the Upper Silesian Center Laboratory of Scientific and Engineering Calculations, and associated with the implementation of construction and installation works. Basic CPV codes: 32.42.40.00-1 network infrastructure. 32.42.00.00-3 Network devices. 48.51.70.00-5 software package. 30.20.00.00-1 computer equipment. 34.97.10.00-4 camera equipment. 42.96.11.00-1 access control system. 31.62.52.00-5 Fire Protection Systems. 71.32.00.00-7 engineering services for the design. 45.45.30.00-7 Overhaul and refurbishment work. 45.30.00.00-0 Building installation work. 2. Lead time: up to 42 days from the date of the contract, including up to 14 days from the date of the agreement approved by the Employer to develop design documentation.

Portable computers

Politechnika Śląska | Published January 31, 2015  -  Deadline March 10, 2015
cpvs
30213100

A. 1. The contract is for the supply of computer equipment for the Silesian University of Technology. Offered equipment must be CE marked. All equipment and components for construction equipment, which are the subject of the contract must be brand new. Supply of equipment is divided into 5 tasks. Task 1 - portable computer (CPV 30.21.31.00-6 laptops). Task 2 - Notebooks (CPV 30.21.31.00-6 laptops). Task 3 - Notebooks (CPV 30.21.31.00-6 laptops). Task 4 - Set Computer (CPV 30.21.30.00-5 personal computers) Task 5 - U1 Laptop computer (CPV 30.21.31.00-6 laptops). 2. Delivery time: - task 1, 2, 3, 5 - 14 days from the date of the contract, - the task 4 - to 20 days from the date of the contract. B. Requirements of the contract, to be met by the Contractor: 1. The offering price and terms of the contract in accordance with the requirements of the Employer; 2. The object of the contract offer that meets the requirements of the Employer. Required documents and attachments confirming the fulfillment of requirements for the object of the contract: 1.1. quotation; 2.1. technical parameter table. C) The Purchaser shall check whether the object of the contract offered meets the requirements set by the Employer. Lack of any of the documents and attachments or submission of documents and annexes containing errors will result in rejection of the offer pursuant to Art. 89 paragraph. 1 of the Act, subject respectively. 87, paragraph 26. Paragraphs 4 and 26. 3 of the Act. D) ANNEXURE in printed form is available at the Purchaser - contact point specified in point I.1) of this notice, and in electronic form - on the website of the Employer, the date of opening of tenders. E). Previous publication specified in point. IV.3.2 regarding the task of Conduct 4 OZ / D / 134 / BL / 14.

Engineering design services for the construction of civil engineering works

Zarząd Dróg Miejskich w Gliwicach | Published February 4, 2015  -  Deadline March 12, 2015
cpvs
71322000

I. Object of the contract The contract is for the execution of project documentation for the construction of the southern part of the city ring road and the reconstruction and expansion of the road system between ul. Bojko and Pszczyńska consisting of the following tasks: 1. Reconstruction of the street the Ring; 2. Construction and reconstruction of roads on the south side of the street. Circular; 3. Reconstruction of the street Bojkowska; 4. Construction of the bypass section of the southern part of the city from the street. Bojkowska to the street. Circular; 5. Rain water discharge into the stream Ligocki. Detailed Description of the contract includes the Terms of Reference.

Portable computers

Politechnika Śląska | Published February 7, 2015  -  Deadline March 17, 2015
cpvs
30232100

