Construction work

Gmina Stalowa Wola | Published January 3, 2017  -  Deadline January 24, 2017

1. The contract is for the construction and reconstruction of the municipal road ul. Solidarity in Stalowa Wola together with the intersection of ul. Grabski, and the construction of the connector road between ul. Grabski, and ul. Energetyków.

Construction supervision services

Śląskie Centrum Chorób Serca w Zabrzu | Published December 9, 2016  -  Deadline April 14, 2017
Construction supervision services

Construction work

PKP Polskie Linie Kolejowe S.A. | Published December 28, 2016  -  Deadline February 8, 2017
Performing comprehensive as-built documentation 4.Carry conformity assessment of each structural subsystem covered by the scope of the order at any stage. 

The whole object of the contract includes the construction of the following elements:

Project documentation necessary for the proper and safe execution of all required works, developed for geodetic documentation for design purposes (m. In .: construction design, detailed design, traffic organization) and get her all the required opinions, agreements, approvals, conditions, decisions and permits.

290), hereinafter referred to as the Construction Law.

Performing comprehensive as-built documentation, including m. In. as-built geodesic inventory.

Assess the compliance of each structural subsystem covered by the scope of the order at any stage (design, construction and final testing of the subsystem).

Betting Railways in Tarnów Mountains and Opole.

Construction work

Gmina Wrocław, pl. Nowy Targ 1-8, 50-141 Wrocław, w imieniu i na rzecz której działają Wrocławskie Inwestycje Sp. z o.o. z siedzibą przy ul. Ofiar Oświęcimskich 36, 50-059 Wrocław | Published January 6, 2017  -  Deadline January 23, 2017

The subject of this contract is the execution of construction works on the extension and reconstruction of ul. Buffer in the provincial road No. 395 in Wroclaw on the section of the railway viaduct over the street. Bardzka to the border city of Wroclaw, the demolition of the old viaduct and construction of a new railway viaduct with obtaining the total investment permit.

The investment will be carried out expansion of the road on the section of the railway crossing the railway line No 285 from Wroclaw Main - Swidnica suburb to the border city of Wroclaw with the construction of drainage, street lighting, urban technological channel MTTK, construction traffic lights at intersections, and the removal of colliding with existing network sanitary, gas, water supply, power and communications.

Detailed order was presented in Part III of the Terms of Reference.

Construction work

Zarząd Infrastruktury Komunalnej i Transportu w Krakowie | Published January 4, 2017  -  Deadline February 1, 2017

The contract is for construction work involving the construction and development of ul. Myślenice as a county road class "Z" on the section from the roundabout at the junction of the A4 motorway to the intersection of streets and Niewodniczański Krzyzanowski.

Note: The Contractor shall coordinate the work of the task and the alien robots performed during the task (especially for other investments in the lane street. Myślenickie by the managers or owners of arming underground) and recognizes the costs of implementing the annual maintenance performed by greenery. The Employer recommends that the vision of the local area.

Construction work

Centrum Opieki Medycznej | Published January 3, 2017  -  Deadline February 10, 2017
The contract is: "Expansion, reconstruction and superstructure of the building for the needs of the operating theater, a division of gynecological-obstetric, Neonatal SOR Center for Medical Care in Yaroslavl ', involving the execution of construction works, assembly, installation, road and finishing including expansion, reconstruction and superstructure Building multifunctional building elevated above the building helicopter pads, the construction of the connector connecting the landing of the building SOR 

The facility will be implemented medical functions in the following branches:

1) The Department of Gynaecology and Obstetrics: 23 beds in the subdivision gynecological and obstetric 12 in the sub-unit of the maternity Tract;

2) neonatal Branch 11 cots;

3) Operating Block (4 operating rooms).

In addition, the facility provides:

1) Pharmacy hospital;

2) The central sterilization;

3) PRO-MORTE ,;

4) Technical rooms and warehouses.

The contract is for construction works, assembly, installation,

road and finishing, including the expansion and reconstruction of the building multifunctional,

building elevated above the building helicopter pads Air Rescue, the construction of the connector connecting the landing of the building SOR.

