Call +44 800 9755 164

Public tenders for construction in Gdynia Poland

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Wharf construction work

Dyrektor Urzędu Morskiego w Gdyni | Published April 19, 2017  -  Deadline May 16, 2017
cpvs
45241500, 45111100, 45200000, 45223000, 45100000

The contract is for construction works on the Project Modernization of the entrance to the inner port (in Gdansk).

Stage IIIA involving the reconstruction and modernization:

1) Rafters Quay (approx. 306 m).

2) Quay XVIII (approx. 531 m).

3) Quay Retmanów (approx. 938 m)

under the terms of FIDIC (Conditions of Contract for Construction for the construction and engineering works designed by the Employer (FIDIC 1999 4- tert edition 2008) - valid text in Polish. A detailed description of the order as a description of the contract with the technical documentation which are respectively part 1 -3 contract attachments 4A to 4C hereto.

Secondary school construction work

Gmina Miasta Gdyni | Published April 6, 2017  -  Deadline May 16, 2017
cpvs
45214220, 71221000

194 Wins in Gdynia "functioning as the School Administration - Economics (ZSAE), together with technical infrastructure and adaptation to the needs of disabled people and the applicable regulations, including fire safety.

11, paragraph 8 of the Public Procurement Act.

194 Wins in Gdynia "functioning as the School Administration - Economics (ZSAE), together with technical infrastructure and adaptation to the needs of disabled people and the applicable regulations, including fire safety.

Performance of the contract is divided into 2 stages described as Stage I and Stage II:

Stage I - preparation of project documentation, including construction and executive drawn up on the basis of functional - utility program and the Annex to the Program Functional - utility Employer and guidelines, obtaining a building permit.

Stage II - construction works together with all other associated works, on behalf of the Employer to obtain the use permit in accordance with its intended purpose and the author's supervision on site.

Secondary school construction work

Gmina Miasta Gdyni | Published April 7, 2017  -  Deadline May 17, 2017
cpvs
45214220, 71221000

186 in the Gdynia Maritime "functioning as the School for Environmental and Transport (ZSET), together with technical infrastructure and adaptation to the needs of disabled people and the applicable regulations, including fire safety.

11, paragraph 8 of the Public Procurement Act.

186 in the Gdynia Maritime "functioning as the School for Environmental and Transport (ZSET), together with technical infrastructure and adaptation to the needs of disabled people and the applicable regulations, including fire safety.

Implementation of the contract is divided into 2 stages described as Stage I and Stage II:

Stage I - preparation of project documentation, including construction and executive drawn up on the basis of functional - utility program guidelines and the Employer and obtaining a building permit and certificate of acceptance notification of the intention of works.

Stage II - construction works together with all other associated works and to obtain on behalf of the Employer's permission to use the building for its intended purpose and the author's supervision on site.

Secondary school construction work

Gmina Miasta Gdyni | Published April 7, 2017  -  Deadline May 18, 2017
cpvs
45214220, 71221000

Maritime 75 and 77 in Gdynia "functioning as the Hotel Management School - Catering (ZSHG), together with technical infrastructure and adaptation to the needs of disabled people and the applicable regulations, including fire safety.

11, paragraph 8 of the Public Procurement Act.

Maritime 75 and 77 in Gdynia "functioning as a team Hotelarsko - Gastronomy (ZSHG), together with technical infrastructure and adaptation to the needs of disabled people and the applicable regulations, including fire safety.

Implementation of the contract is divided into 2 stages described as Stage I and Stage II:

Stage I - preparation of project documentation, including construction and executive drawn up on the basis of functional - utility program guidelines and the Employer and obtaining a building permit and certificate of acceptance notification of the intention of works.

Stage II - construction works together with all other associated works and to obtain on behalf of the Employer's permission to use the building for its intended purpose and the author's supervision on site.