A) 1. The contract is for the supply of computer equipment for the Silesian University of Technology. Offered equipment must be CE marked. All equipment and components for construction equipment, which are the subject of the contract must be brand new. Supply of equipment divided into 3 tasks. Task 1 - Set Computer (CPV 30.21.31.00-6 laptops), (CPV 30.23.21.00-5 printers and plotters), Task 2 - LCD Monitor (CPV 30.23.13.00-0 Displays), Task 3 - Multifunction ( CPV 30.23.21.00-5 printers and plotters). 2. Delivery time: - task 2 - up to 20 days from the date of the contract, - task 1, 3 - 14 days from the date of the contract. B) requirements of the contract, to be met by the Contractor: 1. The offering price and terms of the contract in accordance with the requirements of the Employer. 2. Offering the object of the contract that meets the requirements of the Employer. Required documents and attachments confirming the fulfillment of requirements for the object of the contract: 1.1. Quotation; 2.1. Technical Parameters table. C) The Purchaser shall check whether the object of the contract offered meets the requirements set by the Employer. Lack of any of the documents and attachments or submission of documents and annexes containing errors will result in rejection of the offer pursuant to Art. 89 paragraph. 1 of the Act, subject respectively. 87, paragraph 26. Paragraphs 4 and 26. 3 of the Act. D) ANNEXURE in printed form is available at the Purchaser - contact point specified in point I.1) of this notice, and in electronic form - on the website of the Employer, the date of opening of tenders.

Engineering design services for the construction of civil engineering works

Zarząd Dróg Miejskich w Gliwicach | Published February 25, 2015
Winner
Zakład Inżynierii Ruchu Systemy Projektowe A. Dumnicki i s-ka S.J.
cpvs
71322000

The contract is for construction of the project construction executive for the project "Reconstruction of the intersection of Dworcowa-Lower Ramparts-John Paul II Mikołowska-Dunikowskiego)". Project documentation should be made based on the concept developed by "TTG Project" with Andrychowa in 2013.

Desktop computer

Politechnika Śląska | Published March 4, 2015  -  Deadline April 9, 2015
cpvs
30213300

A) 1. The contract is for the supply of computer equipment for the Silesian University of Technology. Offered equipment must be CE marked. All equipment and components for construction equipment, which are the subject of the contract must be brand new. Supply of equipment is divided into 5 tasks. Task 1 - Set Computer (CPV 30.21.33.00-8 desktop). Task 2 - Set Computer (CPV 30.21.33.00-8 desktop). Task 3 - Set Computer (CPV 30.21.33.00-8 desktop). Task 4 - Set Computer (CPV 30.21.33.00-8 desktop). Task 5 - Set Computer (CPV 30.21.33.00-8 desktop). 2. Delivery time - up to 20 days from the date of the contract, in all tasks. B) requirements of the contract, to be met by the Contractor: 1. The offering price and terms of the contract in accordance with the requirements of the Employer. 2. Offering the object of the contract that meets the requirements of the Employer. Required documents and attachments confirming the fulfillment of requirements for the object of the contract: 1.1. Quotation. 2.1. Technical Parameters table. C) The Purchaser shall check whether the object of the contract offered meets the requirements set by the Employer. Lack of any of the documents and attachments or submission of documents and annexes containing errors will result in rejection of the offer pursuant to Art. 89 paragraph. 1 of the Act, subject respectively. 87, paragraph 26. Paragraphs 4 and 26. 3 of the Act. D) ANNEXURE in printed form is available at the Purchaser - contact point specified in point I.1) of this notice, and in electronic form - on the website of the Employer, the date of opening of tenders.

Personal computers

Politechnika Śląska | Published March 5, 2015
Winner
Marcin Dejas prowadzący działalność gospodarczą pod firmą Centrum Komputerowe „Planeta”
cpvs
30213000, 30231300

The contract is for the supply of computer equipment for the Silesian University of Technology. Offered equipment must be CE marked. All equipment and components for construction equipment constituting the object of the contract must be brand new. Supply of equipment divided into 4 tasks. CPV 30.21.30.00-5 personal computers; CPV 30.23.13.00-0 Displays. Delivery time (for all jobs): up to 20 days from the date of the contract.

