Call +44 800 9755 164

Public tenders for construction in Gdynia Poland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Zarząd Morskiego Portu Gdynia S.A. | Published May 3, 2017  -  Deadline May 30, 2017
cpvs
45000000

The subject of the order is execution of construction works: Rozbudowa Obrotnicy nr 2 "conducted under the investment project" Deepening of the approach track and internal waters of the Port of Gdynia - Stage I ", which will consist in particular in the reconstruction (extension) of Turning point No. 2 with the reconstruction of the Pirates No. III and corroding robots.

Construction work for waterways

Dyrektor Urzędu Morskiego w Gdyni | Published May 12, 2017  -  Deadline May 31, 2017
cpvs
45247100, 45244000, 90520000, 45310000, 45223000, 45223100

1. The subject of the order is the execution of construction works on the Project "Modernization of the fairway to the North Harbor in Gdansk" consisting of its modernization. Construction works will in particular include:

- Dredging - reffing,

- cleaning the bottom of ferromagnetic material including explosive,

- Implementation of the navigation marking of the fairway.

The order will be executed in accordance with FIDIC (Contract Terms for Construction of Engineering and Construction Works Designed by the Purchaser (FIDIC 1999, 4th Edition, 2008).

2. A detailed description of the subject of the order is enclosed in Appendix No. 4 to SIWZ.

Construction work for waterways

Dyrektor Urzędu Morskiego w Gdyni | Published May 23, 2017  -  Deadline June 22, 2017
cpvs
45247100, 45244000, 90520000, 45310000, 45223000, 45223100

1. The subject of the order is the execution of construction works on the Project "Modernization of the fairway to the North Harbor in Gdansk" consisting of its modernization. Construction works will in particular include:

- Dredging - reffing,

- cleaning the bottom of ferromagnetic material including explosive,

- Implementation of the navigation marking of the fairway.

The order will be executed in accordance with FIDIC (Contract Terms for Construction of Engineering and Construction Works Designed by the Purchaser (FIDIC 1999, 4th Edition, 2008).

2. A detailed description of the subject of the order is enclosed in Appendix No. 4 to SIWZ.

Wharf construction work

Dyrektor Urzędu Morskiego w Gdyni | Published March 16, 2017  -  Deadline April 21, 2017
cpvs
45241500, 45111100, 45200000, 45223000, 45100000

The contract is for construction works on the Project Modernization of the entrance to the inner port (in Gdansk).

Stage IIIA involving the reconstruction and modernization:

1) Waterfront Rafters (approx. 306 m)

2) Quay XVIII (approx. 531 m)

3) Quay Retmanów (approx. 938 m)

under the terms of FIDIC (Conditions of Contract for Construction for construction and engineering works designed by the Employer (FIDIC 1999 4te edition 2008) - valid text in Polish. detailed order as a description of the contract with the technical documentation which are respectively part 1 -3 order Annexes 4A to 4C hereto.

Wharf construction work

Dyrektor Urzędu Morskiego w Gdyni | Published April 19, 2017  -  Deadline May 16, 2017
cpvs
45241500, 45111100, 45200000, 45223000, 45100000

The contract is for construction works on the Project Modernization of the entrance to the inner port (in Gdansk).

Stage IIIA involving the reconstruction and modernization:

1) Rafters Quay (approx. 306 m).

2) Quay XVIII (approx. 531 m).

3) Quay Retmanów (approx. 938 m)

under the terms of FIDIC (Conditions of Contract for Construction for the construction and engineering works designed by the Employer (FIDIC 1999 4- tert edition 2008) - valid text in Polish. A detailed description of the order as a description of the contract with the technical documentation which are respectively part 1 -3 contract attachments 4A to 4C hereto.

Construction work for water and sewage pipelines

Przedsiębiorstwo Wodociągów i Kanalizacji Sp. z o.o. w Gdyni | Published January 19, 2017  -  Deadline February 7, 2017
cpvs
45231300

The contract "Construction of sanitary sewage system and water supply system in the Municipality of Gdynia and Wejherowo."

