Public tenders for construction in Hengelo Netherlands

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

Twence BV | Published November 10, 2017  -  Deadline December 1, 2017
cpvs
45000000

The scope of the tender will focus on the following aspects (lump sum turn key design&construct):

CO2 capture with Quench, absorption and desorption process including appendages, piping and all the utilities,

Integration with WtE plant 3 flue gas treatment,

Electrical and Instrumentation (including process control, standard DCS),

Civil and infrastructural works,

Overall project coordination including interface management and HSE supervision,

Multi solvent use,

Integration with existing steam / heat distribution process responsibility and design responsibility.

Optional scope:

Liquefaction and storage buffers of the CO2, depending on the outcome of tender 62069 (Concurrentiegerichte dialoog Afzet CO2),

Extension of scope to include full CO2 capture at WtE line 3 as well as future CO2 capture at WtE lines 1 and 2 and / or at the biomass energy plant, based on similar technology,

Maintenance contract for the period of the technical and economic life cycle.

The scope of the tender will focus on the following aspects (lump sum turn key design&construct):

CO2 capture with Quench, absorption and desorption process including appendages, piping and all the utilities,

Integration with WtE plant 3 flue gas treatment,

Electrical and Instrumentation (including process control, standard DCS),

Civil and infrastructural works,

Overall project coordination including interface management and HSE supervision,

Multi solvent use,

Integration with existing steam / heat distribution process responsibility and design responsibility.

Optional scope:

Liquefaction and storage buffers of the CO2, depending on the outcome of tender 62069 (Concurrentiegerichte dialoog Afzet CO2),

Extension of scope to include full CO2 capture at WtE line 3 as well as future CO2 capture at WtE lines 1 and 2 and / or at the biomass energy plant, based on similar technology,

Maintenance contract for the period of the technical and economic life cycle.

Engineering works and construction works

Gemeente Hengelo | Published September 20, 2016  -  Deadline September 20, 2016
cpvs
45220000

Engineering works and construction works

Construction work

Stichting Carmelcollege | Published June 4, 2016
Winner
Van Wijnen Rosmalen BV
cpvs
45000000

The Contracting Authority is seeking a contractor, which is capable of the current draft (DO) continue to develop on the basis of output specifications. The works related to the further uitontwerpen (engineering), construction (build) and optional maintenance (maintain) these services for the new building Augustinianum and monitoring and ensuring the agreed performance for at least two years after completion.

Road bridge construction work

Gemeente Hengelo | Published July 5, 2016
cpvs
45221111, 45233100, 45000000, 22314000

Replacing Book Lose Bridge and construction Avenue Hart van Zuid (south side) in Hengelo.

Engineering works and construction works

Gemeente Hengelo | Published August 19, 2016  -  Deadline September 20, 2016
cpvs

The construction of the northern part of the Hart Avenue South. The work consists broadly of the following elements:

- Remove hardening,

- Include existing sewer,

- Apply new sewer,

- Construction watercourse,

- Apply surfacing,

- Apply culvert bridge,

- Establishing separate bicycle paths,

- Apply landscaping,

- Remove VRI including cables (by others).

- Record old and supplying and installing new public lighting.

Engineering works and construction works

Gemeente Hengelo | Published October 13, 2016
Winner
NTP Infra
cpvs
45220000

The construction of the northern part of the Hart Avenue South. The work consists broadly of the following elements:

- Remove hardening;

- Include existing sewer;

- Apply new sewer;

- Construction watercourse;

- Apply surfacing;

- Apply culvert bridge;

- Establishing separate bicycle paths;

- Apply landscaping;

- Remove VRI including cables (by others).

- Record old and supplying and installing new public lighting.

Road bridge construction work

Gemeente Hengelo | Published July 19, 2016  -  Deadline September 2, 2016
cpvs
45221111, 45233100, 45000000, 22314000

Replacing Book Lose Bridge and construction Avenue Hart van Zuid (south side) in Hengelo.

The contracting authority intends to award the contract on the basis of an integrated contract to which the Uniform Administrative Conditions for Integrated Contract types 2005 (UAV-GC 2005) have been declared applicable.

The project involves the realization of a new bridge over the Twente Canal and construction of the Avenue Hart van Zuid (south side). Global concerns the following activities:

- Preparation of Preliminary Design for an Integrated Final Design and Off-liner design in accordance with the specification;

- Realization of the System;

- The transfer of the system to the client after completion.

Works for complete or part construction and civil engineering work

Twence BV | Published October 8, 2016
Winner
Visser en Smit Bouw BV
cpvs
45200000, 45300000

The purpose of the contracting authority has a contract for the construction (turbine building and pipe bridge) in the context of the BEC exit 2.0 project, or for lot 5 of the BEC 2.0 project.

