Public tenders for construction in S-hertogenbosch Netherlands

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Brabant Water NV | Published September 6, 2016
cpvs

Construction work

Construction work

Brabant Water NV | Published November 21, 2015  -  Deadline February 12, 2016
cpvs
45000000, 45300000, 45200000, 45230000

The work consists broadly of the water production Bergen op Zoom: achieving process automation & electrical works, mechanical works, civil engineering and construction work and field leadership works for the renovation of water production facility in Bergen op Zoom. The contractor of this work as the general contractor or the Alliance, responsible for governance, coordination and management of above mentioned disciplines.

Construction, foundation and surface works for highways, roads

Provincie Noord-Brabant | Published July 1, 2016  -  Deadline July 26, 2016
cpvs
45233000

Construction of highways and roads

Construction work for buildings relating to education and research

Stichting Algemeen Toegankelijk Onderwijs 's-Hertogenbosch en omstreken | Published June 12, 2015
Winner
Rots-Bouw
cpvs
45214000, 45300000

New construction Kinder Campus North in 's-Hertogenbosch.

Works for complete or part construction and civil engineering work

Provincie Noord-Brabant | Published April 28, 2016  -  Deadline May 23, 2016
cpvs
45200000

Complete or part construction and civil engineering work

Road construction works

Provincie Noord-Brabant | Published July 10, 2015
Winner
Heijmans Wegen BV Regio Zuid
cpvs
45233120

The project involves the construction of a roundabout at the site of the Kortveldsesteeg safe and sustainable design of the road segments: as mentioned in the traffic action plan; connection to highway A27 roundabout Nieuwesteeg in Dussen and Rotunda Molenkade in Dussen to roundabout Armenian Gull Lane in Meeuwen, all falling within the N283. Roundabouts New Lane and Molenkade be milled and repaved. For the construction of a sewer pressure pipe (partly in the municipality Werkendam, partly in the municipality of Aalburg), building two concrete culverts and pressing 1 steel culvert, Rivierenland Water would like to hitch a ride with the provincial work. The following activities should be carried out activities I. province: 1. roundabout construction Kortveldsesteeg; 2. durable safe installation N283; 3. N283 major maintenance, including milling and resurfacing roundabouts Nieuwesteeg and Molenkade; 4. applying for taxes; 5. detail research NGE; 6. remove stumps 7. construction of parallel roads 8. dig ditches 9. make trees and hedges II. Water activities Rivierenland 10. construction sewer pressure pipe; 11. construction concrete culverts; 12. construction 1 FRP GRP diver.

Road construction works

Provincie Noord-Brabant | Published March 10, 2015  -  Deadline April 23, 2015
cpvs
45233120

The project involves the construction of a roundabout at the site of the Kortveldsesteeg and Sustainable Safety arranging the sections: as mentioned in traffic action plan; connection to highway A27 roundabout New Lane in Dussen and Rotunda Molenkade in Dussen to roundabout Gull Lane in Armenian Gulls, all falling within the N283. Roundabouts New Lane and Molenkade be milled and repaved. For the construction of a sewer pressure pipe (partly in the municipality Werkendam, partly in the municipality of Aalburg), building two concrete culverts and pressing 1 steel diver wants Rivierenland water like piggyback with the provincial work. The following activities must be performed: Work Province; 1. Construction roundabout Kortveldsesteeg. 2. Durable safely organize N283. 3. Major maintenance N283, including milling and resurfacing roundabouts New Lane and Molenkade. 4. Applying for taxes. 5. Detail Research NGE. 6. Remove stumps. 7. Construction parallel roads. 8. Digging ditches. 9. Putting trees and hedges. Work Rivierenland water 10. Construction sewer discharge line. 11. Construction of concrete culverts. 12. Construction 1 FRP GRP diver.

Theatre construction work

Gemeente 's-Hertogenbosch | Published April 20, 2016  -  Deadline May 27, 2016
cpvs
45212322, 71220000

The object of tender for the (full) EBM command in the context of the new Theater aan de Parade 's-Hertogenbosch.

This integrated command exists (at least) the following elements:

* Demolition of the existing theater, including site preparation of the construction site;

* Engineering: elaboration of the tender specifications (see paragraph 2.5 of the Selection guide EBM-command) to a draft version (UO), including application of (inter alia) the environmental permit;

* Design coordination for the attention of theater art;

* Realization;

* Implementation Coordination attention of theater art;

* Long-term maintenance for a period of (at least) 10 years, with the possibility (optional) to extend that period until (up to) 20 years.