This contract is divided into 5 parts:

Part 1 - Construction of sanitary sewage system and water supply system in Gdynia

Part 2 - Construction of sanitary sewage system in Bolszewo and water supply network in the Municipality Gościnin Wejherowo

Part 3 - Construction of sanitary sewage system in Łężyce (Głodówko and Rogulewo) in the Municipality of Wejherowo

Part 4 - Construction of sanitary sewage system in the Municipality of Zibertowie in Wejherowo

Part 5 - Construction of sanitary sewage system with 2 pumping stations in Kąpinie in the Municipality of Wejherowo

Construction of sanitary sewage system and water supply system in the Municipality of Gdynia and Wejherowo includes the execution of all necessary works, including dewatering of excavations, restoration of road surfaces after completed construction works, removal of the collision, felling trees and shrubs, hardening areas around the pumping station and the construction of access roads.

Construction work for water and sewage pipelines

Przedsiębiorstwo Wodociągów i Kanalizacji Sp. z o.o. w Gdyni | Published March 28, 2017
Winner
Przedsiębiorstwo Wielobranżowe Instalacyjno-Sanitarne i Remontowo-Budowlane „Skibiński” Mieczysław Skibiński
cpvs
45231300

The contract is the construction of sewage and water supply network in the Municipality of Gdynia and Wejherowo.

This contract is divided into 5 parts:

Part 1 - Construction of sanitary sewage system and water supply system in Gdynia

Part 2 - Construction of sanitary sewage system in Bolszewo and water supply network in the Municipality Gościnin Wejherowo

Part 3 - Construction of sanitary sewage system in Łężyce (Głodówko and Rogulewo) in the Municipality of Wejherowo

Part 4 - Construction of sanitary sewage system in the Municipality of Zibertowie in Wejherowo

Part 5 - Construction of sanitary sewage system with 2 pumping stations in Kąpinie in Gmininie Wejherowo

Construction of sanitary sewage system and water supply system in the Municipality of Gdynia and Wejherowo includes the execution of all necessary works, including dewatering of excavations, restoration of road surfaces after completed construction works, removal of the collision, felling trees and shrubs, hardening areas around the pumping station and the construction of access roads.

Part 1 - Construction of sanitary sewage system and water supply system in Gdynia:

a) the network of a sanitary sewage system of length L = 1 988.0 m,

b) water mains of length L = 1 m 044.0

A detailed description of the order is attached as Appendix 5 to the ToR.

Object of the contract will be implemented according to the "Conditions of Contract for Construction work for engineering works designed by the Employer", first published in English in 1999, the fourth edition of the English-Polish 2008 (SIDIR.).

Part 2 - Construction of sanitary sewage system in Bolszewo and the water supply system in Gościnin Wejherowo Commune:

a) a network of sanitary sewage system with a length L = 7 910.0 m in Bolszewo,

b) water mains of length L = 1 m 262.0 Gościnin

A detailed description of the order is attached as Appendix 5 to the ToR.

Object of the contract will be implemented according to the "Conditions of Contract for Construction work for engineering works designed by the Employer", first published in English in 1999, the fourth edition of the English-Polish 2008 (SIDIR).

Part 3 - Construction of sanitary sewage system in Łężyce (Głodówko and Rogulewo) in the Municipality of Wejherowo:

a) a network of sanitary sewage system with a length L = 322.0 m Głodówku,

b) a network of sanitary sewage system with a length L = 1 m 740.0 Rogulewie

A detailed description of the order is attached as Appendix 5 to the ToR.

Object of the contract will be implemented according to the "Conditions of Contract for Construction work for engineering works designed by the Employer", first published in English in 1999, the fourth edition of the English-Polish 2008 (SIDIR).

Part 4 - Construction of sanitary sewage system in Zibertowie Wejherowo Commune:

a) the network of a sanitary sewage system of length L = 1 m 855.0

A detailed description of the order is attached as Appendix 5 to the ToR.

Object of the contract will be implemented according to the "Conditions of Contract for Construction work for engineering works designed by the Employer", first published in English in 1999, the fourth edition of the English-Polish 2008 (SIDIR).

Part 5 - Construction of sanitary sewage system with 2 pumping stations in Kąpinie Wejherowo Commune:

a) a network of sanitary sewage system with a length L = 8 115.0 m,

b) 2 sewage pumping stations

A detailed description of the order is attached as Appendix 5 to the ToR.