Construction work

Zarząd Morskiego Portu Gdynia S.A. | Published March 24, 2017  -  Deadline May 10, 2017
cpvs
45000000

The contract is for the execution of works entitled. : Extension Overhead 2 "under the investment project" Deepening the approach fairway and waters inside the Port of Gdynia - Stage I ", which will be based in particular on reconstruction (expansion) Overhead No. 2 with the reconstruction of Pier No. III and dredging works.

1. Object of the contract includes:

1) Reconstruction of the jetty No. III and Pier No. II

a) Demolition of section of pier No. III (Nab. Gościnny);

b) Transfer of strengthening the bottom;

c) Protection forehead condensed pier No. III;

d) Conversion of terrestrial networks located in areas belonging, on the date of announcement of this contract to the Naval Shipyard SA in liquidation bankruptcy, KRS number 0000245948 (hereinafter: "SMW"), associated with the shortening of the pier;

e) Breaking dolphins dock in the area of ​​the pier No. II;

f) Changing floating dock;

g) Conversion and set the boxes in the temporary storage area.

2) dredging WITH FULL FIELD REFULACYJNEGO, including among others:

a) Execution of dredging works in the port areas to the elevation of -13.50 m, in terms of implementing the turntable 2 with a diameter of 480 m;

b) Postpone the field refulacyjnym No. II, located on the south side of the street. Logistics excavated material from dredging work.

3) OBTAINING OF THE USE OF THE COMPLETED CONSTRUCTION WORKS.

Construction work

Zarząd Morskiego Portu Gdynia S.A. | Published April 19, 2017  -  Deadline May 10, 2017
cpvs
45000000

The contract is for the execution of works titled .: Extension Overhead 2 "under the investment project" Deepening the approach fairway and internal bodies of the Port of Gdynia - Phase I, "which will consist in particular in reconstruction (expansion) Overhead No. 2 with the reconstruction of the pier No III and dredging works.

Environmental monitoring for construction

Dyrektor Urzędu Morskiego w Gdyni | Published April 11, 2017  -  Deadline May 15, 2017
cpvs
71313450

The contract is for supervision of natural and duties related to the protection of the environment during the execution of works under the project "Modernization of the seawalls in the Northern Port in Gdansk" according to the decision of the Regional Director for Environmental Protection in Gdansk Gd-RDOŚ WOO.4211.30.2014. KSZ.18 of 05 September 2016. and "Modernization of the approach fairway to the Northern Port in Gdansk" according to the decision of the Regional Director for Environmental Protection in Gdansk Gd-RDOŚ WOO.4211.2.2013.ER.27 of June 14, 2016 year. Detailed order description of the order are attachments 5A (Part 1 contract) and 5B (part 2 of the contract) to the ToR.

Environmental monitoring for construction

Dyrektor Urzędu Morskiego w Gdyni | Published March 31, 2017  -  Deadline May 11, 2017
cpvs
71313450

The contract is for supervision of natural and duties related to the protection of the environment during the execution of works under the project "Modernization of the seawalls in the Northern Port in Gdansk" according to the decision of the Regional Director for Environmental Protection in Gdansk Gd-RDOŚ WOO.4211.30.2014. KSZ.18 of 05.09.2016 and "Modernization of the approach fairway to the Northern Port in Gdansk" according to the decision of the Regional Director for Environmental Protection in Gdansk Gd-RDOŚ WOO.4211.2.2013.ER.27 of 06/14/2016. Detailed order description of the order are attachments 5A (Part 1 contract) and 5B (part 2 of the contract) to the ToR.

The contract is for supervision of natural and duties related to the protection of the environment during the execution of works under the project "Modernization of the seawalls in the Northern Port in Gdansk" according to the decision of the Regional Director for Environmental Protection in Gdansk Gd-RDOŚ WOO.4211.30.2014. KSZ.18 of 05/09/2016. Detailed description of the order of description of the subject 1 for lots 5A annexed hereto.