This will be the fourth-storey building posadowiony directly on the ground.

19,65m ± 0.2 m above ground level.

Detailed Description of the Contract is attached as Annex 1 to the Terms of Reference:

1) construction project;

2) Project Executive;

3) STWiORB;

4) The documents, opinions and arrangements

The scope of works includes:

- Demolition works

- Earthworks

- Construction of hospital facilities construction

- Works in buildings

- Road works (squares, sidewalks)

The contractor, which refers to a solution equivalent to those described by the Employer is obliged to prove that he offered supplies, services or construction works meet the requirements set by the Employer.

Construction work

PKP Polskie Linie Kolejowe S.A. | Published December 24, 2016  -  Deadline February 1, 2017

The contract is for the construction of a new railway line in an underground tunnel between the stations diametric Fabryczna, Łódź Kaliska and Łódź Żabieniec. The scope of the project also includes the construction of two service points travelers in the area of ​​the intersection of the Garden / Drewnowska / Karski, as well as in the area of ​​the intersection of Western / Green / Kosciuszko. Route tunnels will be made by mechanized shield (two-track tunnel) and open-pit and mining (tunnels monorail).

Construction work

Enea Operator Sp. z o.o. | Published January 11, 2017  -  Deadline January 27, 2017

The contract is for reconstruction of 110 kV overhead line Kromolice - Nagradowice - Kromolice - Swarzędz and Kromolice - Gądki with the construction of the RS 110 Garaszewo to enhance the energy security of the agglomeration and the construction of double-circuit overhead line in relation Nagradowice - RS Garaszewo.

A detailed description of the contract will be in the tender documents, posted on the website of the contracting authority indicated in the section I.3) Communication - Ads.

Construction work

Zespół Opieki Zdrowotnej w Dębicy | Published January 12, 2017  -  Deadline February 8, 2017

Execution of construction and reconstruction of the existing hospital building with a change in the way the use of facilities for central sterilization, disinfection stations beds, operating theater and elevated helipad on the basis of a construction permit and project implementation. Deconstruction of the existing building, Laundry, upgrade or detailed design of mechanical ventilation, renovation project helipad. Reconstruction of the existing premises of the hospital pharmacy, delivery and installation of lifting equipment, delivery and installation of sterilizers 2 pieces, delivery and installation of the column power indoor units operating rooms. 10.

Construction work

PKP Polskie Linie Kolejowe S.A. | Published January 18, 2017  -  Deadline February 24, 2017

Design and construction works at the station Opoczno South. within the framework of the project entitled. "Modernization of the railway line No. 4 - Central Bus Station Phase II".

Design and construction works at the station Opoczno South. within the framework of the project entitled. Modernization of the railway line No. 4 - Central Bus Station Stage II.

Construction work

Miasto Zielona Góra | Published December 24, 2016  -  Deadline January 23, 2017

1. The contract is for the implementation of the following tasks:

1.1. Task 1: Construction of ul. Agglomeration along with paths, under which will be conducted:

a) construction of the street. Agglomeration on the section from the street. Unification of the street. The station in Zielona Gora;

b) expansion of the provincial road No. 280 (ul. Unification) in Zielona Gora, involving the construction of the junction roundabout and the necessary infrastructure;

c) extension of ul. The station on the section from the street. Stefan Batory ul. Ułańska with the brim in Zielona Gora;

d) building links Canal Street. Unification in Zielona Gora;

1.2. Task 2: Construction of water in the street. Agglomeration and ul. Stefan Batory

in Zielona Gora, under which they will be conducted:

a) construction of water supply network of branches and connections - Phase II - in the street Stefan Batory (from the street. Energetyków to ul. Dworcowa) in Zielona Gora;

b) reconstruction of water mains in the street. Agglomeration in Zielona Gora.