Modernization - hydrant.

 | Published March 6, 2015  -  Deadline March 23, 2015
cpvs
45000000, 45330000, 42131160, 45310000, 45315700, 45400000

The subject of the contract is works. 59. Tarnogórska in the following areas: - works - electrical works - works - Complementary construction and installation works related to the performance of the contract - other associated works for completeness and readiness for use of the contract As a result of the contract purchaser has obtained the object of the contract in are complete, ready-to-use. The Contractor shall, in addition, in the execution of the contract and within the price offered: - perform the scope of work required for proper use, even not specified in the bill of quantities, and necessary for the proper use of the contract, - provide all the equipment, the equipment necessary for the proper use, even not specified in the bill of quantities, and necessary for the proper use of the contract, - cover the costs of water, electricity, a flat rate: water - 25 PLN gross per week of work, energy - 25 PLN gross per week - Floor and perform security floors from damage in connection with the execution of the works, - protect against dust adjacent spaces in connection with the execution of the works, - on a regular basis will maintain order and perform maintenance work - and surrender exported from waste disposal, - submits a utility scrap from demolition in the place indicated by the contracting authority , exported from and selling scrap derived from the demolition and return the funds received to the contracting authority - Draft a work organization BIOZ plan and submit it to the contracting authority to be arranged, if required - to communicate: built documentation, all approvals for materials and equipment, Short description of the contract ( extract from the project documentation) Description of planned-industry installation old hydrant box must be removed and the cavity hollow brick to brick, plaster and paint. Plugging the renovated fire protection system shall be set wodomierzowym. In this way, only the internal hydrant installation is the water supply and the water flow is directed to it. The advantage of this solution is the ability to isolate the circuit automatic existentially - business, no need for electricity control and the fact that at work in normal idle valve is not only works as a pressure reducer in plumbing livelihood. Due to the lack of pressure in the existing hydrant systems in the building should be placed in the basement of the school in the pom. storage (next exchanger) Tank Unit ZH-ICL / S 2.4.7B / 1.1 kW + OT50Z. The conducted calculations show that the pressure loss hydrant p for two hydrants placed in the most unfavorable place are 470 kPa (hydronic calculations were made using the Instal San Geberit and are available in the archives office). OT50Z damper is equipped with electric actuator, water meter to the transmitter and the throttle. Description of the planned-electric industry Electrical installations: Due to the lack of pressure, and the capacity of the existing hydrant systems in a building designed to place in the basement of the school in the pom. storage (next exchanger) hydrophore set ZH-ICL / S 2.4.7B / 1.1 kW + OT50Z. The conducted calculations show that the required pressure p for two hydrants located in the worst place should be 470 kPa. The pumps are equipped with a set of standard (normalized) electric motor 1.1 kW / 2880 rev / min, the total installed capacity (2 x 1.1 kW) = 2.2 kW. T-ZH hydrophore set located in the pom. storage (next exchanger). Route cable placement is shown in Figures throws basement and ground floor. With the array powered T-ZH is powered by the control board TS-ZH ICL, compact power cord hydrophore set YDY 5x4mm2, n / t. The storehouse - hydroforowi - electric table will be located. T-ZH, equipped with a switch fuse - 25A. PE rail must be connected pipelines of other installations as ground lightning protection, heating cables, metal water installation, etc. A detailed description of the object of the contract is contained in the following publications: - bills of quantities - Annex 9 to the SETC - design documentation - Appendix 10 to this Terms of Reference (ToR) - Technical Specifications and Acceptance of Performance - Annex 11 to the Terms of Reference - application works - Appendix 12 to the ToR Contractor, which refers to equivalent solutions described by the Employer is obliged to prove that offered by the materials, equipment, components meet the requirements specified by the Employer, through eg. adding catalogs, brochures, technical descriptions, certificates, approvals offered disbanded

Personal computers

Politechnika Śląska | Published March 7, 2015  -  Deadline April 17, 2015
cpvs
30213000

