Public tenders for construction in Gdynia Poland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Ships

Dyrektor Urzędu Morskiego w Gdyni | Published March 9, 2017
cpvs
34510000

The contract is for the design, construction and delivery of specialized ship double-hulled (catamaran), designed to conduct work related to research and hydrographic and research conditions of navigability of waterways, moorings and other bodies of water utility and determination of parameters of safe deep sea routes in the area of ​​the port of Gdynia, Gdańsk, Hel , Władysławowo, Puck, on the Gulf of Gdansk and Puck, in the region of the Hel Peninsula and the coast of central and eastern as well as in open areas of the Baltic Sea for the purpose of ensuring navigational safety shipping. Unit with aluminum structure completely welded. Detailed order specification is a unit which is Annex 1 to the Terms of Reference.

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Gmina Miasta Gdyni | Published March 9, 2017  -  Deadline April 21, 2017
cpvs
45230000, 45231000, 45232460, 45233140, 45232130, 45232454, 45112710, 45223200, 45314000

The contract is for the execution of works: Construction of streets Zwierzyniecka, Bobrowa, Wolf and Demptowskiej and the section of the street Sakowicz in Gdynia with the construction of technical infrastructure.

Supervision of building work

Gmina Miasta Gdyni | Published March 9, 2017  -  Deadline April 21, 2017
cpvs
71247000

The contract is to perform services investment supervision over the implementation and the warranty period of works entitled .: Construction of streets Zwierzyniecka, Bobrowa, Wolf and Demptowskiej and the section of the street Sakowicz in Gdynia with the construction of technical infrastructure.

11, paragraph 8 of the PPA.

The contract is to perform services investment supervision over the implementation and the warranty period of works entitled .: Construction of streets Zwierzyniecka, Bobrowa, Wolf and Demptowskiej and the section of the street Sakowicz in Gdynia with the construction of technical infrastructure.

Object of the contract does not include the performance of services investor's supervision over the implementation period and a performance guarantee of sanitary sewage system in the street Zwierzyniecka, Bobrowa, Wolf and part of the street Demptowskiej along with sections of the sewage system to the limits of the property to the extent specified in the project documentation; investor's supervision over the scope of the work will be held PEWIK Gdynia.

Scope of the object of the contract executed by the Contractor will include:

1) the execution of works according to the documentation provided by the Contracting Authority and taking into account design features the Terms of Reference,

2) author's supervision over the implementation of works executed in the whole range of substantive accordance with point 1), from the day the construction site until final acceptance of the works, both in terms of the documentation developed by the Contractor, as well as the documentation provided by the Employer,

3) respectively to obtain a use permit or a notification of the completion of works to the competent construction supervision and submit to the Employer proof of the effectiveness of this notice; The Employer will provide the Contractor appropriate powers of attorney in this regard.

Wharf construction work

Dyrektor Urzędu Morskiego w Gdyni | Published March 11, 2017  -  Deadline April 21, 2017
cpvs
45241500, 45111100, 45200000, 45223000, 45100000

Stage IIIA involving the reconstruction and modernization:

306 mb)

531 mb)

938 mb)

A detailed description of the contract constitute a description of the contract with the technical documentation which are respectively part of the order 1-3 Annexes 4A to 4C hereto.

A detailed description of the order is a description of the contract with the technical documentation for one of the lots constituting Appendix 4A to the Terms of Reference.

A detailed description of the order is a description of the contract with the technical documentation for the two lots constituting Appendix 4B to the Terms of Reference.

A detailed description of the order is a description of the contract with the technical documentation for the 3 lots constituting Appendix 4C to the ToR.

Building demolition and wrecking work and earthmoving work

Rejonowy Zarząd Infrastruktury | Published February 28, 2017  -  Deadline April 10, 2017
cpvs
45110000, 45111100, 45100000, 45262520, 45223500, 45430000, 45440000, 45320000, 45421000, 45421141, 45421160, 45432000, 45450000, 45261210, 45261320, 45111220, 45111200, 31214500, 45311200, 31518200, 31527200, 45312310, 45312311, 31321000, 45310000, 45330000, 45231300, 45332200, 45332300, 45331100, 45331210, 45321000, 45331221, 32000000, 32234000, 32235000, 32320000, 32400000, 32410000, 32412100, 32415000, 32520000, 35120000, 35121700, 45232300, 45311000, 45312000, 45312200, 45314000, 45314300, 45216000, 45000000, 45300000, 45400000, 45315600

Construction of a temporary control center (stage I) and the reconstruction of the barracks building No. 14 on the multi-purpose building in the military in Redzikowo (stage II) - Task 13738.

