Public tenders for construction in Ede Netherlands

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Construction work

COG | Published December 3, 2016
Winner
Bouwbedrijf Kreeft BV
cpvs
45000000, 71000000, 45214200

The contracting authority is looking for a contractor who is able to ensure, on the basis of spatial functional and technical requirements to design Technova College, realize, maintain and energy volumes or costs serving the building-related energy.

Realizing within the principles and frameworks (DBME) project Technova Colleagues Ede, consisting of new construction, large approx 6100 sqm GLA and functional customization and climate technically improving existing buildings, large approx 4100 sqm GFA.

Construction work

COG | Published April 27, 2016  -  Deadline May 23, 2016
cpvs
45000000, 45214200, 71000000

The contracting authority is looking for a contractor who is able to ensure, on the basis of spatial functional and technical requirements to design Technova College, realize, maintain and energy volumes or costs serving the building-related energy.

Building construction work

Aeres groep | Published October 21, 2017
cpvs
45210000, 45261000, 45440000

Aeres Group intends to enter into an agreement for architectural maintenance of facades and roofs with the associated maintenance management of the Aeres Group's buildings for an indefinite period with a 1 year notice period.

As the purchasing methodology, the "best value" approach will be followed. See: https://www.pianoo.nl/praktijk-tools/method/prestatie-inkoop-of-best-value-procurement As a variant of this methodology, as a part of the award criterion price, a nominal sum will be requested for the concretization phase. . The contractor with the EMVI will only be given a contract for the concretization phase for the amount offered for this phase after publication of the award. After the completion of the concretization phase, the final award will be published.

The weighting of the award criteria price will be less than 30%.

Unknown.

That is, the estimated value is unknown, for the size see Annex 1 of the subscriptions.

Building construction work

Aeres groep | Published October 7, 2017  -  Deadline November 17, 2017
cpvs
45210000, 45261000, 45440000

Aeres Group intends to enter into an agreement for architectural maintenance of facades and roofs with the associated maintenance management of the Aeres Group's buildings for an indefinite period with a 1 year notice period.

As the purchasing methodology, the "best value" approach will be followed. See: https://www.pianoo.nl/praktijk-tools/method/prestatie-inkoop-of-best-value-procurement As a variant of this methodology, as a part of the award criterion price, a nominal sum will be requested for the concretization phase. . The contractor with the EMVI will only be given a contract for the concretization phase for the amount offered for this phase after publication of the award. After the completion of the concretization phase, the final award will be published.

The weighting of the award criteria price will be less than 30%.

Unknown.

That is, the estimated value is unknown, for the size see Annex 1 of the subscriptions.

Engineering works and construction works

Gemeente Ede | Published December 3, 2016
Winner
Gebr. van Kessel Speciale Technieken en Producten BV
cpvs
45220000

See the tender documents and tender specification.

Engineering works and construction works

Gemeente Ede | Published July 26, 2016  -  Deadline September 15, 2016
cpvs
45220000

See the tender documents and tender specification.

Architectural, construction, engineering and inspection services

Aeres groep | Published February 17, 2015  -  Deadline March 4, 2015
cpvs
71000000

Dienstverlening op het gebied van architectuur, bouwkunde, civiele techniek en inspectie

Construction work for engineering works except bridges, tunnels, shafts and subways

Gemeente Ede | Published October 31, 2015
Winner
Van Hattum Infra BV
cpvs
45222000

The Water Plan 2013-2017 (WP 2013) and integrated broadened Municipal Sewerage (vGRP) is the objective "in 2020, 20% of the existing paved surface throughout the municipality disconnected from the combined sewer system" included. Regarding the implementation of the Water Plan 2013-2017 the municipality of Ede's disconnection at various locations and / or replace sewerage and elsewhere sewer relining. The eastern part of Bennekom designated to disconnect. In addition, various activities are provided here. The area is divided into sub-areas indicative.

Construction work for engineering works except bridges, tunnels, shafts and subways

Gemeente Ede | Published November 29, 2014  -  Deadline January 14, 2015
cpvs
45222000

The Water Plan 2013-2017 (WP 2013) and integrated broadened Municipal Sewerage (vGRP) is the objective "In 2020, 20% of the existing paved surface throughout the municipality disconnected from the combined sewer system" is included. Regarding the implementation of the Water Plan 2013-2017 the municipality of Ede is disconnected at various locations and / or replace the sewerage and other locations sewer relining. The eastern part of Bennekom designated to disconnect. In addition, various activities are provided here. The area is divided into sub-areas indicative.

BRM barracks areas Phase 1 Ede - Municipality of Ede

Gemeente Ede | Published February 18, 2015  -  Deadline March 17, 2014
cpvs
45100000, 45100000

The work consists mainly of:  cleaning the worksite  the inclusion of the existing pavement and drainage  installing new sewers  applying construction roads

Ancillary works for pipelines and cables

Gemeente Ede | Published September 9, 2015
Winner
Syntax InfraMediairs BV
cpvs
45232000

Employee hiring basis: - Communication and coordination with utility companies; - Organizing, chairing and minutes of utility consulting; - Doing tracéverkenningen; - Guidance and monitoring implementation utilities parties (bijwoonpunten); - Carrying out feasibility studies of K & L sections; - Designing voorkeurstracés for utilities; - Critically evaluating proposals from utilities; - Making short and long-term planning for implementation; - Maintaining this schedule showing that all work can be carried out within the prescribed deadlines; - Monitoring the progress of the implementation of these activities; - Preparing deflections and maintain adaptations of K & L on the barracks grounds; - The phasing of the conversion of the buildings consist of the defense network on the new construction of underground infrastructure. Engineering services: - the updating of web-Click (process K & L mutations, adding information and updating surface); - Conflict analysis of existing and new underground infrastructure with new to empty sewage; - Make plan for the function free up K & L in the defense network; - Delivery on demand of a Plant Managers in the field of electricity, gas and heat and advise on safety and security around the indicated distribution facilities at HBO / IV level; - Delivery on demand from a person having access geotiriseerd are through to view in installations for electricity, gas and heat.
  • 1