Construction work

Twence BV | Published July 19, 2016  -  Deadline August 26, 2016
cpvs
45000000, 14900000, 34000000, 45100000, 45200000, 60100000, 60600000, 90500000, 90700000, 90900000, 14000000

Ensuring proper coordination with the immediate neighbors / area of ​​work.

The tender aims to reach one agreement with one market player, each market player who is able to perform the contract in accordance with the conditions set by the Contracting authority to give an equal chance to qualify for the Contractor command to carry out.

Weighbridge construction work

Twence Holding BV | Published December 12, 2015  -  Deadline February 17, 2016
cpvs
45221117

Introduction Twence. Twence in Hengelo is an (inter) national player on the market of raw materials and renewable energy and high-quality processing of waste streams. Twence is working with innovative technologies and state-of-the-art installations used to convert waste from Twente, Netherlands and abroad in raw materials and green energy. It contributes to a healthy environment, the saving of fossil fuels and CO2 emissions. Furthermore Twence supplies with sales of some 100 000 000 EUR a major boost to the Twente economy, education and social projects. Our long term goal is a waste-free society with optimal reuse of goods and recovery of raw materials. Energy must ultimately still only be generated from renewable sources. Twence is majority owned by the municipalities of Twente Twente and indirectly of all people. The profit made by the company as dividends again distributed to the municipalities and regions, economic and social development of Twente. Further information can be found on our website; http://www.twence.nl Project description. The existing weighing pillars are no longer manufactured and are amortized and should be replaced. In addition, the license plate recognition is outdated and must be replaced. Since its implementation in January 2009, the license plate recognition and weighing pillars functioned well. After more than 6 years, it is necessary to find connection with new equipment and functionalities. 2016 will be the tender.

AVI Twente BV: Engineering and Construct MSW sorting facility.

AVI Twente BV | Published December 3, 2015
Winner
Stadler Anlagenbau
cpvs
45222100, 45252000, 51000000, 71800000, 79720000, 90000000

AVI Twente BV: Engineering and Construct MSW sorting facility Project background: At this moment Twence has been investigating the possibility of a Municipal Solid Waste (MSW), coming from Dutch municipalities with a range of different materials and also consisting of packaging waste materials and Pre-sorted municipal packaging waste material (in Dutch KVM+), including plastic, liquid packaging board, paper and metal packaging materials (ferro and non-ferro), hybrid sorting facility at his site in Hengelo. An indicative capacity of the sorting facility is given as 150.000~250.000 tons of MSW and 25.000~50.000 tons of KVM+. Given the current developments with respect to recycling of (pre-sorted) packaging waste materials in the Netherlands, Twence has decided to send out a Request for Proposal to market parties, capable of developing a ‘Engineer and Construct’ (E&C) package for such a MSW and KVM+ sorting facility. — Maintenance can be added as an option in the contract — Location:It is foreseen that the complete handling and storage of the materials will be indoor. The contractor takes into account that certain civil restrictions should be considered. For the sorting facility there is an existing building provided at the Twence location. The dimensions (inside) are approximately 160*50*10 meters. For input and output material handling there is a possibility for a new building, the new building is out of the scope for this tender. Time table: Publishing the Specific Project Requirements May 2015 Evaluation of contractors September 2015 Finishing detail, Start construction End 2015 Start commissioning First Half 2016.

District-heating mains construction work

Gemeente Hengelo | Published April 20, 2016  -  Deadline May 17, 2016
cpvs
45315100

Heat piping, mechanical and electrical systems.

Building construction work

AVI Twente BV | Published December 4, 2015
Winner
Moekotte BV
cpvs
45210000, 45220000, 45300000, 45100000

AVI Twente BV (Twence) intends to build a separation and sorting plant for the production of renewable raw materials from household and residual waste (source separated) plastic and other lightweight packaging. The total separation installation consists of three sub-processes, namely: receipt and storage of the waste (input), the separator (process), and the storage of the separated and sorted products (output). These three processes are positioned in the existing TAS hall (8000 m²) and building a new hall (part of this scope) of around 4000-5000 sqm. The process and the storage of baled products will be housed in the former TAS hall. In the newly built inputhal (around 4000-5000 sqm) Domestic Rest of the receipt and storage, waste and plastic packaging material be accommodated. From the separator, a large part of the input to be processed as residue does not bear sorting the waste in power plants with a Twence. This residue will be with a conveyor (part of the scope) automatically from the separator to the waste incineration plant will be transported. This conveyor belt will be positioned at a height and covered. The new hall, yard and conveyor must be fully equipped with building systems, a sprinkler system and updated facilities.