Engineering design services

Dyrektor Urzędu Morskiego w Gdyni | Published February 24, 2017
Winner
Mosty Gdańsk Sp. z o.o.
cpvs
71320000, 71248000, 71313440

The contract is for the development of design documentation for the project - Construction of a navigable channel connecting the Vistula Lagoon of the Gulf of Gdansk in the airlock with the design of the closures, the main channel and sections connecting the outport port shielding from the Gulf of Gdansk and the marina parking / parking spots on the side of the Vistula Lagoon ( depending on the results of the analysis wave). In addition, the scope of the project includes: road and bridge along with accompanying infrastructure: modernization of the port entrance Elblag - on the section of the Vistula Lagoon to the bridge in Nowakowie and the section from the bridge in Nowakowie a length of about 2.5 km; fairway from the Gulf of Elblag to the desired location navigable channel; artificial island / island on the Vistula Lagoon. Object of the contract also includes supervision in the field of copyright under Article. 20 paragraph. 1 point 4) of the Act of 07.07.1994 r. Construction Law.

Repair and maintenance services of locomotive wheelsets

„Przewozy Regionalne” Sp. z o.o. Oddział Pomorski z siedzibą w Gdyni | Published February 21, 2017  -  Deadline March 28, 2017
cpvs
50221300

1. Object of the contract.

The contract is the exchange of monobloc wheels and brake discs with 4 wheel sets (each set consists of 2 monobloc wheels and 1 double-sided disc brake for 1 wheel), according to the technological documentation of the vehicle and the standards indicated in the Documentation Maintenance System (DSU) on the bus rail series SA109-009.

2. The scope of work includes:

1) removal of monobloc wheels with wheel sets,

2) exchange of monobloc wheels on the new conditions specified in standard PN-K91045 / 2002 shown in the Documentation System Maintenance,

3) installation of new brake discs on the monobloc wheels, meet the requirements of UIC 541-3 7th edition of 2010.,

4) chill the friction surfaces of brake discs,

5) transfusion outline of the rim to justice in accordance with the technical drawing - construction dimensions after transfusion - by measurement cards for P4 and P5 attached to the Agreement constituting the enclosure 5 to Announcements

6) balancing static wheel sets,

7) testing flaw detection axis,

8) examine the axlebox bearing wheel sets.

3. A process for the contract:

1) The transfer wheel sets to replace the monobloc wheels and their return after completing all the steps referred to in paragraph 2 shall take place on the street. Tucholska 6a in Chojnice (89-600). Transmission and reception of wheel sets will take place at the expense of the Contractor.

2) Scope of the service which is the subject of the contract should be done in accordance with the technical documentation.

3) Scrap recovered during the service which is the subject of the contract is the property of the Employer and the Contractor shall deliver it to the Purchaser on the date of the return wheel sets.

4) All assembly operations must be received by the Commissioner receiving.

5) The required guarantee period - a minimum of 12 months.

Supervision of building work

Dyrektor Urzędu Morskiego w Gdyni | Published March 4, 2017  -  Deadline March 23, 2017
cpvs
71247000, 71000000, 71315400, 71244000, 79200000

The contract is the function of Contract Engineer for the Project "Modernization of seawalls in the Northern Port in Gdansk" better defined in FIDIC (Conditions of Contract for Construction for construction and engineering works designed by the Employer (FIDIC 1999 4te edition 2008) - valid text Polish, item description, draft contract, including the responsibilities of investor's supervision inspector under the construction Law. the Terms of Reference is attached as Appendix 4 to the ToR.

Ships

Dyrektor Urzędu Morskiego w Gdyni | Published February 28, 2017  -  Deadline March 22, 2017
cpvs
34510000

The contract is for design and construction inspection vessel designed for work control - inspection in port areas and przystoczniowych on seaways, anchorages and other waters utility maritime routes in the area of ​​the port of Gdynia and Gdansk Gulf region. The unit made of steel, fully welded. Description of the order is attached as Appendix 4 to the ToR.