A) 1. The contract is for the supply of computer equipment for the Silesian University of Technology. Offered equipment must be CE marked. All equipment and components for construction equipment, which are the subject of the contract must be brand new. Supply of equipment is divided into five tasks: Task 1 - Systems (CPV 30.21.30.00-5 personal computers, computer monitors 30.23.13.00-0) Task 2 - Systems (CPV 30.21.30.00-5 personal computers, 30.23.13.00-0 Display Screen) Task 3 - Set Computer (CPV 30.21.30.00-5 personal computers, computer monitors 30.23.13.00-0) Task 4 - Notebooks (CPV 30.21.31.00-6 laptop) Task 5 - Desktops (CPV 30.21. 30.00-5 personal computers) 2. Delivery time - a task 1,2,3 and 5 - to 20 days from the date of the contract, - the task 4 - 14 days from the date of the contract. B) requirements of the contract, to be met by the Contractor: 1. The offering price and terms of the contract in accordance with the requirements of the Employer. 2. Offering the object of the contract that meets the requirements of the Employer. Required documents and attachments confirming the fulfillment of requirements for the object of the contract: 1.1. Quotation; 2.1. Technical Parameters table. C) The Purchaser shall check whether the object of the contract offered meets the requirements set by the Employer. Lack of any of the documents and attachments or submission of documents and annexes containing errors will result in rejection of the offer pursuant to Art. 89 paragraph. 1 of the Act, subject respectively. 87, paragraph 26. Paragraphs 4 and 26. 3 of the Act. D) ANNEXURE in printed form is available at the Purchaser - contact point specified in point I.1) of this notice, and in electronic form - on the website of the Employer, the date of opening of tenders.

Personal computers

Politechnika Śląska | Published April 15, 2015
Winner
Marcin Dejas prowadzący działalność gospodarczą pod nazwą Centrum Komputerowe Planeta
cpvs
30213000, 30232110

A. The contract is for the supply of computer equipment for the Silesian University of Technology. Offered sprzętmusi CE marked. All equipment and components for construction equipment stanowiąceprzedmiot orders must be brand new. Supply of equipment divided into 4 tasks: - task 1 - Systems (CPV 30.21.30.00-5 personal computers); - Task 2 - Desktop (CPV 30.21.30.00-5 personal computers); - Task 3 - Systems (CPV 30.21.30.00-5 personal computers); - Task 4 - Laser Printers (CPV 30.23.21.10-8 laser printers). The term of up to 20 days from the date of the agreement (in all jobs).

Personal computers

Politechnika Śląska | Published April 18, 2015  -  Deadline May 26, 2015
cpvs
30232110

A) 1. The contract is for the supply of computer equipment for the Silesian University of Technology. Offered equipment must be CE marked. All equipment and components for construction equipment, which are the subject of the contract must be brand new. Supply of equipment is divided into six tasks: Task 1 - portable computer U1 (CPV 30.21.31.00-6 laptops) Task 2 -Computers stationary S3 and monitors (CPV 30.21.30.00-5 personal computers, computer monitors 30.23.13.00-0) Task 3 - Laser Printers (Laser printer 30.23.21.10-8 CPV) Task 4 - Notebooks (CPV 30.21.31.00-6 laptops) Task 5 - A portable computer (CPV 30.21.32.00-7 computer, tablet) Task 6 - Laser Printers (CPV 30.23.21.10-8 laser printers) 2. Delivery time: task 1, 4, 5 - 14 days from the date of the contract, task 2,3,6 - up to 20 days from the date of the contract. B) requirements of the contract, to be met by the Contractor: 1. The offering price and terms of the contract in accordance with the requirements of the Employer. 2. Offering the object of the contract that meets the requirements of the Employer. Required documents and attachments confirming the fulfillment of requirements for the object of the contract: 1.1. Price Offer; 2.1. Technical Parameters table. C) The Purchaser shall check whether the object of the contract offered meets the requirements set by the Employer. Lack of any of the documents and attachments or submission of documents and annexes containing errors will result in rejection of the offer pursuant to Art. 89 paragraph. 1 of the Act, subject respectively. 87, paragraph 26. Paragraphs 4 and 26. 3 of the Act. D) ANNEXURE in printed form is available at the Purchaser - contact point specified in point I.1) of this notice, and in electronic form - on the website of the Employer, the date of opening of tenders.