Object of the contract will be implemented according to the "Conditions of Contract for Construction work for engineering works designed by the Employer", first published in English in 1999, the fourth edition of the English-Polish 2008 (SIDIR).

Secondary school construction work

Gmina Miasta Gdyni | Published April 6, 2017  -  Deadline May 16, 2017
cpvs
45214220, 71221000

194 Wins in Gdynia "functioning as the School Administration - Economics (ZSAE), together with technical infrastructure and adaptation to the needs of disabled people and the applicable regulations, including fire safety.

11, paragraph 8 of the Public Procurement Act.

194 Wins in Gdynia "functioning as the School Administration - Economics (ZSAE), together with technical infrastructure and adaptation to the needs of disabled people and the applicable regulations, including fire safety.

Performance of the contract is divided into 2 stages described as Stage I and Stage II:

Stage I - preparation of project documentation, including construction and executive drawn up on the basis of functional - utility program and the Annex to the Program Functional - utility Employer and guidelines, obtaining a building permit.

Stage II - construction works together with all other associated works, on behalf of the Employer to obtain the use permit in accordance with its intended purpose and the author's supervision on site.

Construction work

Rejonowy Zarząd Infrastruktury | Published August 1, 2015
Winner
Konsorcjum firm: Zakład Remontowo-Budowlany „TYM-BUD” Waldemar Tymoszewski i „COMAS GROUP” Piotr WYRWIAK
cpvs
45000000

The construction Command and sztabowo-training for troops practicing on the range wicko morskie with obtaining a decision on the permit to use - job No. 13612.

Gdynia: Construction of the playground at ul.Żeliwnej in Gdynia.

Zarząd Dróg i Zieleni w Gdyni | Published September 19, 2016  -  Deadline September 6, 2016
Winner
PPE POLAND Sp. z o. o., ul. Metalowców 3A, 41-600 Świętochłowice, kraj/woj. śląskie.
cpvs
45112000, 45233252, 45233000, 45236250, 45112723, 37535200

1. The contract is for construction of a playground at ul. Cast iron in Gdynia. 2. A detailed description of the contract provides: a) construction project with design elements executive - Appendix A to SIWZ, b) the technical specifications - Annex B to SIWZ c) bill of quantities - Annex C to siwz ..

Gdynia: Construction of the playground at ul.Żeliwnej in Gdynia

Zarząd Dróg i Zieleni w Gdyni | Published July 19, 2016  -  Deadline August 11, 2016
cpvs
45111200, 45233252, 45233000, 45236250, 45112723, 37535200

1. The contract is for construction of a playground at ul. Cast iron in Gdynia. 2. A detailed description of the contract provides: a) construction project with design elements executive - Appendix A to SIWZ, b) the technical specifications - Annex B to SIWZ c) bill of quantities - Annex C to siwz ..

Construction work for water and sewage pipelines

Przedsiębiorstwo Wodociągów i Kanalizacji Sp. z o.o. w Gdyni | Published December 22, 2016  -  Deadline February 7, 2017
cpvs
45231300

The contract "Construction of sanitary sewage system and water supply system in the Municipality of Gdynia and Wejherowo."

This contract is divided into 5 parts:

Part 1 - Construction of sanitary sewage system and water supply system in Gdynia

Part 2 - Construction of sanitary sewage system in Bolszewo and water supply network in the Municipality Gościnin Wejherowo

Part 3 - Construction of sanitary sewage system in Łężyce (Głodówko and Rogulewo) in the Municipality of Wejherowo

Part 4 - Construction of sanitary sewage system in the Municipality of Zibertowie in Wejherowo

Part 5 - Construction of sanitary sewage system with 2 pumping stations in Kąpinie in the Municipality of Wejherowo

Construction of sanitary sewage system and water supply system in the Municipality of Gdynia and Wejherowo includes the execution of all necessary works, including dewatering of excavations, restoration of road surfaces after completed construction works, removal of the collision, felling trees and shrubs, hardening areas around the pumping station and the construction of access roads.

Part 1 - Construction of sanitary sewage system and water supply system in Gdynia:

a) the network of a sanitary sewage system of length L = 1 988.0 m,

b) water mains of length L = 1 044.0 m.

