Public tenders for construction in Teigebyen Norway

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Oslo Lufthavn AS (Oslo Airport) | Published August 18, 2016
cpvs

Construction work

Construction works for buildings — Commercial areas

Oslo Lufthavn AS [Oslo Airport] | Published February 4, 2016
cpvs
45210000, 45262700

Construction works for buildings — Commercial areas

Construction work for swimming pool

Øvre Romerike Innkjøpssamarbeid | Published March 7, 2015  -  Deadline April 15, 2015
cpvs
45212212, 45000000

Construction work for swimming pool

Architectural, construction, engineering and inspection services

Avinor AS | Published July 17, 2015  -  Deadline August 17, 2015
cpvs
71000000, 90420000, 90740000, 44611410, 71311240, 71310000, 71300000

Architectural, construction, engineering and inspection services

Consultancy service and engineering design of building and construction works, water and sewage the Flight side — Preliminary project Non-Schengen East

Oslo Lufthavn AS (Oslo Airport) | Published April 29, 2016
cpvs
71000000

Consultancy service and engineering design of building and construction works, water and sewage the Flight side — Preliminary project Non-Schengen East

Construction work

Avinor AS | Published October 14, 2017
cpvs
45000000, 45210000, 45212411, 45236000, 45300000, 45310000, 45311000, 45330000, 45332200, 45400000, 51900000

The expansion includes approx. 216 rooms, including restaurants and conference facilities for approx. 700-1 000 persons. The total area is approx.12 000 m2. Due to the reconstruction in the interfaces between the new and old building, including the reconstruction of a new canteen kitchen to a new exercising room, adaptations in the adjacent driving culvert for load bearing of the room wing girders and accompanying emergency exit system, necessary upgrading of the technical infrastructure's capacities.

P-72717 Construction works for buildings — Commercial areas.

Oslo Lufthavn AS (Oslo Airport) | Published June 18, 2015  -  Deadline August 5, 2015
cpvs
45210000, 45262700

K-72717 includes works that future tenants wish that the T2 project shall execute. The rental area is in principle an empty ‘box’ that the tenant shall further develop in order to meet own requirements in relation to surfaces, furnishing and technical installations. These works shall then be ordered by K-72717. The works will mainly include the following: — Camp and operation responsibility (building walls, waste management, provisional fire protection measures etc.) for own and others works. — Demolition of the existing buildings (internal walls, ceiling, floor). — Simple steel works. — Internal walls. — Painting, flooring/parquet floors, pitching, repairs of the existing cover stone surface. — Metal and glass works. — Fire protection. — Auxiliary works in relation to technical contracts. — Doors/fittings. — Provisional measures in maintaining the terminal in operation, protect the existing facility. A large amount of works shall be executed in a relatively short period, at an airport in full operation. This involves stringent demands on implementation and control, as well as challenges in relation to logistics and camp site operations.

Works for complete or part construction and civil engineering work

Avinor AS | Published October 4, 2017  -  Deadline November 2, 2017
cpvs
45200000, 45236000, 45262000, 45262210, 45262300

Project temporary storage A-glycol.

Contract ground and concrete work A-glycol.

Project temporary storage A-glycol.

Contract ground and concrete work A-glycol.

185,999 - Framework agreement - Stand construction

AVINOR AS | Published December 21, 2016  -  Deadline January 24, 2017
cpvs
39154100, 79950000

Avinor AS shall acquire supplier of stand-construction for use at international conferences in the aviation industry.

Construction plan for Rådhusgata - Vorma road - Wergelandsgate, Eidsvoll municipality

Øvre Romerike Innkjøpssamarbeid | Published June 18, 2015  -  Deadline August 3, 2015
cpvs
45000000

Eidsvoll municipality want a quote for the preparation of complete construction plan for the quarter Rådhusgata - Vorma road - Wergelandsgate in Hobart center (see attached map). It should first be drawn up an idea sketch with proposals for detailed solutions as the basis for preparation of construction plan. Ide-sketch must be approved by Eidsvoll municipality before preparation of construction schedule starts. The idea sketch and construction plan shall be prepared in accordance with current zoning and its forming supervisor.

Framework agreement for construction work - Stavanger Airport

AVINOR AS | Published January 20, 2016  -  Deadline February 17, 2016
cpvs
45000000, 45230000, 45235000, 45235100

Stavanger Airport Sola shall enter into framework agreements for construction works. The contract will have a duration of 5 years, including options. Further information on procurement is given in the qualification documents.

P-183 715 resurfacing western runway - Construction Worker

Oslo Lufthavn AS | Published March 27, 2015
Winner
Veidekke Entreprenør AS
cpvs
14213200

Announcement of contract award K-183 715 resurfacing western runway - Construction Worker

Framework agreement consultants - subjects: PL and BL - Construction (186021)

AVINOR AS | Published March 15, 2017  -  Deadline April 6, 2017
cpvs
71541000

Avinor AS, hereinafter referred to as the Principal, hereby invites you to contest for procurement of framework agreements consultants works in the fields of PL (Project Management) and BL (Construction Management). The consultants hired for the projects in different phases as idea, regulation, pilot projects, detailed project design management, contracting, supervision of construction, delivery, documentation and condition analysis.