Repair and maintenance services of locomotive wheelsets

„Przewozy Regionalne” Sp. z o.o. Oddział Pomorski z siedzibą w Gdyni | Published February 9, 2017  -  Deadline March 17, 2017
cpvs
50221300

1. Object of the contract

The contract is the exchange of monobloc wheels in 4 wheel sets (2 sets of driving and 2 sets of bearings), according to the technological documentation of the vehicle and the standards indicated in the Documentation Maintenance System (DSU) on the bus rail SA103 series.

2. The scope of work includes:

1) removal of monobloc wheels with wheel sets,

2) exchange of monobloc wheels on the new conditions specified in standard PN-K91045 / 2002 shown in the Documentation System Maintenance,

3) chill the friction surfaces of brake discs,

4) transfusion outline of the rim to justice in accordance with the technical drawing - construction dimensions after transfusion - by measurement cards for P4 and P5 attached to the Agreement constituting the enclosure 5 to Announcements

5) balancing of the static wheel sets,

6) study of flaw detection axis,

7) The revision of the bearings in axlebox wheelset.

3. A process for the contract:

1) The transfer wheel sets to replace the monobloc wheels and their return after completing all the steps referred to in paragraph 2 shall take place on the street. Tucholska 6a, in Chojnice (89-600). Transmission and reception of wheel sets will take place at the expense of the Contractor.

2) Service which is the object of the contract shall be made in accordance with the technical documentation.

3) Scrap recovered during the service which is the subject of the contract is the property of the Employer and the Contractor shall deliver it to the Purchaser on the date of the return wheel sets.

4) All assembly operations must be received by the Commissioner receiving.

5) The required guarantee period - a minimum of 12 months.

Construction work for buildings relating to railway transport

PKP Szybka Kolej Miejska w Trójmieście Sp. z o.o. | Published December 14, 2016
Winner
Przedsiębiorstwo Usługowo Handlowe „Rajbud” Sp. z o.o.
cpvs
45213320

The contract is the realization of works for the investment task. "Modernization of platform No. 1 at the station Gdynia Chylonia." Construction work describes in detail the design documentation (indicated in Chapter V of the SETC).

Ships

Dyrektor Urzędu Morskiego w Gdyni | Published February 1, 2017  -  Deadline March 10, 2017
cpvs
34510000

The contract is for design and construction inspection vessel designed for work control - inspection in port areas and przystoczniowych on seaways, anchorages and other waters utility maritime routes in the area of ​​the port of Gdynia and Gdansk Gulf region. The unit made of steel, fully welded. Description of the order is attached as Appendix 4 to the ToR.

The contract is for design and construction inspection vessel designed for work control - inspection in port areas and przystoczniowych on seaways, anchorages and other waters utility maritime routes in the area of ​​the port of Gdynia and Gdansk Gulf region. The unit of steel completely welded. Description of the order is attached as Appendix 4 to the ToR.

The contract will be financed by the European Union from the Cohesion Fund under the Operational Programme Infrastructure and Environment 2014 - 2020 Title of the project "Replacement of floating stock of the Maritime Office in Gdynia."

The contractor is obliged to carry out the contract on the terms and conditions described in the model contract attached as Appendix 3 hereto.

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Gmina Miasta Gdyni | Published January 5, 2017  -  Deadline January 16, 2017
cpvs
45230000, 45231000, 45233140, 45232130, 45233293, 45112710, 45223200, 45314000, 45232460

The contract is for the execution of works: Revitalization District Chylonia in Gdynia m. In. through the expansion of streets Komierowskiego, Abbot Hackiego, Zamenhof, and St. Chylońskiej. Nicholas and the construction of a collector of rain into the river Chylonki - Phase 1. These proceedings concern the part of the contract for the regeneration of the district Chylonia described as Phase 1. The contracting authority is planning the development of Phase 2 of revitalization. The total estimated value of the works of Phase 1 and Phase 2 exceeds the equivalent of 5 225 000 EUR. The Employer has applied open tendering of contract value exceeding the amount specified in regulations issued pursuant to art. 11, paragraph 8 of the PPA.