Maintainer WABO, specialization Construction / fire - 's-Hertogenbosch

Gemeente 's-Hertogenbosch | Published March 30, 2015
Winner
Falck Spoordijk 17 3534BD Utrecht (NL) E-mail: d.vanriel@falck.nl
cpvs
79000000

The basis for this are the 'policy monitoring and enforcement physical environment' and on that basis prepared for implementation. • Detecting illegal construction and use and abuse, conducting investigation and the action in the context of administrative enforcement in accordance with the Brabant enforcement strategy. • Handling complaints from citizens and businesses. • Performing work outside office hours (availability control). • Performing tasks for other municipalities in RUD context. • Reporting and providing correspondence incl. Administrative issuing requests (in consultation with legal staff), except in cases of illegal construction and illegal use. • Communicating with stakeholders (complainants, licensing authorities, fire department, legal support, etc.). • In case of the execution of the controls, use is made of digital checklists. • Notes / reporting the results of the checks in automated systems. Formally, the candidate falls under the Department of Building Urban Development. Feiter. The Building Department is working with 40 employees to the spatial quality and viability of this means proper management of spatial and architectural surroundings and the environment. In addition, a good "team spirit" is important to ensure consistency in the implementation of the tasks. Pitch 's-Hertogenbosch. It is a hiring / posting for 36 hours per week. Extension is possible. Working days and working hours are completed in consultation. There is no fixed contract lies ahead.

Maintainer WABO, specialization Construction / fire - 's-Hertogenbosch

Gemeente 's-Hertogenbosch | Published February 3, 2015  -  Deadline February 20, 2015
cpvs
79000000

The basis for this are the 'policy monitoring and enforcement physical environment' and on that basis prepared for implementation. • Detecting illegal construction and use and abuse, conducting investigation and the action in the context of administrative enforcement in accordance with the Brabant enforcement strategy. • Handling complaints from citizens and businesses. • Performing work outside office hours (availability control). • Performing tasks for other municipalities in RUD context. • Reporting and providing correspondence incl. Administrative issuing requests (in consultation with legal staff), except in cases of illegal construction and illegal use. • Communicating with stakeholders (complainants, licensing authorities, fire department, legal support, etc.). • In case of the execution of the controls, use is made of digital checklists. • Notes / reporting the results of the checks in automated systems. Formally, the candidate falls under the Department of Building Urban Development. Feiter. The Building Department is working with 40 employees to the spatial quality and viability of this means proper management of spatial and architectural surroundings and the environment. In addition, a good "team spirit" is important to ensure consistency in the implementation of the tasks. Pitch 's-Hertogenbosch. It is a hiring / posting for 36 hours per week. Extension is possible. Working days and working hours are completed in consultation. There is no fixed contract lies ahead.

New construction Kinder Campus North 's-Hertogenbosch - Foundation General Accessible Education' s-Hertogenbosch and surroundings

Stichting Algemeen Toegankelijk Onderwijs 's-Hertogenbosch en omstreken | Published January 24, 2015  -  Deadline March 3, 2015
cpvs
45214000, 45300000, 45214000, 45300000

New construction Kinder Campus North in 's-Hertogenbosch

New construction Kinder Campus North 's-Hertogenbosch - Foundation General Accessible Education' s-Hertogenbosch and surroundings

Stichting Algemeen Toegankelijk Onderwijs 's-Hertogenbosch en omstreken | Published January 30, 2015  -  Deadline March 3, 2015
cpvs
45214000, 45300000, 45214000, 45300000

New construction Kinder Campus North in 's-Hertogenbosch

Construction work for highways, roads

Provincie Noord-Brabant | Published April 1, 2016  -  Deadline July 7, 2016
cpvs
45233100

In the bowl of Baarle-Nassau and Baarle-Hertog is a question of quality of life and flow problems by high traffic load. This high traffic load is mainly caused by two provincial highway running through the bowl. The provincial road N639 runs from Ulvenhout (A58) through Chaam Baarle-Hertog / Nassau and the provincial road N260 runs from Gilze (A58) from Alphen to Baarle-Hertog / Nassau. N260 then continues to Turnhout, making it a cross-border connection.

In the center of Baarle-Nassau and Baarle-Hertog two roads come together. Every day, agricultural vehicles, cars and trucks use this road through the village. The traffic load in the city center in particular on Sunday so that the traffic flow, quality of life and safety are at risk. Partly on the basis of the autonomous traffic growth and already planned urban developments in Breda, Tilburg and Turnhout can be expected that the intensities of the main (freight) traffic on these roads will increase further in the near future. The quality of life along the roads and other roads around the city center is under pressure from the high intensity in relation to the capacity and function of the roads where traffic is settled. To solve this problem is recognized the need to submit to the provincial roads Baarle.