The contract is for supervision of natural and duties related to the protection of the environment during the execution of works under the project "Modernization of the approach fairway to the Northern Port in Gdansk" according to the decision of the Regional Director for Environmental Protection in Gdansk Gd-RDOŚ WOO.4211.2.2013.ER .27 of 14/06/2016. Detailed description of the order of description of the subject for the two lots constituting Annex 5B hereto.

Gdynia: Manufacturing, assembly and disassembly 2 pcs. Of urban furniture on the street. Starowiejska in Gdynia

Zarząd Dróg i Zieleni w Gdyni | Published July 27, 2016  -  Deadline October 31, 2017
cpvs
45000000

1. The contract is for construction, assembly and disassembly 2 pcs. Of urban furniture on the street. Starowiejska in Gdynia - based on the building-executive, technical specifications and conditions for the implementation of construction works and the bill of quantities - excluding items affecting filling and planting in pots, greenery maintenance and storage. 2. A detailed description of the contract provides: a) construction project - executive - Appendix A to SIWZ, b) the technical specifications - Annex B to SIWZ c) bill of quantities - Annex C to siwz ..

Ships

Dyrektor Urzędu Morskiego w Gdyni | Published April 11, 2017  -  Deadline May 4, 2017
cpvs
34510000

The contract is for the design, construction and delivery of specialized ship's double-hulled (catamaran), designed to conduct work related to research and hydrographic and research conditions of navigability of the fairway, moorings, other bodies of water utility and determining the parameters of safe depth maritime routes in the area of ​​the port of Gdynia, Gdańsk, Hel , Władysławowo, Puck, on the Gulf of Gdansk and Puck, in the region of the Hel Peninsula and the coast of the central and eastern areas and the open Baltic Sea for the purpose of ensuring navigational safety shipping. The unit of all-welded aluminum construction. Detailed description of the order of specification of the unit being Appendix 1 hereto.

Ships

Dyrektor Urzędu Morskiego w Gdyni | Published March 28, 2017  -  Deadline May 4, 2017
cpvs
34510000

Detailed order specification is a unit which is Annex 1 to the Terms of Reference.

Detailed order specification is a unit which is Annex 1 to the Terms of Reference.

The value currently granted part is 26 400 000,00 PLN.

The Contracting Authority does not allow variants.

1 point 7.

The Contracting Authority reserves the obligation of personal performance by the contractor following the siting and installation of the delivery item: construction work bays, assembly and organization of testing and inspection.

Specialised boats

Morska Służba Poszukiwania i Ratownictwa | Published April 20, 2017  -  Deadline May 25, 2017
cpvs
34521000, 34223300

Object of the contract includes:

1) The implementation and delivery of 8 pieces. Boat for carrying out activities related to search and rescue of human life at sea, all-season hydrological and meteorological conditions of the Baltic Sea with the exception of periods of freezing,

1 capable of unrestricted movement on roads and unpaved, beaches and sandy areas in seawater at a depth of 500 mm, in all seasons, and various atmospheric conditions.

The contract includes:

Boat drive will be the two-stroke outboard engines with a capacity of 66.2 kW min each, of low molecular weight and the smallest width. The boat should meet the requirements of Polish Register of Shipping in the construction, the relevant document certified and meet the requirements for equipment SOLAS 74/83 with recommendations resolution MSC.48 (66) on the standards of equipment for emergency measures, with the exception of the drive motors.

Guarantee quality:

- rescue boat for a period of not less than 24 months,

- engine and components for a period of 12 months

- to equip a boat for a period of 12 months and

- for the supply of spare parts for boats and motors for a period of 60 months.

2) Execution and delivery of 8 pieces. Uniaxial boat trailers described in item 1 are capable of unrestricted movement:

- the roads paved and unpaved;

- sandy beach area;

- in seawater at a depth of 500 mm

- in all seasons and different weather conditions.

Trailer must meet the requirements of Polish road traffic regulations, a certificate of approval to allow its registration.

Guarantee the quality of the transport trailer for a period of 12 months.

  • 1