Roadworks

Gmina Miasta Gdyni – Zarząd Dróg i Zieleni | Published January 4, 2017
cpvs
45233140

Execution of construction works on the execution of maintenance and repairs of roads and engineering facilities in the city of Gdynia divided into 3 parts (three areas).

Management-related services

Dyrektor Urzędu Morskiego w Gdyni | Published December 15, 2016  -  Deadline January 5, 2017
cpvs
79420000

The contract is to act as a site engineer in the implementation of the agreement with the contractor on "Design, construction and delivery of specialized hydrographic units with equipment in the form of a new system for collecting and processing hydrographic data for the Maritime Office in Gdynia." The contract scope includes in particular the supervision of the merits on behalf of the investor over the course of the design and construction of hydrographic units in order to ensure the quality of execution of works and technical advice to the Employer for the design, construction, equipment, testing and inspection. Description of the order is attached as Appendix 3 hereto.

Construction work for water and sewage pipelines

Przedsiębiorstwo Wodociągów i Kanalizacji Sp. z o.o. w Gdyni | Published December 22, 2016  -  Deadline February 7, 2017
cpvs
45231300

The contract "Construction of sanitary sewage system and water supply system in the Municipality of Gdynia and Wejherowo."

This contract is divided into 5 parts:

Part 1 - Construction of sanitary sewage system and water supply system in Gdynia

Part 2 - Construction of sanitary sewage system in Bolszewo and water supply network in the Municipality Gościnin Wejherowo

Part 3 - Construction of sanitary sewage system in Łężyce (Głodówko and Rogulewo) in the Municipality of Wejherowo

Part 4 - Construction of sanitary sewage system in the Municipality of Zibertowie in Wejherowo

Part 5 - Construction of sanitary sewage system with 2 pumping stations in Kąpinie in the Municipality of Wejherowo

Construction of sanitary sewage system and water supply system in the Municipality of Gdynia and Wejherowo includes the execution of all necessary works, including dewatering of excavations, restoration of road surfaces after completed construction works, removal of the collision, felling trees and shrubs, hardening areas around the pumping station and the construction of access roads.

Part 1 - Construction of sanitary sewage system and water supply system in Gdynia:

a) the network of a sanitary sewage system of length L = 1 988.0 m,

b) water mains of length L = 1 044.0 m.

A detailed description of the order is attached as Appendix 5 to the ToR.

Part 1 will be co-financed by the European Union within the framework of the Project entitled .: "Optimization and expansion of the system of collective water supply and sewage disposal PEWIK Gdynia."

Object of the contract will be implemented according to the "Conditions of Contract for Construction work for engineering works designed by the Employer", first published in English in 1999, the fourth edition of the English-Polish 2008 (SIDIR).

Part 2 - Construction of sanitary sewage system in Bolszewo and the water supply system in Gościnin Wejherowo Commune:

a) a network of sanitary sewage system with a length L = 7 910.0 m in Bolszewo,

b) water mains of length L = 1 m 262.0 Gościnin.

Part 2 will be co-financed by the European Union within the framework of the Project entitled .: "Optimization and expansion of the system of collective water supply and sewage disposal PEWIK Gdynia."

Object of the contract will be implemented according to the "Conditions of Contract for Construction work for engineering works designed by the Employer", first published in English in 1999, the fourth edition of the English-Polish 2008 (SIDIR).

Part 3 - Construction of sanitary sewage system in Łężyce (Głodówko and Rogulewo) in the Municipality of Wejherowo:

a) a network of sanitary sewage system with a length L = 322.0 m Głodówku,

b) a network of sanitary sewage system with a length L = 1 m 740.0 Rogulewie.

A detailed description of the order is attached as Appendix 5 to the ToR.

Object of the contract will be implemented according to the "Conditions of Contract for Construction work for engineering works designed by the Employer", first published in English in 1999, the fourth edition of the English-Polish 2008 (SIDIR).

Part 4 - Construction of sanitary sewage system in Zibertowie Wejherowo Commune:

a) the network of a sanitary sewage system of length L = 1 855.0 m.

A detailed description of the order is attached as Appendix 5 to the ToR.