Construction work

Miasto Zielona Góra | Published January 11, 2017  -  Deadline January 30, 2017

1. The contract is for the implementation of the following tasks:

1.1. Task 1: Construction of ul. Agglomeration along with paths, under which will be conducted:

a) construction of the street. Agglomeration on the section from the street. Unification of the street. The station in Zielona Gora;

b) expansion of the provincial road No. 280 (ul. Unification) in Zielona Gora, involving the construction of the junction roundabout and the necessary infrastructure;

c) extension of ul. The station on the section from the street. Stefan Batory ul. Ułańska with the brim in Zielona Gora;

d) building links Canal Street. Unification in Zielona Gora;

1.2. Task 2: Construction of water in the street. Agglomeration and ul. Stefan Batory

in Zielona Gora, under which they will be conducted:

a) construction of water supply network of branches and connections - Phase II - in the street Stefan Batory (from the street. Energetyków to ul. Dworcowa) in Zielona Gora;

b) reconstruction of water mains in the street. Agglomeration in Zielona Gora.

Szczerców: Construction of a garage in Borowej

Gmina Szczerców | Published July 21, 2016  -  Deadline May 31, 2017
Construction of a garage in Sylvan.

Hospital facilities construction work

Śląskie Centrum Chorób Serca w Zabrzu | Published December 9, 2016  -  Deadline April 14, 2017
Construction of hospital facilities

Road construction works

Miejski Zarząd Dróg i Transportu w Częstochowie | Published January 5, 2017  -  Deadline March 30, 2017
Construction work for roads

Road construction works

Miejski Zarząd Dróg i Transportu w Częstochowie | Published January 5, 2017  -  Deadline March 29, 2017
Construction work for roads

Consultative engineering and construction services

Podkarpacki Zarząd Dróg Wojewódzkich | Published January 7, 2017  -  Deadline January 24, 2017
Consultative engineering and construction services

Construction work

Zespół Opieki Zdrowotnej | Published January 11, 2017  -  Deadline January 29, 2017

* Construction "pn. Expansion of Hospital Health Care Team in Gniezno, along with the necessary technical infrastructure pn. "Improving the quality of health services and increase access to medical services including electronic services to health care institutions Gniezno to increase the efficiency and availability of ongoing medical services" - Adaptation and equipment Building General Hospital at ul. 3 Maja 37, for the proper functioning of the health care team in Gniezno .

The present proceedings are works carried out on the basis of the construction project replacement building extension Hospital Health Care Team in Gniezno, along with the necessary technical infrastructure on the plot number 109/6 Street. 3 Maja 37 in Gniezno. Changes to the approved construction design result from the revised Investor functional program and purpose of the building of the hospital.

Construction work

Gminne Przedsiębiorstwo Komunalne „EKO-BABICE” Sp. z o.o. | Published January 13, 2017  -  Deadline February 21, 2017
A detailed description of the contract includes terms of reference (TOR częśćIIII - description of the order) and design documentation annexed hereto. 

Construction of the complex of buildings in Zielonki Lots in the Municipality of Stare Babice consisting of building school and educational, cultural center and sports hall with facilities, with a total usable area of ​​approximately 8 700 m2, building area 7 176 m2 with land development area of ​​about 43 709 m2

Object of the contract includes:

1) Provide container office, warehouse and social services to the needs of their own construction.

Recreation with driveways, sidewalks, bike path.

3) Execution of fire road with parking and maneuvering squares.

4) Execution of the access road to the building, along with economic maneuvering squares.

5) Execution of pavements and street furniture.

6) Execution of trash.

7) Execution of the fence.

Detailed Description of the order is included in the technical documentation:

1) Construction Projects

a) land development project and architecture - construction project, part I

b) structural design, static calculations - construction project, part II

c) design of sanitary installations - construction project, part III

d) design electrical and telecommunication installations - construction project, part IV

e) Project roads and surfaces - construction project, part V

f) Information BIOZ

2) implementing projects

a) Executive design - Architecture - Building A (includes drawings DFA)

b) Executive design - Architecture - Building B and C (contains drawings DFA)

c) Project Executive - Freight

d) Project constant traffic organization

e) PZT - replacement construction project with the correction of the fence

f) The pitch and running track - changes sidewalks

3) Documentation included for auxiliary purposes:

Recreation, sanitary sewer connection and the internal network Fr.

b) Executive design - sanitary - storm water drainage network

c) Executive design - sanitary installations - Connections and internal water supply system

d) Project Executive - Green

4) The technical specifications for execution and acceptance of construction works - architecture stage I and II (includes work on DFA) and technical specifications, performance and acceptance of road works.

