Public tenders for construction in Dokkum Netherlands

Find all Construction tenders in the world.
Finding business opportunities has never been easier.

Results for construction. Make a new search!

Multi-purpose sports facilities construction work

Gemeente Dongeradeel | Published March 1, 2016  -  Deadline March 23, 2016
cpvs
45212220, 92610000

Construction of multi-sports

Multi-purpose sports facilities construction work

Gemeente Dongeradeel | Published February 10, 2016  -  Deadline March 2, 2016
cpvs
45212220, 92610000

Construction of multi-sports

Construction work

Gemeente Dongeradeel | Published January 24, 2017  -  Deadline February 9, 2017
cpvs
45000000, 45200000

The municipality Dongeradeel intends to existing Crescent Gate Bridge (built

1952) to renovate in Dokkum. Research has shown that the construction of the bridge in

poor condition, and that the concrete deck has to be replaced. The abutments can be renovated. The renovation will also seized upon the headroom to

increase so that the waterway between literate. The existing abutments and piers are therefore increased and the new

higher than the current applied bridge deck.

After the renovation of the views of the bridge must be equal to the current situation.

Among other things, the masonry along the edges of the deck and the handrail existing work will

therefore be replaced.

Multi-purpose sports facilities construction work

Gemeente Dongeradeel | Published October 28, 2015  -  Deadline February 17, 2016
cpvs
45212220, 92610000

The project involves the design, build, maintain and operate a sports center. The design and construction relates to new construction to the existing pool with catering space. The new building consists of a sports hall (24 x 44 m³), ​​a club room and support spaces and design of the surrounding space.

Construction structures and materials; auxiliary products to construction (except electric apparatus)

Gemeente Dongeradeel | Published February 9, 2017  -  Deadline February 13, 2017
cpvs
44000000

The municipality Dongeradeel intends to existing Crescent Gate Bridge (built

1952) to renovate in Dokkum. Research has shown that the construction of the bridge in

poor condition, and that the concrete deck has to be replaced. The abutments can be renovated. The renovation will also seized upon the headroom to

increase so that the waterway between literate. The existing abutments and piers are therefore increased and the new

higher than the current applied bridge deck.

After the renovation of the views of the bridge must be equal to the current situation.

Among other things, the masonry along the edges of the deck and the handrail existing work will

therefore be replaced.

Construction structures and materials; auxiliary products to construction (except electric apparatus)

Gemeente Dongeradeel | Published January 17, 2017  -  Deadline February 9, 2017
cpvs
44000000

The municipality Dongeradeel intends to existing Crescent Gate Bridge (built

1952) to renovate in Dokkum. Research has shown that the construction of the bridge in

poor condition, and that the concrete deck has to be replaced. The abutments can be renovated. The renovation will also seized upon the headroom to

increase so that the waterway between literate. The existing abutments and piers are therefore increased and the new

higher than the current applied bridge deck.

After the renovation of the views of the bridge must be equal to the current situation.

Among other things, the masonry along the edges of the deck and the handrail existing work will

therefore be replaced.

- Traffic measures.

- Cleanup work.

- Earthworks.

- Bridge deck replacement.

- Concrete.

- Brickwork.

- Remove paving elements.

- Replace sewer.

- Apply Elements Pavement.

- Additional work.

Construction structures and materials; auxiliary products to construction (except electric apparatus)

Gemeente Dongeradeel | Published December 22, 2016
cpvs
44000000

The municipality Dongeradeel intends to existing Crescent Gate Bridge (built

1952) to renovate in Dokkum. Research has shown that the construction of the bridge in

poor condition, and that the concrete deck has to be replaced. The abutments can be renovated. The renovation will also seized upon the headroom to

increase so that the waterway between

terd. The existing abutments and piers are therefore increased and the new

higher than the current applied bridge deck.

After the renovation of the views of the bridge must be equal to the current situation.

Among other things, the masonry along the edges of the deck and the handrail existing work will

therefore be replaced.

- Traffic Measures

- Clean-up work,

- Earthworks,

- Bridge deck replacement,

- Concrete works,

- brickwork,

- Remove elements hardening,

- Replace sewage,

- Applying elements hardening,

- Additional work.

Multi-purpose sports facilities construction work

Gemeente Dongeradeel | Published November 8, 2016
Winner
Optisport Exploitaties BV
cpvs
45212220, 92610000

The project involves the design, build, maintain and operate a sports center, by realizing new building to the existing pool with catering space. The new building consists of a sports hall (24 x 44 m), a club room and support spaces.
  • 1