A detailed description of the order is attached as Appendix 5 to the ToR.

Part 1 will be co-financed by the European Union within the framework of the Project entitled .: "Optimization and expansion of the system of collective water supply and sewage disposal PEWIK Gdynia."

Object of the contract will be implemented according to the "Conditions of Contract for Construction work for engineering works designed by the Employer", first published in English in 1999, the fourth edition of the English-Polish 2008 (SIDIR).

Part 2 - Construction of sanitary sewage system in Bolszewo and the water supply system in Gościnin Wejherowo Commune:

a) a network of sanitary sewage system with a length L = 7 910.0 m in Bolszewo,

b) water mains of length L = 1 m 262.0 Gościnin.

Part 2 will be co-financed by the European Union within the framework of the Project entitled .: "Optimization and expansion of the system of collective water supply and sewage disposal PEWIK Gdynia."

Object of the contract will be implemented according to the "Conditions of Contract for Construction work for engineering works designed by the Employer", first published in English in 1999, the fourth edition of the English-Polish 2008 (SIDIR).

Part 3 - Construction of sanitary sewage system in Łężyce (Głodówko and Rogulewo) in the Municipality of Wejherowo:

a) a network of sanitary sewage system with a length L = 322.0 m Głodówku,

b) a network of sanitary sewage system with a length L = 1 m 740.0 Rogulewie.

A detailed description of the order is attached as Appendix 5 to the ToR.

Object of the contract will be implemented according to the "Conditions of Contract for Construction work for engineering works designed by the Employer", first published in English in 1999, the fourth edition of the English-Polish 2008 (SIDIR).

Part 4 - Construction of sanitary sewage system in Zibertowie Wejherowo Commune:

a) the network of a sanitary sewage system of length L = 1 855.0 m.

A detailed description of the order is attached as Appendix 5 to the ToR.

Object of the contract will be implemented according to the "Conditions of Contract for Construction work for engineering works designed by the Employer", first published in English in 1999, the fourth edition of the English-Polish 2008 (SIDIR).

Part 5 - Construction of sanitary sewage system with 2 pumping stations in Kąpinie Wejherowo Commune:

a) a network of sanitary sewage system with a length L = 8 115.0 m,

b) 2 sewage pumping stations.

A detailed description of the order is attached as Appendix 5 to the ToR.

Object of the contract will be implemented according to the "Conditions of Contract for Construction work for engineering works designed by the Employer", first published in English in 1999, the fourth edition of the English-Polish 2008 (SIDIR).

Environmental monitoring for construction

Dyrektor Urzędu Morskiego w Gdyni | Published April 29, 2017  -  Deadline June 9, 2017
cpvs
71313450

The subject of the order is the supervision of nature and environmental obligations during the execution of construction works within the project "Modernization of the entrance to the internal harbor (Gdańsk). Phase III A "according to the decision of the Regional Director of Environmental Protection in Gdansk RDOŚ-Gd-WOO.42.11.11.5.2011.AT dated May 10, 2011. Detailed description of the subject of the order is a description of the subject of the order enclosure No. 5 to SIWZ.

Wharf construction work

Dyrektor Urzędu Morskiego w Gdyni | Published May 11, 2017  -  Deadline May 30, 2017
cpvs
45241500, 45111100, 45200000, 45223000, 45100000

The subject of the order is execution of construction works on the Project Modernization of the entrance to the internal harbor (in Gdansk). Phase IIIA of redevelopment and modernization:

1) Flisak wharf (about 306 m)

2) Pier XVIII (about 531 m)

3) Retman Quay (about 938 mb)

Detailed description of the subject of the order is a description of the subject of the order together with the technical documentation constituting part 1 respectively. -3 order attachments from 4A to 4C to SIWZ.

Wharf construction work

Dyrektor Urzędu Morskiego w Gdyni | Published May 19, 2017  -  Deadline June 6, 2017
cpvs
45241500, 45111100, 45200000, 45223000, 45100000

The subject of the order is execution of construction works on the Project Modernization of the entrance to the internal harbor (in Gdansk). Phase IIIA of redevelopment and modernization:

1) Flisak wharf (about 306 m)

2) Pier XVIII (about 531 m)

3) Retman Quay (about 938 mb)

Detailed description of the subject of the order is a description of the subject of the order together with the technical documentation constituting part 1 respectively. -3 order attachments from 4A to 4C to SIWZ.