Notes on the terms of reference:

The scope of these works should be performed no later than 31 August 2017.

2) Determination of Phase I and Phase II of the agreement refers to the execution of the contract terms, while the designation of Phase I and Phase II in the documentation and cost estimates only applies to those documents.

3) The contract scope includes surveying services along with the implementation built inventory of roads, sidewalks, utilities (sewer manholes), buildings, along with bringing to material accountancy state resource surveying and mapping.

2 of the PPL Contracting Authority requires that the contractor has done in person at least 50% of the work paved surfacing.

Order in the first place must be made in accordance with the tender documents, contract, project documentation, technical specifications for execution and acceptance of construction works, technical expertise, construction practices and regulations in force.

A detailed description of the contract includes terms of reference (TOR) and the design documentation annexed hereto, which consists, in particular projektybudowlane, regulations, technical specifications of performance and acceptance of works.

Construction work

Zespół Opieki Zdrowotnej | Published January 18, 2017  -  Deadline February 2, 2017

* Construction "pn. Expansion of Hospital Health Care Team in Gniezno, along with the necessary technical infrastructure pn. "Improving the quality of health services and increase access to medical services including electronic services to health care institutions Gniezno to increase the efficiency and availability of ongoing medical services" - Adaptation and equipment Building General Hospital at ul. 3 Maja 37, for the proper functioning of the health care team in Gniezno .

The present proceedings are works carried out on the basis of the construction project replacement building extension Hospital Health Care Team in Gniezno, along with the necessary technical infrastructure on the plot number 109/6 at ul.3 Maja 37 in Gniezno. Changes to the approved construction design result from the revised Investor functional program and purpose of the building of the hospital.

Categories
  Poland - Show all countries
Warszawa (31)Rzeszów (12)Wrocław (10)Siedlce (9)Białystok (8)Katowice (8)Kraków (8)Lublin (8)Poznań (8)Ustka (8)Bydgoszcz (6)Gliwice (6)Limanowa (6)Nowy dwór mazowiecki (6)Turek (6)Gdańsk (5)Włodawa (5)Andrychów (4)Bochnia (4)Krosno (4)Opole (4)Raszyn (4)Stalowa wola (4)Tuplice (4)Zabrze (4)Łódź (4)Głogów (3)Iława (3)Kalisz (3)Kozienice (3)Nisko (3)Przasnysz (3)Racibórz (3)Słupno (3)Tarnowo podgórne (3)Tarnów (3)Wejherowo (3)Wierzbica (3)Wilkowice (3)Wojaszówka (3)Zielona góra (3)Babimost (2)Bełchatów (2)Białobrzegi (2)Biłgoraj (2)Chojnice (2)Chorzów (2)Dąbrowa górnicza (2)Grodzisk mazowiecki (2)Głuchołazy (2)Hrubieszów (2)Jarocin (2)Kraśnik (2)Krzeszowice (2)Krzyżowice (2)Lubaczów (2)Małkinia górna (2)Międzyrzec podlaski (2)Międzyrzecz (2)Nowa sól (2)Ostrołęka (2)Ostrów wielkopolski (2)Połaniec (2)Pruszcz gdański (2)Przysucha (2)Płock (2)Radom (2)Rakszawa (2)Skierniewice (2)Strzegowo (2)Strzelce krajeńskie (2)Szczerców (2)Słupca (2)Słupsk (2)Toruń (2)Ustrzyki dolne (2)Warsaw (2)Wieluń (2)Wiązowna (2)Wodzisław śląski (2)Wołów (2)Zamość (2)Łapy (2)Łęczyce (2)Świecie (2)Żory (2)Babice (1)Baranowo (1)Baranów (1)Barcin (1)Bartoszyce (1)Bielsk (1)Bielsko-biała (1)Bobowa (1)Bolesławiec (1)Brodnica (1)Brudzeń duży (1)Brzozów (1)Bystra (1)