Object of the contract will be implemented according to the "Conditions of Contract for Construction work for engineering works designed by the Employer", first published in English in 1999, the fourth edition of the English-Polish 2008 (SIDIR).

Part 5 - Construction of sanitary sewage system with 2 pumping stations in Kąpinie Wejherowo Commune:

a) a network of sanitary sewage system with a length L = 8 115.0 m,

b) 2 sewage pumping stations.

A detailed description of the order is attached as Appendix 5 to the ToR.

Object of the contract will be implemented according to the "Conditions of Contract for Construction work for engineering works designed by the Employer", first published in English in 1999, the fourth edition of the English-Polish 2008 (SIDIR).

Ships

Dyrektor Urzędu Morskiego w Gdyni | Published April 11, 2017  -  Deadline May 4, 2017
cpvs
34510000

The contract is for the design, construction and delivery of specialized ship's double-hulled (catamaran), designed to conduct work related to research and hydrographic and research conditions of navigability of the fairway, moorings, other bodies of water utility and determining the parameters of safe depth maritime routes in the area of ​​the port of Gdynia, Gdańsk, Hel , Władysławowo, Puck, on the Gulf of Gdansk and Puck, in the region of the Hel Peninsula and the coast of the central and eastern areas and the open Baltic Sea for the purpose of ensuring navigational safety shipping. The unit of all-welded aluminum construction. Detailed description of the order of specification of the unit being Appendix 1 hereto.

Environmental monitoring for construction

Dyrektor Urzędu Morskiego w Gdyni | Published April 11, 2017  -  Deadline May 15, 2017
cpvs
71313450

The contract is for supervision of natural and duties related to the protection of the environment during the execution of works under the project "Modernization of the seawalls in the Northern Port in Gdansk" according to the decision of the Regional Director for Environmental Protection in Gdansk Gd-RDOŚ WOO.4211.30.2014. KSZ.18 of 05 September 2016. and "Modernization of the approach fairway to the Northern Port in Gdansk" according to the decision of the Regional Director for Environmental Protection in Gdansk Gd-RDOŚ WOO.4211.2.2013.ER.27 of June 14, 2016 year. Detailed order description of the order are attachments 5A (Part 1 contract) and 5B (part 2 of the contract) to the ToR.

Construction work

Zarząd Morskiego Portu Gdynia S.A. | Published March 24, 2017  -  Deadline May 10, 2017
cpvs
45000000

The contract is for the execution of works entitled. : Extension Overhead 2 "under the investment project" Deepening the approach fairway and waters inside the Port of Gdynia - Stage I ", which will be based in particular on reconstruction (expansion) Overhead No. 2 with the reconstruction of Pier No. III and dredging works.

1. Object of the contract includes:

1) Reconstruction of the jetty No. III and Pier No. II

a) Demolition of section of pier No. III (Nab. Gościnny);

b) Transfer of strengthening the bottom;

c) Protection forehead condensed pier No. III;

d) Conversion of terrestrial networks located in areas belonging, on the date of announcement of this contract to the Naval Shipyard SA in liquidation bankruptcy, KRS number 0000245948 (hereinafter: "SMW"), associated with the shortening of the pier;

e) Breaking dolphins dock in the area of ​​the pier No. II;

f) Changing floating dock;

g) Conversion and set the boxes in the temporary storage area.

2) dredging WITH FULL FIELD REFULACYJNEGO, including among others:

a) Execution of dredging works in the port areas to the elevation of -13.50 m, in terms of implementing the turntable 2 with a diameter of 480 m;

b) Postpone the field refulacyjnym No. II, located on the south side of the street. Logistics excavated material from dredging work.

3) OBTAINING OF THE USE OF THE COMPLETED CONSTRUCTION WORKS.

Ships

Dyrektor Urzędu Morskiego w Gdyni | Published March 24, 2017  -  Deadline March 28, 2017
cpvs
34510000

The contract is for design and construction inspection vessel designed for work control - inspection in port areas and przystoczniowych on seaways, anchorages and other waters utility maritime routes in the area of ​​the port of Gdynia and Gdansk Gulf region. The unit made of steel, fully welded. Description of the order is attached as Appendix 4 to the ToR.