The purpose of the realization of the rearrangement Baarle N260-N639 is to find solutions to these problems. With the construction of the diversion Baarle N260-N639 to be achieved the following objectives:

- Improving the quality of life and safety in the bowl of Baarle;

- Improving traffic flow on the roads N639 and N260;

- Improving safety by applying a sustainably safe road users.

Construction work

Waterschap Aa en Maas | Published October 16, 2015  -  Deadline November 23, 2015
cpvs
45000000, 45310000, 45350000, 45220000

Waterboard Aa en Maas intends to realize a influentvoorbehandelingsinstallatie with fine screens at the sewage treatment plant (STP) in Aarle-Rixtel. The work consists of civil, mechanical, electrical and control installations. The project will be tendered in accordance with an open procedure.

Construction work

Enexis BV | Published January 10, 2015  -  Deadline February 3, 2015
cpvs
45000000

Mission includes the renovation and partial extension of the above regional office in Zwolle. This concerns both the Casco realization, W and E systems, conveying systems, and possibly a portion of the field device. Enexis wants a top regional office in which it proposes the following objectives: - BREEAM "Very Good" certification; - Technical installation reduced energy consumption.

Sewer construction work

Gemeente 's-Hertogenbosch | Published December 31, 2014
cpvs
45232400

Bouwwerkzaamheden voor riool

Construction of roundabout connection N625 - Beatrixweg to Lithoijen. This is an Engineer & Construct contract based on UAV-GC 2005 - Province of Noord-Brabant

Provincie Noord-Brabant | Published October 8, 2014  -  Deadline July 18, 2014
Winner
Den Ouden Aannemingsbedrijf BV Hermalen 7 Schijndel, 5481 XX Nederland Telefoon: +31 735431000 (URL): www.denoudengroep.com
cpvs
45233120, 45233120

The roundabout to be constructed new projected north of the current N625, at the height of the T-junction with the Beatrixweg. The grounds for this are necessary for agricultural purposes. Current use is Schapenwei arable dog train track. Bike paths along the N625 are narrow. The bicycle crossings are no amenities and are close to the roadway. Spot the Lith Oijense dike there is a (bicycle) crossing. This is called a "cold" crossing. Along the N625 is approximately 400 m west of the T-connector with Beatrixweg a bus stop. On the north side there is a halt port and bus shelters. On the south side is gehalterd on the roadway. East of the T-connector, Oss, there is about 600 m away an identical stop. The objective is the contracting of a professional market party for the realization of the new roundabout (engineering and construction) within the time limit set for them. In general, the following operations must be performed: - Construction of roundabout at the site of the current T connection N625-Beatrixweg - Adaptation of the nearby intersection N625-Lutter Street / Osseweg - Abolish the (bicycle) crossing Lith Oijense Dijk - Adjust paths - Moving bus Kennedy Job and Father de Weert Street and merge into a single new bus stop near the roundabout - Adjusting the signage to the new situation - Adjusting public lighting to the new situation - Pushing K & L - The engineering of the work. See also the contract.

Construction work for highways, roads

Provincie Noord-Brabant | Published January 12, 2017
Winner
BAM Infra BV
cpvs
45233100

These are the N272 and the N264, the latter of which forms the most direct connection.

In the future, take the traffic volume continued to increase, partly through organic growth in car use, partly because of the traffic generating effect produced by spatial developments such as housing and in particular the realization of the Regional Business Parks Laarakker (RBL).

Construction work for swimming pool

Gemeente 's-Hertogenbosch | Published January 21, 2017  -  Deadline February 10, 2017
cpvs
45212212

Subject capping a swimming pool.

This concerns the selection phase. In the enrollment phase, the ceiling amount of € 1.7 million excluding VAT.

Car park building construction work

Gemeente 's-Hertogenbosch | Published January 4, 2017
Winner
Ballast Nedam Infra BV
cpvs
45213312

Opdrachtnemer wordt gevraagd:

* een ontwerp en technisch ontwerp te maken van de nieuwe „groenste transferium van Nederland” met haar omgeving;

* de benodigde uitvoeringswerkzaamheden te verrichten en voor te bereiden ten behoeven van het bouwrijp maken, faseringen;

en nieuwbouw van de transferiumgarage in combinatie met het ontwerpen en realiseren nieuwe infrastructuur en aanpassingen

aan de bestaande infrastructuur;

* omgevingsmanagement uit te voeren in nauwe samenwerking met opdrachtgever;

* alle nodige vergunningen aan te vragen, waarbij o.a. gedacht moet worden aan het verkrijgen van

de benodigde omgevingsvergunning (sloop, bouw, etc.);

* varianten/alternatieven zijn niet toegestaan.

Zie ook de selectieleidraad.