Call +44 800 9755 164

Public tenders for construction in Eindhoven Netherlands

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

District-heating mains construction work

Gemeente Eindhoven | Published November 26, 2016  -  Deadline December 5, 2016

This is a market consultation. The market consultation covers the following topics:

1. design, construction, management and maintenance of the heat;

2. delivery, installation and maintenance of heat sets;

3. customer handling, invoicing, management and / or performance management / maintenance related to the heat and warmth connections (in accordance with obligations arising from Heat).

The purpose of this market consultation is to gain insight into:

- The interested market which wholly or partly can provide synergistic benefits to the above services;

- The optimal nature and extent of potential spend on assignment (s) and the field distribution;

- The optimum division of labor between client and contractor;

- Possible innovative, efficient and / or cost-effective solutions in the market.

- The risks involved:

- Understanding of the investment costs for the relevant services.

The slate ...

District-heating mains construction work

Gemeente Eindhoven | Published November 9, 2016  -  Deadline December 5, 2016
See guide market consultation.

Structural engineering consultancy services

Gilde Opleidingen p/a Het NIC BV | Published June 10, 2015  -  Deadline July 16, 2019
Requires Guild looking for consultants with experience in the following areas: - consulting and project management services to surrounding property-related projects; - Technical advice on property related projects, such as construction and renovation. First further interrogation: This extension means and the experience gained from one of the most innovative and sustainable renovation projects in the Netherlands, namely the renovation of the education building since the Groenveld Singel 40 Venlo Guild. The tender will be held on the basis of best value procurement, with most quality is achieved at the most advantageous tender. The total size of the two educational buildings in Roermond concerns approximately 12 000 sqm, where the estimated total construction costs (including VAT) are estimated at around six million euros.

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Gemeente Eindhoven, Sector Realisatie, Beheer en Toezicht | Published November 23, 2016  -  Deadline January 17, 2017

The contract mainly concerns the repairs to drains.

The work broadly comprises the following activities:

A. To carry out repairs to building connections with additional work;

b. performing unclogging of house connections with additional work;

c. assisting in resolving sewage and flooding issues throughout the public space of the city of Eindhoven. For this, the contractor should have a so-called 24/7 (24 hours a day / 7 days a week) waiting and repair service for urgent orders;

d. creating new domestic connections;

e. working with the Curative Notification System (CMS).

More information about the activities and indicative amounts included in the framework agreement.

The work will be provided in section assignments. The city of Eindhoven is not obliged to actually contract providing all work on drainage and additional works to the contractor of these specifications.

na

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

Gemeente Eindhoven, Sector Realisatie, Beheer en Toezicht | Published November 15, 2016  -  Deadline January 10, 2017

The work consists of carrying out earthworks, removal and installation of drainage, foundations, curbs, paving elements, asphalt paving and lighting columns, applying traffic policies and additional work.

The work broadly comprises the following activities:

- Applying drainage (450 m);

- Carrying out earthworks (approximately 4000 m³);

- The breaking up of house connections and kolk- (ca. 352 m);

- Breaking up drains (approx 29 pcs);

- Applying swirl (approx 31 pcs);

- Applying kolk- and house connections (approximately 235 m);

- The breaking up of sewage (ca. 39 m);

- Applying sewage (about 14 wells and about 400 m);

- Breaking up foundations (about 572 m²);

- Applying foundations (approximately 1,113 sqm);

- The breaking up of curbs (ca. 954 m);

- Applying curbs (ca. 1,033 m);

- The breaking up of channel layers (about 254 m);

- Applying gutter layers (about 381 m);

- Breaking up paving elements (approximately 3221 m²);

- Applying paving elements (approximately 2797 m²);

- Breaking up asphalt pavement (about 354 tonnes);

- Applying asphalt pavement (about 463 tonnes);

- Installing concrete print (about 36 m²);

- The removal and installation of signage (approx 13 pcs);

- The removal and installation of lighting columns (about 3 pcs);

- Removal and heraanbrengen of noise barrier and barrier (about 64 m);

- The removal and installation of other street furniture;

- Setting up and removing of temporary storage;

- The use of temporary traffic measures.

na

School furniture

Stichting Eindhovens Christelijk Voortgezet Onderwijs (SECVO) | Published December 3, 2016  -  Deadline January 13, 2017

The purpose of the construction of new housing for the Frits Philips Lyceum and MAVO Eindhoven (completion is planned in July 2017), Foundation ECVO a European tendering procedure has been launched for the supply, installation and maintenance of equipment of the BINASK spaces.

  • 1