Framework agreement for plumbing work

Avinor AS | Published April 13, 2016  -  Deadline May 9, 2016
cpvs
45231110, 45231100, 45330000

Framework agreement for plumbing works pertaining to building and construction at Oslo Airport.

T-186561 - Vardø airport - Reasphalting of runway - Construction worker

AVINOR AS | Published May 20, 2017  -  Deadline June 9, 2017
cpvs
45235210

Avinor AS at Vardø Airport, is in need of reassignment of the runway, shoulders, both taxiways and aprons. This purchase is for Construction Workers

Nannestad secondary and Culture, reconstruction and new construction

Øvre Romerike Innkjøpssamarbeid | Published November 20, 2015  -  Deadline February 12, 2016
cpvs
45000000, 45214200

Nannestad ungdomsskole: Nannestad municipality will upgrade and expand Nannestad middle school. By middle school will be built a new annex with ia canteen and new teaching jobs for school. Parts of the existing secondary schools (comprised of two buildings; NUS and EKER) will be rehabilitated internal structural and technical. Nannestad Culture: Until banquet hall at Nannestad council shall be the same contractor built an annex for arts in the municipality. Outside areas: outdoor area at the middle school and the extension to the performing arts to be upgraded. The school moved into temporary premises (barracks) which remains on the same site during the construction period. TE's logistics and work order by implementation must be adapted to this. It should be particularly noted that there are schools operating near the construction work.

Construction work airside BA / VA (185325)

AVINOR AS | Published August 25, 2016  -  Deadline September 28, 2016
cpvs
45213331, 45210000, 45213000, 45235100, 45300000

Avinor AS, Oslo Airport (OSL) is planning the expansion of areas for Non-Schengen traffic which includes terminal and airside. Entreprise includes necessary construction works for reconstruction and the establishment of new aircraft parking and other infrastructure and basement and shafts built. The contract also includes the expansion and extension of the taxiway, culvert and expansion of existing storm water pumping station.

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

AVINOR AS | Published April 28, 2017  -  Deadline May 24, 2017
cpvs
45230000, 45000000, 45213331, 45235000, 45235100, 45300000, 45310000, 45315100

Avinor AS is planning the expansion of the areas for Non-Schengen traffic at Oslo Airport.

The area is situated east of the eastern pier, at a security checked area of the airport.

The expansion includes both the terminal building and the air side. Neighbouring areas will be in operation during the expansion.

The area subject to reconstruction in the project ‘Expansion Non-Schengen East (UNSØ)’ will have a footprint of approx. 5 000 m² and the area of the new building is approx. 26 000 m² including 8 new fixed points with passenger bridges. Moreover, the parts of the current eastern pier shall be reconstructed.

Avinor AS is planning the expansion of the areas for Non-Schengen traffic at Oslo Airport.

The area is situated east of the eastern pier, at a security checked area of the airport.

The expansion includes both the terminal building and the air side. Neighbouring areas will be in operation during the expansion.

The area subject to reconstruction in the project ‘Expansion Non-Schengen East (UNSØ)’ will have a footprint of approx. 5 000 m² and the area of the new building is approx. 26 000 m² including 8 new fixed points with passenger bridges. Moreover, the area in the existing eastern pier shall be reconstructed.

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Avinor AS | Published October 20, 2017
cpvs
45230000, 45000000, 45213331, 45235000, 45235100, 45300000, 45310000, 45315100

Avinor AS is planning the expansion of the areas for Non-Schengen traffic at Oslo Airport.

The area is situated east of the eastern pier, at a security checked area of the airport.

The expansion includes both the terminal building and the air side. Neighbouring areas will be in operation

during the expansion.

The area subject to reconstruction in the project ‘Expansion Non-Schengen East (UNSØ)’ will have a

footprint of approx. 5,000 m² and the area of the new building is approx. 26,000 m² including 8 new

fixed points with passenger bridges. Moreover, the area in the existing eastern pier shall be reconstructed.

Avinor AS is planning the expansion of the areas for Non-Schengen traffic at Oslo Airport.

The area is situated east of the eastern pier, at a security checked area of the airport.

The expansion includes both the terminal building and the air side. Neighbouring areas will be in operation

during the expansion.

The area subject to reconstruction in the project ‘Expansion Non-Schengen East (UNSØ)’ will have a

footprint of approx. 5,000 m² and the area of the new building is approx. 26,000 m² including 8 new

fixed points with passenger bridges. Moreover, the area in the existing eastern pier shall be reconstructed.

Consulting and engineering construction, water and wastewater Airside - Pilot Project Non-Schengen East

Oslo Lufthavn AS | Published April 26, 2016
Winner
Cowi AS
cpvs
71000000

Announcing the award of the contract K-184 255 Consulting and engineering construction, water and wastewater Airside - Pilot Project Non-Schengen East