Refuse-incineration plant construction work

Twence BV | Published September 13, 2016  -  Deadline October 10, 2016
cpvs
45252300, 45000000, 45200000, 50500000, 50700000, 44000000

Build incinerator

Refuse-incineration plant construction work

Twence BV | Published July 19, 2016  -  Deadline August 31, 2016
cpvs
45252300, 45000000, 45200000, 50500000, 50700000, 44000000

Dimensions, performance and other detailed design is the responsibility of the Contractor.

Architectural, construction, engineering and inspection services

Twence Holding BV | Published February 4, 2015  -  Deadline March 9, 2015
cpvs
71000000, 71300000, 71600000, 71700000, 71800000, 77000000, 90000000

Groundwater Monitoring landfill sites Twence: sampling, analysis, reporting and advising. Annual monitoring of the landfill sites at Twence. Based on the Authority approved plan of landfill sites for groundwater should annually sampled at Twence and analyzed. On that basis, following a report and recommendation for Twence and the competent authority.

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Twence Groene Energie BV | Published October 3, 2015  -  Deadline November 5, 2015
cpvs
45230000, 44160000

The purpose of the contracting authority has a contract for the realization of the heat pipes and related activities within the framework of the BEC 2.0 project to shut down, or for lot 2 of the BEC 2.0 project. Introduction This grant expires 12/31/2017. Twence Green Energy BV intends to continue this renewable energy production. BEC BEC 2.0 2.0 Project The project consists of the following components: Lot 1: turbine (with limited piping) Lot 2; connection between BEC and heat = the tender Lot 3; boiler optimizations (to increase capacity) Lot 4; flue gas cleaning heat Lot 5; civil (new building turbine and pipe bridge) delivery Lot 2 will consist of the following main items: detailed design and construction of pipelines between the BEC and heat supply (dealing with the pipe bridge) and push (re) laying of various pipes for the new turbine optional panel providing piping at lot 3 and 4 This involves the design and construction of a new HD-LP steam regulator with piping (DN700) by existing boiler house, including injection water and all associated systemen.stoom (DN 700, 4 bara) and condensate pipe (DN 150, PN25) over a pipe bridge (about 150 m) and connections to the existing heat supply (pipe bridge will be made by lot 5) .the construction of two city water pipes (DN 300) over the same pipe bridge (IOM fate 4) including a portion of the existing building Experience turbine contractors is a pre.condensaatleidingen, cooling water pipes, drainage pipes, air ducts, and smaller sub-systems enable the creation of a temporary steam blowing system optionally providing piping at lot 3 and 4. When fate 3, the following running on main line; Enlarge drum, inconel welding in boiler feed water pushing, adjust safeties. At lot 4, a heat recovery system installed in the flue gas cleaning and an SNCR system is expected to be built next to the existing SCR. It is optional to realize: piping to divert feedwater (PN100) adjust piping safeties (including shock). Piping for ammonia injection system in boiler At the moment, these items have not yet been elaborated, it will take place in the first half of 2016. The potential contractor will have to be sufficiently "flexible" to perform certain realizations quickly.

Building construction work

Stichting VMBO Hengelo | Published May 16, 2015  -  Deadline June 16, 2015
cpvs
45210000, 45300000, 50000000, 45259000

The work involves the construction of VMBO Hengelo on the location of the Fre Cohen Street Dijksweg Hengelo. The school is given both practice and theory sessions divided into three layers. At the same location next to the school gymnasium hall realized with four parts. The school will comprise approximately 11,500 m² gross floor area and the sports hall of approximately 2,200 sqm GFA.

Preselection of Construction Southern Randweg Borne.

Gemeente Hengelo | Published November 13, 2014  -  Deadline December 3, 2014
cpvs
45000000, 45112000, 45232400, 45233120

The municipality of Borne intends to conclude a UAV-gc agreement with a contractor for the design and construction of the Southern Ring Road to Borne. It is intended that (hereinafter referred to as "the work") procurement by a Party after the preliminary "work Southern Ring Road" expands to a finished design implementation and take the implementation, maintenance and long-term maintenance in itself.

preselection of Construction Southern Randweg Borne - Hengelo Municipality

Gemeente Hengelo | Published November 10, 2014  -  Deadline December 3, 2014
cpvs
45000000, 45112000, 45232400, 45233120

The municipality of Borne intends to conclude a UAV-gc agreement with a contractor for the design and construction of the Southern Ring Road to Borne.Het is intended that after procurement by a Party's draft 'work Southern Ring Road' (hiernate call "work") expands to a finished design implementation and take the implementation, maintenance and long-term maintenance in itself.