Public tenders for construction in Holmestrand Norway

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Consultancy services, Designing, project management and construction management

Holmestrand kommune | Published December 27, 2014  -  Deadline February 11, 2015
cpvs
71318000, 71541000, 71320000, 71200000

Consultancy services within designing, project and construction management of Water and Sewage and Roads. Designing services, building and construction.

Parkour Barli road

Holmestrand kommune | Published July 9, 2015  -  Deadline August 19, 2015
cpvs
45262300, 37420000, 37440000, 44114200, 45262420, 37451000

Establishing less Parkour Construction / activity park. Turnkey.

Walking - and bicycle Ekeberg

Holmestrand kommune | Published April 29, 2016  -  Deadline May 23, 2016
cpvs
45233161, 45233162, 34928510, 45316110

Construction of about 130m walking - and cycle. Street lights will be set up according to the description

Assisted living Rove

Holmestrand kommune | Published December 8, 2015  -  Deadline January 25, 2016
cpvs
45215210

Holmestrand municipality will undertake the construction of the project "Assisted living Rove." It will be built a total of 8 apartments innklusive two common with associated car-port for 8 cars.

Outside Ekeberg school 2016

Holmestrand kommune | Published May 2, 2016  -  Deadline May 23, 2016
cpvs
45262300, 45112710, 43325000, 45112723

Construction of the amphitheater, about 140 M2 surface. Establishing area for activities with apparatus, rubber cover.

The acquisition is based on the attached description and must be carried out as a turnkey project.

Prequalification for a negotiated extension Holmestrand treatment plants

Holmestrand kommune | Published September 30, 2016  -  Deadline November 14, 2016
cpvs
45232421, 45232400, 45252000, 45252100, 45232422, 45232453, 45252121, 71320000

This pre-qualification is the first step in the competition for "turnkey machine and process equipment" for the expansion of Holmestrand plants.

Featured providers, see the qualification documents will be invited to a negotiated about.

Construction Division and interfaces are described in the qualification basis

Designing Dunk Bekken

Holmestrand kommune | Published March 9, 2017  -  Deadline March 13, 2017
cpvs
71320000

Holmestrand municipality will redevelop the entire drainage zone called Dunk Bekken (Appendix 1). Detailed engineering will build on the pilot project that was prepared in 2016 (Appendix 2). The goal is a separate system where the water goes to the fjord and the wastewater goes to the treatment plant in Hagemann. The whole area will be going from a pipe system to a two-pipe. In connection with these works shall all water lines in the area to be replaced, as they are also from the same time period, and is ripe for replacement. The municipality will start with detailed design of the risers. This part of the work will be Phase 1. Furthermore, smaller subareas detailed engineering design (phase 2). Both in Phase 1 and 2, the number of construction steps be run in parallel. The smaller wires in the drain zone shall not detail planned in Phase 1, but one should in an adequately plan future location of these wires to detail projecting connections to the mains.

Designing Dunk Bekken

Holmestrand kommune | Published March 16, 2017
cpvs
71320000

Holmestrand municipality will redevelop the entire drainage zone called Dunk Bekken (Appendix 1). Detailed engineering will build on the pilot project that was prepared in 2016 (Appendix 2). The goal is a separate system where the water goes to the fjord and the wastewater goes to the treatment plant in Hagemann. The whole area will be going from a pipe system to a two-pipe. In connection with these works shall all water lines in the area to be replaced, as they are also from the same time period, and is ripe for replacement. The municipality will start with detailed design of the risers. This part of the work will be Phase 1. Furthermore, smaller subareas detailed engineering design (phase 2). Both in Phase 1 and 2, the number of construction steps be run in parallel. The smaller wires in the drain zone shall not detail planned in Phase 1, but one should in an adequately plan future location of these wires to detail projecting connections to the mains.
  • 1