Engineering design services for the construction of civil engineering works

Zarząd Dróg Miejskich w Gliwicach | Published May 2, 2015  -  Deadline June 8, 2015
cpvs
71322000

The contract involves the design documentation for the tasks: 1) Problem # 1- Design of building and performing with obtaining a decision ZRID for the reconstruction of the intersection: Tarnogórska-Kurpiowska-Olszewski in Gliwice. 2) Exercise No. 2 Design of building and performing for construction of a road on the outskirts of Old Gliwice in the wake road 04KDD1 / 2 on the extension of ul. F.Kona in Gliwice. 3) Problem # 3 - Execution of building and performing project for the construction of an access road connecting the street. Forest with parking at the cemetery Lipowy in Gliwice. Detailed description of the Contract for each task is given in Annex No. 10 hereto. The contractor may bid for one or more selected their tasks, but for each task should demonstrate other personnel.

Portable computers

Politechnika Śląska | Published May 6, 2015
Winner
AF Seko Sp. z o.o.
cpvs
30213100, 30232100, 30231300

1. The contract is for the supply of computer equipment for the Silesian University of Technology. Oferowanysprzęt must be CE marked. All equipment and components for construction equipment stanowiąceprzedmiot orders must be brand new. Supply of equipment divided into 3 tasks. Task 1 - Set Computing (CPV 30.21.31.00-6 laptops), (CPV printer 30.23.21.00-5 iplotery). Task 2 - LCD Monitor (CPV 30.23.13.00-0 Displays). Task 3 - Multifunction (CPV 30.23.21.00-5 printers and plotters). 2. Delivery time: - task 2 - to 20 days from the date of conclusion of the contract, - the task 1, 3 - 14 days from the date of the agreement.

Engineering design services for the construction of civil engineering works

Zarząd Dróg Miejskich w Gliwicach | Published May 16, 2015
Winner
WYG Consulting Sp. z o.o.
cpvs
71322000

The contract is for the execution of project documentation for the construction of the southern part of the city ring road and the reconstruction and expansion of the road system between ul. Bojko and Pszczyńska consisting of the following tasks: 1. Reconstruction of the street Ring; 2. Construction and reconstruction of access roads on the south side of the street. Circular; 3. Reconstruction of the street Bojkowska; 4. Construction of the southern section of the ring road section from the street. Bojkowska to the street. Circular; 5. Rain water discharge into the stream Ligocki.

Personal computers

Politechnika Śląska | Published May 19, 2015  -  Deadline June 8, 2015
cpvs
30211000

A) 1. The contract is for the supply of computer equipment for the Silesian University of Technology. Offered equipment must be CE marked. All equipment and components for construction equipment, which are the subject of the contract must be brand new. Supply of equipment divided into 5 tasks: Task 1 - 1 CPV Systems 30.21.30.00-5 personal computers, 30.23.13.00-0 display screen, Task 2 - 2 CPV Systems 30.21.30.00-5 personal computers, 30.23.13.00-0 display screen, Task 3 - Set 3 CPV 30.21.30.00-5 computer personal computers, 30.23.13.00-0 display screen, Task 4 - Notebooks CPV 30.21.31.00-6 laptop computer, Task 5 - Server CPV 30.21.10.00-1 high-performance computers. 2. Delivery time: - task 1, 2, 3, 5 - to 20 days from the date of the agreement. - Task 4 - 14 days from the date of the agreement. B) The requirements for the order to be met by the Contractor: 1. The offering price and terms of the contract in accordance with the requirements of the Purchaser. 2. Offering of the contract that meets the requirements of the Employer. Required documents and attachments confirming the fulfillment of requirements for the object of the contract: 1.1. Price Offer; 2.1. Technical Parameters table. C) The Contracting Authority will check whether the offered object of the contract meets the requirements set by the Employer. Lack of any of the documents and attachments or submission of documents and attachments that contain errors will result in rejection of the offer pursuant to Art. 89 paragraph. 1 of the Act, subject to, respectively Art. 87, paragraph 26. 4 and 26 paragraph. 3 of the Act. D) ANNEXURE in printed form is available at the Purchaser - contact point specified in point I.1) of this notice, in electronic form - on the website of the Employer, until the opening of tenders.

Engineering design services for the construction of civil engineering works

Zarząd Dróg Miejskich w Gliwicach | Published May 20, 2015  -  Deadline June 8, 2015
cpvs
71322000

Usługi inżynierii projektowej w zakresie inżynierii lądowej i wodnej