Construction work for buildings relating to railway transport

PKP Szybka Kolej Miejska w Trójmieście Sp. z o.o. | Published August 25, 2016  -  Deadline September 13, 2016
cpvs

Construction work for buildings relating to railway transport

Construction work for buildings relating to railway transport

PKP Szybka Kolej Miejska w Trójmieście Sp. z o.o. | Published August 19, 2016  -  Deadline September 5, 2016
cpvs

Construction work for buildings relating to railway transport

Secondary school construction work

Gmina Miasta Gdyni | Published April 7, 2017  -  Deadline May 17, 2017
cpvs
45214220, 71221000

186 in the Gdynia Maritime "functioning as the School for Environmental and Transport (ZSET), together with technical infrastructure and adaptation to the needs of disabled people and the applicable regulations, including fire safety.

11, paragraph 8 of the Public Procurement Act.

186 in the Gdynia Maritime "functioning as the School for Environmental and Transport (ZSET), together with technical infrastructure and adaptation to the needs of disabled people and the applicable regulations, including fire safety.

Implementation of the contract is divided into 2 stages described as Stage I and Stage II:

Stage I - preparation of project documentation, including construction and executive drawn up on the basis of functional - utility program guidelines and the Employer and obtaining a building permit and certificate of acceptance notification of the intention of works.

Stage II - construction works together with all other associated works and to obtain on behalf of the Employer's permission to use the building for its intended purpose and the author's supervision on site.

Secondary school construction work

Gmina Miasta Gdyni | Published April 7, 2017  -  Deadline May 18, 2017
cpvs
45214220, 71221000

Maritime 75 and 77 in Gdynia "functioning as the Hotel Management School - Catering (ZSHG), together with technical infrastructure and adaptation to the needs of disabled people and the applicable regulations, including fire safety.

11, paragraph 8 of the Public Procurement Act.

Maritime 75 and 77 in Gdynia "functioning as a team Hotelarsko - Gastronomy (ZSHG), together with technical infrastructure and adaptation to the needs of disabled people and the applicable regulations, including fire safety.

Implementation of the contract is divided into 2 stages described as Stage I and Stage II:

Stage I - preparation of project documentation, including construction and executive drawn up on the basis of functional - utility program guidelines and the Employer and obtaining a building permit and certificate of acceptance notification of the intention of works.

Stage II - construction works together with all other associated works and to obtain on behalf of the Employer's permission to use the building for its intended purpose and the author's supervision on site.

Construction work

Zarząd Morskiego Portu Gdynia S.A. | Published March 24, 2017  -  Deadline May 10, 2017
cpvs
45000000

The contract is for the execution of works entitled. : Extension Overhead 2 "under the investment project" Deepening the approach fairway and waters inside the Port of Gdynia - Stage I ", which will be based in particular on reconstruction (expansion) Overhead No. 2 with the reconstruction of Pier No. III and dredging works.

1. Object of the contract includes:

1) Reconstruction of the jetty No. III and Pier No. II

a) Demolition of section of pier No. III (Nab. Gościnny);

b) Transfer of strengthening the bottom;

c) Protection forehead condensed pier No. III;

d) Conversion of terrestrial networks located in areas belonging, on the date of announcement of this contract to the Naval Shipyard SA in liquidation bankruptcy, KRS number 0000245948 (hereinafter: "SMW"), associated with the shortening of the pier;

e) Breaking dolphins dock in the area of ​​the pier No. II;

f) Changing floating dock;

g) Conversion and set the boxes in the temporary storage area.

2) dredging WITH FULL FIELD REFULACYJNEGO, including among others:

a) Execution of dredging works in the port areas to the elevation of -13.50 m, in terms of implementing the turntable 2 with a diameter of 480 m;

b) Postpone the field refulacyjnym No. II, located on the south side of the street. Logistics excavated material from dredging work.

3) OBTAINING OF THE USE OF THE COMPLETED CONSTRUCTION WORKS.